HomeMy WebLinkAbout20173549.tiffMEMORANDUM
TO: Kim Ogle, Planning Services
DATE: August 17, 2017
FROM: Hayley Balzano, E.I., Development Engineer
SUBJECT: USR17-0038 Woodruff
The Weld County Department of Planning Services -Engineering has reviewed this proposal. Staff
comments made during this phase of the application process may not be all-inclusive, as other issues may
arise during the remaining application process.
COMMENTS:
General Project Information/Location:
Project description: Brewery
This project is east of and adjacent to County Road 39 and is south of County Road 86.
Parcel number: 070905200036
Drainage Requirements:
Please contact Department of Planning Services/Engineering Development Review for questions or
assistance for drainage requirements at 970-353-6100.
URBANIZING VS NON -URBANIZING DRAINAGE AREA:
This area IS within a Non -Urbanizing Drainage Area:
Non -Urbanizing Drainage Areas typically require detention of runoff from the 1 -hour, 100 -year, storm falling
on the developed site and release of the detained water at the historic runoff rate of the 1 -hour, 10 -year
storm falling on the undeveloped site for NON -URBANIZING areas.
The applicant has submitted a Drainage Narrative stating that the site will meet exception 1.a.14 for a parcel
greater than 5 gross acres in size being allowed a onetime exception for a new 2,000 sq ft building or
equivalent imperviousness.
Geologic Hazard Area:
This area IS NOT in a Geologic Hazard Area.
Floodplain:
This area IS NOT in a FEMA regulatory floodplain.
CONDITIONS OF APPROVAL:
A. The plan shall be amended to delineate the following:
1. The applicant shall show the drainage flow arrows. (Department of Planning Services -Engineer)
2. Show and label the parking. (Department of Planning Services -Engineer)
DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN)
1. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Planning
Services -Engineer)
MEMORANDUM
TO: Kim Ogle, Planning Services DATE: August 17, 2017
FROM: Evan Pinkham, Public Works
SUBJECT: USR17-0038 Woodruff
The Weld County Department of Public Works has reviewed this proposal. Staff comments made during
this phase of the application process may not be all-inclusive, as other issues may arise during the
remaining application process.
COMMENTS
GENERAL PROJECT INFORMATION/LOCATION
Project description: A Site Specific Development Plan and Special Review Permit for a Brewery (Sheaf &
Kettle Brewing Company, LLC) in the (A) Agricultural Zone District
This project is east of and adjacent to CR 39 and is south of CR 86. Parcel number 070905200036.
Access is from CR 39.
ACCESS
An Access Permit application was submitted with the application materials. Public Works will review the
application and provide an access permit and permit number if approved. Questions concerning access
requirements can be directed to Public Works access permit division.
Per Chapter 12, Article 5, Section 12-5-30, an Access Permit is required for access to Weld County
maintained roadways. We strongly encourage you to discuss your access with public works prior to laying
out your site plan to ensure the approved accesses are compatible with your layout.
For new accesses and/or change of use of an existing access, the fee and photos are required (photo
looking left and right along roadway from the access point and looking in to and out of the access point).
These photos are used to evaluate the safety of the access location. Access permit instructions and
application can be found at https://www.weldgov.com/departments/publIc works/permits/. Chapter 6,
Sections 6.3, 6.4 and 6.5 of the Weld County Engineering and Construction Criteria offer access design
guidance, which can be accessed at: https://www weldgov com/departments/public works/engineering/.
For shared accesses, Public Works strongly recommends the property owner establish an access road
maintenance agreement so future owners of the properties will be aware of their requirements for shared
maintenance of the access road. This is not a requirement, but is recommended to avoid property owner
conflicts in the future.
Per Chapter 12, Appendix 12A.4.1 of the Weld County Code, an access approach that is gated shall be
designed so that the longest vehicle (including trailers) using the access can completely clear the traveled
way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled surface
be less than 35 feet.
ROADS AND RIGHTS -OF -WAY
County Road 39 is a gravel road and is designated on the Weld County Functional Classification Map (Code
Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way. The applicant shall delineate
on the site map or plat the future and existing right-of-way and the physical location of the road. If the right-
of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County
Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-
way line. Be aware that physical roadways may riot be centered in the right-of-way. This road is maintained
by Weld County.
Weld County will riot replace overlapping easements located within existing right-of-way or pay to relocate
existing utilities within the County right-of-way.
TRAFFIC
Latest ADT on CR 39 was taken on 11/20/2015 which counted 138 vpd with 29% trucks.
The traffic information submitted with the application materials indicated that there will be approximately 20
daily roundtrips.
TRACKING CONTROL POLICY
Per Chapter 12, Appendix 12A.10.1, traffic volumes to the proposed facility may require the installation of
a tracking control device and/or a minimum of four inches of compacted recycled asphalt or aggregate road
base. Tracking control is required to prevent tracking from the site onto public roadways. Minimal standards
are listed below. Temporary Tracking Control shall be used during construction unless permanent tracking
control is installed ahead of construction activities.
20 to 50 passenger vehicle round trips/day or less than 4 truck round trips/day:
• Access onto gravel roads includes 50 feet of road base or recycled asphalt.
• Access onto paved roads includes 100 feet of road base or recycled asphalt.
*Note: Recycled concrete is not allowed in County right-of-way
**Tracking control devices can be double cattle guards or rip rap (6" washed rock)
***Tracking control for unmaintained public right-of-way is required just prior to entering publicly maintained
roadways.
