Loading...
HomeMy WebLinkAbout20171970.tiffRESOLUTION RE: APPROVE AGREEMENT TO CONDUCT SITE CHARACTERIZATION ACTIVITIES AND REPORTING FOR 1399 N. 17TH AVENUE AND AUTHORIZE CHAIR TO SIGN - PALMETTO ENVIRONMENTAL GROUP, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Agreement to Conduct Site Characterization Activities and Reporting for 1399 N. 17th Avenue between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Buildings and Grounds, and Palmetto Environmental Group, LLC, commencing upon full execution of signatures and ending with further terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Agreement to Conduct Site Characterization Activities and Reporting for 1399 N. 17th Avenue between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Buildings and Grounds, and Palmetto Environmental Group, LLC, be and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 5th day of July, A.D., 2017. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: ditifeov�, Weld County Clerk to the Board BY: APP Julie A. Cozad, Chair Steve Moreno, Pro-Tem Sean P. Conway ike Freeman unty AttorneyA- Barbara Kirkmey Date of signature: 'T(0CoI (7 cc. C3E,CTT/SG), Ca.cee) C- 2017-1970 BG0019 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 June 27, 2017 To: Board of County Commissioners From: Toby Taylor Subject: Motor Pool Underground Storage Tank — Soil Sampling In March, we discovered the underground storage tank used for temporary storage of motor oil and antifreeze at Motor Pool had been compromised. At that time, it was thought just the inner wall failed and the outer wall was still intact. So, we placed the tank replacements out to bid. We have discovered the soils test report immediately around the tanks have indicated a breach of the outer tank too. Subsequent contamination has extended to the surrounding soils. When surrounding soils are contaminated, a Site Characterization Report (SCR) must be completed within 180 -days from the first report. To comply with this requirement, we received four bids from the State's approved vendor list. The low bidder was Palmetto Environmental Group LLC. Their quote identifies performing five borings around the tank's perimeter, laboratory tests and drafting the Site Characterization report for $8,007.30. If additional borings are needed to determine the spread of contamination, the additional borings/tests would be performed at the State's approved clean up rates. Buildings and Grounds is recommending approval of this agreement. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director 2017-1970 Ve, PALMETTO ENVIRONMENTAL GROUP LLC June 21, 2017 Butch Gillingham Weld County Government Buildings and Grounds 1105 11 Street Greeley, CO 80632 RE: Proposal to Conduct Site Characterization Activities and Reporting at 1399 North 17a` Ave., Greeley, Colorado Dear Mr. Gillingham, Palmetto Environmental Group LLC, (Palmetto) is pleased to provide Weld County Government Building and Grounds this Proposal to Conduct Site Characterization and Reporting at the above referenced site. Site Characterization Palmetto will advance five soil borings to a depth up to 25 feet below ground surface (bgs) to collect soil samples for the vertical and horizontal definition of the waste