Loading...
HomeMy WebLinkAbout20173634.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 19 BETWEEN COUNTY ROADS 20 AND 22 FOR APPROXIMATELY FIVE (5) DAYS, FOR CULVERT REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 19, between County Roads 20 and 22, be temporarily closed, with said closure being effective October 30, 2017, for approximately five (5) days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc 3ocRSJ , O ; apo•-4ch, GO 5 i-O,-Ea t'O1 2017-3634 EG0024 TEMPORARY CLOSURE - COUNTY ROAD 19 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 23rd day of October, A.D., 2017. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: dithov ,e1 Weld County Clerk to the Board BY oe., l iV puty Clerk to the Board ED County Attorney Date of signature: ► I t3( I ez,a Julie 9,. Cozad, Chair Steve Moreno, Pro -Tern Sean P. Conway ke Freeman C- c) 2017-3634 EG0024 MEMORANDUM TO: Clerk to the Board DATE: October 18, 2017 FROM: Amy Joseph, Public Works Department SUBJECT: BOCC Agenda [tern 4 WCR 19 between WCR 20 and WCR 22 is closed from 10/30/2017 thru 11/3/2017 for a culvert replacement. WCR 47 between WCR 72 and WCR 74 is closed from 10/30/2017 thru 11/3/2017 for a culvert replacement. See attached closure diagram(s). M:\Marj\AGENDA memos \Agenda Road Closures.docx 2017-3634 104 m 14-1494 k'tRt1/2)04#11-a H WC rart ...,.w, .•V, CIWJAIMW 0-.14 t," NO 1.411% V yY WCR 22 41.44fp'14E-R44*AI ED41*f-+Jrr] ..Gfi4+24•9F+JH14Li4F:r3iith*L6t1HHaE'L'+Ji.o44.H1 !44Kat113i$+!IC•SHitHO1611414 Litie4e•Jthl9: yr'tai �l fl Hletib4. B4.d# S 19 -•-' 4? 77 TiivAgr 2 ROA LOCALOSED IrAtit D CL TRAFFIC ONLY 2 i is 1. ' .iet I I WCR 20 i t x cbt �m 0 c WCR 23 bno1RG i! HI DI tog! a N S Project # AN -59 Road closure description WCR 19 between WCR 20 and WCR 22 closed 10/30/2017 thru 11/3/2017 for culvert replacement Notice to Public Road signs and barricaded during closure Message boards to be used Detour Route WCR 20 between WCR 19 and WCR 23 2 mile paved WCR 23 between WCR 20 and WCR 22 1 mile paved WCR 22 between WCR 19 and WCR 23 2 mile gravel Notes ADT of WCR 19 is; 2479/2017 Culvert replaced is drainage: with new 24" RCPA Mag chloride to be used for dust control Culvert is .2 north of WCR 20 on WCR 19 Placement of signs not to scale Date 10/18/2017 Prepared by LEE STEPHEN Approved by county engineer CAMERON PARROTT Hello