HomeMy WebLinkAbout20171301.tiffRESOLUTION
RE: EXTENSION OF REGULATING, WARNING AND GUIDING TRAFFIC DURING THE
TEMPORARY CLOSURE OF COUNTY ROAD 13 BETWEEN COUNTY ROAD 56 AND
U.S. HIGHWAY 34 FOR AN ADDITIONAL TWO (2) WEEKS, TO ACCOMMODATE THE
REORGANIZED FARMER'S DITCH AND UPRR
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 13, between County Road 56 and
U.S. Highway 34, be extended, with said extended closure being effective April 17, 2017, for an
additional two (2) weeks through June 8, 2017, for unanticipated delays due to the Farmer's Ditch
and UPRR reorganization, and further, that standard official traffic control devices shall be erected
at said closure giving notice of the restrictions.
cct t SOCRSS, (Dispatch,
CO SA -o -4-e... Pc' +ro I
2017-1301
EG0024
EXTENSION OF CLOSURE - COUNTY ROAD 13
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 10th day of May, A.D., 2017.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: diewv JC/49;g1 EXCUSED
Weld County Clerk to the Board
BY:
uty Clerk to the Board
APPD AS
../C`dunty Forney
Date of signature: / a ' 11-1
Julie A. Cozad, Chair
Steve Moreno, Pro -Tern
Sean P. Conway
Mike Freeman
arbara Kirkmeyer
2017-1301
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: May 8, 2017
FROM: Janet Lundquist, Public Works Department
SUBJECT: BOCC Agenda Item
Gerard Excavating is requesting an extension for the CR 13 between CR 56 & US 34
construction project road closure. The original road closure was to be closed to thru traffic from
4/17/2017 to 5/26/17. The Contractor is requesting an extension to 6/8/17. The project has had
delays to accommodate the Reorganized Farmer's Ditch and UPRR.
See attached diagrams.
2017-1301
aGooaci
V
z_
O
CC
z
O
V
LL
LL
Q
I-
O
0
O
0
V
2
w
cc
O
2
INDICATES PLACEMENT OF SIGN
INDICATES FRONT OF SIGN
St
APPROXIMATE LOCATION OF WORK ZONE
NOT DRAWN TO SCALE
§4013
II /u/ bua
(r
a
a-
u
SUMMARY OF DEVICES
U
p
Q =
J Ca I r g
J
u-
< r 0—Ws—
o= 0 w-crtcc
• Q r
W W LLi
Q p Q QQ O O 0 Y Y Y
Y w W W a W
� cn=(n(na¢¢<Qw
O 0<00< 222<0
UUUIXCCCtfY00
J JJJJMM
QQOQ0000OQQ
O 0wOOwwwwmm
2CYpCeCC0000 pQ
Co Co Co co co co 0 0 bol ar 07 OD M CI CO
g ±
I I I l i I I I
OD On aO '7 W uC(a OD OD
D
3
u
4•..
r:
it 0
4. 4 u
e
r
ti?
e
::br%o
U Q sU
0.,
E
AM
12
Ga
ig U
O
9
C
O
N
M
w
w
a Z
X O
w
mZ
w
oQ
o
a
MA
I- r
O
w w
a O
Z
N O LL o p Z a
W
4.00 D a On<
°xzwOti0 O t -U2
ltQ¢wQr -Z Zam
r N r ±t; � < -3 J
rtOSwQW'-Oael(nCnLU
or -.LL �>
nw>:pQCWjQ�QESZg 2
?4QzaDO>aLr\OWQ
J�
z�rzO��OOWa
�OU�mJ�0rc�3rp
QW re, JUJU O�Z��j2
w�*..aI.wiwoW0acoa0
U= u.U?u)a�;;,wvJwp
Z�OZco—MJY-4tQrW
w0WZpaLs'2LCO= Zco
rCW 0)Qcna.2Urr .e>OQ
O c • c- N C`7 • Ln (0
E
LEGEND.
Q TICATES PI ACFHFNT CF SIGN
INDICATES FRONT OF SIGN
ORUM
3M -A BARRICADE
CERTIFIED FLAGGER
ALL @E'i40E.S SXALL 9 €T
9 WIDDSDLMIARDS
._I's—.
