HomeMy WebLinkAbout20173764RESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 78 BETWEEN COUNTY ROADS 29 AND 31 FOR
APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 78, between County Roads 29 and 31,
be temporarily closed, with said closure being effective November 6, 2017, for approximately four
(4) days for a culvert replacement, and further, that standard official traffic control devices shall
be erected at said closure giving notice of the restrictions.
Gc:8OcRS), Digpo..+ch,
CO Sto,te. Po..+re, I
(It 97/ ( 7
2017-3764
EG0024
TEMPORARY CLOSURE - COUNTY ROAD 78
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 1st day of November, A.D., 2017.
BOARD OF COUNTY COMMISSIONERS
WELD COU,l,\ITY, COLORADO
ATTEST: d,,,,f4„,„
Weld County Clerk to the Board
BY:C0.047
ty Clerk to the Board
APPROV D AS T
oun= torney
Date of signature: 11 I R 7/ 1
G)
Julie ozad, Chair
Steve Moreno, Pro-Tem
ara Kirkmeyer
2017-3764
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: October 27, 2017
FROM: Amy Joseph, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 8.5 between WCR 27 and west to end is closed from 11/6/2017 thru 11/9/2017 for a culvert
replacement.
WCR 78 between WCR 29 and WCR 31 is closed from 11/6/2017 thru 11/9/2017 for a culvert
replacement.
WCR 8 between WCR 37 and WCR 41 is closed from 11/13/2017 thru 11/17/2017 for a culvert
replacement.
WCR 31 between WCR 88 and WCR 90 is closed from 11/13/2017 thru 11/17/2017 fora culvert
replacement.
See attached closure diagram(s).
2017-3764
016
M\Marj\AGENDA memos\Agenda Road Closures. docx
+k!7 Ey 4 4 € t. rj - . N4 €4•EB'e. kt 1.24 rim.*ea"' i?3 F7 fe3 gsa z-7 %r" F'1 �R
Im p
Qty
WC ' 29
srlolaa
HID
WCR 78
L"sCG'A ,4!49r W IM +4 TES 1,5;WA ir trio' fall S4sii•r
41094 imiii•rag AA Q
* Y V
S S
"'Art r, is
ROAD CLOSED •
LOCAL ' f
riffs- S9'' d' AttirAns
I I
Dt
o WCR 76
s}1avi 1rr;rk$'jfrifirma+t'iWtr+1+* i "'. - *lee t hiw-t�ir3 •.
WC 31
•
S
Project # AN -59
Road closure description
WCR 78 between WCR 29 and WCR 31
closed 11/6/2017 thru 11/9/2017
for culvert replacement
Notice to Public
Road signs and barricaded during closure
No Message boards to be used
Detour Route
WCR 29 between WCR 78 and WCR 76 1 mile paved
WCR 76 between WCR 29 and WCR 31 1 mile gravel
WCR 31 between WCR 78 and WCR 76 1 mile paved
Notes
ADT of WCR 78 is; 51/2015
Culvert replaced is irrigation" with new 26"
Water to be used for dust control
Culvert is .1 west of WCR 31 on WCR 78
Placement of signs not to scale
Date
10/27/2017
Prepared by
LEE STEPHEN
Approved by county engineer
CAMERON PARROTT
Hello