HomeMy WebLinkAbout20171970.tiffRESOLUTION
RE: APPROVE AGREEMENT TO CONDUCT SITE CHARACTERIZATION ACTIVITIES
AND REPORTING FOR 1399 N. 17TH AVENUE AND AUTHORIZE CHAIR TO SIGN -
PALMETTO ENVIRONMENTAL GROUP, LLC
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with an Agreement to Conduct Site
Characterization Activities and Reporting for 1399 N. 17th Avenue between the County of Weld,
State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf
of the Department of Buildings and Grounds, and Palmetto Environmental Group, LLC,
commencing upon full execution of signatures and ending with further terms and conditions being
as stated in said agreement, and
WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy
of which is attached hereto and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County, Colorado, that the Agreement to Conduct Site Characterization Activities and Reporting
for 1399 N. 17th Avenue between the County of Weld, State of Colorado, by and through the
Board of County Commissioners of Weld County, on behalf of the Department of Buildings and
Grounds, and Palmetto Environmental Group, LLC, be and hereby is, approved.
BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized
to sign said agreement.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 5th day of July, A.D., 2017.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: ditifeov�,
Weld County Clerk to the Board
BY:
APP
Julie A. Cozad, Chair
Steve Moreno, Pro-Tem
Sean P. Conway
ike Freeman
unty AttorneyA-
Barbara Kirkmey
Date of signature: 'T(0CoI (7
cc. C3E,CTT/SG), Ca.cee)
C-
2017-1970
BG0019
DEPARTMENT OF BUILDINGS AND GROUNDS
PHONE: (970) 304-6531
FAX: (970) 304-6532
WEBSITE: www.co.weld.co.us
1105 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
June 27, 2017
To: Board of County Commissioners
From: Toby Taylor
Subject: Motor Pool Underground Storage Tank — Soil Sampling
In March, we discovered the underground storage tank used for temporary storage of motor oil and
antifreeze at Motor Pool had been compromised. At that time, it was thought just the inner wall failed
and the outer wall was still intact. So, we placed the tank replacements out to bid.
We have discovered the soils test report immediately around the tanks have indicated a breach of the
outer tank too. Subsequent contamination has extended to the surrounding soils.
When surrounding soils are contaminated, a Site Characterization Report (SCR) must be completed
within 180 -days from the first report. To comply with this requirement, we received four bids from the
State's approved vendor list.
The low bidder was Palmetto Environmental Group LLC. Their quote identifies performing five borings
around the tank's perimeter, laboratory tests and drafting the Site Characterization report for
$8,007.30. If additional borings are needed to determine the spread of contamination, the additional
borings/tests would be performed at the State's approved clean up rates.
Buildings and Grounds is recommending approval of this agreement.
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
2017-1970
Ve,
PALMETTO
ENVIRONMENTAL GROUP LLC
June 21, 2017
Butch Gillingham
Weld County Government Buildings and Grounds
1105 11 Street
Greeley, CO 80632
RE: Proposal to Conduct Site Characterization Activities and Reporting at
1399 North 17a` Ave., Greeley, Colorado
Dear Mr. Gillingham,
Palmetto Environmental Group LLC, (Palmetto) is pleased to provide Weld County Government Building
and Grounds this Proposal to Conduct Site Characterization and Reporting at the above referenced site.
Site Characterization
Palmetto will advance five soil borings to a depth up to 25 feet below ground surface (bgs) to collect soil
samples for the vertical and horizontal definition of the waste oil and glycol impacts. Following drilling
activities, soil cuttings will be utilized to backfill the borings to approximately 3 feet bgs. Bentonite will
be utilized to plug the boring and surface completion will be installed to match surrounding surface
conditions. Palmetto will package and submit the five soil samples to an accredited laboratory for analysis
of full volatile organic compounds, oil and grease and glycol, with one soil sample submitted for
polycyclic aromatic hydrocarbons. If the vertical and horizontal extent of impacts are defined following
soil sampling activities, Palmetto will generate and submit a Site Characterization Report with a No
Further Action Request by the September Sri' 2017 deadline. Additionally, Palmetto has included the Cost
Summary Spreadsheet and Task & Labor Codes which billable rates are applied.
