Loading...
HomeMy WebLinkAbout20173244.tiffRESOLUTION RE: APPROVE PUBLIC ROAD AT -GRADE CROSSING IMPROVEMENT AGREEMENT FOR COUNTY ROAD 49 AND AUTHORIZE CHAIR TO SIGN - UNION PACIFIC RAILROAD COMPANY WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Public Road At -Grade Crossing Improvement Agreement for County Road 49 between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Union Pacific Railroad Company, commencing upon full execution of signatures, with further terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Public Road At -Grade Crossing Improvement Agreement for County Road 49 between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Union Pacific Railroad Company be and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 20th day of September, A.D., 2017. BOARD OF COUNTY COMMISSIONERS ATTEST: ddmvo Weld County Clerk to the Board BY: • eputy Clerk to the Board APPED AS Coun y Attorney Date of signature: 9 /91/ 7 WELD COUNTY, C,Q RADO 6 Steve Moreno, arbara Kirkmeyer 2017-3244 EO0074 10414,1 MEMORANDUM TO: Esther Gesick, CTB DATE: September 18, 2017 FROM: Clay Kimmi, P.E., Public Works SUBJECT: Union Pacific Crossing Agreement for CR 49 just North of CR 54 Please place the attached crossing agreement on the BOCC Agenda. Once the agreement has been signed, please return a signed original back to me so I can provide it to Union Pacific Railroad. This agreement is for the replacement and widening of the railroad crossing at CR 49 just north of CR 54. The railroad will widen their crossing across the new CR 49 alignment. Since the crossing is classified as an exempt crossing by the Colorado PUC, the flashing lights and gates will not be reinstalled. However, the crossing will be equipped with all of the necessary conduits needed to install the lights and gates in the future. Weld County is paying the railroad $176,638.00 for the agreement and the construction. Of the $176,638, $44,000 is for the lease of the area covered by the crossing and $132,638.00 is for the construction activities. The term of the lease is for as long as the roadway is in place. The cost for the agreement and the construction activities will be paid by IHC. I will plan on attending the BOCC hearing to answer any questions that the Board may have regarding this agreement. Page 1 of 1 M:`. --Active ProjectsSTRATEGIC CORRIDOR`WCR 49 Corridor\Railroad\Union Pacific RR Agreement Memo to CTB 9-18-17 docx 2017-3244 E- Do -r L WELD COUNTY ROAD 49 Updates Work Session AGENDA Monday, September 18, 2017 • IHC Design/Construction Updates — Greg • Railroad Update — Elizabeth/Clay • WCR 47 ROW — Tiffane • Dechant Update — Bob During the work session, the BOCC directed staff to send the railroad agreement to CTB and have it included on the agenda for Wednesday, September 20, 2017. *753004* I hull 11111 11111 11111 11111 11111 11111111 REMS FileNet Cover Sheet AUDIT NUMBER 84874 FOLDER NUMBER 0305783 CITY KERSEY STATE CO PARTY NAME WELD COUNTY PRIMARY PURPOSE Warning Devices - Public Roadway EFF. DATE 9/26/2017 MP START 145.19 MP END PRIMARY CIRC7 NJ508 DESCRIPTION Crossing - Public Roadway BOX NUMBER 0 BATCH 00 Public E-lighwt` '1tA,rade ( ro.`ittu 03 01 i 1 Standard Form .1ppru•cil. .1\ P 1 .tck UP Real Estate Folder No.: 3057-83 Agreement Number ,��y :Cr 7 PUBLIC HIGHWAY AT -GRADE CROSSING AGREEMENT COUNTY ROAD 49 DOT NUMBER 805243D MILE POST 145.19 MONFORT IND. LD. KERSEY, WELD COUNTY, COLORADO THIS AGREEMENT ("Agreement") is made and entered into as of the ay of 2011 ("Effective Date"), by and between UNION PACIFIC RAILROAD COMPANY. a Delaware corporation, to be addressed at Real Estate Department, 1400 Douglas Street, Mail Stop 1690, Omaha, Nebraska 68179 ("Railroad") and Weld County, a municipal corporation or political subdivision of the State of Colorado to be addressed at 1111 H St., Greeley. CO 80632 ("Political Body"). RECITALS: The Political Body desires to undertake as its project (the "Project") the widening of an existing at -grade public road crossing over County Road 49, DOT Number 805243D at Railroad's Milepost 145 19 on Railroads Monfort Ind Ld. at or near Kersey. Weld County. Colorado (the "Crossing Area"). The area currently used by the Political Body is depicted on Exhibit A as the "Existing Crossing Area" and the new area which the Poltiical Body needs in order to construct the Project is the 'New Crossing Area". The Existing Crossing Area and the New Crossing Area are collectively referred to as the Crossing Area. The New Crossing Area is described in the legal description marked Exhibit A-1. The portion of the roadway located within the Crossing Area is the "Roadway". The Railroad and the Political Body are entering into this Agreement to cover the above. 4339963 Pages: 1 of 36 09/28/2017 03:47 PM R Fee:$0 00 Carly KopReS : Clerk and Recorder, Weld County, CO I I II III I Ik, � aW ICI I� III I ■IIIl� e2?o / 302046 t'tjhii fit lt«c�} Ar-(iradc l no%%my. 01 ti! I I Standard hum \ppwnned, follows AGREEMENT: NOW, THEREFORE. it is mutually agreed by and between the parties hereto as Section 1. EXHIBIT B The general terms and conditions marked Exhibit B, are attached hereto and hereby made a part hereof. Section 2. RAILROAD GRANTS RIGHT For and in consideration of the sum of FORTY FOUR THOUSAND DOLLARS ($44,000) to be paid by the Political Body to the Railroad upon the execution and delivery of this Agreement and in further consideration of the Political Body's agreement to perform and comply with the terms of this Agreement, the Railroad hereby grants to the Political Body the right to construct, maintain and repair the Roadway over and across the Crossing Area. Section 3. DEFINITION OF CONTRACTOR For purposes of this Agreement the term 'Contractor" shall mean the contractor or contractors hired by the Political Body to perform any Project work on any portion of the Railroads property and shall also include the Contractor's subcontractors and the Contractor's and subcontractors respective employees, officers and agents. and others acting under its or their authority. Section 4. CONTRACTOR'S RIGHT OF ENTRY AGREEMENT - INSURANCE A. Prior to Contractor performing any work within the Crossing Area and any subsequent maintenance and repair work, the Political Body shall require the Contractor to • execute the Railroad's then current Contractor's Right of Entry Agreement • obtain the then current insurance required in the Contractor's Right of Entry Agreement: and • provide such insurance policies, certificates, binders and/or endorsements to the Railroad B The Railroad's current Contractor's Right of Entry Agreement is marked Exhibit D. attached hereto and hereby made a part hereof. The Political Body confirms that it will inform its Contractor that it is required to execute such form of agreement and obtain the required insurance before commencing any work on any Railroad property Under no circumstances will the Contractor be allowed on the Railroad's property without first executing the Railroad's Contractor's Right of Entry Agreement and obtaining the 4339963 Pages: 2 of 36 00 09/28/2017 03:47 PM R Fee.