HomeMy WebLinkAbout20171301.tiffRESOLUTION RE: EXTENSION OF REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 13 BETWEEN COUNTY ROAD 56 AND U.S. HIGHWAY 34 FOR AN ADDITIONAL TWO (2) WEEKS, TO ACCOMMODATE THE REORGANIZED FARMER'S DITCH AND UPRR WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 13, between County Road 56 and U.S. Highway 34, be extended, with said extended closure being effective April 17, 2017, for an additional two (2) weeks through June 8, 2017, for unanticipated delays due to the Farmer's Ditch and UPRR reorganization, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cct t SOCRSS, (Dispatch, CO SA -o -4-e... Pc' +ro I 2017-1301 EG0024 EXTENSION OF CLOSURE - COUNTY ROAD 13 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 10th day of May, A.D., 2017. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: diewv JC/49;g1 EXCUSED Weld County Clerk to the Board BY: uty Clerk to the Board APPD AS ../C`dunty Forney Date of signature: / a ' 11-1 Julie A. Cozad, Chair Steve Moreno, Pro -Tern Sean P. Conway Mike Freeman arbara Kirkmeyer 2017-1301 EG0024 MEMORANDUM TO: Clerk to the Board DATE: May 8, 2017 FROM: Janet Lundquist, Public Works Department SUBJECT: BOCC Agenda Item Gerard Excavating is requesting an extension for the CR 13 between CR 56 & US 34 construction project road closure. The original road closure was to be closed to thru traffic from 4/17/2017 to 5/26/17. The Contractor is requesting an extension to 6/8/17. The project has had delays to accommodate the Reorganized Farmer's Ditch and UPRR. See attached diagrams. 2017-1301 aGooaci V z_ O CC z O V LL LL Q I- O 0 O 0 V 2 w cc O 2 INDICATES PLACEMENT OF SIGN INDICATES FRONT OF SIGN St APPROXIMATE LOCATION OF WORK ZONE NOT DRAWN TO SCALE §4013 II /u/ bua (r a a- u SUMMARY OF DEVICES U p Q = J Ca I r g J u- < r 0—Ws— o= 0 w-crtcc • Q r W W LLi Q p Q QQ O O 0 Y Y Y Y w W W a W � cn=(n(na¢¢<Qw O 0<00< 222<0 UUUIXCCCtfY00 J JJJJMM QQOQ0000OQQ O 0wOOwwwwmm 2CYpCeCC0000 pQ Co Co Co co co co 0 0 bol ar 07 OD M CI CO g ± I I I l i I I I OD On aO '7 W uC(a OD OD D 3 u 4•.. r: it 0 4. 4 u e r ti? e ::br%o U Q sU 0., E AM 12 Ga ig U O 9 C O N M w w a Z X O w mZ w oQ o a MA I- r O w w a O Z N O LL o p Z a W 4.00 D a On< °xzwOti0 O t -U2 ltQ¢wQr -Z Zam r N r ±t; � < -3 J rtOSwQW'-Oael(nCnLU or -.LL �> nw>:pQCWjQ�QESZg 2 ?4QzaDO>aLr\OWQ J� z�rzO��OOWa �OU�mJ�0rc�3rp QW re, JUJU O�Z��j2 w�*..aI.wiwoW0acoa0 U= u.U?u)a�;;,wvJwp Z�OZco—MJY-4tQrW w0WZpaLs'2LCO= Zco rCW 0)Qcna.2Urr .e>OQ O c • c- N C`7 • Ln (0 E LEGEND. Q TICATES PI ACFHFNT CF SIGN INDICATES FRONT OF SIGN ORUM 3M -A BARRICADE CERTIFIED FLAGGER ALL @E'i40E.S SXALL 9 €T 9 WIDDSDLMIARDS ._I's—. iiiiS— MEDIAN INSTALLAT R11-2 ROAD CLOSED rata RFSIGFh7It acCE an NOTES: 1) ADVANCED WARNING PER MHT # 2 & # 2 - A 