iiiiS—
MEDIAN
INSTALLAT
R11-2
ROAD
CLOSED
rata
RFSIGFh7It
acCE
an
NOTES:
1) ADVANCED WARNING PER MHT # 2 & # 2 - A
2) SEE MHT # 2 FOR ADVANCED WARNING AT WEST END OF PROJECT
AND MHT # 2 - A FOR ADVANCED WARNING AT EAST END OF PROJECT
3) SIGN SPACING SHALL BE A MIN. OF 500' OR AS SPACE ALLOWS
4) PLAN IS FOR RAILROAD CROSSING CLOSURE
5) MHT # 9 - A SHALL WORK IN CONJUNCTION WITH MHT # 9, # 9 - B,
MHT#9-CANDMHT#9-D
6) SEE MHT # 9 FOR CLOSURES ON US 34, # 9 - B FOR ADDITIONAL
ROAD CLOSURE DETAIL, MHT # 9 - C FOR DETOUR ROUTE SOUTH OF
US 34 AND MHT # 9 • D FOR DETOUR ROUTE DETAIL NORTH OF US 34
7) ACCESS TO ALL ADJACENT PROPERTIES AND ACCESS POINTS SHALL BE
PROVIDED AT ALL TIMES DURING CONSTRUCTION, RESIDENTS SHALL BE
ADVISED TO DETOUR TO SOUTH DURING RAILROAD CROSSING CLOSURE
8) EQUIPMENT/TRUCKS ENTERING LANE CLOSURES SHALL USE CAUTION
LIGHTS AND TURN SIGNAL LIGHTS, STROBE/AMBER FLASHING LIGHT
ON TOP OF VEHICLE IS REQUIRED
9) PERSONAL VEHICLES SHALL NOT BE ALLOWED TO PARK WHERE IT
CONFLICTS WITH THE SAFETY OF THE TRAVELING PUBLIC OR WITHIN
WORK ZONE
10) WORKERS SHALL NOT CROSS LANES OF LIVE TRAFFIC WITHOUT USING
THE BUDDY SYSTEM
11) FLAGGER AND FLAG SYMBOLS SHALL BE ADDED AS REQUESTED BY
CONTRACTOR
12)ALL DEVICES SHALL MEET NCHRP 350 CRASH REQUIREMENTS AND
MUTCD STANDARDS
13) ON SITE ADJUSTMENTS SHALL BE MADE AS NEEDED AND APPROVED
BY PROJECT ENGINEER
14) PLAN DRAWN PER 2012 M&S STANDARDS S-631-1, CASE NO. 10
Aga
Ala
•
Nis
MHT#9
9
WRTHERN COLORADO TIYLFFIC CONTROL I
SEE MHT # 9 FOR
US 34 CLOSURE K
C
MHT # 9 -A - SH 34 TURN LANE CLOSURES COUNTY ROAD 13 CLOSURE ,
FOR
CENTER MEDIAN INSTALLATION ON CR 13,
COMPLETION OF CR 13 WIDENING &
RAILROAD TRACK REPLACEMENT
Was
sala
S
. ! / / / -
-i--i is
RESIDENTIAL
ArcccS
PESCENTIAL
ACCESS
OIL TANK
TT82Y
R' 1
ROAD
CLOSED
...11. "It..
•
a8 -k46 -
V
NOT DRAWN TO SCALE
SUMMARY OF DEVICES
1 - 48" ROAD CLOSED AHEAD
3 - 48" ROAD CLOSED
1 - 48" ROAD CLOSED
LOCAL TRAFFIC ONLY
1 - 24" BUSINESS ACCESS OPEN
2 - 48" FLAGGER SYMBOL (IF NEEDED)
3 - 3M -B BARRICADE
1 - 3M -A BARRICADE
"WO .7 ■,
TO BE ADDED
AS REQUESTED BY
CONTRACTOR
WELD COUNTY
GERRARD EXCAVATING
NCTC L.f3..,0-f' /q %`)-QV•-ac D3r1 5/217
OrFar
Ines
Access
D,I-3
: __ _
REVISED
03/15/2017
MATCH LINE
MATCH LINE
MHT#9
0100
WELD COUNTY
CR 13 ROAD CLOSURE
NORTHERN COLORADO
TRAFFIC CONTROL INC.