$0 Weld County; CO Carly Koppe$ � Clerk and Recorder, der , t I III III I� �"h I� i�•11� Public I i law. :rd. \t -(trade ( missing 0; tl l I t Stant.larcl 1 tInn .1pprtbved. A\ P-I.J S insurance set forth therein and also providing to the Railroad the insurance policies binders, certificates andior endorsements described therein. C. All insurance correspondence, binders, policies, certificates and/or endorsements shall be sent to: Senior Manager - Contracts Union Pacific Railroad Company Real Estate Department 1400 Douglas Street, Mail Stop 1690 Omaha, NE 68179-1690 UP File Folder No, 3057-83 D. If the Political Body's own employees will be performing any of the Project work, the Political Body may self -insure all or a portion of the insurance coverage subject to the Railroad's prior review and approval. Section 5. FEDERAL AID POLICY GUIDE If the Political Body will be receiving any federal funding for the Project, the current rules, regulations and provisions of the Federal Aid Policy Guide as contained in 23 CFR 140, Subpart I and 23 CFR 646, Subparts A and B are incorporated into this Agreement by reference. Section 6. NO PROJECT EXPENSES TO BE BORNE BY RAILROAD The Political Body agrees that no Project costs and expenses are to be borne by the Railroad In addition. the Railroad is not required to contribute any funding for the Project. Section 7. WORK TO BE PERFORMED BY RAILROAD; BILLING SENT TO POLITICAL BODY; POLITICAL BODY'S PAYMENT OF BILLS A. The work to be performed by the Railroad, at the Political Body's sole cost and expense, is described in the Railroad's Summary of Material and Force Account Work dated September 9. 2017, marked Exhibit C. attached hereto and hereby made a part hereof (the "Estimate"). As set forth in the Estimate, the Railroad's estimated cost for the Railroad's work associated with the Project is One Hundred Thirty Two Thousand Six Hundred Thirty Eight Dollars ($132,638). B. The Railroad, if it so elects, may recalculate and update the Estimate submitted to the Political Body in the event the Political Body does not commence construction on the portion of the Project located on the Railroad's property within six (6? months from the date of the Estimate C. The Political Body acknowledges that the Estimate does not include any estimate of flagging or other protective service costs that are to be paid by the Political 4339963 Pages: 3 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III 'J!P 'J:wLt IiyiI 111111 Public Highvbay NIA trace ( n sing 11 t t)1 I Standard Form Apprcnc:d. AVI' -I a1; Body or the Contractor in connection with flagging or other protective services provided by the Railroad in connection with the Project. All of such costs incurred by the Railroad are to be paid by the Political Body or the Contractor as determined by the Railroad and the Political Body. If it is determined that the Railroad will be billing the Contractor directly for such costs, the Political Body agrees that it will pay the Railroad for any flagging costs that have not been paid by any Contractor within thirty (30) days of the Contractor's receipt of billing D. The Railroad shall send progressive billing to the Political Body during the Project and final billing to the Political Body within one hundred eighty (180) days after receiving written notice from the Political Body that all Project work affecting the Railroad's property has been completed. E. The Political Body agrees to reimburse the Railroad within thirty (30) days of its receipt of billing from the Railroad for one hundred percent (100%) of all actual costs incurred by the Railroad in connection with the Project including, but not limited to, all actual costs of engineering review (including preliminary engineering review costs incurred by Railroad prior to the Effective Date of this Agreement). construction, inspection, flagging (unless flagging costs are to be billed directly to the Contractor), procurement of materials, equipment rental, manpower and deliveries to the job site and all direct and indirect overhead labor/construction costs including Railroad's standard additive rates Section 8. PLANS A. The Political Body, at its expense. shall prepare, or cause to be prepared by others, the detailed plans and specifications for the Project and the Structure and submit such plans and specifications to the Railroads Assistant Vice President Engineering - Design, or his authorized representative, for prior review and approval. The plans and specifications shall include all Roadway layout specifications, cross sections and elevations, associated drainage, and other appurtenances. B. The final one hundred percent ( 100%) completed plans that are approved in writing by the Railroads Assistant Vice President Engineering -Design, or his authorized representatives are hereinafter referred to as the "Plans". The Plans are hereby made a part of this Agreement by reference. C. No changes in the Plans shall be made unless the Railroad has consented to such changes in writing. D The Railroad's review and approval of the Plans will in no way relieve the Political Body or the Contractor from their responsibilities, obligations and/or liabilities under this Agreement. and will be given with the understanding that the Railroad makes no representations or warranty as to the validity, accuracy, legal compliance or completeness of the Plans and that any reliance by the Political Body or Contractor on the Plans is at the risk of the Political Body and Contractor. 4339963 Pages: 4 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County; CO III J!j'J q ellihill,101ilrhtIII , 4 Public Highway •\t -t irade Crossing 01 0! } Z Standard Form \ppnwed. AVP.l..ay. Section 9. NON -RAILROAD IMPROVEMENTS A Submittal of plans and specifications for protecting, encasing, reinforcing. relocation, replacing, removing and abandoning in place all non -railroad owned facilities (the "Non Railroad Facilities") affected by the Project including, without limitation, utilities. fiber optics. pipelines, wirelines, communication lines and fences is required under Section 8. The Non Railroad Facilities plans and specifications shall comply with Railroad's standard specifications and requirements, including, without limitation, American Railway Engineering and Maintenance -of -Way Association ("AREMA") standards and guidelines Railroad has no obligation to supply additional land for any Non Railroad Facilities and does not waive its right to assert preemption defenses, challenge the right -to -take, or pursue compensation in any condemnation action, regardless if the submitted Non Railroad Facilities plans and specifications comply with Railroad's standard specifications and requirements. Railroad has no obligation to permit any Non Railroad Facilities to be abandoned in place or relocated on Railroad's property. B. Upon Railroad's approval of submitted Non Railroad Facilities plans and specifications, Railroad will attempt to incorporate them into new agreements or supplements of existing agreements with Non Railroad Facilities owners or operators. Railroad may use its standard terms and conditions, including, without limitation. its standard license fee and administrative charges when requiring supplements or new agreements for Non Railroad Facilities. Non Railroad Facilities work shall not commence before a supplement or new agreement has been fully executed by Railroad and the Non Railroad Facilities owner or operator, or before Railroad and Political Body mutually agree in writing to (i) deem the approved Non Railroad Facilities plans and specifications to be Plans pursuant to Section 8B, (ii) deem the Non Railroad Facilities part of the Structure, and (iii) supplement this Agreement with terms and conditions covering the Non Railroad Facilities. Section 10. EFFECTIVE DATE; TERM; TERMINATION A. This Agreement is effective as of the Effective Date first herein written and shall continue in full force and effect for as long as the Roadway remains on the Railroad's property. B. The Railroad, if it so elects, may terminate this Agreement effective upon delivery of written notice to the Political Body in the event the Political Body does not commence construction on the portion of the Project located on the Railroad's property within twelve (12) months from the Effective Date. C If the Agreement is terminated as provided above, or for any other reason, the Political Body shall pay to the Railroad all actual costs incurred by the Railroad in connection with the Project up to the date of termination, including, without limitation, all actual costs incurred by the Railroad in connection with reviewing any preliminary or final Project Plans. 