Estimate of Costs
• Field Labor, Travel, Equipment & Materials = $1,511.80
• Drilling = $3,300.50
• Laboratory Analysis =1,495.00
• Site Characterization Report = $1,700.00
The total cost to complete this phase of work is $8,007.30
Additional Provisions/Exclusions
The above pricing and scope of work does not include additional work in the event definition prior to
groundwater cannot be demonstrated and/or carcinogens are detected following laboratory analysis. Items
also excluded include drums, soil disposal, groundwater sampling, compaction testing, fencing and
multiple mobilizations to complete the scope of work. In the event additional impacts are observed and
groundwater monitoring wells are required, Palmetto expects site characterization costs will increase
based on the need to conduct additional assessment activities. In the event the total cost of assessment
exceeds $10,000, Palmetto will prepare a submittal to the Colorado Petroleum Storage Tank Fund on your
behalf.
(303) 825-8117 fax (303) 534-5049 4995 York Street a Denver, Colorado 80216
1399 North 17th Ave
Proposal to Conduct Site Characterization Activities and Reporting
Palmetto appreciates the opportunity to provide you with this Proposal. If you have any questions or
require additional information, please contact me at (303)825-8117 ext. 103.
Sincerely,
Palmetto Environmental Group, LLC
AhelA efi,149
Michael R. Critchley
Project Geologist
Acceptance of this bid as a contract for work to be performed is agreed upon by signing below:
almetto iro ' ental Group
Mr. Tccby Taylor
Weld County Government; Buildings and Grounds
Julie A. Cozad, a L JUL 0 5 2017
Weld County Govemme
Board of Weld County Commissioners
020 7-/970
RE: MOTOR POOL UNDERGROUND STORAGE TANK (SOIL SAMPLING) - PALMETTO
ENVIRONMENTAL GROUP, LLC
APPROVED AS TO SUBSTANCE:
Elected Official or Department Head
APPROVED AS TO FUNDING:
Controller
APPROVED AS TO
N rdita-------
County Attorney
02.0 /7- /97e,
REMEDIATION ECONOMIC FEASIBILITY SUMMARY
Site Name: Weld County Government Event ID:
Site Address: 1399 North 17th Ave., Greeley
Remediation Method(s): N/A "SCR Phase of Work"
12728
• HASE OF WORK CODE
PWC)
a5.
w
O
V
i.
w
o
v
o
m
g
...
<.
Reporting
TASK DESCRIPTION
r
=
)
Z
7
h
z
H
a
reH2
a
L-
uQ O
- g
'71 w
°z
Q
O
2C i. I SCR/NFA Report I report 1.00 $ 1,700.00 $ 1,700.00I_-�
$ 1,700.00
Activity Code i. Subtotal
$ 1 700.00
TOTAL 2C COSTS:
$ 1,700.00
2D Remediation system lnstallation/excavatlon
k. Drilling
Drilling
2D
k
2.1
drilling (5 Soil borings to 25 feet)
feet
125.00
$ 18.00
$ 2,250.00
$ 337.50
$ 2,587.50
2D
k.
2.2
mobilization / demobilization 1.0 days
miles
130.00
$ 4.00
$ 520.00
$ 78.00
-
$ 598.00
2D
k.
2.8
decontamination
days
1.00
$ 100.00
$ 100.00
$ 15.00
$ 115.00
TLC -2 group - Drilling Subtotal
$ 3 300.50
Labor
2D
k
5.3
project manager (1 hours for prep, planning
and permitting)
hours
1.00
$ 117.00
$ 117.00
$ 117.00
2D
k
5.4
project engineer / scientist (drilling, prep and
planning)
hours
4.00
$ 97.00
$ 388.00
$ 388.00
2D
k.
5.5
staff engineer / scientist (oversight,
samples, plus travel)
hours
10.00
$ 83.00
$ 830.00
$ 830.00
TLC -5 group - Labor Subtotal
$ 1 335.00
Laboratory Analysis
2D
k.
6.6
Oil & Grease
samples
5.00
$ 65.00
$ 325.00
$ 48.75
$ 373.75
2D
k.
6.11
VOA
samples
5.00
$ 100.00
$ 500.00
$ 75.00
-
$ 575.00
2D
k
6.30
Semi -VOA (16 Priority PAH's)
samples
1.00
$ 100.00
$ 100.00
$ 15.00
$ 115.00
2D
k
6.99
Glycol
samples
5.00
$ 75.00
$ 375.00
$ 56.25
$ 431.25
TLC -6 group - Laboratory Analyses
$ 1,495.00
Travel
2D
k.
