Loading...
HomeMy WebLinkAbout20170905.tiffUSE BY SPECIAL REVIEW (USR) APPLICATION DEPARTMENT OF PLANNING SERVICES * 1555 N. 17TH AVENUE * GREELEY, CO 80631 www.weldaov.com * 970-353-6100 EXT 3540 * FAX 970-304-6498 FOR PLANNING DEPARTMENT USE: AMOUNT $ APPLICATION RECEIVED BY DATE RECEIVED: 1/19/17 CASE # ASSIGNED: USR17-0003 PLANNER ASSIGNED: DA Parcel Number: 1 0 5 7_ 1 2_ 3 _0 0_ 0 0 5 Address of site: Legal Description: Lot A Red Ex 4599 (*A 12 *lit number on Tax LD. information, obtahaiale at w w w .w eldgov.com). Section: 12 Township: 4 N Range: 66 W Zone District: Ag Acreage: 6.94 Floodplain:OYON Geological Hazard:CWY N Airport Oreriay:OYON FEE OWNER(S) OF THE PROPERTY: Name: Delbert & Rosalie Wertz Company: Phone #: 970-396-4554 Email: Street Address: 17491 County Road 46 City/State/Zip Code: La Salle, CO. 80645 Name: Company: Phone #: Street Address: City/State/Zap Code: Name: Company: Phone #: Email: Street Address: _ CityfState/Zp Code: Email: APPLICANT OR AUTHORIZED AGENT (See belowAuthorization mustacconpanyafl applications signed byAuthorizedAgents) Name: Jeff Winter Company: Winter Seed & Ag Services LLC Phone #: 970-573-0840 Email: jeff.winter@plantpioneer.com Street Address: 1727 19th ave City/State/Zip Code: Greeley, CO. 80631 PROPOSED USE: Agricultural seed sales/storage and boat, R.V., trailer storage facility. l (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property mustsign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating that the signatory has to legal authorityto sign for the corporation. SignsAmer or Authorized Agent Signature: Owner or Authorized Agent Date Jeff Winter 1 7 1 at Print Name Print Name Rev 412016 DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 PHONE: (970) 353-6100, Ext. 3540 FAX: (970) 304-6498 AUTHORIZATION FORM I J efrrei 0 id.-n3s-r represent.ik,442ERT 9i AS ./E tdr or he property (AgentlApplicant) (Owner) Z located at .4- Pec Ex cs-1 q LEGAL DESCRIPTION: SEC 1 Z TWN f III RNG G6 4) SUBDIVISION NAME: AyA- LOT BLK I can be contacted at the following Home 970 MI6 -1O,Cet Email: Work 170- S 7 - Cie?" er'1aN_,,f ,der. co AI The property owner can be contacted at the following Home 970- P'q-2P8/ Work 17C -- fv - Email: 00 e pcop. f TZ/.0 .11NE-T Correspondence emailed to: (Check one) DATE I2 -7F~ 267/rP OWNER'S SIGNATURE ❑ Agent/Applicant ❑ Property Owner USE BY SPECIAL REVIEW (USR) QUESTIONNAIRE REPLIES FOR JEFF WINTER Answer the following questions on a separate sheet. If a question does not pertain to your use, please respond with "not applicable". For assistance with some of these questions see this website: http://www.co.weld.co.us/Departments/PlanningZoning/LandUseApplicationsAssistance/ApplicationAssistance.html Planning Questions: Planner on Call 970-353-6100 x3540 1. Explain, in detail, the proposed use of the property. The project will consist of an agricultural seed business and storage facility. A portion of the site will be outside storage and the rest will be in buildings planned for the site. It is anticipated that the outside storage will consist of RV's and boats but could consist of Construction Equipment and Commercial Vehicles such as trailers and Semi Trucks. There could be up to 200 spaces for RV's outside. There will be up to 125 spaces for RV's inside the buildings 2. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 22 of the Comprehensive Plan. The project is being located on farmland that has been previously dried up. The seed business portion of the facility will directly serve neighboring Ag uses. 3. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 23 (Zoning) and the zone district in which it is located. Per section 23-3-40 the location can be used for business via a Use by Special Review process. 4. Describe what type of land uses surround the site. Explain how the proposed use is consistent and compatible with surrounding land uses. The proposed facility will be surrounded on all sides by farm land. The northwest border is formed by the Union Pacific Railroad and HW 85 north west of the Railroad. 5. What are the hours and days of operation? (e.g. Monday thru Friday 8:00 a.m. to 5:00 p.m.) The storage facility will be open 7 days a week and have hours from 6:00 a.m. to 10:00 p.m. The seed dealership will also be open 7 days a week during planting season (8 weeks a year in the spring) but most times of the year will not have regular office hours. Planting season will be from April 15t to May 31't. During this time period the office will be open 7 days a week from 6:00 a.m. to 8:00 p.m. 6. List the number of full time and/or part time employees proposed to work at this site. There are four partners in the ownership of the facility. Most times of the year there will be one person on site maximum. During planting season there may be up to 3 of the ownership partners on site to assist customers. 7. If shift work is proposed include the number of employees per shift. No shift work is planned 8. List the number of people who will use this site. Include contractors, truck drivers, customers, volunteers, etc. The storage facility is estimated to have possibly 20 people a day visit the site. The seed facility the peak times of the year will have up to 10 people a day visit the site. 9. If this is a dairy, livestock confinement operation, kennel, etc., list the number and type of animals. No animals are planned for the site. 10. Describe the type of lot surface and the square footage of each type. (e.g. asphalt, gravel, landscaping, dirt, grass, buildings) The lot drive surfaces will be road base. A detention pond will account for each type of impervious surface. 11. How many parking spaces are proposed? How many handicapped (ADA) parking spaces are proposed? The site will have (3) spaces available for employees and customers in addition to a loading/ unloading area that most seed customers will use for parking. There will be one ADA space provided. 12. Explain the existing and proposed landscaping for the site. There is no current landscaping on the site. The proposed site will have some landscaping around the perimeter and the detention pond. The landscaping will consist of native grasses and possibly some evergreen trees. Please see the USR map for the landscaping hatch to see location of Landscaping 13. Describe the type of fence proposed for the site (e.g. 6 foot chain link with earth tone slats) The fencing will be 6' chain link with no slats to discourage theft. 14. Describe the proposed screening for all parking and outdoor storage areas. If the site is located in a floodplain outdoor storage is restricted. The site is not planned to be screened to discourage theft at the facility. The property is not in a flood plain. 15. Explain any proposed reclamation procedures when termination of the Use by Special Review activity occurs. There will be no reclamation required for the facility if the USR termination occurs 16. Who will provide fire protection to the site? LaSalle Fire Protection 17. List all proposed on -site and off -site improvements associated with the use (e.g. landscaping, fencing, buildings, drainage, turn lanes, etc.) and a timeline of when you will have each one of the improvements completed. The central buildings and the northern half of the eastern building are the only items shown on the site plan that may not be built with the initial construction. The remainder of the facility will be completed prior to occupancy. (Including gravel surface to provide emergency vehicle access to all the buildings) Engineering questions: 970-353-6100 x3540 1. Describe how many roundtrips/day are expected for each vehicle type: Passenger Cars/Pickups, Tandem Trucks, Semi-Truck/Trailer/RV (Roundtrip = 1 trip in and 1 trip out of site) Passenger Cars/Pickups for all uses up to 15 trips a day. Pickups with Trailers for all uses up to 5 trips a day. Tandem Trucks for all uses up to 2 trips a month. Semi Truck/RV for all uses up to 10 trips a month. 2. Describe the expected travel routes for site traffic. The majority of the traffic will come from HW 85 via 35 and then 46. Customers west of HW 85 will probably go south to CR 42 to use the stoplight to cross HW 85 and then north on CR 35. 3. Describe the travel distribution along the routes (e.g. 50% of traffic will come from the north, 20% from the south, 30% from the east, etc.) 70% of the traffic will access the site via HW 85. The remainder will access the site from CR 35 from the south and CR 46 from the east. 4. Describe the time of day that you expect the highest traffic volumes from above. 9:00 am to 10:00 am. 5. Describe where the access to the site is planned. The access point to the site will be off of CR 46 along the eastern side of the site. 6. Drainage Design: Detention pond summarized in a drainage report is required unless the project falls under an exception to stormwater detention requirements per code section 23-12-30 F.1. A. Does your site qualify for an exception to stormwater detention? If so, describe in a drainage narrative the following: 1. Which exception is being applied for and include supporting documentation. N/A 2. Where the water originates if it flows onto the property from an offsite source. Offsite flows originate from the RR ROW 3. Where it flows to as it leaves the property. It is conveyed in the on -site swales to detention pond where it will be released undetained 4. The direction of flow across the property West to East 5. If there have been previous drainage problems with the property N/A B. Does your site require a stormwater detention pond? If so, the following applies: 1. A drainage report summarizing the detention pond design with construction drawings and maintenance plan shall be completed by a Colorado Licensed Professional Engineer and adhere to the drainage related sections of the Weld County Code. Included 2. The drainage report must include a certification of compliance stamped and signed by the PE which can be found on the engineering website. Stamped Certificate of Compliance will be provided with final report. 3. A general drainage report guidance checklist is available on the engineering website. More complete checklists are available upon request. Noted Environmental Health questions: 970-304-6415 x2702 1. What is the drinking water source on the property? If utilizing a drinking water well include either the well permit or well permit application that was submitted to the State -Division of Water Resources. If utilizing a public water tap include a letter from the Water District, a tap or meter number, or a copy of the water bill. A Central Weld Water Tap will be applied for. 2. What type of sewage disposal system is on the property? If utilizing an existing septic system provide the septic permit number. If there is no septic permit due to the age of the existing septic system, apply for a septic permit through the Department of Public Health and Environment prior to submitting this application. If a new septic system will be installed please state "a new septic system is proposed". Only propose portable toilets if the use is consistent with the Department of Public Health and Environment's portable toilet policy. A new septic system is planned for the facility. 3. If storage or warehousing is proposed, what type of items will be stored? The seed business will store seeds only. No fertilizers or other ag chemicals. The storage facility could store RV's, boats, cars, trucks, trailers, ag equipment, construction equipment, semi trucks and semi trailers. 4. Describe where and how storage and/or stockpile of wastes, chemicals, and/or petroleum will occur on this site. There will be a dumpster planned for the site to handle normal wastes. No other chemicals or petroleum wastes are anticipated to be required to be removed. 