Loading...
HomeMy WebLinkAbout20173407.tiffRESOLUTION RE: APPROVE AGREEMENT FOR SOFTWARE UPGRADE SUPPORT AND AUTHORIZE CHAIR TO SIGN - JOHNSON CONTROLS, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Agreement for Software UpgradeSupport between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Information Technology, and Johnson Controls, Inc., commencing October 2, 2017, with further terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Agreement for Software Upgrade and Support between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Information Technology, and Johnson Controls, Inc., be and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 2nd day of October, A.D., 2017. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: d Weld County Clerk to the Board BY: APP County Attorney Date of signature: l O t t O l t GC. ZTC RR), e)GCT-r/SC,) O/(O/(-7 • L -6/ Julie A, ozad, Chair Steve Moreno, Pro-Tem EXCUSED can P. Conway e Freeman arbara Kirkmeyer 2017-3407 IT0006 a,a.«s kba MEMORANDUM TO: Esther Gesick, Clerk to the Board Sept 26, 2017 FROM: Ryan Rose, Chief Information Officer SUBJECT: Johnson Controls, Inc. Johnson Controls, Inc. provides software to Weld County Building and Grounds to manage the HVAC controls for approximately half of the county's buildings. This agreement is for the purchase of software support and upgrade of their software. The requested cost is $31,500. We ask that the BOCC approve the contract agreement as submitted. 1 ►ova 7Zo i 7- a3,10 7 -Z-TO00C, BOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW/ WORK SESSION REQUEST RE: Johnson Controls Software Upgrade and Support DATE: September 19, 2017 DEPARTMENT: Information Technology PERSON REQUESTING: Ryan Rose . Brief description of the problem/issue: Johnson Controls, Incorporated provides software and services to Weld County. The software is used by the Buildings & Grounds department to manage the HVAC controls for approximately half the Weld County buildings. The application is in need of being upgraded. This agreement is to get vendor assistance to upgrade the application and to obtain software support for 3 years. The cost has been accounted for in B&G's budget. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) Support is also offered for a one year period, however, this option would be more expensive over a 3 year period. Recommendation: The agreement has been reviewed and approved by Legal. It is recommended that the BOCC approve the agreement for the three year period for a total of $31,500. Approve Recgtamendation Julie Cozad, Chair Sean P. Conway Mike Freeman Steve Moreno Barbara Kirkmeyer Schedule Work Session Other/Comments: J/' Johnson Controls August 28, 2017 Ryan Rose Weld County 1105 H Street Greeley, Colorado 80632 Project Name: Metasys Software Upgrade Johnson Controls, Inc. 2600 Old Happy Jack Road Cheyenne, Wyoming 82001 Tel: 970-818-1550 Johnson Controls would like to thank you for the opportunity to present this proposal for your consideration. We propose to furnish the materials and/or perform the work described below for the net price of: Ootlon 1 Scone of Work • Upgrade existing Johnson Controls Metasys ADX software version 5.2 to the newest version of Metasys software on a virtual server owned and provided by Weld County. Weld County will need to review the attached specifications and confirm the server meets or exceeds these specifications. • Metasys software is compatible with Windows Server 2012 R2 • Weld County to provide SQL software for installation by Johnson Controls. See attached specifications for which SQL versions are compatible with Metasys. • Upgrade software on (6) Johnson Controls NAE's as necessary so they are compatible with the newest version of Metasys and Windows • Weld County will have an individual from their IT department available during upgrade for support as required • Startup and testing for proper operation • 4 hours of onsite owner training Option 1 Total Net Price (if purchased before September 30, 2017): $15,200 Option 1 Total Net Price (if purchased after September30, 2017): $17,470 Page 1 of 6 Weld County Metasys Upgrade Proposal 8.28.17.Docx August 28, 2017 2o/7-3 7 option 2 scone of Work • Upgrade existing Johnson Controls Metasys ADX software version 5.2 to the newest version of Metasys software on a virtual server owned and provided by Weld County. Weld County will need to review the attached specifications and confirm the server meets or exceeds these specifications. • Metasys software is compatible with Windows Server 2012 R2 • Weld County to provide SQL software for installation by Johnson Controls. See attached specifications