4339963 Pages: 5 of 36 09/28/2017 O3:47 CIe k PM d R Recorder, e$0W0 Weld County, CO Carly Koppes,Minin% ,III I tAnil OM�� Public Hig'may 1t -t iradc ( rti iiig 0; tt I I 1 Standard Form \pprc,g ed. 1 \ P- I: Anu Section 11. CONDITIONS TO BE MET BEFORE POLITICAL BODY CAN COMMENCE WORK Neither the Political Body nor the Contractor may commence any work within the Crossing Area or on any other Railroad property until- (i) The Railroad and Political Body have executed this Agreement (ii) The Railroad has provided to the Political Body the Railroad's written approval of the Plans. (iii) Each Contractor has executed Railroad's Contractor's Right of Entry Agreement and has obtained and/or provided to the Railroad the insurance policies, certificates. binders. and/or endorsements required under the Contractor's Right of Entry Agreement. (iv) Each Contractor has given the advance notice(s) required under the Contractor's Right of Entry Agreement to the Railroad Representative named in the Contactor's Right of Entry Agreement. Section 12. FUTURE PROJECTS Future projects involving substantial maintenance, repair, reconstruction, renewal and/or demolition of the Roadway shall not commence until Railroad and Political Body agree on the plans for such future projects. cost allocations, right of entry terms and conditions and temporary construction rights. terms and conditions. Section 13. ASSIGNMENT; SUCCESSORS AND ASSIGNS A. Political Body shall not assign this Agreement without the prior written consent of Railroad. B Subject to the provisions of Paragraph A above, this Agreement shall inure to the benefit of and be binding upon the successors and assigns of Railroad and Political Body. Section 14. SPECIAL PROVISIONS PERTAINING TO AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 If the Political Body will be receiving American Recovery and Reinvestment Act ("ARRA") funding for the Project, the Political Body agrees that it is responsible in performing and completing all ARRA reporting documents for the Project. The Politica Body confirms and acknowledges that Section 1512 of the ARRA provisions applies only to a "recipient" receiving ARRA funding directing from the federal government and, therefore. (I) the ARRA reporting requirements are the responsibility of the Political Body and not cf 4339963 Pages: 6 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III lig.firro'JVAirtlitlfrriiii0DlitlkiNilliblilli IA 111111 Title: 4339963 Pages: 7 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO �III rdP1.1114:JULAIIFisi WitildiliiiMeliiir Public Highway \t -t it de ( mssinii 03 01 I t Standard Form-\pprovcd..1‘P-Lau the Railroad, and (ii) the Political Body shall not delegate any ARRA reporting responsibilities to the Railroad. The Political Body also confirms and acknowledges that (1) the Railroad shall provide to the Political Body the Railroad's standard and customary billing for expenses incurred by the Railroad for the Project including the Railroad's standard and customary documentation to support such billing, and (ii) such standard and customary billing and documentation from the Railroad provides the information needed by the Political Body to perform and complete the ARRA reporting documents. The Railroad confirms that the Political Body and the Federal Highway Administration shall have the right to audit the Railroad's billing and documentation for the Project as provided in Section 11 of Exhibit B of this Agreement. Section 15. SPECIAL PROVISION In the event that the Railroad were to re -activate the Monfort Ind. Ld. at any time in the future, the Political Body shall reimburse Railroad for all costs associated with the installation of all improvements, including without limitation all warning devices at the Crossing Area. IN WITNESS WHEREOF, the parties have caused this Agreement to be duly executed as of the Effective Date first herein written. UNION PACIFIC RAILROAD COMPANY (Federal Tax IL) #94-60013?3) By /11� LEI444 S IS Name: Name: Title: GENERAL DIRECTOR REAL ESTATE - CONTRACTS WELD COUNTY By: Ida 0 Prin ame: Julie A. Cqz• Chair, Board of County Commissioners SEP 2 0 2017 O2 o c5aZt4K1) • Public Highway At -Grade (missing 111 t11 Standard Fonn Approved. A VP- L;.►c+ EXHIBIT A TO PUBLIC HIGHWAY AT GRADE CROSSING AGREEMENT Exhibit A will be a print showing the Crossing Area (see Recitals) 4339963 Pages: 8 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III r1ltYGk}I. 521,0,14Xplimi, liii MIND. NEW CROSSING AREA TOTAL NEW CROSSING AREA = 22.T21SO. FT. •,- EXISTING CROSSING AREA EXISTING CROSSING AREA = 10.900 50. FT. ♦ / UPRRCO. R/W OUTLINED CALL FILENAME ,M. l 'SSw 204 4 ems'} ti, A N ( L f 1 o i%-{: i 4339963 Pages: 9 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO NOTE: BEFORE YOU BEGIN ANY WORK. SEE AGREEMENT FOR FIBER OPTIC PROVISIONS. EXHIBIT "A" UNION PACIFIC RAILROAD c:NPN KERSEY. WELD COUNTY, COLORADO M.P. 1 4 i . 1 9 - MIlNI nR T :Nn. L E an MAP UP v -s / 37 SCALE: 1 = 100 - ()iglu 01 PEAL ESTATE 3MARA. NEBRASKA DATE: 9-1 -201 7 PuB r : L E : 0305783 ��► III PiCcfrillViiiiIINITIVAI "Ill • public Ftsght a> �t (,r:u ( r� 0)1 ►► i I Standard Fonu -‘planed. EXHIBIT A-1 TO PUBLIC HIGHWAY AT GRADE CROSSING AGREEMENT Exhibit A-1 will be the legal description of the New Crossing Area (see Recitals) 4339963 Pages: 10 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO VIII tedivimiodiotriociallaPAripintliki �I III EXHIBIT - A-1 UNION PACIFIC RAIL ROAD WELD COUNTY RIGHT-OF-WAY PARCEL WITHIN THE SE 1/4 OF SECTION 24, TSN, R65W A TRACT OF LAND, lying and being situate within the Southeast % of Section 24, Township 5 North, Range 65 West, 6th Principal Meridian, Weld County, Colorado, and being more particularly described as: BEGINNING AT A POINT on the Westerly Right -of -Way Line of Weld County Road 49, whence the Southeast Corner of Said Section 24 bears 529°40'27"E, a distance of 61.42 feet; THENCE 569°02'46"W, a distance of 87.20 feet; THENCE N00°26'21"E, a distance of 215.30 feet, to the Northerly Right -of -Way Line of the Union Pacific Rail Road THENCE N69°01'55"E, a distance of 83.69 feet to the Westerly Right -of -Way Line of Weld County Road 49; THENCE S00°26'16"E along Said Westerly Right -of -Way Line, a distance of 214.07 feet, to the POINT AND PLACE OF BEGINNING, containing 17,129 square feet (0.39 Acres) more or less. All bearings in the above description are referenced to the East Line of Section 24 being 500°26'16"E. UNION PACIFIC RAIL ROAD WELD COUNTY RIGHT-OF-WAY PARCEL WITHIN THE NE 1/4 OF SECTION 25, TSN, R65W A TRACT OF LAND, lying and being situate within the Northeast ''A of Section 25, Township 5 North, Range 65 West, 6th Principal Meridian, Weld County, Colorado, and being more particularly described as: BEGINNING AT A POINT, said point being the intersection of the Westerly Right -of -Way Line of Weld County Road 49 with the North Line of Said Section 25, whence the Northeast Corner of Said Section 25 bears N89°39'27"E, a distance of 30.00 feet; THENCE S00°12'42"W along the westerly Right -of -Way Line of Weld County Road 49, a distance of 52.89 feet