5. If there will be fuel storage on site indicate the gallons and the secondary containment. State the number of tanks and gallons per tank. There will be no fuel storage on site. 6. If there will be washing of vehicles or equipment on site indicate how the wash water will be contained. There will be no washing of vehicles or equipment on the site 7. If there will be floor drains indicate how the fluids will be contained. There will be no floor drains in any of the buildings 8. Indicate if there will be any air emissions. (e.g. painting, oil storage, etc.) Not applicable 9. Provide a design and operations plan if applicable. (e.g. composting, landfills, etc.) Not applicable 10. Provide a nuisance management plan if applicable. (e.g. dairies, feedlots, etc.) Not applicable 11. Additional information may be requested depending on type of land use requested. Building questions: Jose Gonzalez 970-353-6100 1. List the type, size (square footage), and number of existing and proposed structures. Show and label all existing and proposed structures on the USR drawing. Label the use of the building and the square footage. The seed business will initially be a 40' x 100' warehouse facility with an additional 20' x 50' office along one side. The storage facility buildings will be open on one side (similar to a carport) and be approximately 9600 square feet. The future buildings on the map will be pole barn type buildings up 15,000 square feet in size (23,000 sq ft total of future buildings) but fire walls may be required to eliminate the need for sprinkling. The future 40' x 200 sq ft building and the future 50' x 300' building will be used for RV Storage 2. Explain how the existing structures will be used for this USR? Not applicable 3. List the proposed use(s) of each structure. Please see #1 Additional Response to comment #1 the 200' oil and gas setbacks shown are the only ones that reach the boundary of the USR Notice of Inquiry Development within an Intergovernmental Agreement Urban Growth Boundary Date of Inquiry 10/13/16 Town Referred to: LaSalle Name of Person Inquiring Jeff Winters Property Owner Derek and Rosalie Wertz Planner Diana Aungst Legal Description Lot A of RE -4599 PT SW4 12 4 66 Legal Parcel # 105712300005 Major Crossroads CR 35 and CR 46 Type of Inquiry Seed dealership and RV Storage The above person inquired about developing a parcel of land inside your designated intergovernmental Agreement Urban Growth Boundary. This person has been referred to your community by Weld County Planning to discuss development options on this site, Weld County Comments: Do you wish to annex this property? Town/City Comments: Ahn,Q.11.a1or61— Z.-IV-DU( \L W C,A okJ I2--13~He Signature of Weld County Planner c Signature of Town/City Representative It is the applicant's responsibility to return the completed form to Weld County. Weld County Planning Department 1555 N 17" h Ave. Greeley, Co 8063.1 - (970) 353.6100, ext. 3540 - (970) 304-6498 Fax FOR COMMERCIAL SITES, PLEASE COMPLETE THE FOLLOWING INFORMATION BUSINESS EMERGENCY INFORMATION: Busine Name: winter Seed & Ag Services LLC Address:1727 19th ave Business Owner:Jeff Winter Phone: 979-573-994° City, ST, Zip: Greeley, CO. 80631 Phone: 970-573-0840 Home Address: 1727 19th ave City, ST, Zip: Greeley, CO. 80631 List three persons in the order to be called in the event of an emergency: NAME TITLE ADDRESS PHONE Jennifer Winter property co-owner 1727 19th ave. Greeley, CO. 80631 970-302-4027 Michelle Fried property co-owner 1559 41st ave. Greeley, CO. 80634 970-302-4007 Craig Fried property co-owner 1559 41st ave. Greeley, CO. 80634 360-460-5041 Business Hours: Days: Type of Alarm: None Burglar Holdup Fire Silent Audible Name and address of Alarm Company: N/A Location of Safe: N/A MISCELLANEOUS INFORMATION: Number of entry/exit doors in this building: 2 Location(s): South end of seed shed and south end of office. Is alcohol stored in building? NIA Location(s): Are drugs stored in building? N/A Location(s): Are weapons stored in building? N/A Location(s): The following programs are offere programs of interest. a public service of the Weld Coun Physical Security Check UTILITY SHUT OFF LOCATIONS. Main Electrical: unknown at time of application riffs Office. Please indicate the Crime Prevention Presentation Gas Shut Off: unknown at time of application Exterior Water Shutoff: unknown at time of application Interior Water Shutoff: unknown at time of application Weld County Treasurer Statement of Taxes Due Account Number 8.4786507 Parcel 105712300005 Legal Description Situs Address PT SW4 12-4-66, LOT A REC EXEMPT RE -4599 Account: R4786507 WERTZ DELBERT E 17491 COUNTY ROAD 46 LASALLE, CO 80645 Year Tax Interest Fees Payments Balance Tax Charge 2016 $2.62 $0.00 $5.00 $0.00 $7.62 Total Tax Charge $7,62 Grand Total Due as of 01/10/2017 $7.62 COLLECT $5.00 Tax Billed at 2016 Rates for Tax Area 0140 - 0140 Authority WELD COUNTY SCHOOL DIST RE1 NORTHERN COLORADO WATER (NC CENTRAL COLORADO WATER (CCw CENTRAL COLORADO WATER SUED LASALLE FIRE AIMS JUNIOR COLLEGE HIGH PLAINS LIBRARY WEST GREELEY CONSERVATION Mill Levy 15.8000000* 16.9560000 1.0040400 2.0040400 1.5830000 5.1540000 6.3080000 3.2710000 0.4140000 Amount Values Actual Assessed $0,80 AG -DRY FARM LAND $145 $40 $0.85 AG -WASTE LAND $2 $10 $0.05 Total $147 $50 $0.10 $0.08 $0.25 $0.31 $0.16 $0.02 Weld County Treasurer Pursuant to the Weld County Subdivision Ordinance, the attached Statement(s) of Taxes Due, issued by the Weld County Treasurer, are evidence of the status as of this date of all property taxes; special assessments and prior tax liens attached to this (these) account(s). Signed: Current year's taxes are due but not delinquent. Date: I-ja` I7 JEFF WINTER USR 17-0003 MAP CR 46 LASALLE, WELD COUNTY, COLORADO CR 46 10 CC U %I 2 SITE � U CR 46 co VICINITYMAP PLANNING COMMISSION CERTIFICATION This is the certify that the Weld County Planring Commission has certified and does hereby recommend to the Board of County Commissioners_ Weld County Colorado, for its confirmation, approval and adoption this Site Specific Development Plan and Use by Special Review as shown and described thereon this day of 20 Chair_ Weld County Planning Commission BOARD OFCOUNTY COMMISSIONERS CERTIFICATION This is to certify that the Board of County Commissioners. Weld County. Colorado. does hereby confirm and adopt this Site Specific Development Plan and Use by Special Review and Development Standards as shown and described hereon this day of 20 Chair, Board of County Commissioners ATTEST: Weld County Clerk to the Board BY: Deputy Clerk to the Board Dated: PROPERTY OWNER'S CERTIFICATION The undersigned mafor property ownerls) do hereby agree to the Site Specific Development Plan and Use by Special Review Development Standards as described hereon this day of 20 Signature Signature / / RU \NATE NOFE DIRECTION / \ W W W W W W W W W / / +✓ /W w +✓ w W 4' w +✓ W / _�--�,"- W W W W W W W w / / 55 / / W / / / / / / / 55 Y W J 47 W J, W Z. W Y W W. �ww ,4,/www�WWw4W QP FW W W W 4 w W W Ji w W lW W W W W W W i o W W 'W W c W W �Y W W W W W W W wB0&J� AGE 34,55 W wO W W w i \w W W W W 41 /144/1 393w W Wcy) LEGAL DESCRIPT ON LO "A" RECX 1 7-001 PART OF SW 1/4 O- .SEC 12 4N R 66W WILD COUNTY COLORADO W i W 4 w W 44 41 Y W W W W W W YE 4` C0UNTYRD-46 _ (GRAVEL SURFACE) Q W — w W TANK BATT RY �CCESS ROM P17-00070 1 T # 0 50 100 150 LEGEND SWALE PROPERTY LINE EDGE ROW CULVERT PROPOSED 6' FENCE EXISTING FIBER OPTIC ---T EXISTING GAS LINE -GAS SEEDED LANDSCAPE CONCRETE SURFACE GAS GAS DETENTION POND MIN VOLUME = 51,138 CU FT NO BUILD, PARKING OR STORAGE AREA DRAWN FOR: w w cc O wQ CC Thu j 1727 19TH AVE GREELEY, CO 80631 WERNSMA N ENGINEERING ��1 3944986 Pages: 1 of 3 07/02/2013 02:19 PM R Fee:$21.00 Steve Moreno: Clerk and Recorder. Weld County. CO 11111�r11 II III Exhibit "A" PIPELINE RIGHT-OF-WAY GRANT FOR AND IN CONSIDERATION OF THE SUM OF Ten and More ($10.00+) DOLLARS for the pipelines to be constructed under the terms hereof, to be paid after a survey establishing the route of the lines has been completed, and before construction is commenced, IIWE, Delbert E. Wertz and Rosalie K. Wertz, 17491 Weld County Road 46, LaSalle, Colorado 80645 hereinafter referred to as "Grantor" (whether one or more) does hereby grant, sell, convey, and warrant to DCP Midstream. LP, its successors and assigns, hereinafter referred to as "Grantee', the right, privilege and easement, Seventy-five (75) feet in width for a temporary easement for initial construction for these lines only and a permanent easement of Fifty (50) feet in width, for the purpose of two pipelines and from time to time, operating, inspecting, maintaining, protecting, repairing, replacing, and removing two pipelines or other appurtenances, for the transportation of oil, gas, petroleum products, water, and any products and derivatives of any of the foregoing, and any combinations and mixtures of any of the foregoing, upon and along a route through the following described land located in WELD County, State of COLORADO, to wit: Township 4 North. Range 66 West, 6th P.M. Section 12: Part of the SW/4, more particularly described as Lots A and B of Recorded Exemption RE -4599 Said temporary construction easement and permanent pipeline easement being more particularly described on Exhibit "B" attached hereto and made a part hereof. Together with the right of ingress and egress to and from said pipelines, on, over, and across said land and adjacent land of Grantor. It is agreed that the pipelines to be laid under this grant shall be constructed a minimum depth of forty-eight (48) inches below the surface of the ground to permit normal cultivation at the time of construction, and Grantor shall have the right to fully use and enjoy the above described premises subject to the rights herein granted. Grantee agrees to restore the surface and subsurface to its original contour as nearly as practicable and will replace or rebuild all damaged parts of all drainage systems, irrigation systems or other property of Grantor, all to the reasonable satisfaction of Grantor. Grantee also agrees to reseed those lands disturbed with a native grass blend or blend requested by Grantor. Grantee shall have the right to clear all trees, undergrowth and other obstructions from the herein granted permanent right-of-way, and Grantor agrees not to build, construct or create any buildings, structures or engineering works on the herein granted right-of-way that will interfere with the normal operation and maintenance of said lines. Grantee agrees to pay to the owners and to any tenant, as their interests may be, any and all damages to crops, timber, fences, drain tile, or other improvements on said premises that may arise from the exercise of the rights herein granted; provided, however, that after the pipelines have been constructed hereunder, Grantee shall not be liable for damages caused on the easement by keeping said easement clear of trees, undergrowth, and brush in the exercise of the rights herein granted. Any payment due hereunder may be made direct to the said Grantor or any one of them. The initial consideration paid by Grantee to Grantor includes any and all damages that may be sustained by original construction of the pipelines within the easement area, including without limitation, cutting trees and damages to surface, fences or any other property owned by Grantor. The grant is made in consideration that Grantee, its successors and assigns, shall hold Grantor, its successors and assigns, harmless from damages or liability of any character which may arise out of the exercise of the rights herein granted. The terms, conditions, and provisions of the contract shall extend to and be binding upon the heirs, executors, administrators, personal representatives, successors, and assigns of the parties hereto. 3944986 Pages: 2 of 3 07/02/2013 02:19 PM R Fee:$21.00 Steve Moreno Clerk and Recorder- Weld County CO 1111INP,Ii4KZl4+'ti:I 14i:144Ptiea11iniTi1:.V.i1,ti.11Ili TO HAVE AND TO HOLD said easement, rights, estates, and privileges unto Grantee, its successors and assigns, as long as said easement is used for the purposes granted herein. IN WITNESS WHEREOF, Grantor has executed this instrument this signed, sealed, and delivered in the presence of: Delbert E. Wertz STATE OF COLORADO SS. COUNTY OF f�/� Art( day of r, J , 2011 4-)624/.6a n Rosalie K. Wertz ACKNOWLEDGEMENT Before Me, the undersigned, a Notary Public in and for said County and State, on this day personally appeared, l�el.6Gt lot0,44x tom.,/ iaS& e , known to me to be the same person(s) who executed the within and foregoing instrument, and acknowledged to me fey executed the same ase;t free and voluntary act and deed for the purposes and consideration therein expressed. 