Loading...
HomeMy WebLinkAbout20172834.tiffCOLORADO Department of Public Health & Environment Dedicated to protecting and improving the health and environment of the people of Colorado Weld County - Clerk to the Board 11500 St PO Box 758 Greeley, CO 80632 August 8, 2017 Dear Sir or Madam: RECEIVED AUG 1 5 2017 WELD COUNTY COMMISSIONERS On August 10, 2017, the Air Pollution Control Division will begin a 30 -day public notice period for Noble Energy, Inc. - Holman Cockroft. A copy of this public notice and the public comment packet are enclosed. Thank you for assisting the Division by posting a copy of this public comment packet in your office. Public copies of these documents are required by Colorado Air Quality Control Commission regulations. The packet must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please send any comment regarding this public notice to the address below. Colorado Dept. of Public Health Et Environment APCD-SS-B1 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 Attention: Clara Gonzales Regards, Clara Gonzales Public Notice Coordinator Stationary Sources Program Air Pollution Control Division Enclosure Pobl;c iew .I t/I7 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe John W. Hickenlooper, Governor ( Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer C.c:PLC- (NeNrYYf TO, HLCZ T3 PwC£RfCH/,'M Ices) csf( (17 2017-2834 Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: Noble Energy, Inc. - Holman Cockroft - Weld County Notice Period Begins: August 10, 2017 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Noble Energy, Inc. Facility: Holman Cockroft Oil and gas exploration and production facility NENW Sec 15 T5N R64W Weld County The proposed project or activity is as follows: Source is proposing to operate a new unit at an existing oil and gas exploration and production facility. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 17WE0349 have been filed with the Weld County Clerk's office. A copy of the draft permit and the Division's analysis are available on the Division's website at https://www.colorado.gov/pacific/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Any such comment must be submitted in writing to the following addressee: Carissa Money Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 cdphe.commentsapcd@state.co.us ACOLOR ADO 1 I AMPT Permit number: Date issued: Issued to: ADO n Contro c Healt CONSTRUCTION PERMIT 17WE0349 Facility Name: Plant AIRS ID: Physical Location: County: General Description: Issuance: 1 Noble Energy, Inc. Holman Cockroft 123/9CA4 NENW SEC 15 T5N R64W Weld County Well Production Facility Equipment or activity subject to this permit: Facility Equipment ID AIRS Point Equipment Description Emissions Control Description VRT 009 Venting of gas from one Vapor Recovery Tower (VRT) Enclosed Flare This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to this specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION 1. YOU MUST notify the Air Pollution Control Division (the Division) no later than fifteen days of the latter of commencement of operation or issuance of this permit, by submitting a Notice of Startup form to the Division for the equipment covered by this permit. The Notice of Startup form may be downloaded online at www.colorado.gov/pacific/cdphe/other-air-permitting- notices. Failure to notify the Division of startup of the permitted source is a violation of Air Quality Control Commission (AQCC) Regulation Number 3, Part B, Section III.G.1. and can result in the revocation of the permit. 2. Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self -certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. A self certification form and guidance on how to self -certify compliance as required by this permit may be obtained online at www.colorado.gov/pacific/cdphe/air-permit-self- certification. (Regulation Number 3, Part B, Section III.G.2.) COLORADO Air Pollution Control Division D partrnent of P.u".