to the Southerly Right -of -Way Line of the Union Pacific Rail Road; THENCE 569°02'03"W along said southerly Right -of -Way Line of the Union Pacific Rail Road, a distance of 87.56 feet; THENCE N00° 11' 14"W, a distance of 83.73 feet to the North Line of Section 25; THENCE N89°39'27"E along the North Line of Section 25, a distance of 81.84 feet, to the POINT AND PLACE OF BEGINNING, containing 5,592 square feet (0.13 Acres) more or less. All bearings in the above description are referenced to the East Line of Section 25 being SU0°12'42"E. The above described properties are subject to all rights -of -way and easements of whatever kind, both recorded and implied which may be in effect at the time of this document. These property descriptions were prepared entirely from information provided to this Surveyor by Weld County Personnel. ADDITIONAL ROW ACQUISITION €LU) UNION PACIFIC RAIL ROAD WCR 49 WELD COUNTY, COLORADO LOCH ETTI SURVEYING 1975 Prairie Owl Road Parker, C,U SU13 (303)841-2568 C.4e► Cesgao;ta 5gnatureaUSt S gnacuro cot fi jror •rnasto rerAtwon S CO PLS 18468 WELD COUNTY DEPARTMENT OF PUBLIC WORKS WCR 49 CORRIDOR PROJECT AT WCR 54 DATE: 2/27/17 DRAWN 81: MSL 339963 Pages: 11 of 36 9/28/2017 03:47 PM Recoeder$,OWe Weld County, CO arly Koppes, Clerk � � � �N���� Y�liii 1111 !� �LLI�, N� Public Highway Al-( trade ( rtrssiilg (! Z UI Standard Form Appm\ed. A\ P.i au EXHIBIT B TO PUBLIC HIGHWAY AT GRADE CROSSING AGREEMENT SECTION 1. CONDITIONS AND COVENANTS A. The Railroad makes no covenant or warranty of title for quiet possession or against encumbrances. The Political Body shall not use or permit use of the Crossing Area for any purposes other than those described in this Agreement. Without limiting the foregoing. the Political Body shall not use or permit use of the Crossing Area for railroad purposes, or for gas, oil or gasoline pipe lines. Any lines constructed on the Railroad's property by or under authority of the Political Body for the purpose of conveying electric power or communications incidental to the Political Body's use of the property for highway purposes shall be constructed in accordance with specifications and requirements of the Railroad, and in such manner as not adversely to affect communication or signal lines of the Railroad or its licensees now or hereafter located upon said property, No nonparty shall be admitted by the Political Body to use or occupy any part of the Railroad's property without the Railroad's written consent. Nothing herein shall obligate the Railroad to give such consent. B. The Railroad reserves the right to cross the Crossing Area with such railroad tracks as may be required for its convenience or purposes. In the event the Railroad shall place additional tracks upon the Crossing Area, the Political Body shall, at its sole cost and expense. modify the Roadway to conform with all tracks within the Crossing Area. C. The right hereby granted is subject to any existing encumbrances and rights (whether public or private), recorded or unrecorded, and also to any renewals thereof. The Political Body shall not damage. destroy or interfere with the property or rights of nonparties in, upon or relating to the Railroad's property, unless the Political Body at its own expense settles with and obtains releases from such nonparties. D. The Railroad reserves the right to use and to grant to others the right to use the Crossing Area for any purpose not inconsistent with the right hereby granted, including, but not by way of limitation, the right to construct. reconstruct, maintain, operate, repair, alter, renew and replace tracks, facilities and appurtenances on the property; and the right to cross the Crossing Area with all kinds of equipment. E. So far as it lawfully may do so, the Political Body will assume, bear and pay all taxes and assessments of whatsoever nature or kind (whether general, local or special) levied or assessed upon or against the Crossing Area, excepting taxes levied upon and against the property as a component part of the Railroad's operating property. 4339963 Pages: 12 of 36 09/28/2017 03:47 PaMd Recorder, e$O.O Weld County, CO Carly Koppes; Clerk IIII ill Pty' PINIA10711411 1 • Public Highway it -trade ( rl'%\ing () t) J Standard Foram Approved. AA P-1 al.1/4 F. If any property or rights other than the right hereby granted are necessary for the construction. maintenance and use of the Roadway and its appurtenances, or for the performance of any work in connection with the Project, the Political Body will acquire all such other property and rights at its own expense and without expense to the Railroad. SECTION 2. CONSTRUCTION OF ROADWAY A. The Political Body, at its expense. will apply for and obtain all public authority required by law, ordinance, rule or regulation for the Project, and will furnish the Railroad upon request with satisfactory evidence that such authority has been obtained B. Except as may be otherwise specifically provided herein. the Political Body, at its expense, will furnish all necessary labor, material and equipment, and shall construct and complete the Roadway and all appurtenances thereof. The appurtenances shall include. without limitation, all necessary and proper highway warning devices (except those installed by the Railroad within its right of way) and all necessary drainage facilities, guard rails or barriers, and right of way fences between the Roadway and the railroad tracks. Upon completion of the Project, the Political Body shall remove from the Railroad's property all temporary structures and false work, and will leave the Crossing Area in a condition satisfactory to the Railroad. C All construction work of the Political Body upon the Railroad's property (including. but not limited to, construction of the Roadway and all appurtenances and all related and incidental work) shall be performed and completed in a manner satisfactory to the Assistant Vice President Engineering -Design of the Railroad or his authorized representative and in compliance with the Plans. and other guidelines furnished by the Railroad. D All construction work of the Political Body shall be performed diligently and completed within a reasonable time. No part of the Project shall be suspended, discontinued or unduly delayed without the Railroad's written consent. and subject to such reasonable conditions as the Railroad may specify. It is understood that the Railroad's tracks at and in the vicinity of the work will be in constant or frequent use during progress of the work and that movement or stoppage of trains, engines or cars may cause delays in the work of the Political Body. The Political Body hereby assumes the risk of any such delays and agrees that no claims for damages on account of any delay shall be made against the Railroad by the State and/or the Contractor. SECTION 3. INJURY AND DAMAGE TO PROPERTY If the Political Body, in the performance of any work contemplated by this Agreement or by the failure to do or perform anything for which the Political Body is responsible under the provisions of this Agreement, shall injure, damage or destroy any property of the Railroad or of any other person lawfully occupying or using the property of the Railroad, such property shall be replaced or repaired by the Political Body at the 4339963 Pages: 13 of 36 09/28/2017 03:47 PM R Fee:$0,00 Carly Koppes, Clerk and Recorder, Weld County, CO in FAIT v': 4siirsn"it' 111111 Public Highwa), -\t-t snide ( ru»ing 01 01 I I Standard Form \ppro‘ed, '\\ P -low Political Body's own expense, or by the Railroad at the expense of the Political Body, and to the satisfaction of the