9.4
mileage (1 round trip at 120 per round trip)
locates, planning and drilling
miles
120.00
$ 0.540
$ 64.80
..../.........................$
64.80
TLC -9 group - Travel Subtotal
$ 64.80
Field Instrumentation a/b/c/d* : a=daily b=weekly c=month d= rchase
2D
k.
12.1
misc field supplies
days
1.00
$ 12.00
$ 12.00
$ 12.00
2D
k.
12.4
PID
days
1.00
$ 75.00
$ 75.00
$ 75.00_
TLC -12 group - Field Instrumentation Subtotal
$ 87.00
Equ
,ment
2D I k. 11319 jtraffic control barricades/cones I days I 1.001 $ 25.00 I $ 25.00 I -
$ 25.00
TLC -13 group - Equipment Subtotal
$ 25.00
-
Activity Code k. Subtotal
$ 6,307.30
TOTAL 2D COSTS:
$6,307.30
PHASE OF WORK COST SUMMARY
PHASE OF WORK CODE AND DESCRIPTION
EFS
TOTAL COSTS
2C Remediation system design, bid specifications & CAP report preparation
$
1,700.00
20 Remediation system installation/excavation
$
6,307.30
$
8,007.30
Copy and 'insert paste' line items from this Appendix into the EFS form.
DO NOT put formulas it
TASK & LABOR CODES (TLC)
notes at bottom
PWC)
ACTIVITY CODE (AC)
TASK OR LABOR CODE (TLC)
TASK DESCRIPTION
(-
=
m
UANTITY
UNIT RATE
SUBTOTAL
MARKUP
SUBTOTAL BY TASK GROUP
TOTAL
Direct Push Technology
j.
1.1
direct push
feet
$ 10.00
$ -
$
/
$
-
1
j.
1.1
direct push, min. for soil confirmation
days
$ 400.00
$ -
$ -
/
$
-
2
j.
1.2
equipment mileage
miles
$ 2.75
$
$ -
/
$
j.
1.3
temporary well installation
wells
$ 25.00
$
$
/
$
-
j.
1.4
permanent well installation
feet
$ 9.50
$ -
$
/
$
-
3
j.
1.5
well abandonment
wells
$ 50.00
$ -
$
$
j.
1.6
soil vapor implant materials
points
$ 125.00
$ -
$
/
$
j.
1.7
decontamination
days
$ 100.00
$
$ -
'
$
j
1.95
monitoring well permit
wells
$ 100.00
$
$
$
j.
1.96
remediation well permit
wells
$ 100.00
$ -
$
$
j.
1.97
number of boring/injection/probes
locations
/
j.
1.98
number of wells
wells
j.
1.99
other (specify)
list units
$
$ -
$
TLC -1 group - Direct Push Technology Subtotal
$
Drilling
k.
2.1
drilling (2" well, auger, < 50')
feet
$ 18.00
$ -
$
$
k.
2.1
drilling (2" well, auger, portion > 50')
feet
$ 20.50
$
$
/
$
-
1
k.
2.1
drilling (4" well, auger, < 50')
feet
$ 20.50
$
$ -
'
$
1
k.
2.1
drilling (4" well, auger, portion > 50')
feet
$ 23.50
$ -
$
$
1
k.
2.1
drilling (other, submit bids)
feet
$ -
$
!
$
-
1
k.
2.2
mobilization / demobilization
miles
$ 4.00
$
$
/
$
k.
2.4
completion of borehole as 2" MW
feet
$ 18.00
$
$ -
/
$
-
k.
2.4
completion of borehole as 4" MW
feet
$ 27.00
$ -
$
$
-
k.
2.5
2" well abandonment
feet
$ 7.85
$
$ -
'
$
k.
2.5
4" well abandonment
feet
$ 11.75
$
$
/
$
-
k.
2.7
soil vapor implant materials
points
$ 125.00
$
$ -
/
$
-
k.
2.8
decontamination
days
$ 100.00
$ -
$
$
k.
2.95
monitoring well permit
wells
$ 100.00
$
$ -
/
$
-
k.
2.96
remediation well permit
wells
$ 100.00
$ -
$
$
k.
2.97
of wells (insert in EFS for all well
number of
installations)
wells
J///
/
k.
2.99
other (specify)
list units
...,,,,,,,,,,.........„.....,...„.....>
$ -
$
$
-
TLC -2 group - Drilling Subtotal
$
Excavation, Transportation and Disposal of Contaminated Soil
3D
I.
3.2
mileage (in excess of 40 miles one-way)
/mile/yd'
$ 0.14
$ -
$ -
$
-
4
3D
I.
