HomeMy WebLinkAbout20170726.tiffRESOLUTION RE: APPROVE AMENDMENT #2 TO COMMUNITY DEVELOPMENT BLOCK GRANT CONTRACT FOR WATTENBERG WATER SYSTEM PROJECT AND AUTHORIZE CHAIR TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with Amendment #2 to the Community Development Block Grant Contract for Wattenberg Water System Project between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and the Colorado Department of Local Affairs, commencing upon the full execution of signatures, with further terms and conditions being as stated in said amendment, and WHEREAS, after review, the Board deems it advisable to approve said amendment, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that Amendment #2 to the Community Development Block Grant Contract for Wattenberg Water System Project between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and the Colorado Department of Local Affairs, be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said amendment. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 13th day of March, A.D., 2017. BOARD OF COUNTY COMMISSIONERS WELD COUIy,TY, COLORAJ O ATTEST: djtAsis) jell;; - Weld County Clerk to the Board BY: uty Clerk to the Board APPROVE ' AS T County Attorney Date of signature: Li (.1 (1 Julie A. Cozad, Chair Steve Moreno, Pro -Tern Sean P. Conway it l Alike Freeman rbara Kirkmeyer CC p(A)CCR),c-rcBc) (--1 1 —I / I 'l 2017-0726 FI0064 Confr'nc+ ZQ 1078' MEMORANDUM TO: Board of County Commissioners DATE: March 7, 2017 FROM: Elizabeth Relford, Transportation Manager SUBJECT: Contract Amendment #2 for CDBG 15-504 — Wattenberg Water System Improvements Public Works has been working diligently on the Wattenberg Water Systems Improvements grant in spite of all the unforeseen project complications. Public Works has been extremely disappointed with the project's design engineer. Besides nickel and diming the county, we have discovered their on -site piping design was based on as -built drawings without doing any on -site field verification. As a result, we have encountered significant underground piping inconsistencies with the design. The costs we are having to pay for these types of errors and omissions is more than $13,400. In addition, we already had to modify the scope of work to include design in contract amendment #1. DOLA is aware of our budgetary issues on this project and to assist us they are offering $3,800 savings from another project to be allocated to this project. In addition, this project has a very short construction schedule, which has been predominately over the winter, and we've experienced many freezing weather delays. Therefore, this contract amendment also includes a deadline extension request from March 31, 2017 to September 30, 2017. Staff feels confident this project will be completed well in advance of the September 30th deadline. The following table reflects the budget changes identified in the attached contract amendment. Current Project Budget: Requ Budget Line Items Total Cost Grant Funds Other Funds Other Fund Source Architectural/Engineering Services $88,200 $88,200 $0 No match Building or Facility Construction $250,400 $250,400 $0 No match Construction/Improvements of Public Roadways $309,900 $309,900 $0 No match Total $648,500 $648,500 $0 Budget Line Items Total Cost Grant Funds Other Funds Other Fund Source Architectural/Engineering Services $88,200 $88,200 $0 No match Building or Facility Construction $250,400 $250,400 $0 No match Construction/Improvements of Public Roadways $313,700 $313,700 $0 No match Total $652,300 $652,300 SO Staff recommends authorization of the contract amendment. I am available to answer any questions you may have. 2017-0726 COLORADO Department of Local Affairs Division of Local Government March 1,2017 Barbara Kirkmeyer, Chair, Board of County Commissioners Weld County 1150 0 Street Greeley, Colorado 80631 RE: CDBG 15-504 - Wattenberg Water System, Contract Amendment #2 Dear Commissioner Kirkmeyer: Attached is Contract Amendment #2 for the above -referenced Community Development Block Grant project. If the amendment is satisfactory as written, please print and sign the amendment (original signatures only; no photocopies, stamped or e -signatures). The second page of this letter is a Return Routing Memorandum that includes a Grantee Checklist. Please