451 Given Under My Hand and Seal of Office, this day of My commission expires: '41-.42- /1/ ROBERT E BW, II NOTARY PUBUC STATE OF COLORADO • , A.D. 2011. CP..(A7/0 Notary Public • i WI Z ml N Z N W C1 Jd o� z a *6.4 C5 10 pn 0 r - W Wr {,� 4.4 y rep' \\ ��N \ \\ Z z 0 3944986 Pages: 3 of 3 07/02/2013 02:19 PM R Fee:$21.00 Steve Moreno: Clerk and Recorder Weld County: CO EDI INFJPV:ILYVINIIIII , IO, iildi itit Jll\1 !114 11111 -k w ,tZ'6t9Z lM .6t,9Z.00 N M N a- • 3 10 E to �g 0 ,.3 I I I C' m O) eP Q W CC W e PI re, co w Is E P91 iI g - ills 11!! : : sli: 12 2 s tfo !III e Awe igi III: 111 ; v14!Wei el Pi ag: b Pgi gas e • Pi ei d DATE: 3/2/2017 TO: Diana Aungst FROM: Jeff Winter RE: USR 17-0003 Site Plan Changes Diana, The original USR Permit submission included approximately five (5) acres of Union Pacific Railroad property. This acreage was intended for outdoor RV storage parking. The new site plan reflects the Railroad property has been deleted; it will not be used for storage or any other use affiliated with our Permit. The revised site plan includes one (1) 40' x 100' seed shed, as well as one (1) 40' x 240' three - sided RV storage building for Phase I construction. The intent is to use the open space for outdoor RV storage parking, yielding 125 spaces, until additional buildings are constructed in future construction phases. The future construction of the site may include the following: one (1) 50' x 300'; two (2) 40' x 240'; and one (1) 40' x 200' three -sided RV storage buildings. Regards, Jeff Winter Winter Seed & Ag Services LLC 970-573-0840 WERNSMAN mit ENGINEERING, INC. 1011 42nd STREET • EVANS, CO 80620 Phone (970) 353-4463 Fax (970) 353-9257 January 10, 2017 Hayley Brown Drainage Engineer Weld County Planning Dept Greeley CO 8O632 RE: Preliminary Drainage report and plan Winter Seed and Storage Facility Dear Ms. Brown, Attached is the Preliminary Drainage Report and Plan for the new Winter Seed and Storage Facility. This report addresses both the on -site and off -site hydrology that affects, or is affected by the proposed development. If you have any further questions or comments regarding this matter, please contact this office. Sincerely, Eric Wernsman P.E. " I hereby certify that this report for the final drainage design for the new Winter Seed and Storage Facility was prepared by me (or under my direct supervision) in accordance with the provisions of the Weld County Storm Drainage Criteria for the owners thereof" Registered Professional Engineer State of Colorado No. 33371 Index Page 1-10 DRAINAGE REPORT 11 5 YR AND 100 YR RAINFALL DEPTHS FROM GREELEY CRITERIA 12 BASIN AND SUB -BASIN IMPERVIOUSNESS CALCS 13 5-YR PEAK RUNOFF FOR HISTORIC CONDTIONS 14 100-YR PEAK RUNOFF FOR SUBBASIN S1 15 100-YR PEAK RUNOFF FOR SUBBASIN S2 16 100-YR PEAK RUNOFF FOR SUBBASIN S3 17 100-YR PEAK RUNOFF FOR SUBBASIN S4 18 100-YR PEAK RUNOFF FOR SUBBASIN S5 19 100-YR PEAK RUNOFF FOR SUBBASIN S6 20 100-YR PEAK RUNOFF FOR SUBBASIN S7 21 100-YR PEAK RUNOFF FOR THE ENTIRE SITE 22 100-YR PEAK RUNOFF FOR OS1 BASIN 23 100-YR PEAK RUNOFF FOR OS1 BASIN 24 SWALE CALCULATIONS SECTION A -A 25 SWALE CALCULATIONS SECTION B -B 26 SWALE CALCULATIONS SECTION C -C 27 SWALE CALCULATIONS SECTION D -D 28 SWALE CALCULATIONS SECTION E -E 29 SWALE CALCULATIONS SECTION F -F 30 SWALE CALCULATIONS SECTION G -G 31 SWALE CALCULATIONS SECTION H -H 32 SWALE CALCULATIONS SECTION I -I 33 SWALE CALCULATIONS SECTION J -J 34 SWALE CALCULATIONS SECTION K -K 35 SWALE CALCULATIONS SECTION L -L 36 DETENTION VOLUME REQ'D (MODIFIED FAA METHOD) 37 DETENTION VOLUME PROVIDED 38 ORIFICE PLATE FOR 5 YR HISTORIC RELEASE RATE 39 WQCV ORIFICE AND VOLUME REQ'D 40 OVERFLOW CALCULATIONS 41-42 PUMP SPECIFICATIONS 43-44 CULVERT AND RIP RAP CALCULATIONS 45-46 RUNDOWN RIP RAP CALCULATIONS 47-50 NRCS SOIL MAP AND INFORMATION 51 FEMA MAP 52 VICINITY MAP 53 REFERENCES General Description: The proposed site is located on the north side of the Weld County Road 46 (WCR 46) Right -of -Way. The site is south east of Union Pacific Railroad Row which is along the east side of State Highway 85. The proposed site is located on existing dry land farm ground in the south west % of Section 12 Township 4 North, Range 66 West of the 6t" Prime Meridian. The Western Mutual Ditch is about 1200 feet east of the project site. The Farmers Independent Ditch is about 1900 feet northwest of the site. No other major waterways are located near or adjacent to the site. The entire property contains 6.95 acres, but the plan is for the business to lease 3.4 acres of Railroad ROW and construct a road base surface on the ROW. That offsite road base surface will be accounted for in the drainage and detention calculations. The site is currently dry land farm land. A detention pond with a water quality control volume is proposed to hold developed flows from the proposed developed portion of the site and release at a reduced 40 -hour drain time and a five-year historic rate, respectively. The ground cover on the existing site varies because it is dry land farm land. The soil types present on the site are Olney Fine Sandy Loam, 0 percent to 1 percent slopes (Index Number 46 shown on the map) and Vona Sandy Loam, 3 to 5 percent slopes, (Index Number 75). The slight majority of the site is Olney Fine Sandy Loam which is a Hydrologic Soil Type "B" which is used in the calculations. The existing site has a poorly defined ridgeline running north south that is in the western half of the site that splits flows to run east and west. The overall drainage of the area however runs from the south west to the north east. The majority of the runoff generated by the proposed development will be collected via a swale or flow overland toward the on -site detention pond. The remainder of the un-developed on -site flows will sheet flow un-detained to the northeast. This area will not contain proposed improvements. The detention pond is located along the southern side of the property and will be pumped to the eastern side of the site where it will drain as sheet flow to the north east. Drainage Basins and Sub -Basins: There is no Weld County Master Drainage Plan for this site at the current time. The closest major basin is the South Platte River Basin, which lies approximately 4.5 miles to the north west. This project site is not located within the South Platte River 100 -year floodplain. The site is located on FEMA map 8123C1730E. The offsite flows draining toward the site from the south are mainly directed away from the site by CR 46. CR 46 will direct flows from the south west to the east. The Union Pacific also acts as a barrier that prevents flows from the west from entering the site by directing them north east. The areas east of the site will drain north east away from the site. There is small amount of Railroad ROW east of the tracks and west of the site that will drain onto the site. Those areas are designated as basins O51 and OS2 and are accounted for in the drainage design. Historically the site slopes generally to the north east at approximately a 0.5% slope. In the current undeveloped condition the five-year runoff rate is 2.78 2- cubic feet per second (cfs). This historic runoff rate includes the offsite basins that will be leased from the Railroad and developed as road base surfaces (S1 and S2). The detention facilities will be designed to include the runoff from the site and the offsite basins S1 and 52 that will be leased and developed as part of this project. Sub -basin S1 contains 2.93 acres and is comprised of a portion of the railroad row and a about half of the farthest west buildings. The imperviousness of the basin is 43% and the 100 -year runoff rate is 9.98 cubic feet per second (cfs). Sub -basin S2 contains 1.97 acres and is north east of S1. S2 is comprised of the remainder of the railroad row and another portion of the farthest west buildings. The imperviousness of the basin is 44% and the 100 -year runoff rate is 6.73 cfs. Sub -basin S3 contains 1.46 acres and is east of S2. S3 is comprised of a portion of the buildings and road base surfaces. The imperviousness of the basin is 55% and the 100 -year runoff rate is 5.17 cfs. Sub -basin S4 contains 0.91 acres and is east of S1. S4 is comprised of a portion of the buildings and road base surfaces. The imperviousness of the basin is 54% and the 100 -year runoff rate is 4.16 cfs. Sub -basin S5 contains 1.48 acres and is east of 54. S5 is comprised of the central portion of the buildings and road base surfaces. The imperviousness of the basin is 49% and the 100 -year runoff rate is 5.42 cfs. Sub -basin $6 contains 0.95 acres and is south of 54. $6 is mainly comprised of the landscaped detention pond and a small area of road base surface. The imperviousness of the basin is 6% and the 100 -year runoff rate is 3.27 cfs. Sub -basin 57 contains 0.45 acres and is east of 56 and 55. S7 is mainly comprised of the landscaped detention pond and a small area of road base surface. The imperviousness of the basin is 15% and the 100 -year runoff rate is 1.37 cfs. Including S1 and S2 the entire site contains 10.25 acres. The overall imperviousness of the basin is 42% and the 100 -year runoff rate is 29.81 cfs. The Offsite Sub -basin O51 contains 0.81 acres and is west of Si. O51 is undeveloped Railroad ROW that will run onto the site. The imperviousness of the basin is 2% and the 100 -year runoff rate is 2.18 cfs. The Offsite Sub -basin O52 contains 0.50 acres and is west of 52.O52 is undeveloped Railroad ROW that will run onto the site. The imperviousness of the basin is 2% and the 100 -year runoff rate is 1.35 cfs. Drainage Design Criteria: The City of Greeley one -hour rate for the five-year and 100 -year storm events, were used for the project due to the close proximity. A one hour rainfall depth of 1.49 inches and 2.78 inches were used for runoff calculations. The rational method was used to calculate runoff and release rates. The detention pond was sized using a 5 -year historic release rate. A water quality capture volume is designed within the pond to release minor storms over a 40 -hour period to maintain water quality. The on -site swales are sized to pass the 100 - year event. The runoff for specific design points was calculated by inputting the area, imperviousness, soil type, one hour precipitation values, slope, length of travel and conveyance into the peak runoff spreadsheet. Please see the corresponding peak runoff and feature design for each point. The release rate and developed runoff amounts were calculated using the rational method. The detention pond volume was determined using the Modified FAA Method with one exception. The discharge rate did not use the soil type value. The discharge rate was determined by finding the total historic runoff rate for the site and then dividing by the site area per Weld County recommendations. This value was then input into the detention pond spreadsheet to determine the volume required. Drainage Facility Design: The 100-yr storm volume required by using the Modified FAA method was determined to be 51,823 cubic feet. With a pond outlet invert of 4706, the 100 - year high-water elevation is 4712. The available volume provided is approximately 57,357 cubic feet. The water quality capture volume (WQCV) can be included in this volume per the Weld County Addendum to the Urban Drainage Manual. The minimum WQCV allowed for the site is 0.193 acre-feet. (8407 cubic feet) The proposed detention outlet has an initial orifice plate to provide water quality capture volume with one 1-1/8" diameter orifice to release the water quality capture volume runoff. The top of the orifice plate is set at elevation 4708.12 to ensure that once the water quality volume is captured the storm water spills into the next stage of the inlet. The second orifice plate with a 4" high opening releases flow to a 12 -inch diameter corrugated metal pipe (CMP) that empties into a 4' diameter