Railroad's Assistant Vice President Engineering -Design. SECTION 4. RAILROAD MAY USE CONTRACTORS TO PERFORM WORK The Railroad may contract for the performance of any of its work by other than the Railroad forces. The Railroad shall notify the Political Body of the contract price within ninety (90) days after it is awarded. Unless the Railroad's work is to be performed on a fixed price basis, the Political Body shall reimburse the Railroad for the amount of the contract. SECTION 5. MAINTENANCE AND REPAIRS A. The Political Body shall, at its own sole expense, maintain, repair, and renew, or cause to be maintained, repaired and renewed, the entire Crossing Area and Roadway, except the portions between the track tie ends, which shall be maintained by and at the expense of the Railroad B. If, in the future, the Political Body elects to have the surfacing material between the track tie ends. or between tracks if there is more than one railroad track across the Crossing Area. replaced with paving or some surfacing material other than timer planking, the Railroad. at the Political Body's expense. shall install such replacement surfacing, and in the future, to the extent repair or replacement of the surfacing is necessitated by repair or rehabilitation of the Railroad's tracks through the Crossing Area, the Political Body shall bear the expense of such repairs or replacement. SECTION 6. CHANGES IN GRADE If at any time the Railroad shall elect. or be required by competent authority to, raise or lower the grade of all or any portion of the track(s) located within the Crossing Area, the Political Body shall, at its own expense, conform the Roadway to conform with the change of grade of the trackage. SECTION 7. REARRANGEMENT OF WARNING DEVICES If the change or rearrangement of any warning device installed hereunder is necessitated for public or Railroad convenience or on account of improvements for either the Railroad, highway or both, the parties will apportion the expense incidental thereto between themselves by negotiation, agreement or by the order of a competent authority before the change or rearrangement is undertaken. SECTION 8. SAFETY MEASURES; PROTECTION OF RAILROAD COMPANY OPERATIONS It is understood and recognized that safety and continuity of the Railroad's operations and communications are of the utmost importance; and in order that the same 4339963 Pages: 14 of 36 09/28/2017 03:47 PMd Re Fee : $0 .00 Weld County, , CO Carly Koppes , Clerk III VIII filCislk,V,hfl'` II � ��fll ,I Ik'MIL • Public Einem/a\ -it-tirade t rt s ini. () i Il l I ; Standard Funn \ppro rd. A VP -Law may be adequately safeguarded, protected and assured, and in order that accidents may be prevented and avoided, it is agreed with respect to all of said work of the Political Body that the work will be performed in a safe manner and in conformity with the following standards: A. Definitions. All references in this Agreement to the Political Body shall also include the contractor and their respective officers, agents and employees. and others acting under its or their authority: and all references in this Agreement to workof the Political Body shall include work both within and outside of the Railroads property B. Entry on to Railroad's Property by Political Body. If the Political Body's employees need to enter Railroad's property in order to perform an inspection of the Roadway, minor maintenance or other activities, the Political Body shall first provide at least ten (10) working days advance notice to the Railroad Representative. With respect to such entry on to Railroads property, the Political Body, to the extent permitted by law agrees to release, defend and indemnify the Railroad from and against any loss, damage. injury, liability, claim, cost or expense incurred by any person including, without limitation. the Political Body's employees. or damage to any property or equipment (collectively the "Loss") that arises from the presence or activities of Political Body's employees on Railroad's property. except to the extent that any Loss is caused by the sole direct negligence of Railroad. C. Flagging (I) If the Political Body's employees need to enter Railroad's property as provided in Paragraph B above, the Political Body agrees to notify the Railroad Representative at least thirty (30) working days in advance of proposed performance of any work by Political Body in which any person or equipment will be within twenty-five (25) feet of any track, or will be near enough to any track that any equipment extension (such as. but not limited to, a crane boom) will reach to within twenty-five (25) feet of any track No work of any kind shall be performed, and no person. equipment, machinery, tool(s), matenal(s), vehicle(s), or thing(s) shall be located, operated, placed. or stored within twenty-five (25) feet of any of Railroad's track(s) at any time, for any reason. unless and until a Railroad flagman is provided to watch for trains. Upon receipt of such thirty (30) day notice, the Railroad Representative will determine and inform Political Body whether a flagman need be present and whether Political Body needs to implement any special protective or safety measures. If flagging or other special protective or safety measures are performed by Railroad. Railroad will bill Political Body for such expenses incurred by Railroad. If Railroad performs any flagging. or other special protective or safety measures are performed by Railroad, Political Body agrees that Political Body is not relieved of any of its responsibilities or liabilities set forth in this Agreement. (ii) The rate of pay per hour for each flagman will be the prevailing hourly rate in effect for an eight -hour day for the class of flagmen used during regularly assigned hours and overtime in accordance with Labor Agreements and Schedules in effect at the time the work is performed In addition to the cost of such labor, a composite charge for vacation. 4339963 Pages: 15 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III NridPaIA411111 Public HLght s) \t -(irate ( ros,mg 01 0I I Standard form Approved. 14 P-L,nk holiday, health and welfare. supplemental sickness. Railroad Retirement and unemployment compensation. supplemental pension, Employees Liability and Property Damage and Administration will be included, computed on actual payroll. The composite charge will be the prevailing composite charge in effect at the time the work is performed. One and one-half times the current hourly rate is paid for overtime. Saturdays and Sundays, and two and one-half times current hourly rate for holidays. Wage rates are subject to changes at any time, by law or by agreement between Railroad and its employees. and may be retroactive as a result of negotiations or a ruling of an authorized governmental agency. Additional charges on labor are also subject to change. If the wage rate or additional charges are changed, Political Body shall pay on the basis of the new rates and charges (iii) Reimbursement to Railroad will be required covering the full eight -hour day during which any flagman is furnished. unless the flagman can be assigned to other Railroad work during a portion of such day. in which event reimbursement will not be required for the portion of the day during which the flagman is engaged in other Railroad work. Reimbursement will also be required for any day not actually worked by the flagman following the flagman's assignment to work on the project for which Railroad is required to pay the flagman and which could not reasonably be avoided by Railroad by assignment of such flagman to other work, even though