for which SQL versions are compatible with Metasys. • Upgrade software on (6) Johnson Controls NAE's as necessary so they are compatible with the newest version of Metasys and Windows • One (1) year Metasys software subscription (includes labor). Includes major and all minor software revisions during the one (1) year period. • Weld County will have an individual from their IT department available during upgrade for support as required • Startup and testing for proper operation • 4 hours of onsite owner training Option 2 Total Net Price (if purchased before September 30, 2017): $20,900 Option 2 Total NetPrice (If purchased after September 30, 2017): $25,060 Option 3 Scone of Work • Upgrade existing Johnson Controls Metasys ADX software version 5.2 to the newest version of Metasys software on a virtual server owned and provided by Weld County. Weld County will need to review the attached specifications and confirm the server meets or exceeds these specifications. • Metasys software is compatible with Windows Server 2012 R2 • Weld County to provide SQL software for installation by Johnson Controls. See attached specifications for which SQL versions are compatible with Metasys. • Upgrade software on (6) Johnson Controls NAE's as necessary so they are compatible with the newest version of Metasys and Windows • Three (3) year Metasys software subscription (includes labor). Includes major and all minor software revisions during the (3) year period. • Weld County will have an individual from their IT department available during upgrade for support as required • Startup and testing for proper operation • 4 hours of onsite owner training Option 1 Total Net Price (if purchased before September 30, 2017): $31,500 Option 1 Total Net Price (If purchased after September 30, 2017): $38,900 Page 2 of 6 Weld County Metasys Upgrade Proposal 8.28.17.Docx August 28, 2017 Below is a description of the software subscription. Site Subscription Services Site subscription services ensure that the subscriber automatically receives every major and minor Metasys release upgrade for either 1 year or 3 years after purchasing the site subscription. A newly placed 1 -year subscription service order is active for 1 year from the day that the subscriber is billed for the service. For a newly placed 3 -year subscription service order, the order is active for 3 years from the day that the subscriber is billed. Metasys site subscription software packages are identified by an -SCS (1 year) or -SC3 (3 year) suffix on the product code number. When ordering a site subscription service, simply identify the Metasys software package or packages on the site for which you want to purchase a subscription service. When you purchase a site subscription, your Metasys site must be at the current major release level. For example, if you have ADS/ADX Release7.x software and the currently available release for an ADS/ADX is Release 8.x, you must purchase an upgrade to Release8.x before you can purchase a site subscription. Site subscription services are not automatically renewed. You must renew your site subscription at the end of the site subscription agreement. Proposal Clarlflcationj • This proposal shall be included within any contract terms and conditions. • Provide (1) year warranty on all material and workmanship from date of completion of the above referenced project. • Pricing based on normal working hours (Monday - Friday) No overtime work is included in above pricing. • All wiring will be in rigid conduit for exterior locations, EMT conduit for interior exposed locations and in plenum rated cable where applicable by code. • All dampers furnished by the unit manufacturer or HVAC contactor. • Integration to all HVAC VFD`s, chillers, boilers, and any other required mechanical equipment via BACnet MS/TP. Communication cards and any necessary programming to be provided by others. • Pricing includes equipment demonstration and training per the specification. • Lighting controls BACnet/IP or BACnet/MSTP interface by others. Page 3 of 6 Weld County Metasys Upgrade Proposal 8.28.17.Docx August 28, 2017 • Any and all Asbestos abatement. • Sales tax and other miscellaneous taxes. • Electrical or Other Permits, bonds, licenses, and misc. other fees. • 120 VAC Power, including power to control panels and VAV boxes. • Any required trenching for underground conduit and wire. • Any internal control wiring for packaged or terminal units. • Furnishing, wiring or piping of any fire dampers, smoke dampers, combination fire/smoke dampers or associated end switches. • Providing or installing dampers or damper actuators for generator ventilation, exhaust