2) SEE MHT # 2 FOR ADVANCED WARNING AT WEST END OF PROJECT AND MHT # 2 - A FOR ADVANCED WARNING AT EAST END OF PROJECT 3) SIGN SPACING SHALL BE A MIN. OF 500' OR AS SPACE ALLOWS 4) PLAN IS FOR RAILROAD CROSSING CLOSURE 5) MHT # 9 - A SHALL WORK IN CONJUNCTION WITH MHT # 9, # 9 - B, MHT#9-CANDMHT#9-D 6) SEE MHT # 9 FOR CLOSURES ON US 34, # 9 - B FOR ADDITIONAL ROAD CLOSURE DETAIL, MHT # 9 - C FOR DETOUR ROUTE SOUTH OF US 34 AND MHT # 9 • D FOR DETOUR ROUTE DETAIL NORTH OF US 34 7) ACCESS TO ALL ADJACENT PROPERTIES AND ACCESS POINTS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION, RESIDENTS SHALL BE ADVISED TO DETOUR TO SOUTH DURING RAILROAD CROSSING CLOSURE 8) EQUIPMENT/TRUCKS ENTERING LANE CLOSURES SHALL USE CAUTION LIGHTS AND TURN SIGNAL LIGHTS, STROBE/AMBER FLASHING LIGHT ON TOP OF VEHICLE IS REQUIRED 9) PERSONAL VEHICLES SHALL NOT BE ALLOWED TO PARK WHERE IT CONFLICTS WITH THE SAFETY OF THE TRAVELING PUBLIC OR WITHIN WORK ZONE 10) WORKERS SHALL NOT CROSS LANES OF LIVE TRAFFIC WITHOUT USING THE BUDDY SYSTEM 11) FLAGGER AND FLAG SYMBOLS SHALL BE ADDED AS REQUESTED BY CONTRACTOR 12)ALL DEVICES SHALL MEET NCHRP 350 CRASH REQUIREMENTS AND MUTCD STANDARDS 13) ON SITE ADJUSTMENTS SHALL BE MADE AS NEEDED AND APPROVED BY PROJECT ENGINEER 14) PLAN DRAWN PER 2012 M&S STANDARDS S-631-1, CASE NO. 10 Aga Ala • Nis MHT#9 9 WRTHERN COLORADO TIYLFFIC CONTROL I SEE MHT # 9 FOR US 34 CLOSURE K C MHT # 9 -A - SH 34 TURN LANE CLOSURES COUNTY ROAD 13 CLOSURE , FOR CENTER MEDIAN INSTALLATION ON CR 13, COMPLETION OF CR 13 WIDENING & RAILROAD TRACK REPLACEMENT Was sala S . ! / / / - -i--i is RESIDENTIAL ArcccS PESCENTIAL ACCESS OIL TANK TT82Y R' 1 ROAD CLOSED ...11. "It.. • a8 -k46 - V NOT DRAWN TO SCALE SUMMARY OF DEVICES 1 - 48" ROAD CLOSED AHEAD 3 - 48" ROAD CLOSED 1 - 48" ROAD CLOSED LOCAL TRAFFIC ONLY 1 - 24" BUSINESS ACCESS OPEN 2 - 48" FLAGGER SYMBOL (IF NEEDED) 3 - 3M -B BARRICADE 1 - 3M -A BARRICADE "WO .7 ■, TO BE ADDED AS REQUESTED BY CONTRACTOR WELD COUNTY GERRARD EXCAVATING NCTC L.f3..,0-f' /q %`)-QV•-ac D3r1 5/217 OrFar Ines Access D,I-3 : __ _ REVISED 03/15/2017 MATCH LINE MATCH LINE MHT#9 0100 WELD COUNTY CR 13 ROAD CLOSURE NORTHERN COLORADO TRAFFIC CONTROL INC. PREPARED BY: Carol Mooso Project Manager ATSSA: 10t285 EXP. 08/312019 NOT AN ENGINEER Greeley: 970-356-6881 1712 1st Ave • PO Box 490 • Grooby, Co 80623 -riEr 'JJn5 ELIERC:EtI;Y NUGEER 977.35e -f PPM CON7RACTOR: GERRARD EXCAVATING 'RLLECT NAME US34&WCR13 PROJECT NUMBER NCTC #I 15800 PNONa BILL NICHOLL 970-669-1463 S1 -FIT NUMBER_ DATE: MHT # 9 -A 06/01/2016 MHT # 9 - B - SH 34 TURN LANE CLOSURES COUNTY ROAD 13 CLOSURE FOR CENTER MEDIAN INSTALLATION ON CR 13, COMPLETION OF CR 13 WIDENING & RAILROAD TRACK REPLACEMENT M E .1 T MATCH LINE MHT#9-A LEGEND: INDICATES PLACEMENT OF SIGN INDICATES