€r Health & 7:P,vrronment Page 1 of 7 3. expi er or oper �or f ' e source .-.', this permi as issued: tion/modif t -t ,•peration, i -ource withi; 8 months e of tr constr on per or t e date on , ich such was suled commen�.s set h in the permi lication a edwith thi i - (ii ) . : � ' fi -s cons ' • - 'od of eigh - •'' the or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) 4. The operator shall complete all initial compliance testing and sampling as required in this permit and submit the results to the Division as part of the self -certification process. (Regulation Number 3, Part B, Section III.E.) 5. The operator shall retain the permit final authorization letter issued by the Division, after completion of self -certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 6. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4.) Annual Limits: s permit s does not c er either,, stru Facility Equipment ID AIRS Point Tons per Year Emission Type PM2.5 NO. VOC CO VRT 009 --- --- 26.2 4.2 Point Note: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility -wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility -wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility -wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits, for both criteria and hazardous air pollutants, shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate actual emissions each month and keep a compliance record on site or at a local field office with site responsibility for Division review. 7. The emission points in the table below shall be operated and maintained with the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) Facility Equipment ID AIRS Point Control Device Pollutants Controlled VRT 009 Enclosed Flare VOC and HAP PROCESS LIMITATIONS AND RECORDS 8. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, II.A.4.) COLORADO Air Pollution Control Division Deparimenr .:ni Public )iealth c -nvxrrxnere' Page 2 of 7 ss Para ter Annual L Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. 9. The owner or operator must use monthly condensate/crude oil throughput records, calculation methods detailed in the OEM Plan, and the emission factors established in the Notes to Permit Holder to demonstrate compliance with the process and emissions limits specified in this permit. STATE AND FEDERAL REGULATORY REQUIREMENTS 10. The permit number and ten digit AIRS ID number assigned by the Division (e.g. 123/4567/001) shall be marked on the subject equipment for ease of identification. (Regulation Number 3, Part B, Section TILE.) (State only enforceable) 11. No owner or operator of a smokeless flare or other flare for the combustion of waste gases shall allow or cause emissions into the atmosphere of any air pollutant which is in excess of 30% opacity for a period or periods aggregating more than six minutes in any sixty consecutive minutes. (Regulation Number 1, Section II.A.5.) 12. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) OPERATING £t MAINTENANCE REQUIREMENTS 13. Upon startup of these points, the owner or operator shall follow the most recent operating and maintenance (OEM) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to the OEM plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements 14. Within one hundred and eighty days (180) after commencement of operation or issuance of this permit, whichever comes later, the owner or operator shall demonstrate initial compliance with opacity standards, using EPA Reference Method 9, 40 C.F.R. Part 60, Appendix A, to measure opacity from the flare. The observation period shall be 1 hour in duration. (Regulation Number 1, Section II.A.5) ADDITIONAL REQUIREMENTS 15. