HomeMy WebLinkAbout20170613.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 58 BETWEEN COUNTY ROAD 49 PARKWAY AND
COUNTY ROAD 49.5 FOR APPROXIMATELY FIVE (5) DAYS, FOR REPLACEMENT
OF A CULVERT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road 58 to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 58, between County Road 49 Parkway
and County Road 49.5, be temporarily closed, with said closure being effective March 27, 2017,
for approximately five (5) days for replacement of a culvert, and further, that standard official traffic
control devices shall be erected at said closure giving notice of the restrictions.
Cc=SOCRS, O;spo *ch,
CO 5to-k Patrol
3(Co((1
2017-0613
EG0024
TEMPORARY CLOSURE - COUNTY ROAD 58
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 27th day of February, A.D., 2017.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: dato/44) ri :i1
Weld County Clerk to the Board
BY
eputy Clerk to the Board
D AS TO
County A torney
Date of signature:G/Coll "7
Julie A. Cozad, Chair
EXCUSED
Sean P. Conway
Steve Moreno, Pro -Tern
2017-0613
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: February 22, 2017
FROM: Janet Lundquist, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 76 between WCR 31 and WCR 33 is scheduled to be closed from 3/13/2017 to 3/31/2017
for a bridge re -deck.
WCR 47 between Hwy 34 and WCR 54 is scheduled to be closed from 3/20/2017 to 3/24/2017
to replace two culverts.
WCR 58 between WCR 49 Parkway and WCR 49.5 is scheduled to be closed from 3/27/2017 to
3/31/2017 to replace a culvert.
See attached closure diagram(s).
M:Urancie\AGENDA memos\Agenda Road Closures- I .docx
2017-0613
a -o a
> a) a)
03 a) CO
a a a
il2 • .`2a) • E m
'E
O
U
0) M
-0 W CC CC
O CD U O U
cc
c c c c
'O -• O CO CO CO
U O CD M CD
✓ co
o 3 3 3
c _O c c c
ma
C • f0 222
N ..ti ol
73 2 Mco
GS O Cr X Ce Lt
O
CC 333
Hello