HomeMy WebLinkAbout20163122.tiffGRAros< ItiA 633
BOARD OF COUNTY COMMISSIONERS
PASS -AROUND REVIEW
3
RE: Renewal of Xzalt Salt & Sander Test (2016-'$122)
DEPARTMENT: Public Works DATE: 10/11/17
PERSON REQUESTING: Neal Bowers
Brief description of the problem/issue:
Do to the lack of snow last winter the test to compare our sanders to the Xzalt sander was
inconclusive. The Highway Equipment Company has again offered to let Weld County use the Xzalt sander
for this winter season at no cost to the County, same agreement as last year see attached document.
What options exist for the Board? (Include consequences, impacts, costs, etc. of options)
The Board may approve or deny the offer.
Recommendation:
Public Works recommends the approval of the offer.
Sean P. Conway
Julie A. Cozad, Chair
Mike Freeman
Barbara Kirkmeyer
Steve Moreno, Pro -Tern
C_Av\s9A-
P1
Approve
Recommendation
Schedule
Work Session
c.c. Pc„vC6)
11113(11
Other/Comments:
okcp-3 I aD
aG oo-i,5
Xzalt Test Plan
Benefit Material Savings
Directional
Placement
Minimum
Maintenance
Description
70:30 dry to wet ratio Directional placement
applied at the appropriate control and Quicklane
(comparable) rate feature maximize route
minimizes the total amount efficiency.
of material needed to meet
performance requirements.
Product has been designed
and tested to perform with
minimal down -time and
minimal operating
maintenance.
Responsible
Participant and HECO Participant and HECO
Participant, HECO, and
Dealer
Measurement
Process
Comparative data from 1) Determine set route for
Smart Salting participants - machine.
Xzalt vs prior year(s).
2) Collect lane miles spread
per mile driven
information.
3) Collect data from
controller (see example).
1) HECO determines
historical average warranty
cost per machine.
2) Dealer documents repair
time and cost for each test
machine once in service.
3) Participant allows
unrestricted access to the
machine and operator(s)
for the purposes of data
collection and interviews.
Due Date
End of trial End of trial
End of trial
Expected Results 25-35% savings in material Will depend on route.
volume used.
Trial machines have less
maintenance cost and
down -time than historical
averages.
Notes
Participant needs to be able to provide comparative data. Comparison can be
current year with another machine running a similar route or comparable year.
FON mere
Considerations
Acceptable
Consideration Performance
Unacceptable
Performance
Remedy
Application Rates
Machine operates at intended
70:30 dry to liquid ratio.
Participant adjusts ratio
without consultation and
consensus.
Dialog between HECO and
participant to determine
mutually agreed upon rate.
Lane Miles
As many or greater lane miles 20% or fewer miles covered
covered per load than per load than previous years
previous year on same route. on same route.
If machine reduces efficiency
by 20% compared to previous
years dry equivalent on same
route after 2 snow events,
participant may elect to exit
the program.
Mechanical
Electronics
Machine performs as
designed. Participant
responsible for routine
maintenance consistent with
maintaining this type of
equipment.
Electronics and software
perform as designed.
Machine does not perform as
designed resulting from failure
due to factors beyond operator
error.
Controls do not perform as
designed resulting from failure
due to factors beyond operator
error.
Claims submitted and
evaluated according to HECO
standard claims policies.
Upon 2 claims resulting in
determination of mechanical
failure, participant may elect
to exit the program subject to
End of Trial Product Return.
Claims submitted and
evaluated according to HECO
standard claims policies.
Upon 2 claims resulting In
determination of electrical
failure, participant may elect
to exit the program subject to
End of Trial Product Return.
Usage
Normal usage consistent with
participant's practices of
caring for and maintaining
new equipment.
Participant does not exercise
reasonable care of equipment
nor performs regular
operational and preventative
maintenance consistent with
HECO operators manual.
Should machine be returned
at end of trial period, it must
be returned in salable
condition. Any other
condition, participant will be
responsible for necessary
repairs to return machine to
salable condition.
Operator training
Notes
Operators of this machine
participate in and retain
information gathered during
one-time, on -site operator
training.
Operators of this machine
untrained by HECO or dealer.
Any untrained operator must,
at the participant's expense,
travel to HECO or dealer for
appropriate training prior to
operation of machine.
Participant agrees serve as a
reference (public or private is
acceptable).
F0li the BEST
Xzalt Test Plan Agreement
Duration
Use
Insurance
Route
Description
Test period is defined as October 1, 2017 through April 30, 2018. There will be no cost for
the test period.
Normal usage consistent with participant's practices of caring for and maintaining new
equipment consistent with HECO operators manual. Machine to be operated at 70:30 dry
to liquid ratio.
