HomeMy WebLinkAbout20173767RESOLUTION
RE: EXTENSION OF REGULATING, WARNING AND GUIDING TRAFFIC DURING THE
TEMPORARY CLOSURE OF COUNTY ROAD 24.5 BETWEEN INTERSTATE 25
FRONTAGE ROAD AND COUNTY ROAD 11 FOR AN ADDITIONAL TWENTY (20)
DAYS, FOR UNANTICIPATED DELAYS DUE TO SCHEDULING OF WATER MAIN
SHUT DOWN
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 24.5, between Interstate 25 Frontage
Road and County Road 11, be extended, with said extended closure being effective November 2,
2017, for approximately an additional twenty (20) days through November 22, 2017, for
unanticipated delays due to scheduling of the water main shut down, and further, that standard
official traffic control devices shall be erected at said closure giving notice of the restrictions.
0.c = Soc RS). O ;5po.+4-I•,,
c 0 5
I I I a 7 f 17
2017-3767
EG0024
EXTENSION OF TEMPORARY CLOSURE - COUNTY ROAD 24.5
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 1st day of November, A.D., 2017.
ATTEST: datif44) jeido•ti
Weld County Clerk to the Board
BY:
uty Clerk to the Board
APP' • ED AS T
BOARD OF COUNTY COMMISSIONERS
WELD CONTY, COLORADO
CJu ie A. Cozad, Chaiirr�
Steve Moreno, Pro-Tem
Sean P. Conway
ike Freeman
•�i1s• �.J
i
At
Date of signature: I I (7(
arbara Kirkmeyer
2017-3767
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: October 30, 2017
FROM: Amy Joseph, Public Works Department
SUBJECT: BOCC Agenda Item
Crow Creek Construction is requesting an extension of the previously approved closure of CR 24.5
between 1-25 Frontage Rd and CR 11 for the Gateway North Project through November 22nd, 2017. The
delay is due to scheduling of the water main shut down that is necessary to complete relocation of the 18"
Water main which affects the Southwest Service Center and the Tri town area.