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or For volatile organic compounds (VOC) and nitrogen oxides sources (NOr) in ozone nonattainment areas emitting less than 100 tons of VOC or NO. per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or COLORADO Air Pollution Control Division Deparhnent of Public Health & F..n.irnnrrent. Page 3 of 7 tons per ear or mor or any no - - `a rep: utant ore, a c r is less, actual emi e level re ns of five ed on the If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or • Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. 16. Federal regulatory program requirements (i.e. PSD, NANSR) shall apply to this source at any such time that this source becomes major solely by virtue of a relaxation in any permit condition. Any relaxation that increases the potential to emit above the applicable Federal program threshold will require a full review of the source as though construction had not yet commenced on the source. The source shall not exceed the Federal program threshold until a permit is granted. (Regulation Number 3, Parts C and D). GENERAL TERMS AND CONDITIONS 17. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 18. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7- 114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self -Certify for Final Authorization section of this permit. 19. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 20. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 21. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by COLORADO Air Pollution Control Division Department of PbA. Health c -nvvoxnrrant. Page 4 of 7 rato bef it, the o 'vision's perator of °'urce may 22. lion 25 7 4.7(2)( C R .uires t all sou requir file an Air Pollu Emission ) mus .. ,, .nn'. t :,Na,. r- er thf ns and ad n. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 23. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: Carissa Money Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Noble Energy, Inc. for one vapor recovery tower. COLORADO Air Pollution Control Division Department of RANI, Health o -rvrrnmefr Page 5 of 7 Notes t. : rmit Hold.t their• ' " permit iss 1) Thermit holderequi to • ees fort : • "= time fo is p- it. An invo '";, for these fee s -ll be issu-,,' .fter t ermi ssued a perms gilder shay the invoice n 30 days e invure evocationermit. (Regulation Number 3, Part A, Section VI. B. ) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-regs 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. Facility Equipment ID AIRS Point Pollutant CAS # Uncontrolled Emissions (lb/yr) Controlled Emissions (lb/yr) VRT 009 Benzene 71432 5,376 269 Toluene 108883 2,755 138 Ethylbenzene 100414 69 3 Xylenes 1330207 1,033 52 n -Hexane 110543 34,579 1,729 2,2,4- Trimethylpentane 540841 1,121 56 Note: All non -criteria reportable pollutants in the table above with uncontrolled emission rates equal to or greater than 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 009: CAS # Pollutant Uncontrolled Emission Factors (lb/bbl) Controlled Emission Factors (lb/bbl) Source NOx 0.0074 0.0074 AP -42, Table 13.5-1 CO 0.0337 0.0337 AP -42, Table 13.5-1 VOC 4.2403 0.2120 Source (HYSYS) 71432 Benzene 0.0217 0.0011 Source (HYSYS) 108883 Toluene 0.0111 0.0006 Source (HYSYS) 100414 Ethylbenzene 0.0003 0.00001 Source (HYSYS) 1330207 Xylene 0.0042 0.0002 Source (HYSYS) 110543 n -Hexane 0.1398 0.0070 Source (HYSYS) COLORADO Air Pollution Control Division Department of P.irii,- Health c -nvirnn n nt. Page 6 of 7 Uncontr• 3 ed Emission (lb/ l)N Contr = Emission (lb/• • c o S ce 2 2 Trimethy pen ane So :a.� �F YS) Note: The controlled emissions factors for this point are based on the flare control efficiency of 95%. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shalt be submitted no later than 30 days before the five-year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692- 3150. 