Loading...
HomeMy WebLinkAbout20173200.tiffMEMORANDUM TO: Kim Ogle, Planning Services DATE: May 10, 2017 FROM: Hayley Balzano, E.I., Development Engineer SUBJECT: USR17-0023 DCP Midstream The Weld County Department of Planning Services -Engineering has reviewed this proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS: General Project Information/Location: Project description: Oil and Gas Processing Facility This project is east of and adjacent to County Road 49 and is north of County Road 44. Parcel number: 105318300002 Drainage Requirements: Please contact Department of Planning Services/Engineering Development Review for questions or assistance for drainage requirements at 970-353-6100. URBANIZING VS NON -URBANIZING DRAINAGE AREA: This area IS within a Non -Urbanizing Drainage Area: Non -Urbanizing Drainage Areas typically require detention of runoff from the 1 -hour, 100 -year, storm falling on the developed site and release of the detained water at the historic runoff rate of the 1 -hour, 10 -year storm falling on the undeveloped site for NON -URBANIZING areas. Detention Pond summarized in a Drainage Report: The applicant has submitted a Drainage Report that has been reviewed. The applicant can contact Planning Services Engineering to request a checklist for corrections. Grading Permit A Weld County Grading Permit will be required if disturbing more than 1 acre. Grading Permit applications are accepted after the planning process is complete (plan recorded). An Early Release Request Form may be entertained only after the applicant and Planning Department have reviewed the referral and surrounding property owner comments. The Early Release Request may or may not be granted depending on referral comments and surrounding property owner concerns. Contact an Engineering representative from the Planning Department for more information. A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact: Colorado Department of Public Health and Environment, Water Quality Control Division, Rik Gay, 303-692- 3575. Geologic Hazard Area: This area IS NOT in a Geologic Hazard Area. Floodplain: This area IS NOT in a FEMA regulatory floodplain. CONDITIONS OF APPROVAL: A. A Final Drainage Report and Certification of Compliance stamped and signed by a Professional Engineer registered in the State of Colorado is required. (Department of Planning Services -Engineer) B. The plan shall be amended to delineate the following: 1. The applicant shall show and label the accepted drainage features and drainage flow arrows. Water quality features or stormwater ponds should be labeled as "Water Quality Feature/Stormwater Detention, No -Build or Storage Area" and shall include the calculated volume. (Department of Planning Services -Engineer) Prior to Construction: A. If more than one (1) acre is to be disturbed, a Weld County Grading Permit will be required. (Department of Planning Services -Engineer) DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) 1. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Planning Services -Engineer) 2. Weld County is not responsible for the maintenance of onsite drainage related features. (Department of Planning Services -Engineer) MEMORANDUM TO: Kim Ogle, Planning Services DATE: May 5, 2017 FROM: Evan Pinkham, Public Works SUBJECT: USR17-0023 DCP Midstream LP The Weld County Department of Public Works has reviewed this proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS: General Project Information/Location: Project description: A Site Specific Development Plan and a Special Review Permit for Mineral Resource Development, Oil and Gas Support and Service, including oil and gas processing facilities and related equipment, including, but not limited to, four (4) compressors associated with gas processing or which compress gas to enter a pipeline for transport to market, and one (1) one hundred foot in height communications tower in the A (Agricultural) Zone District This project is north of and adjacent to CR 44 and is east of and adjacent to CR 49. Parcel number 105318300002. Access is from 44. Access: An access permit has been approved for the access to the site (AP17-00165). AP17-00165 Special Requirements or Comments: "Parcel 105318300002. Utilize existing upgraded access point on CR 44 (1 -Industrial) located approx. 1890 ft. East of CR 49. Note: CR 44 is a Collector roadway with a 60 ft. setback from centerline. **Crushed concrete SHALL NOT be used for tracking material in the County ROW." For shared accesses, Public Works strongly recommends that the property owner establish an access road maintenance agreement so future owners of the properties will be aware of their requirements for shared maintenance of the access road. This is not a requirement for the recorded exemption but is recommended to avoid property owner conflicts in the future. Entrance gates (if applicable) must be set back a minimum of 100 feet from edge of shoulder to allow a truck with trailer or RV to pull completely off of the roadway and open the gate. In no case shall any vehicle(s) stopped to open a gate be allowed to create a safety issue for roadway users. When feasible, there shall be no net increase in the number of accesses to a public road. Contact Public Works to discuss your access. Roads: County Road 44 is a paved road and is designated on the Weld County Road Classification Plan as a collector road, which requires 80 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the future and existing right-of-way. All setbacks shall be measured from the edge of future right- of-way. This road is maintained by Weld County. County Road 49 is designated on the Weld County Classification Plan as an arterial road, which typically requires 140ft of right-of-way at full build out. Weld County is currently in the process of widening this corridor. The alignment of the road widening project varies along the section line for the corridor. Contact public works for the location of the existing and future right of way and easements and delineate these on the site plan. Traffic: Latest ADT on CR 44 was taken on 8/10/2016 which counted 922 vpd with 36% trucks. A traffic narrative was submitted with the application materials and indicated that there will be approximately 1-2 daily roundtrips. The expected traffic