Participant agrees to maintain insurance pursuant to the Self Insurance program provided
to HECO. To the extent permitted by law, Participant agrees to indemnify and hold HECO
harmless from any liability for losses, claims, injury to or death of any person, or for
damage to property arising from Participant using and possessing the machine. HECO
agrees to be liable for any damage caused to County Property due to failure or defect of
HECO equipment. Replacement cost for the 14' Xzalt spreader and controller
is S59,00.00. This price does not include freight charges, labor for PDI, mounting, etc.
Participant and HECO determine set route for machine. See attached route map.
Participant and HECO collect data from controller (see example).
Comparative Data Participant provides comparative route data from 3 prior years spreading on determined
route utilizing non-Xzalt precision application equipment.
Access Participant allows HECO and/or dealer reasonable, unrestricted access to the machine and
operator(s) for the purposes of data collection and interviews.
End of Trial — Product Participant has opportunity to purchase this test unit from HECO-authorized dealer.
Return
Should participant choose not to purchase test unit, machine must be returned to HECO-
authorized dealer in salable condition within 30 days of the end of the trial. Costs to return
equipment to salable condition will be participant's responsibility, but shall only include
costs attributable to damage caused by Participant.
End of Trial — Product Participant has opportunity to purchase this test unit from HECO-authorized dealer,
Purchase Warranty
Upon purchase, a,13 -month manufacturer warranty against material defects due to faulty
manufacturing will apply, subject to registration within 30 days of purchase.
Termination of HECO reserves the right to terminate this agreement and remove equipment from
Agreement Participant's operation at any time if operation is deemed unsafe according to HECO
operators manual. HECO or Participant may terminate agreement if any conditions within
the test plan are not satisfactorily met.
Reference Participant agrees to serve as a reference for HECO Xzalt (either public or private).
Agreed &
accepted
NOV 13 2017
/2
O2o/Lo - �J�aZv`Z
RESOLUTION
RE: APPROVE AGREEMENT FOR XZALT TEST PLAN AND AUTHORIZE CHAIR TO SIGN
- HIGHWAY EQUIPMENT COMPANY
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with an Agreement for Xzalt Test Plan
between the County of Weld, State of Colorado, by and through the Board of County
Commissioners of Weld County, on behalf of the Department of Public Works, and Highway
Equipment Company, commencing upon full execution and with further terms and conditions
being as stated in said agreement, and
WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy
of which is attached hereto and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County, Colorado, that the Agreement for Xzalt Test Plan between the County of Weld, State of
Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the
Department of Public Works, and Highway Equipment Company be and hereby is, approved.
BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized
to sign said agreement.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 5th day of October, A.D., 2016.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: id(4#)G • 0;g1
Weld County Clerk to the Board
BY •R
puty Clerk to the Board,.
AP" =VED
ou y Attorney
Date of signature: I t / I / I Co
Sean P. C • way, Pro -T
Steve Moreno
Cc _./- Pt.()C c' 6/ acv,)
ttll l ICv
2016-3122
EG0073
BOARD OF COUNTY COMMISSIONERS
PASS -AROUND REVIEW/ WORK SESSION REQUEST
RE: Xzalt Salt Sander Test
DEPARTMENT: Public Works
PERSON REQUESTING: Neal Bowers
DATE: 9/15/16
Brief description of the problem/issue:
Highway Equipment Company has offered to let Weld County use a salt sander for the winter
season at no cost to the County unless damaged see attached document. This would be a test to compare
our sanders to this newer type sander that is supposed to use 25-35% less material. Frank Haug has review
and made changes to the attached document.
What options exist for the Board? (Include consequences, impacts, costs, etc. of options)
The Board may approve or deny the offer.
Recommendation:
Public Works recommends the approval of the offer.
Mike Freeman, Chair
Sean P. Conway, Pro-Tem
Julie A. Cozad
Barbara Kirkmeyer
Steve Moreno
cc: Curtis Hall
Frank Haug
Jay McDonald
Aoorove Schedule
Recommendation Work Session
Other/Comments:
c5%
e,g Db7
/ 147
MEMORANDUM
TO: Clerk to the Board DATE: October 3, 2016
FROM: Neal Bowers, Public Works Department
SUBJECT: Consent Agenda Item
RE: Xzalt Salt Sander Test
Highway Equipment Company has offered a salt sander to Weld County Public Works for the
winter. There is no cost to the County unless damaged. This would be a test to compare sander
material usage efficiencies.
Contract is attached.
2016-3122
•
•
i
Xzalt Test Plan
Directional
Benefit Material Savings Placement
Minimum
Maintenance
Description
70:30 dry to wet ratio Directional placement
applied at the appropriate control and Quicklane
(comparable) rate feature maximize route
minimizes the total amount efficiency.
of material needed to meet
performance requirements.
Product has been designed
and tested to perform with
minimal down -time and
minimal operating
maintenance.
Responsible
Participant and HECO
Participant and HECO
Participant, HECO, and
Dealer
Measurement
Process
Comparative data from 1) Determine set route for 1) HECO determines
Smart Salting participants - machine. historical average warranty
Xzalt vs prior year(s). cost per machine.