use this document to facilitate the return of your contract amendment. Using the Checklist will ensure that your contract amendment has been signed by the appropriate person, that you have enclosed the correct number of documents for return to the State, that you have correctly addressed your return packet, and that you have notified us that your documents are on their way back to us. If you would like your copy of the fully executed contract amendment to contain original signatures, please make sure you sign and return two (2) contract amendments to us. If a photocopy of the originally signed fully executed contract amendment is acceptable to you, then you need only sign and return one (1) contract amendment to us. The State Controller requires hard copies and original signatures for contract amendment execution. We cannot complete the execution of your contract amendment without these. Until your contract amendment is fully executed (signed by all Parties), the changes contained in the amendment are not in effect. If you have any questions about this contract amendment or the contract amendment execution process, please contact your Regional Manager, Don Sandoval, (970) 679-4501, (don.sandoval®state.co.us) or me at (303) 864- 7731. Sincerely, Beth Lipscomb Internal Services Manager Department of Local Affairs Enclosures Governor John W. Hickenlooper I Iry Halter, Executive Director I Chantat Unfug, Division Director 1313 Sherman Street, Room 521, Denver, CO 80203 P 303.864.7720 TDD/TTY 301864.7758 www.dola.colorado.gov Strengthening Colorado Communities RETURN ROUTING MEMORANDUM TO: Beth Lipscomb THROUGH: Donald Warren, Director of Finance £t Administration, Weld County FROM: Beth Lipscomb DATE: March 1, 2017 RE: Contract Amendment Approvals FOR FINAL APPROVAL ROUTING: RE: CDBG 15-504 - Wattenberg Water System CA/#2 GRANTEE CHECKLIST: the Contract Amendment is signed by an authorized signator (original signatures only; no photocopies, stamped or e -signatures) signed by County Chief Elected Official, City/Town Mayor, or District Board President/Chair signed by Other documentation of authority to sign is enclosed the correct number of originals are attached one (1) signed original for the State (required) one (1) signed original for return to the Grantee (optional, at your discretion) documents being sent back to the State must be addressed to: Department of Local Affairs ATTENTION: Beth Lipscomb 1313 Sherman Street, Room 521 Denver, CO 80203 you have sent an email to the State (beth.lipscomb@state.co.us) indicating the date the hard copy will be/has been posted for return to State Governor John W. Hickenlooper I Iry Halter, Executive Director I Chantal Unfug, Division Director 1313 Sherman Street, Room 521, Denver, CO 80203 P 303.864.7720 TDD/TTY 303.864.7758 www.dola.colorado.gov Strengthening Colorado Communities •coto CDBG 15-504 - Wattenberg Water System CONTRACT AMENDMENT Amendment #: 2 Encumbrance #: F16CDB15504 Original Contract CMS or CLIN #: 83978, 87530 Amendment CMS #: 97806 1) PARTIES This Amendment to the above -referenced Original Contract (hereinafter called the Contract) is entered into by and between WELD COUNTY (hereinafter called "Grantee" or "Contractor"), and the STATE OF COLORADO (hereinafter called the "State") acting by and through the Department of Local Affairs, Division of Local Governments, (hereinafter called the "DOLA"). 2) EFFECTIVE DATE AND ENFORCEABILITY This Amendment shall not be effective or enforceable until it is approved and signed by the Colorado State Controller or designee (hereinafter called the "Effective Date"). The State shall not be liable to pay or reimburse Contractor for any performance hereunder including, but not limited to, costs or expenses incurred, or be bound by any provision hereof prior to the Effective Date. 3) FACTUAL RECITALS The Parties entered into the Contract for constructing a water tank, water lines, and a water treatment building for the Wattenberq community in Weld County. Grantee reported that they encountered unforeseen additions in Project costs, and requested additional State grant funds in the amount of $3,800 to cover the additional costs. This request was approved in February 2017 as a Supplement to the original grant award. In addition, Grantee has experienced design and engineering changes as well as numerous weather delays and requests additional time within which to properly complete the Project. This Amendment modifies the Project Budget to reflect the award of additional supplemental funding, and extends the time of performance as requested. 