7) This facility is classified as follows: Applicable Requirement Status Operating Permit Synthetic Minor Source of: VOC, HAPs NANSR Synthetic Minor Source of: VOC 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A - Subpart KKKK NSPS Part 60, Appendixes Appendix A - Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA - Subpart DDD MACT 63.1200-63.1439 Subpart EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ - Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ - Subpart MMMMM MACT 63.8980 -End Subpart NNNNN - Subpart XXXXXX COLORADO Air Pollution Control Division Department of Paid ,^ Ffealth & -nv.rnnrner,r. Page 7 of 7 Colorado Air Permitting Project Project Details Review Engineer: Package #: Received Date: Review Start Date: Section 01- Facility Information Company Name: Noble. Energy, Inc: County AIRS ID: 123 Plant AIRS ID: 9CA4 Facility Name: Holman Cockroft Physical Address/Location: NENW quadrant of Section 15, Township SN, Range 64W, in Weld County, Colorado Type of Facility: Exploration &Production Well Pad What industry segment? Oil &Natural Gas Production- _Processing, Is this facility located in a NAAQS non -attainment area? Yes If yes, for what pollutant? ❑ Carbon Monoxide (CO) Carissa Money 361030 4/14/2017 7/3/2017 Weld Quadrant Section Township Range NENW Section 02 - Emissions Units In Permit Application ❑ Particulate Matter (PM) Ozone (NOx & VOC) AIRs Point # Emissions Source Type Equipment Name Emissions Control? Permit # Issuance # Self Cert Required? Action Engineering Remarks 009 Separator Venting .. ' VRT Yes 17WE0349 1 Yep ;- ; hermit Initial : Issuance Section 03 - Description of Project Source is requesting a new permit for an existing VRT. The VRT used to be recycled via a VRU but Noble is removing the VRU. Now the VRT will be routed, to a flare. Section 04 - Public Comment Requirements Is Public Comment Required? If yes, why? Yes: Requesting Synth€tic Minor Permit Section 05 - Ambient Air Impact Analysis Requirements Was a quantitative modeling analysis required? I�Io If yes, for what pollutants? If yes, attach a copy of Technical Services Unit modeling results summary. Section 06 - Facility -Wide Stationary Source Classification Is this stationary source a true minor? Colorado Air Permitting Project Is this stationary source a synthetic minor? If yes, indicate programs and which pollutants: Prevention of Significant Deterioration (PSD) Title V Operating Permits (OP) Non -Attainment New Source Review (NANSR) 'Fes SO2 NOx CO VOC PM2.5 PM10 TSP HAPs ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ ❑ ❑ El ❑ El Is this stationary source a major source? No If yes, explain what programs and which pollutants here: SO2 NOx CO VOC PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration (PSD) ❑ ❑ ❑ ❑ ❑ ❑ Title V Operating Permits (OP) ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Non -Attainment New Source Review (NANSR) ❑ ❑ Emissions Inventory Section 01- Administrative Information Facility AIRs ID: 123 County 9CA44 Plant 009 Point Section 02 - Equipment Description Details Venting of gas from one vapor rec (VRT)_., Detailed Emissions Unit Description: - - Enclosed combustion device Emission Control Device Description: Requested Overall VOC & HAP Control Efficiency %: Other Equipment Gas meter Section 03 - Processing Rate Information for Emissions Estimates Primary Emissions - Separator Maximum vent rate - Requested Permit Limit Throughput = 95 1,172.0: scf/hr 247,360.5'. Barrels (bbl) per year Potential to Emit (PTE) Throughput = 247,361 Barrels (bbl) per year Process Control (Recycling) VRU: VRU operation: `/! zAir A% Bypass (annual) Secondary Emissions - Combustion Device(s) for Air Pollution Control Separator Gas Heating Value: Section 04 - Emissions Factors & Methodologies Control Efficiency % 2617 Btu/scf Potential Process Parameters: Gas Recycled: 0.0 MMscf/yr Gas Routed to Control: 10.3 MMsd/yr Description This VRTis located downstream of an inlet (high