2) Collect lane miles spread
per mile driven
information.
3) Collect data from
controller (see example).
2) Dealer documents repair
time and cost for each test
machine once in service.
3) Participant allows
unrestricted access to the
machine and operator(s)
for the purposes of data
collection and interviews.
Due Date
End of trial End of trial
End of trial
Expected Results 25-35% savings in material Will depend on route.
volume used.
Trial machines have less
maintenance cost and
down -time than historical
averages.
Notes
Participant needs to be able to provide comparative data. Comparison can be
current year with another machine running a similar route or comparable year.
NEW _
-
Considerations
Acceptable
Consideration Performance
Unacceptable
Performance
Remedy
Application Rates
Machine operates at intended Participant adjusts ratio
70:30 dry to liquid ratio. without consultation and
consensus.
Dialog between HECO and
participant to determine
mutually agreed upon rate.
Lane Miles
As many or greater lane miles 20% or fewer miles covered
covered per load than per load than previous years
previous year on same route. on same route.
If machine reduces efficiency
by 20% compared to previous
years dry equivalent on same
route after 2 snow events,
participant may elect to exit
the program.
Mechanical
Electronics
Machine performs as Machine does not perform as Claims submitted and
designed. Participant designed resulting from failure evaluated according to HECO
responsible for routine due to factors beyond operator standard claims policies.
maintenance consistent with error. Upon 2 claims resulting in
maintaining this type of determination of mechanical
equipment. failure, participant may elect
to exit the program subject to
End of Trial Product Return.
Electronics and software
perform as designed.
Controls do not perform as Claims submitted and
designed resulting from failure evaluated according to HECO
due to factors beyond operator standard claims policies.
error. Upon 2 claims resulting in
determination of electrical
failure, participant may elect
to exit the program subject to
End of Trial Product Return.
Usage
Normal usage consistent with
participant's practices of
caring for and maintaining
new equipment.
Participant does not exercise
reasonable care of equipment
nor performs regular
operational and preventative
maintenance consistent with
HECO operators manual.
Should machine be returned
at end of trial period, it must
be returned in salable
condition. Any other
condition, participant will be
responsible for necessary
repairs to return machine to
salable condition.
Operator training
Operators of this machine
participate in and retain
information gathered during
one-time, on -site operator
training.
Operators of this machine
untrained by HECO or dealer.
Any untrained operator must,
at the participant's expense,
travel to H ECO or dealer for
appropriate training prior to
operation of machine.
Notes
Participant agrees serve as a
reference (public or private is
acceptable!
MEW
Xzalt Test Plan Agreement
Item
Description
Duration
Test period is defined as October 1, 2016 through April 30, 2017. There will be no cost for
the test period.
Use
Normal usage consistent with participant's practices of caring for and maintaining new
equipment consistent with HECO operators manual. Machine to be operated at 70:30 dry
to liquid ratio.
Insurance
Participant agrees to maintain insurance pursuant to the Self Insurance program provided
to HECO. To the extent permitted by law, Participant agrees to indemnify and hold HECO
harmless from any liability for losses, claims, injury to or death of any person, or for
damage to property arising from Participant using and possessing the machine. HECO
agrees to be liable for any damage caused to County Property due to failure or defect of
HECO equipment. Replacement cost for the 14' Xzalt spreader and controller
is $59,00.00. This price does not include freight charges, labor for PDI, mounting , etc.
Route Participant and HECO determine set route for machine. See attached route map.
Participant and HECO collect data from controller (see example).
Comparative Data Participant provides comparative route data from 3 prior years spreading on determined
route utilizing non-Xzalt precision application equipment.
Access Participant allows HECO and/or dealer reasonable, unrestricted access to the machine and
operator(s) for the purposes of data collection and interviews.
End of Trial -- Product Participant has opportunity to purchase this test unit from HECO-authorized dealer.
Return
Should participant choose not to purchase test unit, machine must be returned to HECO-
authorized dealer in salable condition within 30 days of the end of the trial. Costs to return
equipment to salable condition will be participant's responsibility, but shall only include
costs attributable to damage caused by Participant.
End of Trial - Product Participant has opportunity to purchase this test unit from HECO-authorized dealer.
Purchase Warranty
Upon purchase, a 13 -month manufacturer warranty against material defects due to faulty
manufacturing will apply, subject to registration within 30 days of purchase.
Termination of HECO reserves the right to terminate this agreement and remove equipment from
Agreement Participant's operation at any time if operation is deemed unsafe according to HECO
operators manual. HECO or Participant may terminate agreement if any conditions within
the test plan are not satisfactorily met.
Reference
Participant agrees to serve as a reference for HECO Xzalt (either public or private).
Agreed & Accepted
OCT 0 5 2016
oo* &I/4c
"...de .4
aylQ.uipment Co.r_nQ.a_a�c Date
ote9/& c/02,72.
Hello