FRONT OF SIGN DRUM 3M -A BARRICADE CERTIFIED FLAGGER ALL (DEVICES SICZLL iMTJET MV4OD.9a VIDAXAS SIRS IININUIRSOM INIMOKINPROI OR OS <T a MO NOTES: 1) ADVANCED WARNING PER MITT # 2 & # 2 - A 2) SEE MHT # 2 FOR ADVANCED WARNING AT WEST END OF PROJECT AND MHT # 2 - A FOR ADVANCED WARNING AT EAST END OF PROJECT 3) SIGN SPACING SHALL BE A MIN. OF 500' OR AS SPACE ALLOWS 4) PLAN IS FOR TURN LANE CLOSURES ON US 34 AND COUNTY ROAD 13 ROAD CLOSURE 5) MHT # 9 - B SHALL WORK IN CONJUNCTION WITH MITT # 9. # 9 - A, MHT#9-C AND MHT #9-D 6) SEE MHT # 9 FOR CLOSURES ON US 34, # 9 - A FOR CR 13 NORTH ROAD CLOSURE DETAIL MHT # 9- C FOR DETOUR ROUTE DETAIL SOUTH OF US 34 AND MHT # 9 - D FOR DETOUR ROUTE DETAIL NORTH OF US 34 7) ACCESS TO ALL ADJACENT PROPERTIES AND ACCESS POINTS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION 8) EQUIPMENT/TRUCKS ENTERING LANE CLOSURES SHALL USE CAUTION LIGHTS AND TURN SIGNAL LIGHTS, STROBE/AMBER FLASHING LIGHT ON TOP OF VEHICLE IS REQUIRED 9) PERSONAL VEHICLES SHALL NOT BE ALLOWED TO PARK WHERE IT CONFLICTS WITH THE SAFE I Y OF THE TRAVELING PUBUC OR WITHIN WORK ZONE 10) WORKERS SHALL NOT CROSS LANES OF LIVE TRAFFIC WITHOUT USING THE BUDDY SYSTEM 11) FLAGGER AND FLAG SYMBOLS SHALL BE ADDED AS REQUESTED BY CONTRACTOR 12) ALL DEVICES SHALL MEET NCHRP 350 CRASH REQUIREMENTS AND MUTCD STANDARDS 13) ON SITE ADJUSTMENTS SHALL BE MADE AS NEEDED AND APPROVED BY PROJECT ENGINEER 14) PLAN DRAWN PER 2012 M&S STANDARDS S-631-1, CASE NO. 10 MHT#9-A MATCH LINE 2715CR 13 GERRARD EXCAVATING NORTHERN COLORADO TRAFFIC CONTROL INC NOT DRAW TO SCALE SUMMARY OF DEVICES 4 - 48" ROAD CLOSED AHEAD 3 - 48" DETOUR AHEAD 1 - 48" ROAD CLOSED TO THRU TRAFFIC 1 - 60" ROAD CLOSED LOCAL TRAFFIC ONLY 1 - 48" DETOUR ARROW (RIGHT) 1 - 48" DETOUR ARROW (LEFT) 2 - 24" BUSINESS ACCESS OPEN 2 - 30" DETOUR MARKER (LEFT) 1 - 30" DETOUR MARKER (RIGHT) 1 - 3M -A BARRICADE 4 - VERTICAL PANEL NCTC lip-r4O-t' /Q 4r�46- 'Co-: REVISED 03/15/2017 <e• x:E. • ATSSA R 106285 EXP. 08/31/2121 ' NOT AN ENGINEER Gnc/ey: 570-356.6881 1712 1st Ave • PO 8a: 490 • Greeley, Co 80623 03/150017 CR 13 ROAD CLOSURE ADVANCED WARNING NORTHERN COLORADO TRAFFIC CONTROL INC. PREPARED EY: Carol Mooso Project Manager J EP .iQOy$ EMERGENCY tillMeER S; G -35;-6c.1 PAAFR COOT/ WELD COUNTY PROJECT NAME PRIME CONTRACTOR GERRARD EXCAVATING US34&WCR13 PROJECT NURSER NCTC # 15800 RNOME BILL NICHOLL 970.669-1463 91E' IRMSER- MHT#9-B DATE: 06/01/2016 N C a O fx H z O It U UOOZ!-.} rep plaint,' a' Of gg V 00 8 7P - O z a— &Io x -t ¢__ij: tiWg O0 m O a W T, O¢ ha O C ,c (, b• U O cc o ta:wLu zoa_srwa aria. cc0 a o `u g z $ 0 W o a m x = Ili WO O o : pow o o. N ~LL a x440•' m Z atZ Q MI s C x � � W 01 r 06 Z Q � >CI CO QU, Sci a? o Q m 0 0zzoz zOCr2 CC z8 a! WO ce W II a a oQ z� UOOZi-)- o rig Hello