manhole that has three Dayton 4LE17 grinder pumps that will have the combined capacity to pump 2.7 cfs. The pumps will empty into a single 10" PVC pipe that will carry flow to the east property line. Please see the detail for further information. A 20' concrete flow leveler shall be placed at the end of the outlet pipe to convert the point discharge into a more historic sheet flow. An emergency spillway is designed in the detention pond berm to allow on - site flows to leave the detention pond in the event that the pond outlet is clogged. The emergency overflow is provided at elevation 4712. The spillway base shall be a minimum of 35 feet wide and will limit the flow depth to 5-1/2" inches at a discharge rate of 33.34 cubic feet per second. Please refer to the appendix for the calculations regarding the spillway. A swale is designed along the northwest side of the property in Sub -basin S1 that collects flows from S1 and OS1 (12.16 cfs). This swale is designated as Cross -Section A -A in the design calculations and on the drainage plan and has a slope of 0.3%. Using a manning's "n" of 0.03 for a gravel swale, the resulting 100 - year event water depth is 0.55 feet and the Froude Number is 0.39. The velocity of the flow is 1.15 feet per second. The swale provides a minimum of 8" of freeboard to the building elevations. The swale outfalls into Cross- Section B -B. Cross Section B -B has a slope of 0.5%. Sec B -B again collects the flow from S1 and OS1 (12.16 cfs). Using a manning's "n" of 0.03 for a gravel swale, the resulting 100 -year event water depth is 0.84 feet and the Froude Number is 0.53. The velocity of the flow is 1.96 feet per second. The swale provides a minimum of 8" of freeboard to the building elevations. The swale outfalls into Sec G -G. Cross Section C -C has a slope of 0.35%. Sec C -C collects the flow from S2 and O52 (8.08 cfs). Using a manning's "n" of 0.03 for a gravel swale, the resulting 100 -year event water depth is 0.54 feet and the Froude Number is 0.42. The velocity of the flow is 1.28 feet per second. The swale provides a minimum of 1 foot of freeboard to the building elevations. The swale outfalls into Sec D -D. i`D Cross Section D -D has a slope of 0.35%. Sec C -C collects the flow from 52, S3 and O52 (13.25 cfs). Using a manning's "n" of 0.04 for a landscaped swale, the resulting 100 -year event water depth is 0.92 feet and the Froude Number is 0.42. The velocity of the flow is 1.89 feet per second. The swale provides a minimum of 1 foot of freeboard to the building elevations and adjacent top of berm. The swale outfalls into the eastern section of the detention pond. Cross Section E -E has a slope of 0.5%. Sec E -E collects the flow from 53 (5.17 cfs). Using a manning's "n" of 0.03 for a gravel swale (conservative since a portion of the channel is on a concrete pan), the resulting 100 -year event water depth is 0.48 feet and the Froude Number is 0.49. The velocity of the flow is 1.35 feet per second. The swale provides a minimum of 9" of freeboard to the building elevations. The swale outfalls into Sec D -D Cross Section F -F has a slope of 0.5%. Sec F -F collects the flow from 54 (4.16 cfs). Using a manning's "n" of 0.03 for a gravel swale (conservative since a portion of the channel is on a concrete pan), the resulting 100 -year event water depth is 0.41 feet and the Froude Number is 0.47. The velocity of the flow is 1.22 feet per second. The swale provides a minimum of 1 foot of freeboard to the building elevations. The swale outfalls into Sec G -G Cross Section G -G has a slope of 2.2%. Sec G -G collects the flow from 51, 54 and OS1 (16.32 cfs). Using a manning's "n" of 0.016 for a concrete section, the resulting 100 -year event water depth is 0.41 feet. (All of the flow in a 100 —year event remains on the concrete section.) The velocity of the flow is 4.81 feet per second. The swale provides a minimum of 1 foot of freeboard to the building elevations. The swale outfalls into Sec J -J in the detention pond. 7 Cross Section H -H has a slope of 0.6%. Sec H -H collects the flow from S5 (5.42 cfs). Using a manning's "n" of 0.03 for a gravel swale (conservative since a portion of the channel is on a concrete pan), the resulting 100 -year event water depth is 0.33 feet. The velocity of the flow is 1.16 feet per second. The swale provides a minimum of 6" of freeboard to the building elevations. The swale outfalls into Sec L -L in the detention pond. Cross Section I -I has a slope of 0.9%. Sec I -I collects the flow from 54 (4.16 cfs). This is conservative in nature because not all of the flow from 54 can reach I- I. Using a manning's "n" of 0.03 for a gravel swale (conservative since a portion of the channel is on a concrete pan), the resulting 100 -year event water depth is 0.5 feet. The velocity of the flow is 1.81 feet per second. Freeboard for the concrete curb section is not provided because if the channel overtops it will empty into the detention pond. The swale outfalls into Sec J -J in the detention pond. Cross Section J -J has a slope of 19%. Sec J -J collects the flow from S1, S4 and OS1 (16.32 cfs). Using a manning's "n" of 0.016 for concrete section the resulting 100 -year event water depth is 0.27 feet. The velocity of the flow is 15.59 feet per second. Freeboard for the concrete curb section is not provided because if the channel overtops it will empty into the detention pond. The section outfalls into a 16' x 16' x 18" Type "L" Rip Rap pad in the bottom of the detention pond. Cross Section K -K has a slope of 10%. Sec K -K collects the flow from S2, S3, 55, S7 and OS2 (20.04 cfs). Using a manning's "n" of 0.016 for concrete section the resulting 100 -year event water depth is 0.27 feet. The velocity of the flow is 13.56 feet per second. Freeboard for the concrete curb section is not provided because if the channel overtops it will empty into the detention pond. The section outfalls into a 16' x 16' x 18" Type "L" Rip Rap pad in the bottom of the detention pond. 8 Cross Section L -L has a slope of 20%. Sec L -L collects the flow from 55 (5.42 cfs). Using a manning's "n" of 0.016 for concrete section the resulting 100 -year event water depth is 0.25 feet. The velocity of the flow is 14.25 feet per second. Freeboard for the concrete curb section is not provided because if the channel overtops it will empty into the detention pond. The section outfalls into a 8' x 10' x 18" Type "L" Rip Rap pad in the bottom of the detention pond. Sec D -D outfalls to a 36" CMP culvert that crosses the access driveway. The culvert has the ability to pass the flow when the tail water elevation reaches 4711.8 and the head water reaches 4712 which is the detention pond high water elevation. At this elevation (4711.8) the pond has satisfied the detention requirement. The high water elevation of 4712 is used for the total detention calculations has additional volume beyond what is required. The 36" CMP culvert discharges to an 11' x 5' x 18" Rip Rap map to mitigate erosion. Once the site vegetation has been re -seeded very little maintenance should be required for site operation. Care should be taken to keep trash and debris out of inlets and pipes to prevent excess water from building up on the site. If complete blockage would occur in the detention pond outlet the water would release through the emergency spillway. If blockages occur they should be immediately cleaned. All storm water pipes shall be kept clean to maintain full capacity. 9 Conclusions: The proposed site will control developed storm water flows through an on - site detention pond. The allowable release rates from the detention pond include a water quality release rate that allows minor storm flows to release over a 40 - hour time period and a major storm release rate that is equivalent to the five-year historic runoff rate. Off -site flows that drain toward the site are directed through the property and the detention pond spillway. All of these storm water flows are conveyed off -site to the west. This report and design will meet the Weld County Code without any variances. This design should be more than adequate to prevent either on -site or off -site runoff flows from creating damage. The site is not part of any Weld County Master Drainage Plan. Please see the reference sheet for a complete list of references used for this design and report 2 -year 1.04 1.49 1.76 2.51 2.78 50 -year; 190 -year The 1DF curves were developed by distributing the one -hour point rainfall values using the factors obtained from the NOM Atlas as presented below. TABLE 3.4(1). - FACTORS FOR DURATIONS OF LESS THAN ONE HOUR Duration (minutes) 5 10 15 30 Ratio to 1 -hour Depth 0.29 0.45 0.57 0.79 l 1 The point values were then converted to intensities and plotted on Figure 3-1. The data are also presented in Tables 3-1, 3-2, and 3-3. Gf�er.-'I SA -Of y,I\ tsar C Section 3 - Page 4 I( Sub -basin Imperviousness WINTER 1/8/2017 OS1 Land Use Area (ft2) I (%) Impervious Area, Grass 35259 2 Roofs 0 90 Concrete Surfaces 0 100 Driveways, Gravel 0 40 Wghtd Avg & Total Area 35259 2 Acres 0.8 SB1 Land Use Area (ft2) I (%) Impervious Area, Grass 0 2 Roofs 8000 90 Concrete Surfaces 0 100 Driveways, Gravel 119801 40 Wghtd Avg & Total Area 127801 43 Acres 2.93 SB3 Land Use Area (ft2) I (%) Impervious Area, Grass 0 2 Roofs 19340 90 Concrete Surfaces 0 100 Driveways, Gravel 44069 40 Wghtd Avg & Total Area 63409 55 Acres 1.46 SB5 Land Use Area (ft2) I (°/0) Impervious Area, Grass 0 2 Roofs 11510 90 Concrete Surfaces 0 100 Driveways, Gravel 52964 40 Wghtd Avg & Total Area 64474 49 Acres 1.48 SB7 Land Use Area (ft2) I (%) Impervious Area, Grass 13259 2 Roofs 0 90 Concrete Surfaces 0 100 Driveways, Gravel 6553 40 Wghtd Avg & Total Area 19812 15 Acres 0.45 OS2 Land Use Area (ft2) I (%) Impervious Area, Grass 22824 2 Roofs 0 90 Concrete Surfaces 0 100 Driveways, Gravel 0 4O Wghtd Avg & Total Area 22824 2 Acres 0.5 SB2 Land Use Area (ft2) I (°/9_L 2 Impervious Area, Grass 0 Roofs 6200 90 Concrete Surfaces 0 100 Driveways, Gravel 79435 40 Wghtd Avg & Total Area 85635 44 Acres 1.97 SB4 Land Use Area (ft2) I (%) Impervious Area, Grass 0 2 Roofs 11350 90 Concrete Surfaces 0 _ 100 Driveways, Gravel 28504 40 Wghtd Avg & Total Area 39854 54 Acres 0.91 SB6 Land Use Area (ft2) I C/0) Impervious Area, Grass 36798 2 Roofs 0 90 Concrete Surfaces 0 100 Driveways, Gravel 4405 40 Wghtd Avg & Total Area 41203 6 Acres 0.95 ENTIRE SITE Land Use Area (ft2) I (%) Impervious Area, Grass 50057 2 Roofs 56400 90 Concrete Surfaces 0 100 Driveways, Gravel 335731 40 Wghtd Avg & Total Area 442188 42 Acres 10.15 CALCULATION OF -A PEAK:R₹JNOFF-USING RATIONAL METHOD Project Title: _ Catchment ID: WINTER Hi I. Catchment Hydrologic Data Catchment ID = H1 Area = 10.25 Acres Percent Imperviousness = 2.00 % NRCS Soil Type = B A, B, C, or D II. Rainfall Information I (inch/hr) = Cl P1 1(O2 + Td)"C3 Design Storm Return Period, Tr = . 5 years (input return period for design storm) C1 = 28.50 (input the value of C1) C2= 10.00 (input the value of C2) C3= 0.786 (input the value of C3) P1= 1.47 inches (input one -hr precipitation —see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = 0.08 Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 = 0,0B Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Heavy Meadow Tillage/ Field Short Pasture/ Lawns Nearly Bare Ground Grassed Swalesl Waterways LEGEND O Begiiming Flaw Direction Catchmani Boundary NRCS Land Type Conveyance 2.5 5 7 10 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ftlft input Length L ft input 500 ... 5-yr Runoff Coeff C-5 output NRCS Convey- ance input l+1/A 5.00 Flow Velocity V fps output Flow Time Tf minutes output S168 19..58 C: - 0.0050 0.08 0.16 0,35,: 0.00501::'. •- ':415 2 .3......: Sum 915 IV. Peak Runoff Prediction Rainfall Intensity at Computed To, I = 1.32 inch/hr Rainfall Intensity at Regional Tc, I = : 3.33 inch/hr Rainfall Intensity at User -Defined Tc, I = 3.33 inch/hr Computed Tc = Regional Tc = User -Entered Tc = 71.25 15.08 15.08. Peak Flowrate, Op = 1:17 cfs Peak Flowrate, Op = . 