routes are south on CR 49 to CR 44. TRACKING CONTROL: Tracking control is required to prevent tracking from the site onto public roadways. Minimal standards are listed below. Temporary Tracking Control shall be used during construction unless permanent tracking control is installed ahead of construction activities. Less than 20 passenger vehicle round trips/day, no upfront tracking control requirements. Improvements and Road Maintenance Agreement: No improvements agreement will be required as the anticipated traffic is less than 21 round truck trips/day or 50 round passenger vehicle trips/day or if defined as a Site Plan Review (SPR). A development standard will be applied to the recorded map indicating any impacts to the road must be mitigated by the owner. The access on the site shall be maintained to mitigate any impacts to the public road including damages and/or offsite tracking. CONDITIONS OF APPROVAL: A. The plan shall be amended to delineate the following: 1. County Road 44 is a paved road and is designated on the Weld County Road Classification Plan as a collector road which requires 80 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the future and existing right-of-way. All setbacks shall be measured from the edge of future right-of-way. This road is maintained by Weld County. (Department of Public Works) 2. County Road 49 is designated on the Weld County Classification plan as an arterial road which typically requires 140ft of right-of-way at full build out. Weld County is currently in the process of widening this corridor. The alignment of the road widening project varies along the section line for the corridor. Contact Public Works for the location of the existing and future right of way and easements and delineate these on the site plan. (Department of Public Works) 3. Show and label the approved access(es) (APXX-XX)OXX), and the appropriate turning radii on the site plan. (Department of Public Works) 4. Show and label the entrance gate set back a minimum of 100ft from edge of shoulder. (Department of Public Works) DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) 1. The property owner shall control noxious weeds on the site. (Department of Public Works) 2. The access on the site shall be maintained to mitigate any impacts to the public road including damages and/or offsite tracking. (Department of Public Works) 3. There shall be no parking or staging of vehicles on public roads. On -site parking shall be utilized. (Department of Public Works) WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org Memorandum To: Kim Ogle From: Ben Frissell, Environmental Health Services Date: May 10, 2017 Re: USR17-0023 DCP Compressor Station Environmental Health Services has reviewed this proposal for a Site Specific Development Plan and a Special Review Permit for Mineral Resource Development, Oil and Gas Support and Service, including oil and gas processing facilities and related equipment, including, but not limited to, four (4) compressors associated with gas processing or which compress gas to enter a pipeline for transport to market, and one (1) one hundred foot in height communications tower in the A (Agricultural) Zone District There will be no permanent employees on the site. According to the application, once construction is complete one employee may visit the site a few times a week. Environmental Health has no objections to the proposal; however, we recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. The facility shall operate in accordance with Chapter 14, Article 1 of the Weld County Code. 4. Fugitive dust should attempt to be confined on the property. Uses on the property should comply with the Colorado Air Quality Commission's air quality regulations. 5. The applicant shall submit an Air Pollution Emission Notice (A.P.E.N.) and Health Administration Vital Records lot: 9/U 304 6410 Fax: 9/0-301-64 I'2 Public Health & Clinical Services Icic: 9/0 304 6420 Fax: 9,10-304-64 16 Environmental Health Services Tele: 970-304-6415 Fux: 970-304-6411 Communication, Education & Planning Tele: 970-.304-6470 Fox: 970-304-6452 Emergency Preparedness 8 Response Te le: 970-304-6470 Fax: 970-304-6452 Public Health Emissions Permit Application and obtain a permit from the Air Pollution Control Division, Colorado Department of Public Health and Environment, as applicable. 6. Adequate drinking, handwashing and toilet facilities shall be provided for employees and patrons of the facility, at all times. As employees or contractors are on site for less than 2 consecutive hours a day portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. 7. All potentially hazardous chemicals must be handled in a safe manner in accordance with product labeling. All chemicals must be stored secure, on an impervious surface, and in accordance with manufacturer's recommendations. 8. Secondary containment shall be constructed around tanks to provide containment for the largest single tank and sufficient freeboard to contain precipitation. Secondary containment shall be sufficiently impervious to contain any spilled or released material. Secondary containment devices shall be inspected at regular intervals and maintained in good condition. All secondary containment will comply with the Colorado Oil and Gas Conservation (COGCC) Commission Rule 604 and/or the provisions of the State Underground and Above Ground Storage Tank Regulations. 9. A Spill Prevention, Control and Countermeasure Plan, prepared in accordance with the applicable provisions of 40 CFR, Part 112, shall be available on site. 10. The facility shall be constructed and operated to ensure that contamination of soil and groundwater does not occur. 11.Any contaminated soils on the facility shall be removed, treated or disposed of in accordance with all applicable rules and regulations. All spills will be reported to local, state and federal agencies in accordance with all state and federal regulations. 12. The facility shall adhere to the maximum permissible noise levels allowed in the commercial Zone as delineated in 25-12-103 C.R.S. 13. The applicant shall obtain a Colorado Discharge Permit System or CDPS permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division, as applicable. 14. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. Hello