oil and glycol impacts. Following drilling activities, soil cuttings will be utilized to backfill the borings to approximately 3 feet bgs. Bentonite will be utilized to plug the boring and surface completion will be installed to match surrounding surface conditions. Palmetto will package and submit the five soil samples to an accredited laboratory for analysis of full volatile organic compounds, oil and grease and glycol, with one soil sample submitted for polycyclic aromatic hydrocarbons. If the vertical and horizontal extent of impacts are defined following soil sampling activities, Palmetto will generate and submit a Site Characterization Report with a No Further Action Request by the September Sri' 2017 deadline. Additionally, Palmetto has included the Cost Summary Spreadsheet and Task & Labor Codes which billable rates are applied. Estimate of Costs • Field Labor, Travel, Equipment & Materials = $1,511.80 • Drilling = $3,300.50 • Laboratory Analysis =1,495.00 • Site Characterization Report = $1,700.00 The total cost to complete this phase of work is $8,007.30 Additional Provisions/Exclusions The above pricing and scope of work does not include additional work in the event definition prior to groundwater cannot be demonstrated and/or carcinogens are detected following laboratory analysis. Items also excluded include drums, soil disposal, groundwater sampling, compaction testing, fencing and multiple mobilizations to complete the scope of work. In the event additional impacts are observed and groundwater monitoring wells are required, Palmetto expects site characterization costs will increase based on the need to conduct additional assessment activities. In the event the total cost of assessment exceeds $10,000, Palmetto will prepare a submittal to the Colorado Petroleum Storage Tank Fund on your behalf. (303) 825-8117 fax (303) 534-5049 4995 York Street a Denver, Colorado 80216 1399 North 17th Ave Proposal to Conduct Site Characterization Activities and Reporting Palmetto appreciates the opportunity to provide you with this Proposal. If you have any questions or require additional information, please contact me at (303)825-8117 ext. 103. Sincerely, Palmetto Environmental Group, LLC AhelA efi,149 Michael R. Critchley Project Geologist Acceptance of this bid as a contract for work to be performed is agreed upon by signing below: almetto iro ' ental Group Mr. Tccby Taylor Weld County Government; Buildings and Grounds Julie A. Cozad, a L JUL 0 5 2017 Weld County Govemme Board of Weld County Commissioners 020 7-/970 RE: MOTOR POOL UNDERGROUND STORAGE TANK (SOIL SAMPLING) - PALMETTO ENVIRONMENTAL GROUP, LLC APPROVED AS TO SUBSTANCE: Elected Official or Department Head APPROVED AS TO FUNDING: Controller APPROVED AS TO N rdita------- County Attorney 02.0 /7- /97e, REMEDIATION ECONOMIC FEASIBILITY SUMMARY Site Name: Weld County Government Event ID: Site Address: 1399 North 17th Ave., Greeley Remediation Method(s): N/A "SCR Phase of Work" 12728 • HASE OF WORK CODE PWC) a5. w O V i. w o v o m g ... <. Reporting TASK DESCRIPTION r = ) Z 7 h z H a reH2 a L- uQ O - g '71 w °z Q O 2C i. I SCR/NFA Report I report 1.00 $ 1,700.00 $ 1,700.00I_-� $ 1,700.00 Activity Code i. Subtotal $ 1 700.00 TOTAL 2C COSTS: $ 1,700.00 2D Remediation system lnstallation/excavatlon k. Drilling Drilling 2D k 2.1 drilling (5 Soil borings to 25 feet) feet 125.00 $ 18.00 $ 2,250.00 $ 337.50 $ 2,587.50 2D k. 2.2 mobilization / demobilization 1.0 days miles 130.00 $ 4.00 $ 520.00 $ 78.00 - $ 598.00 2D k. 2.8 decontamination days 1.00 $ 100.00 $ 100.00 $ 15.00 $ 115.00 TLC -2 group - Drilling Subtotal $ 3 300.50 Labor 2D k 5.3 project manager (1 hours for prep, planning and permitting) hours 1.00 $ 117.00 $ 117.00 $ 117.00 2D k 5.4 project engineer / scientist (drilling, prep and planning) hours 4.00 $ 97.00 $ 388.00 $ 388.00 2D k. 5.5 staff engineer / scientist (oversight, samples, plus travel) hours 10.00 $ 83.00 $ 830.00 $ 830.00 TLC -5 group - Labor Subtotal $ 1 335.00 Laboratory Analysis 2D k. 6.6 Oil & Grease samples 5.00 $ 65.00 $ 325.00 $ 48.75 $ 373.75 2D k. 6.11 VOA samples 5.00 $ 100.00 $ 500.00 $ 75.00 - $ 575.00 2D k 6.30 Semi -VOA (16 Priority PAH's) samples 1.00 $ 100.00 $ 100.00 $ 15.00 $ 115.00 2D k 6.99 Glycol samples 5.00 $ 75.00 $ 375.00 $ 56.25 $ 431.25 TLC -6 group - Laboratory Analyses $ 1,495.00 Travel 2D k. 9.4 mileage (1 round trip at 120 per round trip) locates, planning and drilling miles 120.00 $ 0.540 $ 64.80 ..../.........................$ 64.80 TLC -9 group - Travel Subtotal $ 64.80 Field Instrumentation a/b/c/d* : a=daily b=weekly c=month d= rchase 2D k. 12.1 misc field supplies days 1.00 $ 12.00 $ 12.00 $ 12.00 2D k. 12.4 PID days 1.00 $ 75.00 $ 75.00 $ 75.00_ TLC -12 group - Field Instrumentation Subtotal $ 87.00 Equ ,ment 2D I k. 11319 jtraffic control barricades/cones I days I 1.001 $ 25.00 I $ 25.00 I - $ 25.00 TLC -13 group - Equipment Subtotal $ 25.00 - Activity Code k. Subtotal $ 6,307.30 TOTAL 2D COSTS: $6,307.30 PHASE OF WORK COST SUMMARY PHASE OF WORK CODE AND DESCRIPTION EFS TOTAL COSTS 2C Remediation system design, bid specifications & CAP report preparation $ 1,700.00 20 Remediation system installation/excavation $ 6,307.30 $ 8,007.30 Copy and 'insert paste' line items from this Appendix into the EFS form. DO NOT put formulas it TASK & LABOR CODES (TLC) notes at bottom PWC) ACTIVITY CODE (AC) TASK OR LABOR CODE (TLC) TASK DESCRIPTION (- = m UANTITY UNIT RATE SUBTOTAL MARKUP SUBTOTAL BY TASK GROUP TOTAL Direct Push Technology j. 1.1 direct push feet $ 10.00 $ - $ / $ - 1 j. 1.1 direct push, min. for soil confirmation days $ 400.00 $ - $ - / $ - 2 j. 1.2 equipment mileage miles $ 2.75 $ $ - / $ j. 1.3 temporary well installation wells $ 25.00 $ $ / $ - j. 1.4 permanent well installation feet $ 9.50 $ - $ / $ - 3 j. 1.5 well abandonment wells $ 50.00 $ - $ $ j. 1.6 soil vapor implant materials points $ 125.00 $ - $ / $ j. 1.7 decontamination days $ 100.00 $ $ - ' $ j 1.95 monitoring well permit wells $ 100.00 $ $ $ j. 1.96 remediation well permit wells $ 100.00 $ - $ $ j. 1.97 number of boring/injection/probes locations / j. 1.98 number of wells wells j. 1.99 other (specify) list units $ $ - $ TLC -1 group - Direct Push Technology Subtotal $ Drilling k. 2.1 drilling (2" well, auger, < 50') feet $ 18.00 $ - $ $ k. 2.1 drilling (2" well, auger, portion > 50') feet $ 20.50 $ $ / $ - 1 k. 2.1 drilling (4" well, auger, < 50') feet $ 20.50 $ $ - ' $ 1 k. 2.1 drilling (4" well, auger, portion > 50') feet $ 23.50 $ - $ $ 1 k. 2.1 drilling (other, submit bids) feet $ - $ ! $ - 1 k. 2.2 mobilization / demobilization miles $ 4.00 $ $ / $ k. 2.4 completion of borehole as 2" MW feet $ 18.00 $ $ - / $ - k. 2.4 completion of borehole as 4" MW feet $ 27.00 $ - $ $ - k. 2.5 2" well abandonment feet $ 7.85 $ $ - ' $ k. 2.5 4" well abandonment feet $ 11.75 $ $ / $ - k. 2.7 soil vapor implant materials points $ 125.00 $ $ - / $ - k. 2.8 decontamination days $ 100.00 $ - $ $ k. 2.95 monitoring well permit wells $ 100.00 $ $ - / $ - k. 2.96 remediation well permit wells $ 100.00 $ - $ $ k. 2.97 of wells (insert in EFS for all well number of installations) wells J/// / k. 2.99 other (specify) list units ...,,,,,,,,,,.........„.....,...„.....> $ - $ $ - TLC -2 group - Drilling Subtotal $ Excavation, Transportation and Disposal of Contaminated Soil 3D I. 3.2 mileage (in excess of 40 miles one-way) /mile/yd' $ 0.14 $ - $ - $ - 4 3D I. 3.4 excavation and loading yd3 $ 11.25 $ - $ - ' $ 5,15 3D I. 3.4 excavation and loading tons $ 8.04 $ - $ - $ - 5,15 3.5 transportation of soil >RBSL yd' $ 11.00 $ - $ ' $ - 5 3.5 transportation of soil >RBSL tons $ 7.86 $ - $ - / $ - 5 3.6 disposal of soil >RBSL yd3 $ 20.00 $ - $ - / $ - 5,6 3.6 disposal of soil >RBSL tons $ 14.30 $ $ - / $ - 5,6 3,7 backfill and compaction, clean site fill yd3 $ 5.50 $ - $ - / $ 5 3.7 backfill and compaction, imported yd3 $ 12.50 $ - $ - $ - 5,7 5,7 3.7 backfill and compaction, imported tons $ 8.93 $ $ $ - 3.8 asphalt removal and disposal ftz $ 2.50 $ - $ J $ 3,9 concrete removal and disposal ft3 $ 3.50 $ - $ - / $ - 3.10 asphalt replacement, 4" thick ft° $ 3.25 $ - $ $ - 3.11 concrete replacement, 4" thick ft5 $ 7.00 $ $ - / $ 3.12 competitive bid for excavation (provide detailed scope of work) yd3 $ $ $ 3.99 other (specify) list units $ $ group - Excavation, Transportation and Disposal oof Contaminated Soil Subtotal TLC -3 group $ Groundwater Sampling TASK & LABOR CODES (TLC PHASE OF WORK CODE I (PWC) ACTIVITY CODE (AC) I TASK OR LABOR CODE (TLC) TASK DESCRIPTION i— Z m QUANTITY UNIT RATE 6, en SUBTOTAL N\I MARKUP SUBTOTAL BY TASK GROUP en sq TOTAL notes at bottom 4.1 sample wells -includes all labor and equipment (bailer, water level indicator/interface probe, temp. conductivity, pH, DO, ORP meter(s), hand tools, cones, safety equipment, PPE, etc.) wells $ 100.00 4.2 gauging geochemical/water quality parameters for wells not sampled all labor and equipment (15 min/well; 1 well = 1/4 of senior tech rate) wells $ 15.00 4.3 slug testing -includes 3 wells tested, all equipment, and labor. event $ 1,907.00 $ $ - TLC -4 group - Groundwater Sampling Subtotal $ - Listed Applicant ,Unlisted Applicant Labor (listed consultant rates shown) 5.1 principal hours $ 149.00 $ - / $ - $ 122 $ 32 5.2 senior engineer / scientist hours $ 123.00 $ $ $ 101 $ 32 5.3 project manager hours $ 117.00 $ - $ $ 95 $ 32 5.4 project engineer/ scientist hours $ 97.00 $ - $ $ 80 $ 32 5.5 staff engineer / scientist hours $ 83.00 $ - $ - $ 68 $ 32 5.6 senior technician hours $ 65.00 $ $ - $ 53 $ 26 5.7 draftsperson hours $ 58.00 $ $ $ 47 $ 24 5.8 staff technician hours $ 52.00 $ - $ $ 42 $ 22 5.9 clerical and courier hours $ 47.00 $ $ - $ 38 $ 18 TLC -5 group - Labor