2.76 cfs Peak Flowrate, Op = 2:78 cfs I-IISTORIC.xls, Tc and Peak° 1/9/2017, 7:06 AM CALCULATION -OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: WINTER S1 I. Catchment Hydrologic Data Catchment ID= S1 Area = 2:93 Acres Percent Imperviousness = 43:00 % NRCS Soil Type = B A, B, C, or D II. Rainfall Information I (inchlhr) = C1 ' P1 !(02 + Td)"C3 Design Storm Return Period, Tr = 100 years C1 = 28.50 C2= 10.00: C3= 0.786 P1= 2.78 inches (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) (input one -hr precipitation --see Sheet "Design Info") Ill. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C 0,5t (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) illustration LEGEND Q Beginning Flew Direction Catchment Benw3arx NRCS Land Type Heavy Meadow Tillage/ Field Shod Pasture/ Lawns Nearly ' Bare Ground Grassed Swales/ Waterways Paved Areas & Shallow Paved Swales (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations: Reach ID Overland Slope S ft/ft in put Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey - anus input N/A Flow Velocity V fps output Flow Time Tf minutes output 0.0076: a003Q: 0.0050 1.83. 255 • 80 2 3 4 5 Sum IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, i = Rainfall Intensity at Regional Tc, I = Rainfall Intensity at User -Defined To, I = 4.53 inchlhr 6.77 inch/hr 6.77 inchlhr 6.31_ 1500 15.00 0.14 0.82 1.06 21.65 -5:17 - 1.26 Computed Tc = Regional Tc = User -Entered To = 28.08 12.89= 12.89 Peak Flowrate, Qp _ Peak Flowrate, Op = Peak Flowrate, Op = 6.68 cfs 9.98 cfs 9.98 cfs S1100.xls, To and PeakQ 1/9/2017, 7:06 AM 1`� .CALCULATION OF A:PEAK RUNOFF -USING RATIONAL METHOD Project Title: Catchment ID: WINTER' S2 I. Catchment Hydrologic Data Catchment ID = S2 Area = 1.97 Acres Percent Imperviousness = 44.00 % NRCS Soil Type = - B A, B, C, or D II. Rainfall Information I (inch/fir) = C1- P1 /(C2 + Td)^C3 Design Storm Return Period, Tr = 100 years (input return period for design storm) C1 = 28.50 (input the value of C1) C2= 10.00 (input the value of C2) C3= 0.786 (input the value of C3) P1= . 2.78 inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = 0.51 Overide Runoff Coefficient, C = _ 5-yr. Runoff Coefficient, C -S = Overide 5-yr, Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 0.32 .. (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Tillage/ Field Short Pasture! Lawns Nearly Bare Ground Grassed Swales/ Waterways LEGEND OB=� 'a now Direction Catchment Boundeiy NRCS Land Heavy Type Meadow Paved Areas & Shallow Paved Swales (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations: Reach ID Overland Slope S filft input Length L It input 162 5-yr Runoff Coefl C-5 output NRCS Convey- ance input N1Ac::.: Flow Velocity V fps output Flow Time Tf minutes output 22.61 5.88 0.0050 0.32 0.12 0.0030 0.0035 290 60 ..,,2 3 4 Sum 532 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 4.36 inchlhr Rainfall Intensity at Regional To, I = 6.75 inch/hr Rainfall Intensity at User -Defined Tc, I = .. 6.75 inchlhr S1200xls, Tc and PeakO 15.0O D:&2::. 0.89 15.00 1.50 Computed Tc = Regional Tc = User -Entered Tc Peak Flowrate, Qp = Peak Flowrate, Qp Peak Flowrate, Op = 30.00 12.96 12.96 4.35 cfs 6.73 cfs 6.73 cfs 119/2017, 7:06 AM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: ...:.:;: �1111NTER Catchment ID: S3 I. Catchment Hydrologic Data Catchment ID = S3 Area = . 1.46 Acres Percent Imperviousness = - 55.00 % NRCS Soil Type = B A, B, C, or D IL Rainfall Information I (inch/hr) = Cl - P1 1(C2 * Td)AC3 Design Storm Return Period, Tr = 100 years (input return period for design storm) Cl = 28.50 (input the value of C1) C2= 10,00 (input the value of C2) C3= 0.786 (input the value of C3) P1= 2.78 inches (input one -hr precipitation —see Sheet "Design Info") Analysis of Flow Time (Time of Concentration) fora Catchment Runoff Coefficient, C = 0:54 Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) ................... 5-yr. Runoff Coefficient, C-5 = 0,38: Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Type Conveyance Calculations: Reach ID Slope S Length L NRCS Convey- ance Tillage/ Field Short Pasture! Lawns 7 Nearly Bare Ground 10 LEGEr' D Ogg Firm Dirac !ion Cateh nevi Boundary Grassed Swalest Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Overland fllft input ft input 5-yr Runoff Coeff C-5 output input NIA::. Flow Velocity V fps output Flow Time Tf minutes output 0-0200 00050:: .0.0050:: 25... 0.38 0.08 5.18 1 2... 356 328:....., Sum 709 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 6.41 inch/hr Rainfall Intensity at Regional Tc, I = . 6.53 inchlhr Rainfall Intensity at User -Defined Tc, I = 6.53 Inch/hr 20.00 15:00 1.41 4:20 5.15 1.06 Computed Tc = Regional Tc = User -Entered Tc = Peak Flowrate, Qp = Peak Flowrate, Op = Peak Flowrate, Qp = 14.53 13.94 13.94 5.08 cfs 5.17 cfs 5.17 cfs S1300.xls, Tc and PeakQ 1/9/2017, 7:06 AM CALCULATION OF APEAK RUNOFF USING RATIONAL METHOD Project Title: WINTER Catchment ID: ._ S4 I. Catchment Hydrologic Data Catchment ID = 54 Area = 0.91 Acres Percent Imperviousness = . 54.0D % NRCS Soil Type = ....:..... B. A, B, C, or D II. Rainfall Information I (lnchihr) = Cl P1 /(C2 + Td)AC3 Design Storm Return Period, Tr = Cl = 28.50 C2= 10.00 C3= 0.786 P1= 100 years 2.78 inches (Input return period for design storm) (input the value of C1) (input the value of C2) (input the value of 03) (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment .............. Runoff Coefficient, C = .. G.54 Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 = '' 0.37 Overide 5-yr, Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C5.) Illustration LEGEND Being Flaw Di¢ection Catchment Boundary NRCS Land Type Heavy Meadow Tillage/ Field Short Pasture/ Lawns Nearly Bare Ground Grassed Swales/ Waterways Paved Areas 8 Shallow Paved Swales (Sheet Flow) Conveyance f 2.5 5 7 14 15 20 Calculations: Reach ID Overland 1 2 Slope S Rift input Length L ft input 35 173 36 5-yr Runoff Coeff C-5 output NRCS Convey- ance input NI/A Flow Velocity V fps output Flow Time Tf minutes output 0.0370 0.0055 0.0270 4 5.. Sum z44 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 8.48 inch/Fir Rainfall Intensity at Regional Tc, I = 714 inchfir Rainfall Intensity at User -Defined Tc, I = 8.48 inchlhr 0.37 2000 20.00 0.1'2 1.48 3.29 5.04 1.94 0.18 ................... Computed Tc = Regional Tc = User -Entered Tc = T.17 11:36: 7:17 Peak Flowrate, Qp = 4.16 cfs Peak Flowrate, Qp = . 3,50 cfs Peak Flowrate, Op = ` :416 cfs S4100.xls, To and PeakQ 1/9/2017, 7:07 AM 17 CALCULATION;OF A PEAK RUNOFF USING RATIONAL METHOD : Project Title: Catchment ID: WINTER S5 I. Catchment Hydrologic Data Catchment ID = S5.. Area = ::.:_ ...:1..48 Acres Percent Imperviousness = . . ,49.00 % NRCS Soil Type = BA,B,C,orD II. Rainfall Information I (inchlhr) = Cl* P1 l(C2 + Td)^C3 Design Storm Return Period, Tr = . 100 years (input return period for design storm) Cl = 28.50 (Input the value of C1) C2= 10.00 (input the value of C2) C3= 0 786 (Input the value of C3) P1= 2.78 inches (input one -hr precipitation -see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) fora Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr, Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.52 (enter an overide C value if desired, or leave blank to accept calculated C.) 0.34; _::: (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Heavy Meadow Tillage/ Field Short Pasture/ Lawns Nearly Bare Ground Grassed Swales/ Waterways LEGEND (� Be hud { Flew Duet lion Caluhmant Be ea.darr NRCS Land Type Conveyance 2.5 5 I�� 10 1 Calculations: 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Reach ID Overland Slope S ft/ft input Length L It input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input N/A. Flow Velocity V fps output Flow Time Tf minutes output 0.0020 25. 0.04' 1.59 11.61 3.16 13.0063: 301 5: Sum 326' IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = _ Rainfall Intensity at Regional To, I = _ Rainfall Intensity at User -Defined Tc, I = 6.36 inch/hr 7.03 inch/hr 7,03 inch/hr 20.00 Computed Tc = Regional Tc User -Entered Tc = 14.77 11.81 11.81 Peak Flowrate, Qp =. Peak Flowrate, Qp = Peak Flowrate, Qp 4.90 cis 5.42 cfs 5.42 cfs S5100.xis, Tc and PeakO 1/912017, 7:07 AM l$ CALCULATION OF A PEAK:RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: WINTTR Se I. Catchment Hydrologic Data Catchment ID = $6 Area = 0.95 Acres Percent Imperviousness = .. 6.00 % NRCS Soil Type = B A, B, C, or D II. Rainfall Information t (inch/hr) = Cl * P1 1(C2 + Td)AC3 Design Storm Return Period, Tr = 100 years C1 = 28.50 C2= 10.00 C3= 0.786 P1= -- 2.78 inches (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time Crime of Concentration) for a Catchment Runoff Coefficient, C = _=r' 0.38 Overide Runoff Coefficient, C = ... (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 = ` 0.11 Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Heavy Meadow Tillage/ Field Short Pasture! Lawns Nearly Bare Ground LEGEND O Beginning Flow Dine[tion Catchment Bdrundaxx NRCS Land Type Conveyances Calculations: 2.5 7 m Grassed Waterways Paved Areas & Shallow Paved Swales (Sheet Flow) 15 20 Reach ID Overland Slope S iVfl input O250D 0.0090 011000 0.0030 Length L ft Input 5 -r - Runoff Coeff C-5 output 0.11 NRCS Convey- ance input N/A Flow Velocity V fps output 0:13 Flow Time Tf minutes output 2.97 1 2 3 4 5 144 24 _.. 63 Sum 254 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 8:96 inch/hr Rainfall Intensity at Regional Tc, I = ` 7.13 inch/hr Rainfall Intensity at User -Defined Tc, I = 8.96 inch/hr S6100.xls, Tc and PeakO 15.00 20.00 15,-00 1.69 0.06 .:.: 1;28 6.32 0.82 Computed To = Regional Tc = User -Entered To = 6.00 11.41 600 Peak Flowrate, Op = 3.27 cfs Peak Flowrate, Op = 2.60 cfs Peak Flowrate, Op 3.27 cfs 1/9/2017, 7:07 AM ft CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: _ Catchment ID: WINTER S7 I. Catchment Hydrologic Data Catchment ID = S7 Area = 0.45 Acres Percent Imperviousness = .. . 15,00. % NRCS Soil Type = ...... B A, B, C, or D II. Rainfall Information I (inchlhr) = Cl * P1 !(C2 + Td)AC3 Design Storm Return Period, Tr = 1.00 years (input return period for design storm) Cl = 28150 (input the value of C1) C2= 10:00: (input the value of C2) C3= 0.786 (input the value of C3) P1= . 2 78 inches (input one -hr precipitation —see Sheet "Design Info") Ill. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = . 0:42 Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C -S = ;;':::::;:;:0.17: Overide 5-yr. Runoff Coefficient, C (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration rNRCS Land Type Conveyance Calculations: Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns Nearly Bare Ground 7 10 LEGEND O Beginning Flew Direction Cateh-mant Boundary Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Reach ID Overland 1 2 3 4 5 Slope S flit input Length L fl input 5-yr Runoff Coeff C-5 output NRCS Flow Flow Convey- Velocity Time - ance V Tf fps minutes input output output N/A 0,11 ...:1.1.57. 0.0200 0.0100': 0.1500 0.0050 76 65.. 12 .. 63 Sum 216 0.17. 10.00 1:00: 1.08 7.00 2.71 0.07 1500 t-:06. 0.99 Computed c = 13.83 Regional Tc = : 11.20 User -Entered Tc = 11.20 IV. Peak Runoff Prediction Rainfall Intensity at Computed To, I = 6.56 inch/hr Peak Flowrate, Op = 1.25 cfs Rainfall Intensity at Regional To, I 7.18 inch/hr Peak Flowrate, Qp = 1,37 cfs Rainfall Intensity at User -Defined Tc, ] =:'x:: .. 718 inch/hr Peak Flowrate, Qp = .. - -1.37 cfs 57100 xls, TO and PeakQ 11912017, 7:07 AM cw0 CALCULATION OF:A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: WINTER ENTIRE SITE I. Catchment Hydrologic Data Catchment ID = ENTIRE SITE Area = 10.15 Acres Percent Imperviousness = 42.04 % NRCS Soil Type = B A, B, C, or D II. Rainfall Information I (inch/hr) = C1* P1 /IC2 + Td)"C3 Design Storm Return Period, Tr = 100 years (input return period for design storm) Cl = 28.50 (input the value of C1) C2= . 