PREPARED BY:
Carol Mooso
Project Manager
ATSSA: 10t285 EXP. 08/312019
NOT AN ENGINEER
Greeley: 970-356-6881
1712 1st Ave • PO Box 490 • Grooby, Co 80623
-riEr 'JJn5 ELIERC:EtI;Y NUGEER 977.35e -f
PPM CON7RACTOR:
GERRARD
EXCAVATING
'RLLECT NAME
US34&WCR13
PROJECT NUMBER
NCTC #I 15800
PNONa
BILL NICHOLL
970-669-1463
S1 -FIT NUMBER_
DATE:
MHT # 9 -A 06/01/2016
MHT # 9 - B - SH 34 TURN LANE CLOSURES COUNTY ROAD 13 CLOSURE
FOR
CENTER MEDIAN INSTALLATION ON CR 13,
COMPLETION OF CR 13 WIDENING &
RAILROAD TRACK REPLACEMENT
M
E
.1
T
MATCH LINE
MHT#9-A
LEGEND:
INDICATES PLACEMENT OF SIGN
INDICATES FRONT OF SIGN
DRUM
3M -A BARRICADE
CERTIFIED FLAGGER
ALL (DEVICES SICZLL iMTJET
MV4OD.9a VIDAXAS
SIRS
IININUIRSOM
INIMOKINPROI
OR OS
<T a MO
NOTES:
1) ADVANCED WARNING PER MITT # 2 & # 2 - A
2) SEE MHT # 2 FOR ADVANCED WARNING AT WEST END OF PROJECT
AND MHT # 2 - A FOR ADVANCED WARNING AT EAST END OF PROJECT
3) SIGN SPACING SHALL BE A MIN. OF 500' OR AS SPACE ALLOWS
4) PLAN IS FOR TURN LANE CLOSURES ON US 34 AND COUNTY ROAD 13
ROAD CLOSURE
5) MHT # 9 - B SHALL WORK IN CONJUNCTION WITH MITT # 9. # 9 - A,
MHT#9-C AND MHT #9-D
6) SEE MHT # 9 FOR CLOSURES ON US 34, # 9 - A FOR CR 13 NORTH ROAD
CLOSURE DETAIL MHT # 9- C FOR DETOUR ROUTE DETAIL SOUTH OF
US 34 AND MHT # 9 - D FOR DETOUR ROUTE DETAIL NORTH OF US 34
7) ACCESS TO ALL ADJACENT PROPERTIES AND ACCESS POINTS SHALL BE
PROVIDED AT ALL TIMES DURING CONSTRUCTION
8) EQUIPMENT/TRUCKS ENTERING LANE CLOSURES SHALL USE CAUTION
LIGHTS AND TURN SIGNAL LIGHTS, STROBE/AMBER FLASHING LIGHT
ON TOP OF VEHICLE IS REQUIRED
9) PERSONAL VEHICLES SHALL NOT BE ALLOWED TO PARK WHERE IT
CONFLICTS WITH THE SAFE I Y OF THE TRAVELING PUBUC OR WITHIN
WORK ZONE
10) WORKERS SHALL NOT CROSS LANES OF LIVE TRAFFIC WITHOUT USING
THE BUDDY SYSTEM
11) FLAGGER AND FLAG SYMBOLS SHALL BE ADDED AS REQUESTED BY
CONTRACTOR
12) ALL DEVICES SHALL MEET NCHRP 350 CRASH REQUIREMENTS AND
MUTCD STANDARDS
13) ON SITE ADJUSTMENTS SHALL BE MADE AS NEEDED AND APPROVED
BY PROJECT ENGINEER
14) PLAN DRAWN PER 2012 M&S STANDARDS S-631-1, CASE NO. 10
MHT#9-A
MATCH LINE
2715CR 13
GERRARD EXCAVATING
NORTHERN COLORADO TRAFFIC CONTROL INC
NOT DRAW TO SCALE
SUMMARY OF DEVICES
4 - 48" ROAD CLOSED AHEAD
3 - 48" DETOUR AHEAD
1 - 48" ROAD CLOSED
TO THRU TRAFFIC
1 - 60" ROAD CLOSED LOCAL
TRAFFIC ONLY
1 - 48" DETOUR ARROW (RIGHT)
1 - 48" DETOUR ARROW (LEFT)
2 - 24" BUSINESS ACCESS OPEN
2 - 30" DETOUR MARKER (LEFT)
1 - 30" DETOUR MARKER (RIGHT)
1 - 3M -A BARRICADE
4 - VERTICAL PANEL
NCTC lip-r4O-t' /Q
4r�46-
'Co-:
REVISED
03/15/2017
<e• x:E.
•
ATSSA R 106285 EXP. 08/31/2121 '
NOT AN ENGINEER
Gnc/ey: 570-356.6881
1712 1st Ave • PO 8a: 490 • Greeley, Co 80623
03/150017
CR 13 ROAD CLOSURE
ADVANCED WARNING
NORTHERN COLORADO
TRAFFIC CONTROL INC.
PREPARED EY:
Carol Mooso
Project Manager J
EP .iQOy$ EMERGENCY tillMeER S; G -35;-6c.1
PAAFR
COOT/
WELD COUNTY
PROJECT NAME
PRIME CONTRACTOR
GERRARD
EXCAVATING
US34&WCR13
PROJECT NURSER
NCTC # 15800
RNOME
BILL NICHOLL
970.669-1463
91E' IRMSER-
MHT#9-B
DATE:
06/01/2016
N
C
a
O
fx
H
z
O It
U
UOOZ!-.} rep
plaint,' a'
Of
gg V
00 8 7P
-
O z a— &Io x -t
¢__ij: tiWg
O0 m O a W T,
O¢ ha O C ,c (, b•
U O cc o ta:wLu
zoa_srwa aria.
cc0 a o `u g z $ 0
W o a m x
= Ili WO O o : pow o o. N
~LL a x440•' m
Z atZ Q MI
s
C x
� �
W 01
r
06
Z
Q �
>CI CO
QU,
Sci
a?
o Q m
0
0zzoz
zOCr2
CC z8 a!
WO ce
W
II a a
oQ
z�
UOOZi-)- o
rig
Hello