3.4
excavation and loading
yd3
$ 11.25
$ -
$ -
'
$
5,15
3D
I.
3.4
excavation and loading
tons
$ 8.04
$ -
$ -
$
-
5,15
3.5
transportation of soil >RBSL
yd'
$ 11.00
$ -
$
'
$
-
5
3.5
transportation of soil >RBSL
tons
$ 7.86
$ -
$ -
/
$
-
5
3.6
disposal of soil >RBSL
yd3
$ 20.00
$ -
$ -
/
$
-
5,6
3.6
disposal of soil >RBSL
tons
$ 14.30
$
$ -
/
$
-
5,6
3,7
backfill and compaction, clean site fill
yd3
$ 5.50
$ -
$ -
/
$
5
3.7
backfill and compaction, imported
yd3
$ 12.50
$ -
$ -
$
-
5,7
5,7
3.7
backfill and compaction, imported
tons
$ 8.93
$
$
$
-
3.8
asphalt removal and disposal
ftz
$ 2.50
$ -
$
J
$
3,9
concrete removal and disposal
ft3
$ 3.50
$ -
$ -
/
$
-
3.10
asphalt replacement, 4" thick
ft°
$ 3.25
$ -
$
$
-
3.11
concrete replacement, 4" thick
ft5
$ 7.00
$
$ -
/
$
3.12
competitive bid for excavation (provide detailed
scope of work)
yd3
$
$
$
3.99
other (specify)
list units
$
$
group - Excavation, Transportation and Disposal oof Contaminated Soil Subtotal
TLC -3 group
$
Groundwater Sampling
TASK & LABOR CODES (TLC
PHASE OF WORK CODE I
(PWC)
ACTIVITY CODE (AC) I
TASK OR LABOR CODE (TLC)
TASK DESCRIPTION
i—
Z
m
QUANTITY
UNIT RATE
6, en
SUBTOTAL
N\I MARKUP
SUBTOTAL BY TASK GROUP
en sq
TOTAL
notes at bottom
4.1
sample wells -includes all labor and equipment
(bailer, water level indicator/interface probe,
temp. conductivity, pH, DO, ORP meter(s), hand
tools, cones, safety equipment, PPE, etc.)
wells
$ 100.00
4.2
gauging geochemical/water quality parameters
for wells not sampled all labor and equipment
(15 min/well; 1 well = 1/4 of senior tech rate)
wells
$ 15.00
4.3
slug testing -includes 3 wells tested, all
equipment, and labor.
event
$ 1,907.00
$
$ -
TLC -4 group - Groundwater Sampling Subtotal
$
-
Listed
Applicant ,Unlisted Applicant
Labor (listed consultant rates shown)
5.1
principal
hours
$ 149.00
$ -
/
$ -
$ 122 $ 32
5.2
senior engineer / scientist
hours
$ 123.00
$
$
$ 101 $ 32
5.3
project manager
hours
$ 117.00
$ -
$
$ 95 $ 32
5.4
project engineer/ scientist
hours
$ 97.00
$ -
$
$ 80 $ 32
5.5
staff engineer / scientist
hours
$ 83.00
$ -
$ -
$ 68 $ 32
5.6
senior technician
hours
$ 65.00
$
$ -
$ 53 $ 26
5.7
draftsperson
hours
$ 58.00
$
$
$ 47 $ 24
5.8
staff technician
hours
$ 52.00
$ -
$
$ 42 $ 22
5.9
clerical and courier
hours
$ 47.00
$
$ -
$ 38 $ 18
TLC -5 group - Labor Subtotal
$ -
8
Labor (listed consultant rates shown)
for work prior to 2016 only
5.1
principal
hours
$ 135.00
$ -
/
$
5.2
senior engineer / scientist
hours
$ 112.00
$ -
$
5.3
project manager
hours
$ 106.00
$ -
$
5.4
project engineer / scientist
hours
$ 88.00
$ -
$
5.5
staff engineer / scientist
hours
$ 75.00
$ -
$
5.6
senior technician
hours
$ 59.00
$ -
$
5.7
draftsperson
hours
$ 53.00
$ -
$
5.8
staff technician
hours
$ 47.00
$ -
$
5.9
clerical and courier
hours
$ 43.00
$ -
$
TLC -5 group - Labor Subtotal
$ -
8
Laboratory Analysis
6.1
BTEX
samples
$ 65.00
$ -
$
$ -
6.2
TVPH
samples
$ 55.00
$ -
$ -
/
$
6.3
TEPH
samples
$ 70.00
$
$ -
/
$ -.