Political Body may not be working during such time. When it becomes necessary for Railroad to bulletin and assign an employee to a flagging position in compliance with union collective bargaining agreements, Political Body must provide Railroad a minimum of five (5) days notice prior to the cessation of the need for a flagman. If five (5) days notice of cessation is not given. Political Body will still be required to pay flagging charges for the five (5) day notice period required by union agreement to be given to the employee, even though flagging is not required for that period. An additional thirty (30) days notice must then be given to Railroad if flagging services are needed again after such five day cessation notice has been given to Railroad. D. Compliance With Laws. The Political Body shall comply with all applicable federal. state and local laws. regulations and enactments affecting the work. The Political Body shall use only such methods as are consistent with safety. both as concerns the Political Body, the Political Body's agents and employees, the officers, agents, employees and property of the Railroad and the public in general. The Political Body (without limiting the generality of the foregoing) shall comply with all applicable state and federal occupational safety and health acts and regulations. All Federal Railroad Administration regulations shall be followed when work is performed on the Railroad's premises. If any failure by the Political Body to comply with any such laws, regulations, and enactments, shall result in any fine. penalty, cost or charge being assessed, imposed or charged against the Railroad. the Political Body shall reimburse. and to the extent it may lawfully do so, indemnify the Railroad for any such fine, penalty, cost, or charge, including without limitation attorney's fees, court costs and expenses. The Political Body further agrees in the event of any such action, upon notice thereof being provided by the Railroad, to defend such action free of cost, charge. or expense to the Railroad 4339963 Pages: 16 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO VIII fridninbligh TI:1114.141h,YLI 101:41 14 11111 Public Flighw. r Ai -tirade (ro%.tng 01 HI 1 1 Standard Funs \ppro4 ed. A V P - taw E No Interference or Delays. The Political Body shall not do. suffer or permit anything which will or may obstruct, endanger, interfere with, hinder or delay maintenance or operation of the Railroad's tracks or facilities, or any communication or signal lines. installations or any appurtenances thereof, or the operations of others lawfully occupying or using the Railroad's property or facilities. F. Supervision. The Political Body, at its own expense, shall adequately police and supervise all work to be performed by the Political Body, and shall not inflict injury to persons or damage to property for the safety of whom or of which the Railroad may be responsible, or to property of the Railroad. The responsibility of the Political Body for safe conduct and adequate policing and supervision of the Project shall not be lessened or otherwise affected by the Railroad's approval of plans and specifications. or by the Railroad's collaboration in performance of any work, or by the presence at the work site of the Railroad's representatives, or by compliance by the Political Body with any requests or recommendations made by such representatives. If a representative of the Railroad is assigned to the Project. the Political Body will give due consideration to suggestions and recommendations made by such representative for the safety and protection of the Railroad's property and operations. G Suspension of Work If at any time the Political Body's engineers or the Vice President -Engineering Services of the Railroad or their respective representatives shall be of the opinion that any work of the Political Body is being or is about to be done or prosecuted without due regard and precaution for safety and security, the Political Body shall immediately suspend the work until suitable, adequate and proper protective measures are adopted and provided. H. Removal of Debris. The Political Body shall not cause, suffer or permit material or debris to be deposited or cast upon, or to slide or fall upon any property or facilities of the Railroad and any such material and debris shall be promptly removed from the Railroad's property by the Political Body at the Political Body's own expense or by the Railroad at the expense of the Political Body. The Political Body shall not cause, suffer or permit any snow to be plowed or cast upon the Railroad's property during snow removal from the Crossing Area. I. Explosives. The Political Body shall not discharge any explosives on or in the vicinity of the Railroad's property without the prior consent of the Railroad's Vice President -Engineering Services, which shall not be given if. in the sole discretion of the Railroad's Vice President -Engineering Services, such discharge would be dangerous or would interfere with the Railroad's property or facilities. For the purposes hereof. the "vicinity of the Railroad's property" shall be deemed to be any place on the Railroad's property or in such close proximity to the Railroad's property that the discharge of explosives could cause injury to the Railroad's employees or other persons, or cause damage to or interference with the facilities or operations on the Railroad's property. The Railroad reserves the right to impose such conditions, restrictions or limitations on the transportation, handling. storage, security and use of explosives as the Railroad, in the Railroad's sole discretion. may deem to be necessary, desirable or appropriate. 4339963 Pages: 17 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO ,III Plitiliall2kiilllifiVigaltdiVail'hMlimi 1111 • Public i i;gh4sa), •1t-(irade Crossing t); 01 II Standard Form Appi mcd. 1\ P-Ltu J. Excavation. The Political Body shall not excavate from existing slopes nor construct new slopes which are excessive and may create hazards of slides or falling rock, or impair or endanger the clearance between existing or new slopes and the tracks of the Railroad. The Political Body shall not do or cause to be done any work which will or may disturb the stability of any area or adversely affect the Railroad's tracks or facilities. The Political Body. at its own expense. shall install and maintain adequate shoring and cribbing for all excavation and/or trenching performed by the Political Body in connection with construction, maintenance or other work. The shoring and cribbing shall be constructed and maintained with materials and in a manner approved by the Railroad's Assistant Vice President Engineering - Design to withstand all stresses likely to be encountered, including any stresses resulting from vibrations caused by the Railroad's operations in the vicinity. K. Drainage. The Political Body, at the Political Body's own expense, shall provide and maintain suitable facilities for draining the Roadway and its appurtenances, and shall not suffer or permit drainage water therefrom to flow or collect upon property of the Railroad. The Political Body, at the Political Body's own expense, shall provide adequate passageway for the waters of any streams. bodies of water and drainage facilities (either natural or artificial, and including water from the Railroad's culvert and drainage facilities), so that said waters may not, because of any facilities or work of the Political Body, be impeded, obstructed, diverted or caused to back up. overflow or damage the property of the Railroad or any part thereof, or