pressure) separator and low pressure separator: where the liquids undergo gas/liquid separation prior to the VRT. A pressurized liquid sample was taken from the high pressure separator at 182 prig} 97 deg P (sampled: 2/9/2017) and modeled, using HYSYS Version 84, through the LP separator and VRT. Themass fractions, molecular weight (MW), and sent rate of the waste gas stream are derived from the modeled VRT gas .strearm "VRT Vapors to Bunter'. The model was based on the following parameters. Input Parameters Modeled Liquid Throughput (If applicable) 677.7 Barrels (bbl) per day Separator Pressure ',122. psig Separator Temperature 97 deg F EPA Emission Inventory Improvement Program Publication: Volume II, Chapter 10 - Displacement Equation (10.4-3) Ex=Q'MW'Xx/C Ex = emissions of pollutant x Q= Volumetric flow rate/volume of gas processed MW = Molecular weight of gas = SG of gas ' MW of air Xx = mass fraction of x in gas C = molar volume of ideal gas (379 scf/lb-mol) at 6OF and 1 atm Modeled Vent Rate ........1,:172:0 sd/hr 41.5 scf/bbl Throughput (Q) 10.3 MMscf/yr 1172 scf/hr MW 46.95 lb/lb-mol 0.028128 MMscf/d mass fraction (%) lb/hr lb/yr tpy Helium 0.00 0.00 0.00 CO2 0,96 1.39 12209.54 6.10 N2 020 0.29 2543.65 1.27 methane :2.30 3.34 29252.03 14.'03 ethane 14.09 20.46 179200.45 89.60 propane 3187 46.27 405331 32 202.67 isobutane '.730 10.60 92843 38 4642 n -butane 20.62 29.94 262250.77 131.13 isopentane 5.46 7.93 69441.76 34.72 n -pentane 6.63 9.63 84322.14 42.16 cyclopentane x2.12 3.08 26962.74 13.48 n -Hexane 272 3.95 34593.70 17.30 cyclohexane 0.00 0.00 0.00 Other hexanes 2.35 4.14 36247.07 18.12 heptanes 1.69 2.45 21493.88 10.75 methylcyclohexane 0.00 0.00 0.00 224-TMP '.0-09 0.13 1144.64 0.57 Benzene 0.42 0.61 5341.67 2.67 Toluene 1'.0:22 0.32 2798.02 1.40 Ethylbenzene ,-0.02 0.01 127.18 0.06 Xylenes 0.09 0.13 1144.64 0.57 C8+ Heavies ':0.38 0.55 4832.94 2.42 Total VOC Wt % 100.02 82 47 Total VOC (Uncontrolled)) 524.44 Note: lb/hr emission rates in the table above are based on 8760 hr/yr venting and requested gas volume 3 of 6 K:\PA\2017\17W E0349.CP1.xlsm Emissions Inventory Emission Factors Separator Venting Pollutant VOC Benzene Toluene Ethylbenzene Xylene n -Hexane 224 TMP Uncontrolled Controlled (Ib/bbl) (lb/bbl) Emission Factor Source (Liquid Throughput) (Liquid Throughput) 4.2403 0.2120 0.0217 0.0011 0.1398 0.0045 0.0002 0.00001 0.0002 0.0070 Emission Factors Separator Venting Pollutant VOC Benzene Toluene Ethylbenzene Xylene n -Hexane 224 TMP Pollutant Uncontrolled Controlled (Ib/MMscf) (Ib/MMscf) (Gas Throughput) (Gas Throughput) / ri/ ,;;;x;„r //' 6 Primary Control Device Uncontrolled Uncontrolled (Ib/MMBtu) lb/bbl PM10 0. 0.0008 0.0008 0,0074 0.0337 Section 05 - Emissions Inventory Zline Emission Factor Source Emission Factor Source Criteria Pollutants Potential to Emit Uncontrolled (tons/year) Actual Emissions Uncontrolled Controlled (tons/year) (tons/year) Requested Permit Limits Uncontrolled Controlled (tons/year) (tons/year) VOC PM10 PM2.5 NOx CO 524.4 524.4 26.2 524.4 26.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.9 0.9 0.9 0.9 0.9 4.2 4.2 4.2 4.2 4.2 Hazardous Air Pollutants Potential to Emit Uncontrolled (tons/year) Actual Emissions Uncontrolled Controlled (tons/year) (tons/year) Requested Permit Limits Uncontrolled Controlled (tons/year) (tons/year) Requested Permit Limits Uncontrolled Controlled (Ibs/year) llbs/year) zrce's Requested Permit Lin Uncontrolled Controlled (lbs/year) (Ibs/year) Benzene Toluene Ethylbenzene Xylene n -Hexane 224 TMP 2.6880 2.7 0.1 2.6708 0.1335 5342 267 5376 269 1.3775 1.4 0.1 1.3990 0.0700 2798 140 2755 138 0.0345 0.1 0.0 0.0636 0.0032 127 6 69 3 0.5165 0.6 0.0 0.5723 0.0286 1145 57 1033 52 17.2895 17.3 0.9 17.2968 0.8648 34594 1730 34579 1729 0.5605 0.6 0.0 0.5723 0.0286 1145 57 1121 56 Section 06 - Regulatory Summary Analysis Regulation 3, Parts