Subtotal $ - 8 Labor (listed consultant rates shown) for work prior to 2016 only 5.1 principal hours $ 135.00 $ - / $ 5.2 senior engineer / scientist hours $ 112.00 $ - $ 5.3 project manager hours $ 106.00 $ - $ 5.4 project engineer / scientist hours $ 88.00 $ - $ 5.5 staff engineer / scientist hours $ 75.00 $ - $ 5.6 senior technician hours $ 59.00 $ - $ 5.7 draftsperson hours $ 53.00 $ - $ 5.8 staff technician hours $ 47.00 $ - $ 5.9 clerical and courier hours $ 43.00 $ - $ TLC -5 group - Labor Subtotal $ - 8 Laboratory Analysis 6.1 BTEX samples $ 65.00 $ - $ $ - 6.2 TVPH samples $ 55.00 $ - $ - / $ 6.3 TEPH samples $ 70.00 $ $ - / $ -. 6.4 TRPH samples $ 63.00 $ $ - / $ - 6.5 MTBE samples $ 65.00 $ - $ ' $ - 6.6 Oil & Grease samples $ 65.00 $ $ - ' $ - 6.7 BTEX/TVPH samples $ 93.00 $ - $ - / $ 6.8 BTEX/MTBE samples $ 75.00 $ - $ / $ 6.9 BTEX/MTBE/TVPH samples $ 115.00 $ $ - / $ 6.10 PCB screen samples $ 100.00 $ - $ - $ - 6.11 VOA samples $ 150.00 $ $ / $ - 6.12 Semi -VOA samples $ 285.00 $ - $ / $ - 6.13 Total Lead (Pb) samples $ 28.00 $ - $ / $ - 6.14 TCLP Pb-Includes extraction samples $ 84.00 $ - $ / $ 6.15 TCLP Pb&Cr-Includes extraction samples $ 97.00 $ $ ! $ - 6.16 TCLP VOA samples $ 220.00 $ $ - / $ - 6.19 TCLP 8 RCRA Metals samples $ 160.00 $ $ - / $ - 6.22 lgnitability/Flashpoint samples $ 40.00 $ $ $ 6.23 Corrosivity samples $ 14.00 $ - $ - / $ - 6.24 Paint filter test samples $ 19.00 $ - $ - / $ - 6.25 Reactivity -sulfide samples $ 41.00 $ - $ - ' $ - 6.26 Reactivity -cyanide samples $ 41.00 $ - $ - / $ - 6.27 WET Test (acute test) samples $ 850.00 $ - $ / $ - 6.28 BTEX (soil vapor by Tedlar) samples $ 105.00 $ - $ / $ TASK & LABOR CODES (TLC HASE OF WORK CODE kPWC) CTIVITY CODE (AC) N TASK OR LABOR CODE (TLC) ao TASK DESCRIPTION I — Z m QUANTITY 6, N N N o UNIT RATE a SUBTOTAL Gs MARKUP SUBTOTAL BY TASK GROUP a TOTAL notes at bottom BTEX (soil vapor by Summa) samples 6.29 VOA (indoor air) samples $ 275.00 $ - $ - / $ - 6.30 Semi -VOA (16 Priority PAH's) samples $ 160.00 $ $ - $ - 6.31 Microbe/Plate Count samples $ 35.00 $ - $ - / $ - 6.32 Field test kits samples $ 8.00 $ - $ / $ 6.35 BTEX/TVPH (emissions) samples $ 135.00 $ - $ / $ - 6.36 Total Suspended Solids (TSS) samples $ 20.00 $ $ / $ 6.37 TDS samples $ 20.00 $ - $ - / $ - 6.38 Alkalinity samples $ 20.00 $ $ - $ - 6.39 Total and Ferrous Iron samples $ 55.00 $ - $ - / $ 6.40 Nitrate samples $ 21.00 $ $ / $ 6.41 Sulfate samples $ 22.00 $ $ - / $ - 6.42 BOD samples $ 40.00 $ $ - $ - 6.43 COD samples $ 30.00 $ - $ / $ 6.44 TOC samples $ 35.00 $ $ - / $ - 6.45 FOC samples $ 60.00 $ $ / $ 6.46 Phosphate samples $ $ ' $ 6.98 Rush charges samples $ $ / $ 6.99 other (specify) samples $ - $ /$ TLC -6 group - Laboratory Analyses $ - TASK & LABOR CODES (TLC) notes at bottom PHASE OF WORK CODE (PWC) ACTIVITY CODE (AC) TASK OR LABOR CODE (TLC) TASK DESCRIPTION Z QUANTITY UNIT RATE SUBTOTAL MARKUP SUBTOTAL BY TASK GROUP TOTAL Report Submittals 3G I. 7.1 Monitoring and Remediation Report (MRR) - no system report $ 1,762.00 $ - $ 3O i. 7.2 Monitoring and Remediation Report (MRR) - system/implementation report report $ 2,570.00 $ $ 3C i. 7.3 Corrective Action Plan report $ $ 3C i. 7.4 CAP Modification report $ - $ 3H i. 7.5 Site Decommissioning Report report $ $ TLC -7 group - Report Submittals Report Submittals for workj3rior to 2016 only 3G i. 7.1 Monitoring and Remediation Report (MRR) - no system report $ 1,598.00 $ - ,......:„.