10.00 (input the value of C2) C3= 0.786 (input the value of C3) P1= 2.78 inches (input one -hr precipitation -see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0,50 0.31': (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C -S value if desired, or leave blank to accept calculated C-5.) Illustration LEGEND O Deeming Flow Ditation Catansent Boun3xi7 NRCS Land Type Heavy Meadow Tillage/ Field Short Pasture/ Lawns Nearly Bare Ground Grassed Swales/ Waterways Paved Areas 8 Shallow Paved Swales (Sheet Flow) Conveyance 2.5 5 ` 7 10 15 20 Calculations: Reach ID Overland Slope S ft/fl input Length L ft input 162 290 103 5-yr Runoff Coeff C-5 output NRCS Convey- ance input N/A Flow Velocity V fps output Flow Time Tf minutes output 22.91 4.4050 0.0030 0.0035 0.31 0.12 1.10 0.89 1.06 1.06 ... 1.38 1 2 3 4 5 0.0050 0.0050. 4.0085 571 62 148 Sum 1,336 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = _ Rainfall intensity at Regional Tc, I = _ Rainfall Intensity at User -Defined Tc, I = _ 3.60 inch/hr 5.87 inch/hr 5.87 inch/hr 20.00.::, 4.41 1.93 8.97 0.97`: 1.78 15.00 15.00 Computed To = Regional Tc = User -Entered Tc = 40.98 17.42 17.42 Peak Flowrate, Qp 18,31 cfs Peak Flowrate, Op = "' "29.81 cfs Peak Flowrate, Op = 29.81 cfs ENTIRESITE100.xls, To and PeakQ 1/9/2017, 7:07AM it CALCULATION OFAPEAK RUNOFF USING.RATIONAL:METHOD: Project Title: Catchment ID: WINTER. OS1 I. Catchment Hydrologic Data Catchment ID = O51 Area = 0.81 Acres Percent Imperviousness = 2.00 % NRCS Soil Type = B A, B, C, or D II. Rainfall Information I (inchlhr) C1 " P1 /(C2 + Td)^C3 Design Storm Return Period, Tr = 100 years (input return period for design storm) Cl = 28.50 (input the value of C1) C2= 10.00 (input the value of C2) C3= 0.786 (input the value of C3) P1= 2.78 Inches (input one -hr precipitation —see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = 0.36 Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = 0.08 (enter an overide C value if desired, or leave blank to accept calculated C.) Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Heavy Tillage/ Short Nearly Meadow Field Pasture/ Bare Lawns Ground Grassed Swales/ Waterways ',MEND Q Beaming Flow Direction Catchment Be ....aa' NRCS Land Type Conveyance 2.5 5 I� Calculations: 10 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Reach ID Overland Slope S ft/11 input Length L ft input 5-yr Runoff Coeff c-5 output NRCS Convey- , once input N/A;;;;, Flow Velocity V fps output Flow Time Tf minutes output 0.0100 54 0.08 0.07 13.551 1 2 4 5 Sum 54 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 6.62 inch/hr Rainfall Intensity at Regional Tc, I = : 7.43 inch/hr Rainfall Intensity at User -Defined Tc, I = : r r : 7.43 inch/hr 0S1100.xls, To and PeakQ Computed Tc = Regional Tc = User -Entered Tc = 13.5T- 1O.3O 10.30 Peak Flowrate, Qp = 1.94 cfs Peak Flowrate, Op = 2.18 cfs Peak Flowrate, Qp = 2.18 cfs 1/9/2017, 7:08 AM CALCULATION OF A PEAK.RUNOFF. RATIONAL METHOD Project Title: Catchment ID: WINTER ::" I. Catchment Hydrologic Data Catchment ID = O52 -- Area = 0.50 Acres Percent Imperviousness = 2:00 % NRCS Soil Type = a A, B, C, or D II. Rainfall Information I (inch/hr) = Cl ' P1 i(C2 + Td)AC3 Design Storm Return Period, Tr = 100 years (input return period for design storm) C1 = 28.50 (input the value of C1) C2= wy : 10:00 (input the value of C2) C3= 0786 (input the value of C3) P1= 2.78 inches (input one -hr precipitation —see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = ""` 0:36` Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 = 0.08 Overide 5-yr_ Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Heavy Meadow Tillage/ Field Short Pasture/ Lawns LEGEND O Beginning Flaw Direction Catehmeni BoundeaY NRCS Land Type 5 Nearly Bare Ground Grassed Swafesl Waterwa Paved Areas & Shallow Paved Swabs (Sheet Flow) 7 10 15 20 Calculations: Reach ID Overland Slope S ftlft Input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input NJA Flow Velocity V fps output Flow Time If minutes output • 00089::: 54 0.08_ 0.06 14,54 2 Surn 54... IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 6i40- inch/hr Rainfall Intensity at Regional Tc, I = 7,43 inchmr Rainfall Intensity at User -Defined Tc, I = 7.43 inchlhr Computed Tc = Regional Tc = User -Entered Tc = 14.54 10 30 1.0.30 Peak Flowrate, Op = 1 X16 cfs Peak Flowrate, Op = : 1:35. cfs Peak Flowrate, Op = s.:. 1.35 cfs O521100 xis, Tc and PeakO 1/9/2017, 7:08 AM 7,3 Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER SEC A -A REQ'D TO FLOW 12.16 cfs F Y T Z1 Ye S B Z2 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.0030 ft/ft n = 0.030 B= 6:06ft Z1 = 52.00 ft/ft Z2 = 19.00 ft/ft F= 1.00 ft Y = 0.55 ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force -Q = Fr = V= A= T= P= R= D= Es = Yo = Fs = 12.35 cfs 0.39 115 fps 10.74 sq ft 39.05 ft $9:07 ft 0.27 ft 0.28 ft 0.57 ft 0.18, ft 0.15 kip SECA-A.xlsx, Basics 1/9/2017, 7:09 AM it Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER SEC B-BREQ'D TO FLOW 12.16 cfs F A Y T El Yo B Z2 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.0050 ft/ft n = 0.030 B = 0.04 ft Z1 = 9.00 ft/ft Z2 = 9.00 ft/ft F = 1.00 ft Y= 0.84 ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force 12.46 cfs Fr = _ V= _ A= _ T=` P= _ R= _ D= _ Es = _ Yo = Fs = 0.53 1.96 fps 6.35 sq ft 15.12 ft 15.21 ft 0.42 ft 0.42 ft 0.90 ft 0.28 ft 0,16 kip SECB-B.xlsx, Basics 1/9/2017, 7:09 AM Zs- Normal Flow Analysis - Trapezoidal Channel Project Channel ID: WINTER SEC C -C REQ'D TO FLOW 8.08 .cfs Y T Ye a Z1 < B Z2 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.0035 ft/ft n = 0.030 B= 0.00 ft Z1 = 36.00 ft/ft Z2 = 4.00 ft/ft F= 1.00ft Y= 0.58 ft Normal Flow Condtion (Calculated? Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr = V= A= T= P= R= D=. • Es = Yo = Fs = 8.64 cfs 0.42 1.28 fps 6.73 sq ft 23.20 ft 23.28 ft 0.29 ft 0.29 ft 0.61 ft 0,19 ft 0.10 kip SECC-C.xlsx, Basics 1/9/2017, 7:09 AM Lio Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER • 5EC:D-D REQ'D TO FLOW13.25 cfs F T Z1 Yo B Z2 1 Design Information (Input) Channel invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.0050 ft/ft n = 0.040 B = 4.00 ft Z1 = 4.00 ft/ft Z2 = 4.00 ft/ft F= 1.00 ft Y= 0.92 ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr= A= T= P= R= D= Es = Yo = Fs = 13.38 cfs 0.42 1.89 fps 7.07 sq ft 11.36 ft 11.59 ft 0.61 ft 0.62 ft 0.98 ft 0.39 ft 022 kip SECD-D.xlsx, Basics 1/9/2017, 7:09 AM 27 Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER SEC E=E:REO'D TO FLOW 5.17 cfs Deslcin Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.0050 ft/ft n = 0.030 B= 0.00 ft Z1 = 17.00 ft/ft Z2 = 17.00. ft/ft F= 1.00 ft Y= 0.48 ft Normal Flow Condtion (Calculated). Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Fr= V= A= T= P= R= D= Es = Yo = Fs = 5.31 cfs 0.49 1.35 fps 3.92 so ft 16.32 ft 16.35 ft 0.24 ft 0.24 ft 0.51 ft 0.16 ft 0.05 kip SECe-e.xlsx, Basics 1/9/2017, 7:10 AM Z9 Normal Flow Analysis - Trapezoidal Channel Project: _ Channel ID: WINTER SEC F -F REQ'D TO FLOW 4.16 cfs F Y T Z1 Yo B Z2 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.0050 ft/ft n = 0.030 B = 0.00 ft Z1 = 22.00 ft/ft Z2 = 19.00 ft/ft F= 1,00 ft Y = 0.41 ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr= V= A= T= P= R= D= Es= Ye = Fs 4.20 cfs 0A7 1.22 fps 3.45 sq ft 16.81 ft 16.83 ft 0.26 ft 0.21 ft 0.43 ft 0.14 ft 0.04 kip SECF-F.xlsx, Basics 1/9/2017, 7:10 AM Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER SEC G -G REQ'D TO FLOW 16.32 cfs Design Information (Input) Channel invert Slope -Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.0220 ft/ft n = 0.016 B= 0.00 ft Z1 = 20.00 ft/ft Z2 = 20.00 ft/ft F= 1.00 ft Y = 0:41 ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr= V= A= T= P= R= D= Es= Yo = Fs= 18.34 cfs 1.87 4.81 fps 3,39 sq ft 16.48 ft 16.50 ft 0.21 ft 0.21 ft 0.77 ft 0.14 ft 0.18 kip SECG-G.xlsx, Basics 1/9/2017, 7:10 AM 20 Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER SEC H -H REQ'D TO FLOW 5.64 cfs F Y T Z1 Vo B Z2 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.0060 ft/ft n = 0.030 B= 0.00ft Z1 = 50.00,ff/ft Z2 = 50.00 ftlft F= 1.00 ft Y= 0.33 ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force :. :.6:30 cis Fr = 1).50 ).50 V = 1.16 fps A = 5.45 sg ft T = 33.00 ft P = 33.01 ft R= 0.16 ft D = 0.17 ft Es= 0.35 ft Yo= 0.11 ft Fs = 0.05 kip SECH-H.xlsx, Basics 1/9/2017, 7:11 AM Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER SEC I-1REQ'D TO FLOW 4.16 cfs F Y T Zi Ye B Z2 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = n= B= Z1= Z2 = F= 0.0090 ft/ft 0.030 0.00 ft 0.01 ft/ft 20.00 ft/ft 1.00 ft Y = 0,50 ft Normal Flow Condtion (Calculated' Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr = V= A= T= P= R= D= Es= Yo = Fs 4.53 cfs 0.64 1.81 fps 2.50 so ft 10.01 ft 10.51 ft 0.24 ft 0.25 ft 0.55 fl. 0.17 ft 0.04 kip SECI-I.xlsx, Basics 1/9/2017, 7:11 AM Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER . SECJ-J REQ'D TO FLOW 16.32 cfs F Y T Z1 Ye 0 B Z2 I Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.1900 fUft n = 0.016 B= 4.00 ft Z1 = 0.01 ft/ft Z2 = 0.01 ft/ft F= 1.00 ft Y = 0.27 ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr= V=` A= T= P= R= D= Es = Yo = Fs = 16.85 cfs 5.29 15.59 fps 1.08 so ft 4.01 ft 4.54 ft 0.24 ft 0.27 ft 4.04 ft 0.13 ft 0.52 kip SECJ-Jxlsx.xlsx, Basics 1/9/2017, 7:11 AM Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER SECK-K REQ'D TO FLOW 20.04 cfs T Yo ZI B Z2 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.1000 ft/ft n = 0.016 B = 4.00 ft Zl = 0,01 ft/ft Z2 = 0.01 ft/ft F = 1.00 ft Y= 0.37 ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr= V= A= T= P= R= D= Es = Yo = Fs = 20.09 cfs 3.93 13.56 fps 1.48 sq ft 4.01 ft 4.74 ft 0.31 ft 0,37 ft 3,23 ft 0.18 ft 0.55 kip SECK-K.xlsx, Basics 1/9/2017, 7:11 AM Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: WINTER SECL-L REQ.D TO FLOW 5,42 :cfs F Y T Z1 Ye B Z2 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = 0.2000 Mt c = 0.016 B= 2.00 ft Z1 = 0.01 ft/ft Z2 = 0.01 ft/ft F = 1.00 ft Y = 0.25 ft Normal Flow Condtion (Calculated} Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr= V= A= T= P= R= D= Es = Yo = Fs = 7.14 cfs 5.03 14:25 fps 0.50 sq ft 2,01 ft 2.50 ft 0.20 ft 0.25 ft 3.41 ft 0.12 ft 0.20 kip SECL-L.xlsx, Basics 1/9/2017, 7:11 AM DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Basin ID: (For catchments less than 100 acres only. For larger catchments, use hydrograph routing method} (NOTE: for catchments larger than SO acres, LUMP hydrograph and muting are recommended) Determ l nation of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method Deelpn Information In trt . I.= A= Type • T = To = q = P. _ C. • C; • C, = percent acres A, B, C, or D years (2, 5, 10, 25, 50, or 1090 meutes cfsfaore inches Desion Information finoull: 1e. A Type = 7 .I:.... TO . a = P, _ C,= G, = G = 42.00 10.155 B percent acres A, a, 0, or D years I2, 5, 10, 25. 50, aria]) mlwtes cfs/aore {riches Caldrnen8 Drainage Imperviousness Catchment Drainage Area Predeselopment 9000 Sol Gulp Ream Period for Deteraon Control Time of Concentrator of Watershed Allowable Una Release Rate ❑ne-M:r Prar b5on Design Rainfall 1DF Formula I= C,'P11(Or+T,)^Ca Coefficient One Coefficient Two Coefficient T1eee • : 42-00 : Catdeneet Drainage imperviousness Catdaner,t Drainage Area Predevelopment HRCS 508 Gory Rem Period for Detention Control Time of Concentrator of Watershed Aloenable Unit Release Rate Dno-hos_r Precipda0an Design Rainfall OF Formula 4= C,' P11(C,+T,J^C, Coefficient One Coefficient Two Coeffider4 Three 10.150 B 12 400 • _ l' : - 40 - 40 0.21 ' ' 0.27-_ ' - •7-47 • ?.7B 28.50 _. 16 0 759 28.50 • 13— 0.789 Determination of AVeraae Outflow from the Basin (Calculated): Determination of Areraot Outflow from the as ICalculatedl: Ruoff Coefficient Inflow Peak Allowable Peak C= 0.37 Ruoff Open • 7-18 cue Outflow Race 139 -out • 2.69 off Mod FAA Minor Storage Volume = 14.355 cubic feet Mod FAA Minor Storage Volume = 0.330 acted[ '- Enter 0d0.00 Dua@an IncrementOI Increa55 Value Here ja-g. 5 for 5 -Minutes) Runoff Coefficient C = 0-90 Haw Peak Rs ,off C117 -in = 19.35 cis ANowable Peak Outflow Rate Op -out = 2.74 cis Mad. FAA Major Storage Volume a 51,319 cubic feet Mad. FAA Major Storage Volume = 1.176 acre -41 20 - Rabid DoaSon rcrfutes Iirail) Rainfall Intensity mines le (3018141 Indoor Vuhme acre-feet 4udput) Ad)<stmenl Factor -ni 101118!10 Average OVAow at (output) Outflow Volume acre-feet 1ou181t) Storage Velure acre-feet (output) Rainfall bo ason masses (rq0) Rairla6 ! enity arses J le Iplipll0 I01ow Vohme acre -legit ta•t:00 Adussbnent Factor 'm' (0116'31) Average Outflow cts l0uto.10 Outflow Vehme acre-feet (ouGrt) Storage Volume acre -feel (oe18eR) • 0 000 2 86 1:91 1.47 1.20 1.03 0.93 0 510 073 057 ..