HomeMy WebLinkAbout20172804.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 24.5 BETWEEN COUNTY ROADS 9.5 AND 11 FOR
APPROXIMATELY FOUR (4) DAYS, FOR ROADWAY CONSTRUCTION
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 24.5, between County Roads 9.5 and 11,
be temporarily closed, with said closure being effective August 14, 2017, for approximately four
(4) days for roadway construction, and further, that standard official traffic control devices shall
be erected at said closure giving notice of the restrictions.
Cc'3QCRS). Q;etch.
CG S to +e- ( .r rot
9I(I-1((7
2017-2804
EG0024
TEMPORARY CLOSURE - COUNTY ROAD 24.5
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 14th day of August, A.D., 2017.
ATTEST: dockA) 4;
Weld County Clerk to the Board
BY:
puty Clerk to the Board
unty Attorney
Date of signature: g / I H f 1
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
hZ
Julie A. Cozad, Chair
Steve Moreno, Pro-Tem
can P. Conway
2017-2804
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: August 7, 2017
FROM: Janet Lundquist, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 24.5 between WCR 9.5 and WCR 11 is scheduled to be closed from 8/14/17 to 8/17/17 for
roadway construction.
Contractor: Crow Creek Construction
See attached diagram.
2017-2804
ji,
.z5-< 0 0< u Q u`
0- a w Of N t W !0 - �o N
�LL (04
c oU - _ z— z= c
mrna= .22 aI--0. 0.
owccoww
0 m W W w O O FTH FTO,„= o
NNNN r- e- N
Hello