4) CONSIDERATION - COLORADO SPECIAL PROVISIONS The Parties acknowledge that the mutual promises and covenants contained herein and other good and valuable consideration are sufficient and adequate to support this Amendment. The Parties agree to replacing the Colorado Special Provisions with the most recent version (if such have been updated since the Contract and any modification thereto were effective) as part consideration for this Amendment. 5) LIMITS OF EFFECT This Amendment is incorporated by reference into the Contract, and the Contract and all prior amendments thereto, if any, remain in full force and effect except as specifically modified herein. 6) MODIFICATIONS The Contract and all prior amendments thereto, if any, are modified as follows: a. Grant Agreement, Cover Page, Award Amount is modified by deleting the current amount: "Award Amount: $648,500.00" and inserting the following in lieu thereof: "Award Amount: $652,300.00" Page 1 of 7 Effective Date: 1/6/09 -Rev 5/4/10 CDBG 15-504 - Wattenberg Water System b. Grant Agreement, Cover Page, Project Information is modified by deleting the Performance Period: End Date: "Performance Period: End Date: 03/31/17" and inserting the following in lieu thereof: "Performance Period: End Date: 09/30/17" c. Grant Agreement, Section 5, Term Subsection A, Initial Term -Work Commencement is modified by deleting the subsection: "Unless otherwise permitted in §2 above, the Parties' respective performances under this Grant shall commence on the Effective Date. This Grant shall terminate on March 31, 2017 unless sooner terminated or further extended as specified elsewhere herein." and inserting the following in lieu thereof: "Unless otherwise permitted in §2 above, the Parties' respective performances under this Grant shall commence on the Effective Date. This Grant shall terminate on September 30, 2017 unless sooner terminated or further extended as specified elsewhere herein." d. Grant Agreement, Section 7, Payments to Grantee Section 7.A, Maximum Amount is modified by deleting the current language in its entirety: "The maximum amount payable under this Grant to Grantee by the State is $648,500.00 (SIX HUNDRED FORTY EIGHT THOUSAND FIVE HUNDRED and XX/100 DOLLARS), as determined by the State from available funds. Grantee agrees to provide any additional funds required for the successful completion of the Work. Payments to Grantee are limited to the unpaid obligated balance of the Grant as set forth in Exhibit B." and inserting the following in lieu thereof: "The maximum amount payable under this Grant to Grantee by the State is $652,300.00 (SIX HUNDRED FIFTY TWO THOUSAND THREE HUNDRED and XX/100 DOLLARS), as determined by the State from available funds. Grantee agrees to provide any additional funds required for the successful completion of the Work. Payments to Grantee are limited to the unpaid obligated balance of the Grant as set forth in Exhibit B." e. Exhibit B, Section 6, Funding Subsection 6.2, Budget is modified by deleting the current subsection in its entirety: "Budget Line Item(s) Total Cost Grant Funds Other Funds Other Funds Source Architectural/Engineering Services $88,200 $88,200 $0 No Match Building or Facility Construction $250,400 $250,400 $0 No Match Construction/Improvement of Public Utilities $309,900 $309,900 $0 No Match Total $648,500 $648,500 $0" Page 2 of 7 Effective Date: 1/6/09 -Rev 5/4/10 I CDBG 15-504 - Wattenberg Water System and inserting the following in lieu thereof: "Budget Line Item(s) Total Cost Grant Funds Other Funds Other Funds Source Architectural/Engineering Services $88,200 $88,200 $0 No Match Building or Facility Construction $250,400 $250,400 $0 No Match Construction/Improvement of Public Utilities $313,700 $313,700 $0 No Match Total $652,300 $652,300 $0" f. Exhibit B, Section 7, Payment Subsection 7.1, Payment Schedule is modified by deleting the Payment Schedule Table: "Payment Amount Interim Payment(s) $616,075 Paid upon receipt of actual expense documentation and written