6.4
TRPH
samples
$ 63.00
$
$ -
/
$ -
6.5
MTBE
samples
$ 65.00
$ -
$
'
$ -
6.6
Oil & Grease
samples
$ 65.00
$
$ -
'
$ -
6.7
BTEX/TVPH
samples
$ 93.00
$ -
$ -
/
$
6.8
BTEX/MTBE
samples
$ 75.00
$ -
$
/
$
6.9
BTEX/MTBE/TVPH
samples
$ 115.00
$
$ -
/
$
6.10
PCB screen
samples
$ 100.00
$ -
$ -
$ -
6.11
VOA
samples
$ 150.00
$
$
/
$ -
6.12
Semi -VOA
samples
$ 285.00
$ -
$
/
$ -
6.13
Total Lead (Pb)
samples
$ 28.00
$ -
$
/
$ -
6.14
TCLP Pb-Includes extraction
samples
$ 84.00
$ -
$
/
$
6.15
TCLP Pb&Cr-Includes extraction
samples
$ 97.00
$
$
!
$ -
6.16
TCLP VOA
samples
$ 220.00
$
$ -
/
$ -
6.19
TCLP 8 RCRA Metals
samples
$ 160.00
$
$ -
/
$ -
6.22
lgnitability/Flashpoint
samples
$ 40.00
$
$
$
6.23
Corrosivity
samples
$ 14.00
$ -
$ -
/
$ -
6.24
Paint filter test
samples
$ 19.00
$ -
$ -
/
$ -
6.25
Reactivity -sulfide
samples
$ 41.00
$ -
$ -
'
$ -
6.26
Reactivity -cyanide
samples
$ 41.00
$ -
$ -
/
$ -
6.27
WET Test (acute test)
samples
$ 850.00
$ -
$
/
$ -
6.28
BTEX (soil vapor by Tedlar)
samples
$ 105.00
$ -
$
/
$
TASK & LABOR CODES (TLC
HASE OF WORK CODE
kPWC)
CTIVITY CODE (AC)
N TASK OR LABOR CODE (TLC)
ao
TASK DESCRIPTION
I —
Z
m
QUANTITY
6,
N
N
N
o UNIT RATE
a
SUBTOTAL
Gs
MARKUP
SUBTOTAL BY TASK GROUP
a
TOTAL
notes at bottom
BTEX (soil vapor by Summa)
samples
6.29
VOA (indoor air)
samples
$ 275.00
$ -
$ -
/
$
-
6.30
Semi -VOA (16 Priority PAH's)
samples
$ 160.00
$
$ -
$
-
6.31
Microbe/Plate Count
samples
$ 35.00
$ -
$ -
/
$
-
6.32
Field test kits
samples
$ 8.00
$ -
$
/
$
6.35
BTEX/TVPH (emissions)
samples
$ 135.00
$ -
$
/
$
-
6.36
Total Suspended Solids (TSS)
samples
$ 20.00
$
$
/
$
6.37
TDS
samples
$ 20.00
$ -
$ -
/
$
-
6.38
Alkalinity
samples
$ 20.00
$
$ -
$
-
6.39
Total and Ferrous Iron
samples
$ 55.00
$ -
$ -
/
$
6.40
Nitrate
samples
$ 21.00
$
$
/
$
6.41
Sulfate
samples
$ 22.00
$
$ -
/
$
-
6.42
BOD
samples
$ 40.00
$
$ -
$
-
6.43
COD
samples
$ 30.00
$ -
$
/
$
6.44
TOC
samples
$ 35.00
$
$ -
/
$
-
6.45
FOC
samples
$ 60.00
$
$
/
$
6.46
Phosphate
samples
$
$
'
$
6.98
Rush charges
samples
$
$
/ $
6.99
other (specify)
samples
$ -
$
/$
TLC -6 group - Laboratory Analyses
$ -
TASK & LABOR CODES (TLC)
notes at bottom
PHASE OF WORK CODE
(PWC)
ACTIVITY CODE (AC)
TASK OR LABOR CODE (TLC)
TASK DESCRIPTION
Z
QUANTITY
UNIT RATE
SUBTOTAL
MARKUP
SUBTOTAL BY TASK GROUP
TOTAL
Report Submittals
3G
I.
7.1
Monitoring and Remediation Report (MRR) - no
system
report
$ 1,762.00
$ -
$
3O
i.