property of others. The Political Body shall not obstruct or interfere with existing ditches or drainage facilities. L. Notice. Before commencing any work, the Political Body shall provide the advance notice to the Railroad that is required under the Contractor's Right of Entry Agreement M. Fiber Optic Cables. Fiber optic cable systems may be buried on the Railroad's property Protection of the fiber optic cable systems is of extreme importance since any break could disrupt service to users resulting in business interruption and loss of revenue and profits. Political Body shall telephone the Railroad during normal business hours (TOO a.m. to 9:00 p.m. Central Time, Monday through Friday, except holidays) at 1-800- 336-9193 (also a 24 -hour, 7 -day number for emergency calls) to determine if fiber optic cable is buried anywhere on the Railroad's premises to be used by the Political Body. If it is, Political Body will telephone the telecommunications company(ies) involved. arrange for a cable locator. and make arrangements for relocation or other protection of the fiber optic cable prior to beginning any work on the Railroad's premises. SECTION 9. INTERIM WARNING DEVICES If at anytime it is determined by a competent authority, by the Political Body, or by agreement between the parties, that new or improved train activated warning devices 4339963 Pages: 18 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly rid Koppes, Clerk and Recorder, Weld County, CO III�pi4'hla IiiJaa Public I-I1t-(ir:ak ( ro%.ing (I3.0I I I Standard Form •\ ppro ed. \ \ P•1 as should be installed at the Crossing Area, the Political Body shall install adequate temporary warning devices or signs and impose appropriate vehicular control measures to protect the motoring public until the new or improved devices have been installed. SECTION 10. OTHER RAILROADS All protective and indemnifying provisions of this Agreement shall inure to the benefit of the Railroad and any other railroad company lawfully using the Railroad's property or facilities. SECTION 11. BOOKS AND RECORDS The books, papers. records and accounts of Railroad. so far as they relate to the items of expense for the materials to be provided by Railroad under this Project. or are associated with the work to be performed by Railroad under this Project. shall be open to inspection and audit at Railroad's offices in Omaha, Nebraska, during normal business hours by the agents and authorized representatives of Political Body for a period of three (3) years following the date of Railroad's last billing sent to Political Body SECTION 12. REMEDIES FOR BREACH OR NONUSE A. if the Political Body shall fall. refuse or neglect to perform and abide by the terms of this Agreement, the Railroad. in addition to any other nghts and remedies, may perform any work which in the judgment of the Railroad is necessary to place the Roadway and appurtenances in such condition as will not menace, endanger or interfere with the Railroad's facilities or operations or jeopardize the Railroad's employees and the Political Body will reimburse the Railroad for the expenses thereof B. Nonuse by the Political Body of the Crossing Area for public highway purposes continuing at any time for a period of eighteen (18) months shall, at the option of the Railroad, work a termination of this Agreement and of all rights of the Political Body hereunder. C. The Political Body will surrender peaceable possession of the Crossing Area and Roadway upon termination of this Agreement. Termination of this Agreement shall not affect any rights, obligations or liabilities of the parties, accrued or otherwise, which may have arisen prior to termination. SECTION 13. MODIFICATION - ENTIRE AGREEMENT No waiver, modification or amendment of this Agreement shall be of any force or effect unless made in writing. signed by the Political Body and the Railroad and specifying with particularity the nature and extent of such waiver, modification or amendment Any waiver by the Railroad of any default by the Political Body shall not affect or impair any right arising from any subsequent default. This Agreement and Exhibits attached hereto and made a part hereof constitute the entire understanding between the Political Body 4339963 Pages: 19 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO UI IIII • Public Highway At -Grade Crossing 03.01 1 7 Standard Form Appru ed. A V% P- i.:s« and the Railroad and cancel and supersede any prior negotiations, understandings or agreements, whether written or oral, with respect to the work or any part thereof. 4339963 Pages: 20 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes; Clerk and Recorder, Weld County, CO lil r ..11.11 C" till{1')) O)o+) )d.1 .1'. 1' ,1h' Pirhli� Fly h�cay At-(iradc; Crcr.inL 03 01 11 Standard Fonu Apprn c'd >\, f'-1 an EXHIBIT C TO PUBLIC HIGHWAY AT GRADE CROSSING AGREEMENT Exhibit C (if applicable) will be Railroad's Summary of Material and Force Account Work 4339963 Pages: 21 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III Vila flith176101 1 "Ill SUMMARY OF MATERIAL AND FORCE ACCOUNT WORK BY THE UNION PACIFIC RAILROAD COMPANY KERSEY, CO - WELD CR 49 ROADWAY WIDENING PROJECT DESCRIPTION OF WORK. Widening of an existing at -grade public road crossing located at MP 145.19 on the Monfort industrial Lead, in Kersey. Weld County, Colorado. Includes UPRR work detailed in material and force account estimates - engineering, removal of existing crossing surface. installation of new concrete crossing surface: removal of existing flashers and existing signal cabin. LOCATION Denver Service Unit State Colorado Date 09/09/2017 DESCRIPTION Engineering Recollectable Railroad Work. Surface & Track Recollectable Railroad Work. Signal TOTAL PROJECT STATE TOTAL $10,000 $102.638 $20,000 $132,638 EXISTING REUSABLE MATERIAL - NONE SALVAGE NONUSABLE MATERIAL - NONE TOTAL ESTIMATED COST OF PROJECT LESS CREDITS $132,638 THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION IN THE EVENT OF AN INCREASE OR DECREASE IN THE COST OF AMOUNT OF MATERIAL OR LABOR REQUIRED. THE STATE WILL BE BILLED FOR ACTUAL CONSTRUCTION COST AT THE CURRENT RATES EFFECTIVE THEREOF. 4339963 Pages: 22 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO IIIIMPINVICICA1/41004.1101:11Misi HI (h li ��. ch �.t r. A ' � a �a �� � : � .. . �. I . � • . i �. �i ,ui,l.u .! ( , �i !r. 1 ����i � = , ,:.3 ll P � l .� ,.� EXHIBIT D TO PUBLIC HIGHWAY AT-GRADE CROSSING AGREEMENT CONTRACTOR 'S RIGHT OF ENTRY AGREEMENT THIS AGREEMENT �s made and entered �nto as of the __ day of __, 20 by and between UNION PACIFIC RAILROAD COMPANY . a Delaware corporatron ("Railroad" ) : and ___._._____ __ _ ,__. _ _ _ a corporation ("Coniractor") . RECITALS Contractor has been hired by _ to perform work relating to (the "work" ) . with ail or a portion of such work to be performed on property of Railroad m the vicinrty of Railroad's Milepost on Railroad's _._ [Subdivisionj [BranchJ [at or near DOT No � located at or near __ in ___ County . State of _ , as such location is � n the general location shown on the pr�nt marked Exhibit A. attached hereto and hereby made a part hereof, which woric is the subject of a contract dated ___ between Ra�iroad and _�� Railroad �s w� �l�ng to permit Contractor to perform the work descnbed above at ihe location descnbed above sub�ect to the terms and conditions contained in ihis Agreement AGREEMENT . NOW , THEREFORE . �t �s mutualfy agreed by and between Ra�lroad and Contractor , as follows . ARTICLE 1 - DEFINITION OF CONTRACTOR. For purposes of th � s Agreement . all references in this agreement to Contractor shall mclude Contractor's contractors . subcontractors . officers . agents and employees , and others acting under its or their authonty ARTICIE 2 - RIGHT GRANTED : PURPOSE. Raiiroad hereby grants to Contractor the nght. dunng the term hereinafter stated and upon and sub�ect to each and ail of the terms , provislons and conditions herein contained , to enter upon and have ingress to and egress from the property described in the Rec�tals for the purpose of performmg the work described in the Recrtals above . The right herem granted to Cantractor is limited to those portians of Raiiroad ' s property spec�fically descnbed herein , or as designated by the Raiiroad Representative named in Article 4 . ARTICLE 3 - TERMS AND CONDITIONS CONTAINED IN EXHIBITS B , C AND D. The terms and condiGons contained in Exhibit B, Exhibit C and Exhibit D attached hereto , are hereby made a part of this Agreement . ARTICLE 4 - ALL EXPENSES TO BE BORNE BY CONTRACTOR � RAILROAD REPRESENTATIVE . A Contractor shall bear any and all costs and expenses assoc�ated w�th any work performed by Contractor . or any costs or expenses incurred by Railroad relating to ihis Agreement. 