A, B Regulation 7, Section XVII.B, G Regulation 7, Section XVII.B.2.e (See regulatory applicability worksheet for detailed analysis) Facility is located in non attainment area. Separator is not subject to Reg 7 Separator is not subject to Reg 7 4 of 6 K:\PA\2017\ 17WE0349.CP1.xlsm Emissions Inventory Section 07 - Initial and Periodic Sampling and Testing Reauirements Does the company use site specific emission factors based on a gas sample to estimate emissions? If yes, are the emissions factors based on an gas sample drawn at the facility and from the equipment being permitted? This sample should be considered representative which generally means site -specific and collected within one year of the application received date. However, if the facility has not been modified (e.g., no new wells brought on-line), then it may be appropriate to use an older site -specific sample. If no, the permit will contain an "Initial Compliance" testing requirement to collect a site -specific sample and conduct an emission factor analysis to demonstrate that the emission factors are less than or equal to the emissions factors established with this application. Does the company use site specific emission factors based on a pressurized liquid sample and process simulation to estimate emissions? If yes, are the emissions factors based on an pressurized liquid sample drawn at the facility and from equipment located upstream of the permitted equipment? This sample should be considered representative which generally means site -specific and collected within one year of the application received date. However, if the facility has not been modified (e.g., no new wells brought on-line), then it may be appropriate to use an older site -specific sample. If no, the permit will contain an "Initial Compliance" testing requirement to collect a site -specific liquid sample and conduct an emission factor analysis to demonstrate that the emission factors are less than or equal to the emissions factors established with this application. Does the company request a control device efficiency greater than 95% for a flare or combustion device? If yes, the permit will contain and initial compliance test condition to demonstrate the destruction efficiency of the combustion device based on inlet and outlet concentration sampling Section 08 - Technical Analysis Notes Sincethis unit is a VRT,the source has requested to use liquid throughput for monitoring. Whilethis.is a forge emission source with potetntial uncontrolled emissions greater than 100 tpy. Dimsion policy into allow for liquids rnonitoringfi due Yoffie lower pressureand harder to track flow for these types of units, Since the source wal: be monitoring liquids throughput, the only requirements is that the model be based on a site -specific pressurized liquids sample which it was will be no additionalsampling requirements in the permit. ---- d on Notice of Startup, AIRS ID 061- 004 started 12/29/2013- I couldn't find'anAPEN or NOS for AIRS ID 007. Assuming the VRT was inpface before 8/1/2014. - Section 09 - Inventory SCC Coding and Emissions Factors AIRS Point # 009 Process # 01 SCC Code i1 Uncontrolled Emissions Pollutant Factor Control % PM10 19.50 0 PM2.5 19.50 0 NOx 177.96 0 VOC 102162.70 95 CO 811.27 0 Benzene 523.63 95 Toluene 268.34 95 Ethylbenzene 6.72 95 Xylene 100.62 95 n -Hexane 3368.07 95 224 IMP 109.19 95 5 of 6 K:\PA\2017\17WE0349.CP1.xlsm Separator Venting Regulatory Analysis Worksheet C a E a 0 W E a C a z a eTs C Q a en O 0 Colorado Re ATTAINMENT f11 0 O v m 0 .4 a Q n'1 C .9 O O a 00 N . >- al 0- 0_ F- M C O = i0 OD m CC v m O F- .0 ry O C E .. y v 0 a 0 m y a 0. u o o o ti C 7 « �> v c a, m L X O E z O — a v F c un t° c 0 v 00 c c o o E a. a CO c O O > •H 0) E v 72"".. j 0 C p v > 0 Cro N � v a a a NON -ATTAINMENT J C %1 c O 0 Colorado Re ally fractured, or recompleted on or after August 1, 2014? Was the well newly constructed, hydra tional Section 0 Alternative Emissions Control v O C a • C L G1 O C 0 E a C ai C) a 0 E O v O 0 m a m 0 O 0 m C) m ons control equipment Section XVII.B.2.e — Alternativ Disclaimer 0) N Emission Source AIRS ID: Permit Number: Facility Equipment ID: Section 02 — Requested Action (check applicable request boxes) Section 01— Administrative Information L a) d...c0 .0. 