7.2
Monitoring and Remediation Report (MRR) -
system/implementation report
report
$ 2,570.00
$
$
3C
i.
7.3
Corrective Action Plan
report
$
$
3C
i.
7.4
CAP Modification
report
$ -
$
3H
i.
7.5
Site Decommissioning Report
report
$
$
TLC -7 group - Report Submittals
Report Submittals
for workj3rior to 2016 only
3G
i.
7.1
Monitoring and Remediation Report (MRR) - no
system
report
$ 1,598.00
$ -
,......:„.$
3G
i.
7.2
Monitoring and Remediation Report (MRR) -
system/implementation report
report
$ 2,331.00
$
$
3C
i.
7.3
Corrective Action Plan
report
$ -
$
3C
i.
7.4
CAP Modification
report
$ -
$
3H
i.
7.5
Site Decommissioning Report
report
$ 1,097.00
$ -
$
TLC -7 group - Report Submittals
Subcontractor (submit backup, quote or competetive bids))
8.1
surveyor
hours
$ -
$ -
/
$
8.2
electrical
list units
$
$ -
/
$
8.3
backhoe (trenching, piping, not excavation)
ft3
$ -
$
$
15
8.5
mechanical
list units
$ -
$
$
8.6
plumbing
list units
$
$
$
8.7
private property utility locates
visits
$ 200.00
$
$ -
/
$
3D
d.
8.8
remediation system subcontractor (describe
scope of work, provide detail of cost
calculations)
list units
$ -
$ -
$
3D
d.
8.81
mileage
mile
$
$
/
$
3D
d.
8.82
labor
ppl/hr
$
$ -
/
$
3D
d.
8.83
ancillary equipment (e.g., forklift, drill rig, probe)
list units
$ -
$ -
/
$
3D
d.
8.84
mobilization/demobilization
mile
$
$
/
$
3D
d.
8.85
tax
list units
$
$
$
3D
d.
8.86
freight
list units
$
$
$
3D
d.
8.87
shipping
list units
$ -
$ -
/
$
8.9
traffic control subcontractor
days
$
$
'
$
8.10
subcontractor vacuum truck (fluids)
hours
$ 110.00
$ -
$
/
$ -
9
8.12
horizontal boring subcontractor
feet
$
$
/
$
8.13
flow -fill subcontractor
feet
$ -
$ -
$
8.14
potholing (includes coring)
hours
$ 150.00
$ -
$ -
!
$
10
8.15
potholing mileage
miles
$ 2.75
$ -
$
$
,
8.16
paving subcontractor
ftZ
$
$
$
8.99
other subcontractor (specify)
list units
$
$ -
-
$
TLC -8 group - Subcontractor Subtotal
$
TASK & LABOR CODES (TLC
PHASE OF WORK CODE
PWC)
ACTIVITY CODE (AC)
TASK OR LABOR CODE (TLC)
TASK DESCRIPTION
Z
7
QUANTITY
UNIT RATE
SUBTOTAL
MARKUP
SUBTOTAL BY TASK GROUP
TOTAL
notes at bottom
Travel
9.1
airline travel
tickets
$ -
$ -
11
9.2
lodging(up to GSA rate plus applicable taxes)
days
$ -
$
12
9.3
meals (GSA rate)
days
$ -
$ -
12
9.4
mileage (current IRS rate)
miles
$
$ "
13
TLC -9 group - Travel Subtotal
$
On -Site Utilities - Permits
3F
f.
10.6
on site utilities (specify)
months
3F
f.
10.61
on -site electrical utilities (voltage' amps'
(hours/month)' (square root of phase)' $/KWh)
months10.9
permits (specify)
each
$ -
$
3D
n.