$ 3G i. 7.2 Monitoring and Remediation Report (MRR) - system/implementation report report $ 2,331.00 $ $ 3C i. 7.3 Corrective Action Plan report $ - $ 3C i. 7.4 CAP Modification report $ - $ 3H i. 7.5 Site Decommissioning Report report $ 1,097.00 $ - $ TLC -7 group - Report Submittals Subcontractor (submit backup, quote or competetive bids)) 8.1 surveyor hours $ - $ - / $ 8.2 electrical list units $ $ - / $ 8.3 backhoe (trenching, piping, not excavation) ft3 $ - $ $ 15 8.5 mechanical list units $ - $ $ 8.6 plumbing list units $ $ $ 8.7 private property utility locates visits $ 200.00 $ $ - / $ 3D d. 8.8 remediation system subcontractor (describe scope of work, provide detail of cost calculations) list units $ - $ - $ 3D d. 8.81 mileage mile $ $ / $ 3D d. 8.82 labor ppl/hr $ $ - / $ 3D d. 8.83 ancillary equipment (e.g., forklift, drill rig, probe) list units $ - $ - / $ 3D d. 8.84 mobilization/demobilization mile $ $ / $ 3D d. 8.85 tax list units $ $ $ 3D d. 8.86 freight list units $ $ $ 3D d. 8.87 shipping list units $ - $ - / $ 8.9 traffic control subcontractor days $ $ ' $ 8.10 subcontractor vacuum truck (fluids) hours $ 110.00 $ - $ / $ - 9 8.12 horizontal boring subcontractor feet $ $ / $ 8.13 flow -fill subcontractor feet $ - $ - $ 8.14 potholing (includes coring) hours $ 150.00 $ - $ - ! $ 10 8.15 potholing mileage miles $ 2.75 $ - $ $ , 8.16 paving subcontractor ftZ $ $ $ 8.99 other subcontractor (specify) list units $ $ - - $ TLC -8 group - Subcontractor Subtotal $ TASK & LABOR CODES (TLC PHASE OF WORK CODE PWC) ACTIVITY CODE (AC) TASK OR LABOR CODE (TLC) TASK DESCRIPTION Z 7 QUANTITY UNIT RATE SUBTOTAL MARKUP SUBTOTAL BY TASK GROUP TOTAL notes at bottom Travel 9.1 airline travel tickets $ - $ - 11 9.2 lodging(up to GSA rate plus applicable taxes) days $ - $ 12 9.3 meals (GSA rate) days $ - $ - 12 9.4 mileage (current IRS rate) miles $ $ " 13 TLC -9 group - Travel Subtotal $ On -Site Utilities - Permits 3F f. 10.6 on site utilities (specify) months 3F f. 10.61 on -site electrical utilities (voltage' amps' (hours/month)' (square root of phase)' $/KWh) months10.9 permits (specify) each $ - $ 3D n. 10.91 building permit each $ $ 10.92 NPDES permit each $ 10.93 APEN permit each $ - $ 10.94 right of way permit each $ $ 10.95 road cut permit each 10.96 other sanitary/storm sewer/surface discharge permit each $ - $ TLC -10 group - Project -Related Office Expenses - On -Site Utilities - Permits Subtotal $ Investigation -Derived Waste 11.1 soil disposal (not dig and haul) yd3 $ 20.00 $ $ / $ - 5,6 11.1 soil disposal (not dig and haul) tons $ 14.30 $ - $ - / $ 5,6 11.1 soil disposal (not dig and haul) drums $ 100.00 $ - $ - / $ 11.3 soil treatment (submit backup) list units $ - $ / $ 11.4 free product disposal (submit backup) gallons $ - $ - / $ 11.5 water disposal (offsite treatment) gallons $ 0.60 $ $ / $ 11.6 water treatment (onsite treatment) gallons $ - $ - $ 11.7 waste transport (submit backup) trips $ - $ - / $ 11.99 other (specify) list units TLC -11 group - Investigation -Derived Waste Subtotal $ - Field Instrumentation 12.1 misc field supplies days $ 12.00 $ 12.2 water level indicator (only if separate from 4.1) days $ 25.00 $ 12.3 interface probe (only if separate from 4.1) days $ 60.00 $ - $ 12.4 PID days $ 75.00 $ $ 12.5 explosimeter (LEL, O2, CO, H2S) days $ 65.00 $ - $ 12.6 DO meter (e.g. YSI 550A) (only if separate from 4.1) days $ 50.00 $ 12.7 pH/cond/temp meter (only if separate from 4.1) days $ 30.00 $ - ! $ 14 12.8 datalogger with transducer days $ 155.00 $ 12.9 air velocity meter (e.g. Velocicalc) days $ 25.00 $ - $ 12.10 peristaltic air sampling pump da s $ 10.00 $ - $ 12.11 pressure/vacuum gauges and valves (for portable use at wells) days $ 20.00 $ - $ 12.12 metal detector days $ 45.00 $ - $ - $ 12.13 water sampling pump days $ 12.14 water quality meter (e.g. YSI 556) (only if separate from 4.1) days $ 150.00 $ - $ - 14 12.99 other field instrumentation (specify) days $TLC 12 group - Field Instrumentation Subtotal $ TASK & LABOR CODES (TLC) notes at bottom ASE OF WORK CODE PWC) 'ACTIVITY CODE (AC) TASK OR LABOR CODE (TLC) TASK DESCRIPTION I - Z m QUANTITY UNIT RATE SUBTOTAL MARKUP SUBTOTAL BY TASK GROUP TOTAL Equipment 13.1 water pump each $ $ $ 3D d. 13.2 air stripper each $ - $ 13.3 storage tank each 3D d. 13.4 air compressor (make, model, pressure, flow) each 3D d. 13.5 telemetry each $ - $ - $ 13.6 bailer (non -disposable) each $ - $ - $ 3D d. 13.7 blower (make, model, pressure, flow) each $ $ $ 3D d 13.8 off -gas treatment (list type) list units $ $ $ 13.9 fence each $ - $ - $ 3D n. 13.10 shed (provide size, construction, supplier, ancillary materials or equipment) each 3D d. 13.11 oil / water separator each $ - $ - $ 3D d. 13.12 pressureNacuum gauges and valves each $ $ $ 3D d. 13.13 product skimmer/pump each $ - $ - $ 3D d. 13.14 control panel (make, model) each $ $ $ 13.15 hand auger days $ - $ - $ 13.16 generator (1-6.5 Kw) days $ $ $ 13.17 survey equipment days $ 45.00 $ - $ $ 13.18 concrete saw days $ - $ $ 13.19 traffic control barricades/cones days $ - $ - $ 13.20 oxygen diffusing unit each $ - $ - f $ 3D d. 13.21 knock -out tank each $ - $ - $ 13.22 heavy equipment (specify) days _ $ - $ - $ 13.23 mobile remediation unit (list type) days $ - $ - $ 13.24 consultant vacuum truck hours $ 110.00 $ - $ 3D d. 13.25 stationary LEL sensor each $ - $ - $ 3D d. 13.26 flow meter each $ $ $ 13.27 remediation well vault each $ - $ - $ 13.28 tamper (jumping jack) days $ - $ $ 13.29 jack hammer days $ - $ - $ 3D d. 13.30 heater (including thermostat) each $ $ $ 3D d. 13.31 ventilator/ an (including thermostat) each $ - $ - $ 3D d. 13.32 oxygen/ozone generator each $ - $ - $ - 3D n. 13.33 bollards each $ - $ - $ 13.99 other equipment (specify) days TLC -13 group - Equi ment Subtotal Materials 14.1 lumber (specify) lump sum 14.2 hardware (specify) lump sum $ $ $ 14.3 absorbent booms (specify) lump sum $ - $ - $ 14.4 drums (prefer poly or used steel) drums $ 55.00 $ - $ - ' $ 14.5 bailers (disposable) each $ 6.00 $ - $ - $ 14.6 piping (specify, including fittings) lump sum $ - $ - $ 14.7 sand (bag or yard) (submit bids) list units $ - $ - $ 14.8 trench backfill materials (submit bids) yd3 $ - $ - $ - 5 14.10 concrete (bag or yard) (submit bids) list units $ - $ - ' $ 14.11 