Pay Requests from the Grantee for reimbursement of eligible approved expenses. Final Payment $32,425 Paid upon Substantial Completion of the Project (as determined by the State in its sole discretion), provided that the Grantee has submitted, and DOLA has accepted, all required reports. Total $648,500" and inserting the following in lieu thereof: "Payment Amount Interim Payment(s) $619,685 Paid upon receipt of actual expense documentation and written Pay Requests from the Grantee for reimbursement of eligible approved expenses. Final Payment $32,615 Paid upon Substantial Completion of the Project (as determined by the State in its sole discretion), provided that the Grantee has submitted, and DOLA has accepted, all required reports. Total $652,300" g. Exhibit E, Project Performance Plan is modified by deleting the Seventh Milestone: "Project Completion. March 31, 2017 Review past quarterly reports, conduct on - site monitoring, and review final report. ACHIEVED: MM/DD/20YY" and inserting the following in lieu thereof: "Project Completion. September 30, 2017 Review past quarterly reports, conduct on - site monitoring, and review final report. ACHIEVED: MM/DD/20YY" Page 3 of 7 Effective Date: 1/6/09 -Rev 5/4/10 CDBG 15-504 - Wattenberg Water System h. Exhibit E, Project Performance Plan is modified by deleting the Eighth Milestone: "Submit quarterly progress reports, (30 calendar days after each Review documents which includes: Project Performance Plan quarter): and provide follow up ACHIEVED: accomplishments and a Financial Summary Report for 41h Quarter 2015 January 30, 2016 technical assistance as necessary. If needed, respond to MM/DD/20YY ACHIEVED: MM/DD/20YY 1st Quarter 2016 2nd Quarter 2016 April 30, 2016 July 30, 2016 a request for training within 10 days. ACHIEVED: 3rd Quarter 2016 41hQuarter 2016 October 30, 2016 January 30, 2017 MM/DD/20YY 15{ Quarter 2017 April 30, 2017 ACHIEVED: MM/DD/20YY" Progress shall be evaluated by the Grantee and documented and included at least upon submittal of Quarterly Progress Reports. Such evaluation may consist of any/all of the following monitoring methods: a) on -site walk through inspections of new Wattenberg water system in order to determine if: i) the contractor has constructed and/or procured and installed a percentage of the new tank, water lines, and water treatment building as would be expected under this Grant and Exhibit B (including, but not limited to, site prep, construction of tank, installation of water lines, building construction, and debris removal); ii) the contractor is experiencing delays; iii) the water system construction is progressing in a timely and adequate manner as would be expected under this Grant and Exhibit B (including, but not limited to. obtaining required approvals, use of approved materials, and testing of all elements); and b) question and answer sessions with the contractor to confirm understanding by all parties as to the nature of the Work and how far along it should be dependent upon the Quarter under review. THE REST OF THIS PAGE INTENTIONALLY LEFT BLANK Page 4 of 7 Effective Date: 1/6/09 -Rev 5/4/10 CDBG 15-504 - Wattenberg Water System and inserting the following in lieu thereof: "Submit quarterly progress reports, which includes: Project Performance Plan accomplishments and a Financial Summary Report for: 4th Quarter 2015 (30 calendar days after each quarter): January 30, 2016 Review documents and provide follow up technical assistance as necessary. If needed, respond to a request for training within 10 days. ACHIEVED: MM/DD/20YY ACHIEVED: MM/DD/20YY 15t Quarter 2016 2nd Quarter 2016 3rd Quarter 2016 4th Quarter 2016 April 30, 2016 July 30, 2016 October 30, 2016 January 30, 2017 ACHIEVED: MM/DD/20YY ACHIEVED: 1st Quarter 2017 April 30, 2017 2dd Quarter 2017 July 30, 2017 MM/DD/20YY" 3rd Quarter 2017 October 30, 2017 Progress shall be evaluated by the Grantee and documented and included at least upon submittal of Quarterly Progress Reports. Such evaluation may consist of any/all of the following monitoring methods: a) on -site walk through inspections of new Wattenberg water system in order to determine if: i) the Contractor has constructed and/or procured and installed a percentage of the new tank, water lines, and water treatment building as would be