10.91
building permit
each
$
$
10.92
NPDES permit
each
$
10.93
APEN permit
each
$ -
$
10.94
right of way permit
each
$
$
10.95
road cut permit
each
10.96
other sanitary/storm sewer/surface discharge
permit
each
$ -
$
TLC -10 group - Project -Related Office Expenses - On -Site Utilities - Permits Subtotal
$
Investigation -Derived Waste
11.1
soil disposal (not dig and haul)
yd3
$ 20.00
$
$
/
$ -
5,6
11.1
soil disposal (not dig and haul)
tons
$ 14.30
$ -
$ -
/
$
5,6
11.1
soil disposal (not dig and haul)
drums
$ 100.00
$ -
$ -
/
$
11.3
soil treatment (submit backup)
list units
$ -
$
/
$
11.4
free product disposal (submit backup)
gallons
$ -
$ -
/
$
11.5
water disposal (offsite treatment)
gallons
$ 0.60
$
$
/
$
11.6
water treatment (onsite treatment)
gallons
$ -
$ -
$
11.7
waste transport (submit backup)
trips
$ -
$ -
/
$
11.99
other (specify)
list units
TLC -11 group - Investigation -Derived Waste Subtotal
$ -
Field Instrumentation
12.1
misc field supplies
days
$ 12.00
$
12.2
water level indicator (only if separate from 4.1)
days
$ 25.00
$
12.3
interface probe (only if separate from 4.1)
days
$ 60.00
$ -
$
12.4
PID
days
$ 75.00
$
$
12.5
explosimeter (LEL, O2, CO, H2S)
days
$ 65.00
$ -
$
12.6
DO meter (e.g. YSI 550A) (only if separate from
4.1)
days
$ 50.00
$
12.7
pH/cond/temp meter (only if separate from 4.1)
days
$ 30.00
$ -
!
$
14
12.8
datalogger with transducer
days
$ 155.00
$
12.9
air velocity meter (e.g. Velocicalc)
days
$ 25.00
$ -
$
12.10
peristaltic air sampling pump
da s
$ 10.00
$ -
$
12.11
pressure/vacuum gauges and valves (for
portable use at wells)
days
$ 20.00
$ -
$
12.12
metal detector
days
$ 45.00
$ -
$ -
$
12.13
water sampling pump
days
$
12.14
water quality meter (e.g. YSI 556) (only if
separate from 4.1)
days
$ 150.00
$ -
$ -
14
12.99
other field instrumentation (specify)
days
$TLC
12 group - Field Instrumentation Subtotal
$
TASK & LABOR CODES (TLC)
notes at bottom
ASE OF WORK CODE
PWC)
'ACTIVITY CODE (AC)
TASK OR LABOR CODE (TLC)
TASK DESCRIPTION
I -
Z
m
QUANTITY
UNIT RATE
SUBTOTAL
MARKUP
SUBTOTAL BY TASK GROUP
TOTAL
Equipment
13.1
water pump
each
$
$
$
3D
d.
13.2
air stripper
each
$ -
$
13.3
storage tank
each
3D
d.
13.4
air compressor (make, model, pressure, flow)
each
3D
d.
13.5
telemetry
each
$ -
$ -
$
13.6
bailer (non -disposable)
each
$ -
$ -
$
3D
d.
13.7
blower (make, model, pressure, flow)
each
$
$
$
3D
d
13.8
off -gas treatment (list type)
list units
$
$
$
13.9
fence
each
$ -
$ -
$
3D
n.
13.10
shed (provide size, construction, supplier,
ancillary materials or equipment)
each
3D
d.
13.11
oil / water separator
each
$ -
$ -
$
3D
d.
13.12
pressureNacuum gauges and valves
each
$
$
$
3D
d.
13.13
product skimmer/pump
each
$ -
$ -
$
3D
d.
13.14
control panel (make, model)
each
$
$
$
13.15
hand auger
days
$ -
$ -
$
13.16
generator (1-6.5 Kw)
days
$
$
$
13.17
survey equipment
days
$ 45.00
$ -
$
$
13.18
concrete saw
days
$ -
$
$
13.19
traffic control barricades/cones
days
$ -
$ -
$
13.20
oxygen diffusing unit
each
$ -
$ -
f
$
3D
d.
13.21
knock -out tank
each
$ -
$ -
$
13.22
heavy equipment (specify)
days
_
$ -
$ -
$
13.23
mobile remediation unit (list type)
days
$ -
$ -
$
13.24
consultant vacuum truck
hours
$ 110.00
$ -
$
3D
d.
13.25
stationary LEL sensor
each
$ -
$ -
$
3D
d.
13.26
flow meter
each
$
$
$
13.27
remediation well vault
each
$ -
$ -
$
13.28
tamper (jumping jack)
days
$ -
$
$
13.29
jack hammer
days
$ -
$ -
$
3D
d.
13.30
heater (including thermostat)
each
$
$
$
3D
d.
13.31
ventilator/ an (including thermostat)
each
$ -
$ -
$
3D
d.
13.32
oxygen/ozone generator
each
$ -
$ -
$ -
3D
n.