fans and roof ventilators. • Any painting or patching. • Providing or installing Access doors in ceilings, walls or ducts. • Installation of control valves, pipe taps, sensor wells or automatic dampers. • Thermometers in pipes or ducts. • Providing or installing of any fire life safety systems, including smoke detectors. • Temporary heating/cooling or use of new HVAC equipment for temporary heating/cooling. • Providing or installing of VFDs, motor starters or disconnects. • Wiring for fire alarm shutdown of HVAC equipment . • Monitoring of Fire Alarm System via the Building Automation System. • Any LEED Measurements, Verification, and Scoring. • Demolition (including pneumatic), permits, bonding or asbestos abatement or time spent to repair or replace damaged temperature controls. • Any required mechanical upgrades to existing HVAC control systems or equipment to working condition. • Providing or installing of air flow monitoring stations. • Providing or installing of flow meters or energy meters. • Providing or installing of Humidifier control valves. Brian Suhr, Account Executive Page 4 of 6 Weld County Metasys Upgrade Proposal 8.28.17.Docx August 28, 2017 BY PROPOSAL ACCEPTANCE This proposal incorporates, by reference, the attached terms and conditions. This proposal is hereby accepted and Johnson Controls, Inc. is authorized to proceed with the work; subject however, to credit approval by Johnson Controls, Inc., Milwaukee, Wisconsin. Pricing for the above listed scope of work, equipment and services, is valid for thirty (30) days from date of receipt and excludes any applicable taxes. Each party executing this quotation warrants and represents that it has full power and authority to enter into this agreement and bind itself to performance. Each party binds the party on behalf of which he or she signs. IN WITNESS WHEREOF, the parties have duly executed this Agreement as of the date first stated above. JOHNSON,CONTROLS, INC. BY: NAME OF PERSON SIGNING POSITION OF PERSON SIGNING ATTES' : ddrAt/1) "'' ` ''g`- BOARD OF COUNTY COMMISSIONERS Weld o nt Clerk to th- Board COUNTY, COLORADO k Deputy It -rk to the ;Pr- IE jp,u leGf'ozad, Chair Q,�i/a 2 2017 Date Page 5 of 6 Weld County Metasys Upgrade Proposal 8,28.17.Docx August 28, 2017 02o/7-- ,3147 TERMS AND CONDITIONS By accepting this proposal, Purchaser agrees to be bound by the following terms and conditions: 1. SCOPE OF WORK. This proposal Is based upon the use of straight time labor only. Plastering, patching and painting are excluded. "In -line" duct and piping devices, including, but not limited to, valves, dampers, humidifiers, wells, taps, flow meters, orifices, etc., if required hereunder to be furnished by Johnson, shall be distributed and installed by others under Johnson's supervision but at no additional cost to Johnson. Purchaser agrees to provide Johnson with required field utilities (electricity, toilets, drinking water, project hoist, elevator service, etc.) without charge. Johnson agrees to keep the Job site clean of debris arising out of Its own operations. Purchaser shall not back charge Johnson for any costs or expenses without Johnson's written consent. Unless specifically noted in the statement of the scope of work or services undertaken by JCI under this agreement, JCI's obligations under this agreement expressly exclude any work or service of any nature associated or connected with the identification, abatement, clean up, control, removal, or disposal of environment Hazards or dangerous substances, to include but not be limited to asbestos or PCB's discovered in or on the premises. Any language or provision of the agreement elsewhere contained which may authorize or empower the Purchaser to change, modify, or alter the scope of work or services to he performed by JCI shall not operate to compel JCI to perform any work relating to Hazards without JCI's express written consent, 2, INVOICING & PAYMENTS. Johnson may invoice Purchaser monthly for all materials delivered to the Job site or to an off site storage facility and for all work performed on -site and off -site. Ten percent (10%) of the contract price is for engineering, drafting and other mobilization costs Incurred prior to installation. This 10% shall be included in Johnson's initial invoice. Purchaser agrees to pay Johnson the amount invoiced upon receipt of the invoice. Waivers of lien will be furnished upon request, as the work progresses, to the extent payments are received. If Johnson's Invoice Is not paid within 30 days of its issuance, it is delinquent. 