-.,.080...-:, 057 654 1 . 0.51 0-48 0.45 943 341 0.39 000 0-35 0-34 033 .0.32 031 - ...930.. 0.29 . 9.20 , 0.27 0.27 0.25 - .... 025 0.24 0.24 0.23 0.23 1 0.22 6.22 0.21 0.21 020 . 0.20 l .0.20 , 0,19 0.15 i 0.10 0.18 0.18 , 0.18 t 0.18 D-17 - 0.17 0.17 0.17 0.10 0-15 010 n --- p 16 1 015 0.000 0 296 - 0.396 i 0.455 0.498 0.531 0.559 5592 0.603 0.521 9.638 { 0.653 6867 --.t ._.. - 0.850 ! 0802 I 0704 071! i 0.725 0734 i 0.744 9.752 0.701 n....0769..... . 0177 5 0784 ,....- 0,702 1 0780............054 1 0.806 0.812 , 0.818 0 825 0831 0837 _...-...-.....-. 0 0 - 8943 ' 0-848 0 854 0-655 ` 0.884 0.065 ----0.875 ...{ 0.579 0.804 0.889 .� 0.894 0,898 ..-....--.0.52 0.903 0-907 3911 0.915 0 0.920 i 3.924 f 3.420 l 0:932....-I 0.935 i 0.930 5943 1 0,947 0-960 I 0954 , 0-956 0.961 0.60 000 0 000 0 000 1:00 209 0-058 0 239 ..,.,-190 •.... 2.09 0.115 9,281 ......+..... 0.>Cr l 1.74 0.1 d4 0.311 0.75 - 1.57 0173 0.325 0.70 - 1.46 0.202 0.330 0.87 1'.39 0.230 0.326__-_- 0.64 - 1.34 T 0.258 5.323 0.63 - 1.31 ;.-...0.288 0.315 061 1:28...... ....0317 0,304 ........,180-_-._.-.-126..._..' •. •-.060 - ..» 1.25 ,.......0346..-. -....0292 ........ ..... 0.59 -..»-.124...-......0,374.--.. --- 0,279-..,. t-- ..... ....- 056 122 -_-__. 3453 -.,-.0281,-,-, ...... i 0,58 - - -- 1.2'1 9-432 0.246 } 0.57 119 I 0.451 0.231 057 118 T 0490 0214 0.56 115 0511 0198 --.. •---..0.511....,,i 117 0547 0177 0.50 116 0578 0150 .r-.... ...-.. 4.55 1.16 •r 0-605 0.139 0.55 1-15 9-634 0.114 055 0_15 : 3-682 0099 ---...055.-. , 1 14 - 3691_._ 0070 ..-..,0.54 1.14 3720 ---- 0.057 054 :,...-,.1)3 _.., .,.,0.749.........,.0,030 ..... 054 1.73 0.778 0.014.,, ,.., 1.13 -...---0.606 -0.005 054 1 1.12 i 0-635 0030 0.54 1.12 0.854 .0 062 0.53 1.12 3.093 -0.074 0.53 1.12 - 3.922 .0 .097 OSJ 1.31 • 0.950 •0119 053 : f 11 0.979 .-.. .0.142 ......... ..........1.......... 053 . 111 1008 -0.165 0.53 : 1. 7 1.037 --,-0184 : 0.53 1.11 ' 1.056 0.212 0.53 1 1.14 <---...1.094,., ._., -0.235 7 - 053 l .09 1.123 -0.259 953 -.l 1.10 n 1.152 -0.283 0.53 ., 1.10 0 1.181 - -6.308 0.53 : 110 :: 1.210 -0-330 0.52 1.10 1-238 -0.354 0.52 1.10 ; i.2@7 -0.378 0,52 1.09 • 1.296 I -0.402 i 1.09 . 1.325 :.....-0.427 0.52 . 1.00 1.354 1 -0-451 052 1-09 1382 1 -0.176 9.52 1.04 '. 1-411 -CM 0.522 i 1.09 1440 -4.520 0.52 i 195 1-489 -0-549 0.52 ' 1.04 1.408 -0.574 0.52 1.00 1.526 -0.590 0.52 F 1.08 :1 1555 ` .0.824 052 j 108 1584 i •0.649 0.52 i 708 :,.-.- 1.513 -0.874 --. 05 I 1.00 1.542 ' -0 899 0.52 i 1,06 1172 1 -5.724 0.52 t 1.09 : 1.699 € -0.749 052 7.00 -.._ 1.728 -0.774 052 1.08 1.757 i -0.799 052 1.58 1.785 .0.825 0 0.00 0009 20 5.41 0-717 40 62 1.011 - r 3. .....-..'...... ...........,.. fm 2.77 , 1.163 80 n 228 1.272 100 • 1.94 i 1.357 120 } 1.70 ;' 1.426 140 •1,52 1.488 800 I.1,88 1.541 1588...,:. 200 1.17 ._.1530.... ........2........-.....,....... -...-220-..-,.-...-,1:09..-...- (0.855.,- 240 1.02 1-705 280 0.98 ? 1.738 t 260 090 j 0.789 300 0.66 t 1796 320 - 002 1826 ....{ 340 , 076 j 1852 300 075 I 1877 350 n 0.72 t 1.400 403 06..,.•, 1_023 420 ' 0.56 l 1;945 443 0.84 1.085 ! 4130 -. 0.62 - 1.965 450 '.: 0.69 2.005 502 0.56 - 2.023 520._. 050 2.041 548 ; 0.55 2.050 • 21 500 e- 0.53 - 2.076 :.....051... 590 0.52 2.092 s 560 I 0.50 : 2.100 BZIr 0.49 2.124 810 0.40 : 2'.138 860 9.47 2.154 880 0.46 2.188 720 405l 2.162 1- 720 0 0.44 2.196 p 740 < 0.4! i 2.209 780 0.42 2.222 '. 700 , 0.41 2.235 800 :' 0.40 i 2.247 820 0.39 1 2.2@0 040 0.39 1 2.272 [ / 860 0.39 i 2:284 BBD - 037 2.295 400 0.37 ' 2.306 026 036 i 2.318 i 946 0.35 . 2.329 e 886O 3.35 - 2.339 966 034 2350. 1000 s 034 I 2.360 i 1020 0.33 2371 e 1010 0-33 2.381 -.. 1060 , 0.32 2.391 1 1550 .-.-i 032 2.400 1100 .. 031 2.410 1 1120 031 2.420 � 030 2.48 }- 1140 0 1190 0.30 2.130 1150 ? 0.30 7 2.447 7 120.2 - 0.29 - 2.455 0.00 1.00 1.00 0.83 0.75 i 0.73 067 5.64 5.53 0.51 0.50,.. ... .--..0.59 , 056 4 050 057 • 057 055 - 056 054 055 1 0.55 i 055 j 0.55 054 F i 054 0.54 0.54 0.54 n ` t , 0.59 0.53 - = 4.53 : : 553 0.53 0.53 i 053 : 0.53 I 0.53 ; 0.53 1 D.53 1 0.53 , 0.52 052 l 0.52. 0.52 0.52 0 0.52 052 --...--.-1:13..--. i 052 )-....0.52 052 - 052 0.52 0.52 0.52 - _... 0:62... r 0.52 .. 0.52 i 0.52 0.52 '' 0.52 - 0.00 2.74 2.74 Z.ZB 2.08 1.52 1 93 1.76 1.71 :-_,.,.0.377 1.87...... _., 104 .1, ...--1.82 160 1-SB 1-57 1-55 154 - - 1-53 1-52 151 „-..,.,--0741 1.51.., 1.50 1.49 }.IB 148 1.18 1.48 1.47 ....1.47... • :_...-1,132 1-48 1-16 1 4 i 1 46 1.45 1.45 1.45 1.45 1.A4 1.44 1.44 1.44 1.44 '' 1.44 1.43 1.43 1.43.,, 1.43 1.43 143,_- 1.43 • 102 102 1.42 1.42 1.42 1.42 .. - 1.42 142 1.42 1.42 - 0.000 0.075 0.151 0.189 0.225 0.264 1 0.302 - 0.340 0.415 0.453 • ..-.0.191 0.529 0,566 0.604 0542 ---0074 - 0/17 • 0/55 - ,...0.830 .0.008 0.806 0.944 • 0981 1.019 1.057 1.095 1-170 1209 1.249 - 1283 1.321 1359 1.397 1.434 1,472 , 1.510 1.548 1.585 1.623 1.661 1.899 ....1.730 1.774 1.512 1.850.,... 1.697 -._1.975 1963 2-001. 2.038 2.078 2,114 ....2152....,•; 2.108 .-. ...-.-. 2237 2205 2.303 2.340 0 000 0 681 0,860 0.075 1.048 • 1.093 1.128 1.148 - 1.183 _ 1172.... _ ............ 1.177 .. 1.178.... 1.178 7.172 - 1.165 1156 1146 -- - . l 1.135 .. - 1122 1.108 1002 1 1.570 - 1.059 1,062 - 1.023 1004 0.985 0964 ' .-.0.943-...- 0.922 0.900 0.676 [ 0.855 0.032 1 0.038 1 0.785 0761 - 6.737 0.712 0.087 0.662 •- 9037 -..• 0.611 0.595 ••» 0.559 0.532 0.506 0.479 0.452 ..-. U:i25.. 0,397 0.370 0.342 0314 0.787 0;2SC•.,,, 0230 : 0.202 0,173 0.145 0.115 20 40 ... ... 60 80 100 120 140 150 180 200 ,...229 246 ... 260 280 304 320 -...-..2-.. 340 -...-360 3800.38 460 420 440 /80 480 ....- 500 ... 520. 540 550 560 600 620 _-._,..026 840 - ;-... ._..6660 86 060 . 760 720 742 780 780 ...800 820_ 840 980 BBO ?00 - 920 940 950 980 1000 1020 1040 1060 1090 1150 1120 .... 1140... : 1186 1100 1200 Mod. FAA Manor Storage Volume (csbie 0.) 4 14,155 Mod. FM Major Storage Volume 140015 ftj ._ X1,315 Mod. FAA Minor Storage Volume (acre -114 • 0.3289 Mod. FM Major Storage Volume (acre•h.l = 1.1701 UDFCO DETENTION BASIN VOLUME ESIIM6ATING WORKBOOK Version 2.35, Releases" January 2015 71910260 xis. Modified FAA 17912017, 7'02 AM 2(0 STAGE -STORAGE SIZING FOR DETENTION BASINS Project Basin ID; Design Information (Input): Width of Basin Bottom; W Length of Basin Bottom, L = Dam Side -slope (H:V), Zd = StaneStorane Relationship: ft ft Wit Check Basin Sha e Right Triangle OR - Isosceles Triangle OR Rectangle OR... Circle/Ellipse . OR.. Irregular (Use Overide values in cells 032:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': 0.33 1.18 ::acre -ft. Storage Requirement flan Sheet'liydrograph ;acre -ft. Storage Requirement from Sheet'FullSpectrum': :≥, : :acre -ft La3els Water Side for WoCV, Minor, Surface Slope & Major Storage Elevation (H:V) Stages ft Rlft (input) (input) Below EL Bi00 {input) TOG WoCV 8:00 *in 00 11:00' Tailwater of 11:80 Basin Width at Stage ft (output) Basin Length at Stage ft (output) Surface Surface Volume Area at Area at Below Stage Stage Stage ft2 ft2 User 1t° (output) Overide (output) 3.130. ....... Surface Area at Stage acres (output) (output) Volume Below Stage acre -ft 0.072 0.000 0.00 0.00 4,290 3710 : 0.098 0.085 0.00 ; 0.00 ..5534... 8,672 0.129 0.199 _ 0.00 0-00 7.636 15,307 ' 0.175 0.351 0.00 000 10,880 24,565 0.250 0-564 0.00 0 00 15,855 37,933 0.364 " 0.671 0.00 000 21.273 52,785 0.488 1-212 0.00 12:00 0.00 24.45.1- 57357 ' 0.561 1.317 Target Volumes to: WoCV, Minor, & Major Storage Volumes (for goal seek) gIN/A #N/A _ f4N/A #N/A #NIA _ #N/A #N!A #N/A #N/A #N/A #N1A #N/A *VA #N/A #N!A #N/A #N/A #N/A #N/A #N/A #N/A 4NAA _ #N/A #N/A #N/A #N/A #N/A #N/A #N/A _ #N/A #N/A #N/A 4N/A #N/A #N/A - 4N/A #N/A #WA #NIA ,.. #N/A _ #N/A • #N/A #N/A ' #NIA #N/A --#N!A #N/A #N/A #N/A #N/A 4N/A #NIA ' AMA g4N/A #N/A #N/A #NIA #N/A #N/A #N/A ............ #N/A -t SIVA *WA #N/A #NIA #N/A M — i SN/A #N/A .. #N/A _ #N/A 76F1A260.xls, Basin 115/2017, 7:03 AM 37 x U U m > O o C CV P•Tr- - fl O d c0 l'V i C): N r.. ►fr C?: ictor Plate for Circular Vertical Orifices or U) IX QI II 11 U II II to,.? . c > W at W n a) O 0 C 0 C) ca UU) >05 a 0_ W U) Bs .9 u L .` C O 113 L 0) RI l4 3 E C C L•lti O W . CI a d O O O W d) d) O O'v 0 4- o 0 CC.) C CO a) d) a) U 0 > a) a>m a a) c., iLitE0 Calculated 0 W 14 C) O Full -flow area II II U II Ii II N O 0OC U 6 W t @ d? vck a d) C iu en U) ®.. a) w O o r E ;a m sr o w E0 N cri a C V En caC 40 d) 7 (5 (}z. rD V c 0 O j,c e o y - O d) O =. vb d7 O a 0 < ® > WO N IIII_ — a) m w U Li ° E 5Q- t.- O . la .C O c +r 'F O C oaO 9i Um t w u o 0 m0 0 .4 .2 4) I u. ? Ia_ I— = W CC Calculation of Ori Width of Equivalent Rectangular Vertical Orifice 1/9/2017, 7:03 AM 76F1 A260.xls, Restrictor Plate 4) E 0 L C C av I 4) U a) 0 to I- U w d 81 to 4) t U C II II O US TB O 0 co co o L 000"E':. c.. CNi•N OL b 03 d r cc 10 0:.0 p 31 m a 2 4) IZ E C a) E L w (G U II II < (Q o a ftj • 0 a) a) o. c U) U 3 0 7 O a) 0 O a) Q m a I I I I U 4.: C 'U a, O U a) 0) a) t U co a 4) U O I I a) c C 14 .C C.i a) Lc U H .a) U) 3E D a) 0. O 0) II a) 0 0 a) C a) O w a) E_ H n Information Watershed Des i ' o 0 U) U) Outlet Design Information (Output): U) II) U 4) W W a) a) G' 0) (O 'o II II II II II II U U • 7 0 0 0 ° q } r O` O O 47 x f 03 (B (a E • o. a 5 O Q ` .5 C 4) N 4L) N to = 0 = (1'5 • (p > O 0 0 U a a) U) Tocv to to .0 an 0 0 � L U 0 CS CO 4) 4) al ▪ IV 4) as 4) ( a) c c Q.0. O O m ce D H H M 1/9/2017, 7:03 AM 76F1A260.xls, WQCV 39 Size Overflow Wier FOR SITE H = (Q/Cd*W)".667 Q= 33.34 cfs Cd= 3.1 H = (Q/Cd*W)^.667 W= 35 ft H = (69/3.1'"24)^.667 Height= 0.455 ft Pumps I Sump, Effluent and Sewage Pumps I Submersible Sewage Pumps I 2 HP Manual Submersible Sewage Pump, 230 Voltage, 335 GPM of Water@ 15 Ft. of Head View Product Family DAYTON 2 HP Manual Submersible Sewage Pump, 230 Voltage, 335 GPM of Water @ 15 Ft. of Head item# 4LE17 Mfr. Model# 4LE17 Catalog Page# 3269 UNSPSC#40151517 T How can we improve our Product Images? Compare PRODUCT DETAILS Price 0 $1,065.00 each This item requires special shipping, additional charges may apply. Auto•Reorder Every', 1 Month • Deliver one time only ADD TO CART +Add to List Jump to: Replacement Parts (19) 7 Be the first to write a review Shipping Weight 127.0 lbs. EMAIL b PRINT Confirm ZIP Code to determine availability. 8G631 SAVE Country of Origin China I Country of Origin is subject to change. Nofe: Product availability rs real tune updated and adjusted continuousy. The product WIN be reserved for you when you complete your order. More Dayton submersible ejectors are self-contained and recommended for use in a sump or basin, where they should be vented in accordance with local plumbing codes. They are designed to pump effluent or wastewater, nonexplosive and noncorrosive liquids. and shall not be installed in locations classified as hazardous in accordance with the United Stated Electrical Code (NEC), ANSI/NFPA 70. Never install the pump in a trench, ditch, or hole with a dirt bottom; the legs will sink into the dirt and suction will become plugged. View Less n TECHNICAL SPECS Item Submersible Sewage Pump Pump Type Manual HP 2 Switch Type None Base Material 303 Stainless Steel Housing Material Cast Iron Impeller Material Cast Iron Voltage 230 Phase Amps 19 GPM of Water @ 10 Ft. 375 of Head GPM of Water @ 15 Ft. of Head 335 GPM of Water @ 20 Ft. 290 of Head GPM of Water @ 25 Ft. 250 of Head GPM of Water @ 30 Ft. 200 of Head GPM of Water ,g 40 Ft. 65.0 of Head Max. Head 46.5 ft. Thermal Protection Auto Height 21-1/4" Diameter 16-23/32" Cord Length 25 ft. Max. Dia. Solids 2-1/2" GPM of Water @ 5 Ft. 405 of Head Motor Type PSC Bearing Type BaN Shaft Seal Silicon Carbide Agency Compliance CSA Discharge NPT 3" Max. Liquid Temp. 104 Degrees F Motor RPM 1750 1 CULVERT STAGE DISCHARGE SIZING (INLET vs. OUTLET CONTROL WITH TAILWATER EFFECTS) Project: WINTER Basin ID: E;ULVEP,`C#( Status: _ . x.veken es�Mori z�w;5ea k.smane'Paat; 33 riamws: wr 1 : Iw I 9[p. t�- Design Information (Input): r Circular Culvert: Barrel Diameter in Inches Inlet Edge Type (choose from pull -down list) OR; Box Culvert; Barrel Height (Rise) in Feet Barrel Width (Span) in Feet Inlet Edge Type (choose from pull -down list) Number of Barrels Inlet Elevation at Culvert Invert Outlet Elevation at Culvert Invert OR Slope of Culvert (ftvlft h-) Culvert Length in Feet Manning's Roughness Bend Loss Coefficient Exit Loss Coefficient Design Information (calculated): Entrance Loss Coefficient Friction Loss Coefficient Sum of All Loss Coefficients Orifice Inlet Condition CoeffiCrent Minimum Energy Condition Coefficient Calculations of Culvert Capacity (output): } a <ci Tffiuo1000 r D=i 36 Square End Projection Height (Rise)�t............... Width (Span)- pare E.5.a.: m90-15 Deg Headwall No= Inlet Elev =� _ Cutlet Elev = Kr= .raj ...r.,,...,1 K,=mow.. co KEe..