0 vs ., ❑ o R 0 O: C o p. c oe E cal cu m x a A.. H 4� .°0 T a'"i C •c .. i. ,. c o. .. o Y c 0 0 = ° et $ .y rio v y., 2 m u '.. y 0 i y.., v 5 .. 0 a m .0 C Ca 'a Q FL .a cri y 'a0s I.tooiII o Z . >+ m Z v 47 F y 'tn O < , - .C- a P.. C ;U L 'y n U d o ° O ►• 0 A. ° V Z A bbO bq ._a ZP4^o C O C) n H U awn n P4'Ili10+ Ar A) 6) a) 0 :0 0 0 ag❑❑gc❑❑ ND DO C) T1 CD [V CO fN °,� c c v UU C > U z ,i_.- HOLMAN COCKROFT T5N-R64W-515 L01 Source Name: NENW SEC25 TSN R64W 1625 Broadway, Suite 2200 303-228-4415 Phone Number CC CO L' el Person To Conta 'C CO co U a ece a C L aC) .0 C e CD 111 CC C .0 Cn C TG a Section 03 — General Information CC b •0 .2 0 a) o C CC u u c a) ° 0 3 c1 24 hours/day 7 Vapor Recovery Tower 0 .0 C ��a0 O O a) G) o e ° v 0 0 O cry c far 0 O . C a) E O -0 °z ° a) 0 L O O C E p w °' rn m �i 2 ° p_ C N .. Ol C'< CNi� .rn .C CZ U '�._ y e o00 N U tp. r. .p Q go() N• W `'"' 0 U a77 'F, a .v'.,e„ w a > > '� �: P-. V e, SAcn C c VI m �� Is. co 0to o a.O _F U v t C O O y- ° ^o -n v.0 o °; 00 V ° o G Cr) _..C, C Cl)a0 0. 0 aCi, ° > 3 c .. CD t°,' v -, �« ;, s en ° Ct 3 L ° C° C A ~ 3 p �a v o o L4-• � -a N' b i:uC"611 >> OQ)UN -ameal. O „i..' Q U O ,C C. C yU C 0. O..Cn y U a -.� " 0 O. — o,o ` ° m cil U -CO c,. ea C .2 aVO coC C°. � W .¢ •P.'U 'ty -a O ). to E w� UdvA w .< f.") Q ¢p o ° O O N 8 Gam.' a) c .C C) C 0 a] a U 0 0 0 410 v ° c3 a)3 v,= Section 04 Processing Equipment Information 401 0 0 ad C) MMscf/event 0 CC C) 0 0 U. ba 0 R cU G I G CS 0 o O 01 ° . G L v "g b U n' 00Cty oo EU U CO C) a. a C) A 0 0 I a) C) 0 OOOOO N � a C E C CO U:C) Y` c so O o 1 C) u O• p c.) ti h .0 OT.... 0 0 o 0 p. a 0. al O '0 O 0 0 ooP. o 0 o ea C G' 0 ° ° .0 .0 0 0 U U U v an N Uh V O > -O C.' s: C) ° N 0 b Cis 'C et Vented Gas Properties: N VRT-Natural-Gas-Venting-APEN (2) O C 1 U a, A Emission Source. Permit Number: er Lat/Long or UTM) 6.1 0 tre 0 0 Section 06 —Stack (Source, if no combustio 0. a O 0 0 te b ra E a 9 yrt N O 0 CO ca If rr 0 v Circular: 0 u CO 00 CCO 0 D 7 — Control Device Information U 0) . 0 CO 0 C3 0 O CO .0 00 •0 a a 4) Cam) C) z° 0 v CJ U O [ CT ❑ 2 U N X67 .. W O> Q s,::,, 3:0m obil o A U Ci. 0C ? Q C .' Z E ' O O .C o U E • > C3 Make/Model: U U U O y C7 C)61 II K h Cc w CO W �+ C u a.. 0 �O D O R ai E 0 _y `9 ^c7 C U CS CO a, O 7-4 03 � Lr CO v u O CC 0 V 'Q CO OO •q7,1a W .0 I 1 1 O CFJ E 0 C.) CaC) CC) Estimation Method or Emission Factor Source th >. AP -42 II AP -42 > x > , Hysys Please use the APCD Non -Criteria Reportable Air Pollutant Addendum form to report pollutants not listed above. Requested Permitted Emissions - J $ 8 a o F a N " '2: 0 -1- V '1 o n 0 o 0 a.0 0 LUncontrolled (Tons/Year) 524.49 O o CY co 'r-i o a CV Actual Calendar Year Emissions4 Controlled (Tons/Year) Uncontrolled (Tons/Year) Emission Factor Units .a. .0 0 .Q . .0 a .fl: Uncontrolled Basis Do 0 • ico i 4 I' en Control. Efficiency CA Reduction) e Cif c CC in e in o a 0 a Overall Collection Efficiency Control Device Description T CO 0 C) Primary VOC Burner VOC Burner VOC Burner VOC Burner VOC Burner Pollutant VOC Z CO Benzene a G >, u.4 x N I C u eJ 0 " curl U 44 se O 0 0 i3J ens 2 O U O M 44 0 _ 9 _ .0 0 2 ar 7eo .0 ca. q CD ai o .9 as C U 0 r`l �J O�F P Q N i+ N p'.r y.. 4^, v :. fin Z C U w a).C C3 :? z cOc.O 0 4,O o 44 CL 2- U RC ++ CJ U N 44 N u O >.* .C t7 0 O 0 U a) 0 0) r0-* •0 0 CO CO a 4-r O E z re of Person. Legally Authorized to S VRT:Natural-Gas-Venting-APEN (2) cV O 00 4 FORM APCD-211 Hello