A variance request for alternatives to the above tracking control can be submitted to Public Works for review
and consideration.
IMPROVEMENTS AND ROAD MAINTENANCE AGREEMENT
Public Works may require an Improvements Agreement for one or all the following reasons:
• Off -Site Public Improvements
• Road Maintenance Agreement
• Construction Maintenance Agreement
• Access Improvements Agreement
An Improvements Agreement is required for sites with required offsite improvements per Chapter 12, Article
V, Section 12-5-60. Collateral is required to ensure the improvements are completed, and maintained.
Improvements/Road Maintenance Agreement: An example agreement is available at:
https://www.weldclov com/UserFiles/Servers/Server 6/File/Degartments/Publie/020Works/DevelopmentR
eviewlsprusr.pdf. It will detail the approved haul route(s), outline when offsite improvements will be
triggered, and include a maintenance agreement for the haul routes. Possible mitigations included in the
road maintenance agreement may include but are not limited to: dust control, specified haul routes, damage
repairs, and future improvement triggers.
CONDITIONS OF APPROVAL
A. An Improvements and Road Maintenance Agreement is required for offsite improvements at this
location. Road maintenance including, but not limited to dust control, damage repair, specified haul
routes and future traffic triggers for improvements will be included. (Department of Public Works)
B. The plan shall be amended to delineate the following:
1. County Road 39 is a gravel road and is designated on the Weld County Functional Classification
Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall
delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge
of right-of-way. This road is maintained by Weld County. (Department of Public Works)
2. Show and label the approved access(es) (APXX-XXXXX), and the appropriate turning radii (60')
on the site plan. (Department of Public Works)
3. Show and label the approved tracking control on the site plan. (Department of Public Works)
4. Show and label the entrance gate if applicable. An access approach that is gated shall be designed
so that the longest vehicle (including trailers) using the access can completely clear the traveled
way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled
surface be less than 35 feet. (Department of Public Works)
Prior to Construction:
A. The approved access and tracking control shall be constructed prior to on -site construction.
(Department of Public Works)
DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN)
1. The property owner shall control noxious weeds on the site. (Department of Public Works)
2. The access on the site shall be maintained to mitigate any impacts to the public road including damages
and/or offsite tracking. (Department of Public Works)
3. There shall be no parking or staging of vehicles on public roads. On -site parking shall be utilized.
(Department of Public Works)
TO:
FROM:
DATE:
WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org
MEMORANDUM
Kim Ogle, Planning Services
Lauren Light, Environmental Health Services
August 11, 2017
Environmental Health Services has reviewed this proposal for a Site Specific
Development Plan and Use by Special Review Permit for a Brewery (Sheaf & Kettle
Brewing Company, LLC) in the (A) Agricultural Zone District.
There is an existing home on the property that is served by an onsite wastewater
treatment system (SE -0200028) which is permitted for 3 bedrooms. A commercial septic
system for the tap room will be constructed. Water will be supplied by North Weld
County Water District.
The applicant is proposing to discharge water and food grade sanitizer from the beer
equipment cleaning process to the lawn and pasture. The applicant shall provide
evidence from the Water Quality Control Division of the Colorado Department of Health
and Environment that this proposed discharge is approved.
We recommend that the following requirements be incorporated into the permit as
conditions that must be met prior to the issuance of the Certificate of Occupancy:
1. An onsite wastewater treatment system is required for the proposed facility and
shall be installed per the Weld County Onsite Wastewater Treatment System
Regulations.
2. The applicant shall submit evidence of a Colorado Discharge Permit System
(CDPS) from the Water Quality Control Division of the Colorado Department of
Health and Environment for any proposed discharge into State Waterways, if
applicable.
Health Administration
Vital Records
Icic: 9/0 304 6410
Fax: 9/0-301-64 I'2
Public Health &
Clinical Services
Icic: 9/0 304 6420
Fax: 910-304-64 16
Environmental Health
Services
Tele: 970-304-6415
Fax: 970-304-6411
Communication,
Education & Planning
Tele: 970-304-6470
Fox: 970-304-6452
Emergency Preparedness
8 Response
Te le: 970-304-6470
Fax: 970-304-6462
Public Health
We recommend the following requirements be incorporated into the permit as
development standards:
1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and
Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal
in a manner that protects against surface and groundwater contamination.
2. No permanent disposal of wastes shall be permitted at this site. This is not
meant to include those wastes specifically excluded from the definition of a solid
waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.
3. Waste materials shall be handled, stored, and disposed in a manner that controls
fugitive dust, fugitive particulate emissions, blowing debris, and other potential
nuisance conditions. The applicant shall operate in accordance with Chapter 14,
Article 1 of the Weld County Code.
4. Fugitive dust shall attempt to be confined on the property. Uses on the property
should comply with the Colorado Air Quality Commission's air quality regulations.
5. This facility shall adhere to the maximum permissible noise levels allowed in the
Commercial Zone as delineated in 25-12-103 C.R.S.
6. Adequate drinking, hand washing and toilet facilities shall be provided for
employees and patrons of the facility. Sewage disposal for the facility shall be by
septic system. Any septic system located on the property must comply with all
provisions of the Weld County Code, pertaining to Onsite Wastewater Treatment
Systems.
7. A permanent, adequate water supply shall be provided for drinking and sanitary
purposes.
8. The applicant shall comply with Colorado Retail Food Establishment Rules and
Regulations governing the regulation of food service establishments.
9. The operation shall comply with all applicable rules and regulations of State and
Federal agencies and the Weld County Code.
2