=E 0.189 inches ft ft ft elev. ft. clay. ft Water Surface Teilwater Culvert Culvert Controlling Inlet Elevation Surface Inlet -Control Outlet -Control Culvert Equation Elevation Flowrate Flowrate Flowrate Used: R oft cfs Cfs _ (output 11.00 11.60 5'0 0 -OD 0.00 Min. Energy. Eqn. { N/A 11.10 11 80 : 6 4 0.00 0.00 Min. Energy. Eqn NIA 11.20 11.80 I 7.50 0 09 0.00 ,Min. Energy Egn..,.,.,.,.,x NIA 11.30 11.80 8.70 s 0.00 0.00 Min. E err . Eqn. Nir----1 0.00 1 Min. Energy 11.40 11.60 ! 10.00 # 0 009Y Eqn N/A 1150 ft.. linked 11-60 11-70 11.40 1 0.00 0,00 g Min- Energy. Eqn. Regress., 11.80 12.70 0.04 0,00 i Regression Eqn. NIA 11.80 14.10 0.00 0.00 Regression Eqn. N/A 11-80 11.80 • 15.60 0.00 Regression E. e 0,00 Regress on Eqn. N/A 11-90 1180 1700 11.32 11,32 1 Reg ressiooEqn CUTLET_ 1.____11.9C W � � 12.00 11.80 18.60 16-01 16..01 Regression Eqn. OUTLET M # .......v .....,,v,,,,,,16. 12.10 11 80 20 20 19 61 19.61 Regression Eqn OUTLETN 21.80 % Regression Eqn. . Flow Control Used N/A 12.30 I. 12.40 2180 v.# 22-65 23 40 %_ 24-22 23.40 Regression Eqn. NLET c 2510 # N' 24-72 ..» .»Mu 24.72:AM ,y :Regression Eqn. OUTLET 12.50 26.70 2525 25.25 Re ression Eqn. € OUTLET tu,..,.,,,, 12.60 E 28.40 25 85 25.65 Regression Win. OUTLET 30 Ofl 26.46 26A6 _Regression Eqn OUTLET 31 70 27 16t. 2716 Regression Eqn OUTLET 12.90 f 33%6 j 27.87 27,87 Regression Eqn OUTLET 13.00 ----?.------5:176"— ...,.,.wr:...... "�34 90" NN— 28.55 23.59 i Regression Eqn- ...EOUTLET 13-10 12.70 12.80 1320 1330 13.40 .,. 1350., _ 13-60 13.70 1380 13,90 36 50 39 10 s 31.75 F 3t75 .# Regressloo . OUTLET 39.60 39 60 33.40 - ) 33.40 C Re ression F n- OUTLET 41 10 35 01 ""{ 35,01 e} Regression Eqn- E OUTLET ,w..,...»w.E ..,:... .........<. "' P 35,54 ... 3....RegressionEgn42.60 - .. .. .i. .. 30.16 3D.15 Regression Eqn- OUTLET ,..�..0 ,k 44.00 :,,,,,,,...„.,433,,891.,;038 33.23 Regression Eqn- E OUTLET 45740---1 E39 T8 N Re ressionEqn _OUTLE_T r.46.80 4- } M� 41,25 .. .....j Regression E n Mm OUTLET ..l . 48.10 £.,„• d2-74 ._.... 42,74 f Regression Eqn. OUTLET Processing Time: 00.20 Seconds OUTLET CULVERTUI xlsm, Culvert Rating 1/9/2017. 7:13 AM Determination of Culvert Headwater and Outlet Protection Project: WINTER Basin ID: CULVERT #1 n LP Design Information (Input): Design Discharge Circular Culvert: Barrel Diameter In Inches Inlet Edge Type (Choose from pull -down list) Box Culvert: Beret Height (Rise) in Feet Barrel Width (Span) in Feet Inlet Edge Type (Choose from pull -down list) Number of Barrels Inlet Elevation Outlet Elevation OR Slope Culvert Length Manning's Roughness Bend Loss Coefficient Exit Loss Coefficient Tailwater Surface Elevation Max Allowable Channel Velocity = 14.65 D=I i Square. End Projection Height (Rlse) _ Width (Span) = 36 OR tr No = Elev IN = Elem./ OUT = L= n= k = Elev r,= V= 1 10 9.5 93 0.016 0 1 7 ofs inches ft ft ft n ft ft ft/s Required Protection (output): Tailwater Surface Height Flow Area at Max Channel Velocity Culvert Cross Sectional Area Available Entrance Loss Coefficient Friction Loss Coefficient Sum of All Losses Coefficients Culvert Normal Depth Culvert Critical Depth Tailwater Depth for Design Adjusted Diameter OR Adjusted Rise Expansion Factor Flow/Diameter25 Q$ Flow/(SpanRise' 5) Froude Number Tailwater/Adjusled Diameter Qj3 Tallwater/Adjusted Rise Inlet Control Headwater Outlet Control Headwater Design Headwater Elevation HeadwaterlDlameter 93 Headwater/Rise Ratio Minimum Theoretical Riprap Size Nominal Riprap $ize UDFCD Riprap Type Length of Protection Width of Protection Vt �- A= ke kr= ks = Y = Yu = d= Va = 11(2 1an(0)) Q/D"2.5 = Fr= Yt/D = HW{ HA) = HW = HW)D = d. de.= Type = Lp = T= 1.20 2.09 7.07 0.50 1.01 2.51 1.26 1-22 2.11 6.70 0.94 0.94 0.40 1.74 1.76 11/9 0.59 2 6 VL 9 5 ft ft2 ft' ft ft ft ft ft ttu t/ ft ft in in ft ft Lig Riprap sizing 100 -Year Storm Event Winter prepared by: SLS Riprap at end of Cross -Section J -J Rundown: Pd = (V2+gd)'12 V = design flow velocity at channel outlet (ft/s) _ g = gravity (ft/s2) = d = design depth of flow at channel outlet (ft) _ Pd = riprap sizing design parameter (ft/s) _ D = Channel Design Width (ft) = Riprap type: D50 =riprap diameter (inch) = Bed Length (ft) = Bed Width (ft) _ Bed Thickness (ft) = Conclusion: 4 Eq. HS -16e, UDFCD Drainage Criteria Manual, 2008 15.59 4 Manning's Equation 32.2 0.27 -> Manning's Equation 15.87 4 Eq. HS -16e, UDFCD Drainage Criteria Manual, 2008 4 L 4 From Fig. HS -20c, UDFCD Drainage 9 Criteria Manual, 2008 16 4 Eq. HS -18, UDFCD Drainage Criteria Manual, 2008 16 4 Eq. HS -20, UDFCD Drainage Criteria Manual, 2008 1.31 4 Eq. HS -17, UDFCD Drainage Criteria Manual, 2008 Riprap at end of channel will consist of a 16.0'L x 16'W x 1.5'T bed. Riprap at end of Cross -Section K -K Rundown: Pd = (V2+gd)1/2 V = design flow velocity at channel outlet (ftfs) = g = gravity (ft/s2) _ d = design depth of flow at channel outlet (ft) _ Pd = riprap sizing design parameter (ftls) _ D = Channel Design Width (ft) = Riprap type: D50 =riprap diameter (inch) = Bed Length (ft) = Bed Width (ft) = Bed Thickness (ft) = 13.56 32.2 0.37 13.99 4 Eq. HS -16e, UDFCD Drainage Criteria Manual, 2008 4 Manning's Equation 4 Manning's Equation 4 Eq. HS -16e, UDFCD Drainage Criteria Manual, 2008 4 L 4 From Fig. HS -20c, UDFCD Drainage 9 Criteria Manual, 2008 16 4 Eq. HS -18, UDFCD Drainage Criteria Manual, 2008 16 4 Eq. HS -20, UDFCD Drainage Criteria Manual, 2008 1.31 4 Eq. HS -17, UDFCD Drainage Criteria Manual, 2008 Conclusion: Riprap at end of channel will consist of a 16.0'L x 16W x 1.5'T bed. Riprap sizing (continued) 100 -Year Storm Event Winter prepared by: SLS Riprap at end of Cross -Section L -L Rundown: Pd = (V2+gd)% V = design flow velocity at channel outlet (ft/s) _ g = gravity (ft/s2) = d = design depth of flow at channel outlet (ft) = Pd = riprap sizing design parameter (ft/s) = D = Channel Design Width (ft) = Riprap type: D50 =riprap diameter (inch) = Bed Length (ft) = Bed Width (ft) = Bed Thickness (ft) = -j Eq. HS -16e, UDFCD Drainage Criteria Manual, 2008 14.25 4 Manning's Equation 32.2 0.25 4 Manning's Equation 14.53 4 Eq. HS -16e, UDFCD Drainage Criteria Manual, 2008 2 L 4 From Fig. HS -20c, UDFCD Drainage 9 Criteria Manual, 2008 10.08 4 Eq. HS -18, UDFCD Drainage Criteria Manual, 2008 8 4 Eq. HS -20, UDFCD Drainage Criteria Manual, 2008 1.31 4 Eq. HS -17, UDFCD Drainage Criteria Manual, 2008 Conclusion: Riprap at end of channel will consist of a 10.0'L x 8'W x 1.5'T bed. LAI Warning: Soil Map may not be valid at this scale. Hydrologic Soil Group —Weld County, Colorado, Southern Part MAP INFORMATION MAP LEGEND The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid al this scale. M is U C 8 E 6 N C U w sa •— a m 'Cl cl RS 0.a 4 m E na Sq �7 c c E N N 'a 03 O. C.1 CO w o a c m a t o410 ) o w .0- 0 w ao2� E C C 7 H P„ U etQ7 a r c yEyt fa - p to c - to w E Q N U 0 0 Not rated or not available MEMO O 4 Vs' d w 0 O .yy+ w a 0 p n Z ❑ 0❑ a 0 ❑ a Q 6P 4 a CO 05 0 U o Z a a m 'm 0 0 o 2 = 4 Z CO m C a.R aus a, to 4 CO Water Features Streams and Canals TS 0 s9 C p1 p u f6 @ 06 't C C 03 N U y 'DQ N N J 4 a. '2R EYE °� N Co as 0 w sU '° E E ��p O E [1 N C .� 7 a N 2 w N — a N n o 03 E O Vu�7 ya v 5. 0 N wa .o, w {� y 2TM °c19- N3p U ui� E ¢ rY: N N to ° y o z Li Z , N ° U E w s3 y ° y m o° d m c oz a •-, ¢ 2 of 3 a l en w CO G sU 3 N a) y r.3 U �CO � O a1 0 gw UCV sU 2 °¢a ° imp mtg.sm '3) >.� 0 o c°o�,4'5 0 3'2 Lri o �+ 'ag a.4 y v o 0 o cut. o. a v0-2 s.0 m cc � 7In3' - g m o o m ° °n mo to � y m a' 3 `m N C'73 N VJ w i'3..) C W y in co r y C C JZ Z ce E as "° c- m o °=° R y y 6Y �4 `7 es O m a) C o° R �� R c -� ¢g w m op as d s? W o O U Z E Lo co a G a .0 Q d O .a C o A m N 41 m m 2CD .b o a� 3. 3 2 u m} N a � f (DER E o N O O° N G w. t t '3 0 -p Inc.t o E ,- 'a E to V $ O. 'O ¢ u I- to LC COO o N i- 0 .-0 Transportation Interslate Highways 1 Local Roads vailable CO 00 N N M rn N CP QP 118 Hydrologic Soil Group —Weld County, Colorado, Southern Part Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit —Weld County, Colorado, Southern Part (COS18):.. i Map unit symbol .;.: Map unit name t Rating Acres in AOl Percent of AOl- 46 Olney fine sandy loam, 0 to 1 percent slopes B 7.9 64.5% 75 Vona sandy loam, 0 to 1 i percent slopes A 4.3 35.5% , Totals for Area of Interest 12.2 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, BID, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (AID, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 12/13/2016 Page 3 of 4 Ljq Hydrologic Soil Group —Weld County, Colorado, Southern Part Component Percent Cutoff: None Specified Tie -break Rule: Higher CsDA Natural Resources Web Soil Survey ail. Conservation Service National Cooperative Soil Survey 12/13/2016 Page 4 of 4 so .................... . ................... . C` 52 REFERENCES 1. URBAN STORM DRAINAGE CRITERIA MANUAL VOLUMES 1,2,3 DATED JUNE 2001 REVISED AUGUST 2008 2. RUNOFF ANALYSIS-UD RATIONAL SPREADSHEET v1.02a DATED SEPT 2005 FROM URBAN DRAINAGE CRITERIA MANUAL VOLUME I 3. CULVERT DESIGN-UD -CULVERT SPREADSHEET v2.04 DATED JULY 2012 FROM URBAN DRAINAGE CRITERIA MANUAL VOLUME 1 4. CHANNEL DESIGN-UD-CHANNELS SPREADSHEET v1.05 DATED OCT 2013 5. UD-DETENTION_2.34 DATED NOV 2013 6. CITY OF GREELEY STORM DRAINAGE CRITERIA SECTION 3 DATED JUNE 2008 Weld County Public Works Dept. 1111 H Street P.O. Box 758 Greeley, CO 80632 Phone: (970)304-6496 Fax: (970)304-6497 ApplicantJr � Name � W r ?r Company W4,1er` J..rJ.. .S'er-eJ•'r�r L.L Address (n2 7 iltIL A-irt. City c.17 State to Zip cffitai Business Phone 170 , . 7 3 — O?yv Fax pp�� E-mail j e.#. pj +tan.g.ce rc Parcel Location & Sketch The access is on WCR IV& Nearest Intersection: WCR Lib & WCR �Z Distance from Intersection Parcel Number A0571 O000 Section/Township/Range /2/41/4, 6, Is there an existing access to the property?IOYES NO 0 Number of Existing Accesses Road Surface Nye & Construction Information Asphalt a Gravel Treated in Other Culvert Size & Type /V _. Materials used to construct Access ( 4.5,S ;i ce- Construction Start Date 57/7 Finish Date Proposed Use Temporary (Tracking Pad Required)/ $75 Small Commercial or Oil & Gas/$75 ®Field (Agriculture Only)/Exempt ACCESS PERMIT APPLICATION FORM Property Owner (If different than Applicant) Name . ke. ''Wek Address 17411 Csk Rim) 76 City 4R...Vedic. State !tV Zip fD-yc- 97O-3Y6 - tir-r'`t Phone Fax E-mail ♦= Existing Access A= Proposed Access [] Industrial/$150 Subdivision/$150 ®Single Residential/$75 ®Large Commercial/$150 Is this access associated with a Planning Process? No a° USR ®RE ®PUD ®Other Required Attached Documents - Traffic Control Plan -Certificate of Insurance - Access Pictures (From the Left, Right, & into the access) By accepting this permit, the undersigned Applicant, under penalty of perjury, verifies that they have received all pages of the permit application; they have read and understand all of the permit requirements and provisions set forth on all pages; that they have the authority to sign for and bind the Applicant, if the Applicant is a corporation or other entity; and that by virtue of their signature the Applicant is bound by and agrees to comply with all said permit requirements and provisions, all Weld County ordinances, and state laws regarding facilities construction. 1 �r� Signature Ol� Printed Name Oa (- w) ' 71 Date V23/0 Approval or Dial will be issued in minimum of 5 days. Approved by Revised Date 6/2 /10 .LL„ 1 fv �l��ha-1L�� 141 Hello