expected under this Grant and Exhibit B (including, but not limited to, site prep, construction of tank, installation of water lines, building construction, and debris removal); ii) the Contractor is experiencing delays; iii) the water system construction is progressing in a timely and adequate manner as would be expected under this Grant and Exhibit B (including, but not limited to, obtaining required approvals, use of approved materials, and testing of all elements); and b) question and answer sessions with the Contractor to confirm understanding by all parties as to the nature of the Work and how far along it should be dependent upon the Quarter under review. i. Exhibit E, Project Performance Plan is modified by deleting the Ninth Milestone: "Submit, at a minimum quarterly January 30, 2016 Review backup documentation and basis, pay requests and April 30, 2016 proof of payment prior to approving ACHIEVED: supporting documentation of July 30, 2016 pay request. Reimbursement should MM/DD/20YY" expenses. October 30, 2016 not exceed pro rata share. January 30, 2017 April 30, 2017 Page 5of7 Effective Date: 1/6/09 -Rev 5/4/10 CDBG 15-504 - Wattenberg Water System and inserting the following in lieu thereof: "Submit, at a minimum quarterly basis, pay requests and supporting documentation of January 30, 2016 Review backup documentation and proof of payment prior to approving pay request. Reimbursement should ACHIEVED: MM/DD/20YY" April 30, 2016 July 30, 2016 expenses. October 30, 2016 not exceed pro rata share. January 30, 2017 April 30, 2017 July 30, 2017 October 30, 2017 j. Exhibit E, Project Performance Plan is modified by deleting the Tenth Milestone: "Submit the Project Final Report to DLG within 90 days after the Project Completion or expiration of July 29, 2017 Provide forms to Grantee within 30 days of completion of work or end of the Grant Agreement. Process the ACHIEVED: MM/DD/20YY" Grant Agreement. Final Report and deobligate any remaining grant funds within 30 days of receiving a complete Final report. and inserting the following in lieu thereof: "Submit the Project Final Report to DOLA within 90 days after the Project Completion or expiration of December 29, 2017 Provide forms to Grantee within 30 days of completion of work or end of the Grant Agreement. Process the ACHIEVED: MM/DD/20YY" Grant Agreement. Final Report and deobligate any remaining grant funds within 30 days of receiving a complete Final report. 7) START DATE This Amendment shall take effect on the later of its Effective Date or March 15, 2017. 8) ORDER OF PRECEDENCE Except for the Special Provisions, in the event of any conflict, inconsistency, variance, or contradiction between the provisions of this Amendment and any of the provisions of the Contract, the provisions of this Amendment shall in all respects supersede, govern, and control. The most recent version of the Special Provisions incorporated into the Contract or any amendment shall always control other provisions in the Contract or any amendments. 9) AVAILABLE FUNDS Financial obligations of the state payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted, or otherwise made available. THE REST OF THIS PAGE INTENTIONALLY LEFT BLANK Page 6 of 7 Effective Date. 1/6/09 -Rev 5/4/10 CDBG 15-504 - Wattenberg Water System CMS# 97806 THE PARTIES HERETO HAVE EXECUTED THIS AMENDMENT * Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor's behalf and acknowledge that the State is relying on their representations to that effect. CONTRACTOR WELD COUNTY By: Julie A. Cozad Name of Authorized Individual Chair, Board of Weld County Title: Commissioners Official Title of Authorized Individual Date: MAR 13 2017 STATE OF COLORADO John W. Hickenlooper, GOVERNOR DEPARTMENT OF LOCAL AFFAIRS By: 6--J 1 Iry Halter, Execu ive Director Date: YaiDA PRE-ARPROVE F R M� CONTRACT REVIEWER By: Date: 3/1 QV 1-" ALL CONTRACTS REQUIRE APPROVAL BY THE STATE CONTROLLER CRS §24-30-202 requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor is not authorized to begin performance until such time. If Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Contractor for such performance or for any goods and/or services provided hereunder. Janet Miks, CPA, Controller Delegate Date: 3/30) / 7 Page 7of7 Effective Date: 1/6/09 -Rev 5/4/10 c>2oo7a&(i) Hello