13.33
bollards
each
$ -
$ -
$
13.99
other equipment (specify)
days
TLC -13 group - Equi ment Subtotal
Materials
14.1
lumber (specify)
lump sum
14.2
hardware (specify)
lump sum
$
$
$
14.3
absorbent booms (specify)
lump sum
$ -
$ -
$
14.4
drums (prefer poly or used steel)
drums
$ 55.00
$ -
$ -
'
$
14.5
bailers (disposable)
each
$ 6.00
$ -
$ -
$
14.6
piping (specify, including fittings)
lump sum
$ -
$ -
$
14.7
sand (bag or yard) (submit bids)
list units
$ -
$ -
$
14.8
trench backfill materials (submit bids)
yd3
$ -
$ -
$ -
5
14.10
concrete (bag or yard) (submit bids)
list units
$ -
$ -
'
$
14.11
asphalt patch (submit bids)
bags
$ -
$ -
'
$
14.12
carbon canister (specify)
each
$ -
$ -
$
14.13
oxygen enhancement (submit bids)
list units
$ -
$ -
/
$
14.14
nutrient enhancement (submit bids)
list units
$ -
$ -
/
$
14.15
microbe enhancement (submit bids)
list units
$ -
$ -
/
$
14.16
plastic sheeting (10x100 ft roll, 6 mil)
rolls
$ 60.00
$ -
$ -
/
$
14.17
oxygen tank (K cylinder)
months
$ 50.00
$ -
$ -
$
14.18
tubing (<1/2 inch vinyl or nylon)
feet
$ 1.00
$
$
'
$
14.19
filters (specify)
each
$ -
$ -
/
$
14.20
chemical oxidation products (specify)
each
$
$
/
$
3F
f.
14.21
system belts, oil, etc.
months
$ -
$ -
/
$
14.22
oxygen dewar
months
$ -
$ -
$
14.99
other materials (specify)
list unitsTLC-14
group - Materials Subtotal
$
TASK & LABOR CODES (TLC)
notes at bottom
PWC)
[ACTIVITY CODE (AC)
TASK OR LABOR CODE (TLC)
TASK DESCRIPTION
I-
Z
m
IQUANTITY
UNIT RATE
SUBTOTAL
MARKUP
SUBTOTAL BY TASK GROUP
TOTAL
Other
99.1
Cost not addressed above (be specific)
list units
$
$
'
$
1
All drilling and abandonment to be done in accordance with State Engineer's standards. Drilling costs include collecting
split spoon samples in liners at 5' intervals (for augers and backfilling borings with bentonite grout.
2
The minimum rate is intended for soil confirmation sampling.
3
Permanent well means: 1" inside diameter casing, pre -slotted screen, adequate filter pack, bentonite seal, locking cap,
street box with traffic -rated cover.
4
Not to exceed 200 miles total one-way.
5
If any excavation, transportation or disposal activities are billed by the ton instead of cubic yard, use this conversion
factor: 1.4 tons = 1 cu yd.
6
Laboratory analysis is recommended for each 100 cubic yards transported for disposal to confirm the level of
contamination is in excess of RBSLs for reimbursement eligibility.
7
OPS does not reimburse for fill to account for tank volumes.
8
Total hours in top 3 categories cannot exceed
Unlisted consultants are capped at the 5.5
See http://oil.cdle.state.co for allowed duties
Offsite access: not to exceed 8 hours of 5.5 labor
10% of consultant's total project labor hours
labor rate.
for labor positions.
per project for off -site access on up to three properties.
per project for locating/marking on up to three properties.
5.6 labor per well.
Utility location: not to exceed 8 hours of 5.5 labor
Well development: not to exceed 1.5 hours of
9
Portal to portal, no mileage.
10
Time on site. Includes pavement coring (if necessary).
11
Airline travel will be reimbursed only to the dollar equivalent of 800 miles at the vehicle mileage rate.
12
Input up to the GSA lodging rate plus applicable taxes. See per diem rates at http://www.gsa.gov/perdiem .
Adjust rate for location and season when work will be done. Do not add tax to 9.3 rate.
13
See mileage rate at http:://www.irs.gov/Tax-Professionals/Standard-Mileage-Rates. The Fund will not reimburse vehicle
rental charges to transport personnel or equipment
14
12.7 cannot be used in conjunction with 12.14. Parameters overlap.
15
3.4 cannot be used in conjunction with 8.3.
The Fund will not reimburse the cost to repair or replace equipment that is damaged, lost, stolen, or destroyed due to
negligence or vandalism, or that is covered by warranty or insurance.