3. MATERIALS. If the materials or equipment Included in this proposal become temporarily or permanently unavailable for reasons beyond the control and without the fault of Johnson, than In the case of permanent unavailability, the time for performance of the work shell be extended to the extent thereof, and In the case of permanent unavailability, Johnson shall (a) be excused from furnishing said materials or equipment, and (b) be reimbursed for the difference between the cost of the materials or equipment permanently unavailable and the cost of a reasonably available substitute therefor, 4. WARRANTY. Johnson warrants that the equipment manufactured by It shall be free from defects in material and workmanship arising from normal usage for a period of ninety (90) days from delivery of said equipment, or If Installed by Johnson, for a period of ninety (90) days from Installation. Johnson warrants that for equipment furnished and/or Installed but not manufactured by Johnson. Johnson will extend the same warranty terms and conditions which Johnson receives from the manufacturer of said equipment. For equipment Installed by Johnson, If Purchaser provides written notice to Johnson of any such defect within thirty (30) days after the appearance or discovery of such defect, Johnson shall, at Its option, ropsir or replace the defective equipment and return said equipment to Purchaser. Ali transportation charges incurred In connection with the warranty Mr equipment net installed by Johnson shall be borne by Purchaser. These warranties do not extend to any equipment wNeh has been repaired by others, abused altered or misused, or which has not been properly and reasonably maintained. THESE WARRANTIES ARE IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO. THOSE OF MERCHANTABILITY AND FITNESS FOR A SPECIFIC PURPOSE. 5. LIABILITY. Johnson shall not be liable for any special, indirect or consequential damages arising in any manner from the equipment or material furnished or the work performed pursuant to this agreement, B. TAXES. The price of this proposal does not include duties, sales, use, excise, or other similar taxes, unless required by federal, state or local law. Purchaser shall pay, In addition to the stated price, all taxes not legally required to be paid by Johnson or, alternatively, shall provide Johnson with acceptable tax exemption certificates, Johnson shall provide Purchaser with any tax payment certificate upon request and after completion and acceptance of the work. 7, DELAYS. Johnson shall not be liable for any delay in the performance of the work resulting from or attributed to acts or circumstances beyond Johnson's control, including, but not limited to, acts of God, fire, riots, tabor disputes, conditions of the premises, acts or omissions of the Purchaser, Owner, or other Contractors or delays caused by suppliers or subcontractors of John, etc. B. COMPLIANCE WITH LAWS. Johnson shall comply with all applicable federal, state and local laws and regulations and shall obtain all temporary licenses and permits required for the prosecution of the work. Licenses and permits of a permanent nature shell be procured end paid for by the Purchaser. 9. DISPUTES. All disputes Involving more than $15,000 shell be resolved by arbitration In accordance with the rules of the American Arbitration Association. The prevailing party shall recover all legal costs end attorney's fees Incurred as a result. Nothing here shall limit any rights under construction lion laws 11. INSURANCE. Insurance coverage In excess of Johnson's standard limits will be furnished when requested and required. No credit will be given or premium paid by Johnson for Insurance afforded by others. 12. INDEMNITY. The Parties hereto agree to indemnify each other from any and all liabilities, claims, expenses, losses or damages, including attorneys' fees, which may arise in connection with the execution of the work herein specified and which are caused, in whole or In part, by the negligent act or omission of the Indemnifying PartyTo the extent permitted by law. 13. OCCUPATIONAL SAFETY AND HEALTH. The Parties hereto agree to notify each other immediately upon becoming aware of an inspection under, or any alleged violation of, the Occupational Safety and Health Act relating in any way to the project or project site. 14. ENTIRE AGREEMENT. This proposal, upon acceptance, shall constitute the entire agreement between the parties and supersedes any prior representations or understandings. 15. CHANGES. No change or modification or any of the terms and conditions stated herein shall be binding upon Johnson unless accepted by Johnson In writing. Page 6 of 6 Weld County Metasys Upgrade Proposal 8.28.17,Docx August 28, 2017 Hello