asphalt patch (submit bids) bags $ - $ - ' $ 14.12 carbon canister (specify) each $ - $ - $ 14.13 oxygen enhancement (submit bids) list units $ - $ - / $ 14.14 nutrient enhancement (submit bids) list units $ - $ - / $ 14.15 microbe enhancement (submit bids) list units $ - $ - / $ 14.16 plastic sheeting (10x100 ft roll, 6 mil) rolls $ 60.00 $ - $ - / $ 14.17 oxygen tank (K cylinder) months $ 50.00 $ - $ - $ 14.18 tubing (<1/2 inch vinyl or nylon) feet $ 1.00 $ $ ' $ 14.19 filters (specify) each $ - $ - / $ 14.20 chemical oxidation products (specify) each $ $ / $ 3F f. 14.21 system belts, oil, etc. months $ - $ - / $ 14.22 oxygen dewar months $ - $ - $ 14.99 other materials (specify) list unitsTLC-14 group - Materials Subtotal $ TASK & LABOR CODES (TLC) notes at bottom PWC) [ACTIVITY CODE (AC) TASK OR LABOR CODE (TLC) TASK DESCRIPTION I- Z m IQUANTITY UNIT RATE SUBTOTAL MARKUP SUBTOTAL BY TASK GROUP TOTAL Other 99.1 Cost not addressed above (be specific) list units $ $ ' $ 1 All drilling and abandonment to be done in accordance with State Engineer's standards. Drilling costs include collecting split spoon samples in liners at 5' intervals (for augers and backfilling borings with bentonite grout. 2 The minimum rate is intended for soil confirmation sampling. 3 Permanent well means: 1" inside diameter casing, pre -slotted screen, adequate filter pack, bentonite seal, locking cap, street box with traffic -rated cover. 4 Not to exceed 200 miles total one-way. 5 If any excavation, transportation or disposal activities are billed by the ton instead of cubic yard, use this conversion factor: 1.4 tons = 1 cu yd. 6 Laboratory analysis is recommended for each 100 cubic yards transported for disposal to confirm the level of contamination is in excess of RBSLs for reimbursement eligibility. 7 OPS does not reimburse for fill to account for tank volumes. 8 Total hours in top 3 categories cannot exceed Unlisted consultants are capped at the 5.5 See http://oil.cdle.state.co for allowed duties Offsite access: not to exceed 8 hours of 5.5 labor 10% of consultant's total project labor hours labor rate. for labor positions. per project for off -site access on up to three properties. per project for locating/marking on up to three properties. 5.6 labor per well. Utility location: not to exceed 8 hours of 5.5 labor Well development: not to exceed 1.5 hours of 9 Portal to portal, no mileage. 10 Time on site. Includes pavement coring (if necessary). 11 Airline travel will be reimbursed only to the dollar equivalent of 800 miles at the vehicle mileage rate. 12 Input up to the GSA lodging rate plus applicable taxes. See per diem rates at http://www.gsa.gov/perdiem . Adjust rate for location and season when work will be done. Do not add tax to 9.3 rate. 13 See mileage rate at http:://www.irs.gov/Tax-Professionals/Standard-Mileage-Rates. The Fund will not reimburse vehicle rental charges to transport personnel or equipment 14 12.7 cannot be used in conjunction with 12.14. Parameters overlap. 15 3.4 cannot be used in conjunction with 8.3. The Fund will not reimburse the cost to repair or replace equipment that is damaged, lost, stolen, or destroyed due to negligence or vandalism, or that is covered by warranty or insurance. Hello