1 4339963 Pages : 23 of 36 09/28 /2017 03 : 47 PM R Fee : $0 . 00 Carly Koppes , Clerk and Recorder , Weld County , CO ���� ��1���Q �T�k����� ��L�i��� ��� �:�� ���Y�1� 1� �� � C Ifig;hvka� us\trtt; At-( trade (r (1: (H I t chard Form Appro cd. \VP -1 tit% B Contractor shall coordinate all of its work with the following Railroad representative or his or her duly authonzed representative (the "Railroad Representative"): C. Contractor, at its own expense, shall adequately police and supervise all work to be performed by Contractor and shall ensure that such work is performed in a safe manner as set forth in Section 7 of Exhibit B The responsibility of Contractor for safe conduct and adequate policing and supervision of Contractor's work shall not be lessened or otherwise affected by Railroad's approval of plans and specifications involving the work, or by Railroad's collaboration in performance of any work, or by the presence at the work site of a Railroad Representative, or by compliance by Contractor with any requests or recommendations made by Railroad Representative. ARTICLE 5 - SCHEDULE OF WORK ON A MONTHLY BASIS. The Contractor. at its expense, shall provide on a monthly basis a detailed schedule of work to the Railroad Representative named in Article 4B above. The reports shall start at the execution of this Agreement and continue until this Agreement is terminated as provided in this Agreement or until the Contractor has completed all work on Railroad's property. ARTICLE 6 - TERM: TERMINATION. A. The grant of right herein made to Contractor shall commence on the date of this Agreement, and continue until , unless sooner terminated as herein provided, or at such time as Contractor has completed its work on Railroad's property, whichever is earlier. Contractor agrees to notify the Railroad Representative in writing when it has completed its work on Railroad's property. B. This Agreement may be terminated by either party on ten (10) days written notice to the other party. ARTICLE 7 - CERTIFICATE OF INSURANCE. A. Before commencing any work. Contractor will provide Railroad with the (i) insurance binders. policies, certificates and endorsements set forth in Exhibit C of this Agreement, and (ii) the insurance endorsements obtained by each subcontractor as required under Section 12 of Exhibit B of this Agreement. B. All insurance correspondence, binders, policies, certificates and endorsements shall be sent to: Union Pacific Railroad Company [Insert mailing address] Attn: Folder No. ARTICLE 8 - DISMISSAL OF CONTRACTOR's EMPLOYEE. At the request of Railroad, Contractor shall remove from Railroad's property any employee of Contractor who fails to conform to the instructions of the Railroad Representative in connection with the work on Railroad's property, and any right of Contractor shall be suspended until such removal has occurred. Contractor shall indemnify Railroad against any claims arising from the removal of any such employee from Railroad's property 4339963 Pages: 24 of 36 09/28/2017 03:47 PM Re Fee:$0.O Weld County, CO Carly Koppes, Clerk and II IIIHighway \i-Grade ( russing 0; 01 I i Standard Form .Approx ed. iNA. P -Law ARTICLE 9- ADMINISTRATIVE FEE. Upon the execution and delivery of this Agreement, Contractor shall pay to Railroad Dollars ($ ) as reimbursement for clerical. administrative and handling expenses in connection with the processing of this Agreement. ARTICLE 10 - CROSSINGS; COMPLIANCE WITH MUTCD AND FRA GUIDELINES. A. No additional vehicular crossings (including temporary haul roads) or pedestrian crossings over Railroad's trackage shall be installed or used by Contractor without the prior written permission of Railroad. B. Any permanent or temporary changes, including temporary traffic control, to crossings must conform to the Manual of Uniform Traffic Control Devices (MUTCD) and any applicable Federal Railroad Administration rules, regulations and guidelines. and must be reviewed by the Railroad prior to any changes being implemented. In the event the Railroad is found to be out of compliance with federal safety regulations due to the Contractor's modifications, negligence, or any other reason arising from the Contractor's presence on the Railroad's property. the Contractor agrees to assume liability for any civil penalties imposed upon the Railroad for such noncompliance. ARTICLE 11.- EXPLOSIVES. Explosives or other highly flammable substances shall not be stored or used on Railroad's property without the prior written approval of Railroad. IN WITNESS WHEREOF, the parties hereto have duly executed this agreement in duplicate as of the date first herein written. UNION PACIFIC RAILROAD COMPANY By: Title: • (Name of Contractor) By: Title: 4339963 Pages: 25 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III I h LI '�I���.I I� � II liii >traic J:tllest ‘oittrati, ,tr." x ; ()talk. Right+.n .ir zr i•it• X14 ii -Ir st► i i.° dot SH; hwa> \i-( trade Crossing i); 01 1 1 Standard Form 11'1'roed. >AVP-1.am EXHIBIT A Exhibit A will be a print showing the general location of the work site. 4339963 Pages: 26 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County; CO i '•it.i:1 .lalkt 'k•r.stlif +tiS *c A i1UAhlkk, i;i ttuats. It Lt.td, ;111 I 1. ,. LllINDs NEW CROSSING AREA TOTAL NEW CROSSING AREA = 22.72150. FT. +i- EXISTING CROSSING AREA EXISTING CROSSING AREA = 10.900 SO. F T. * / - UPRRCO. R/W OUTLINED - - - - - _ - . CADD F !LENAME 4339963 Pages: 27 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III PlicillnitelltMli VOA lei ilk 1111 NOTE: BEFORE YOU BEGIN ANY WORKS SEE AGREEMENT FOR F 18ER OPTIC PROVISIONS. EXHIBIT "A" NION PACIFIC RAILROAD COMPAN'. KERSEY, WELD COUNTY. COLORADO M.P. 1 45. 1 q -- MfNFflRT IND. FM) MAP UP V-5 / 37 SCALE: 1" = 100' OFFICE OF REAL ESTATE OMAHA. NEBRASKA DATE: 9 -20 1 ? PjB r :LE : 0305783 • Highway \t -Grade ( rot ing sit t1I I Standard Form Approved. AVP-law EXHIBIT B TO CONTRACTOR'S RIGHT OF ENTRY AGREEMENT Section 1. NOTICE OF COMMENCEMENT OF WORK - FLAGGING. A. Contractor agrees to notify the Railroad Representative at least ten (10) working days in advance of Contractor commencing its work and at least thirty (30) working days in advance of proposed performance of any work by Contractor in which any person or equipment will be within twenty-five (25) feet of any track, or will be near enough to any track that any equipment extension (such as. but not limited to. a crane boom) will reach to within twenty-five (25) feet of any track No work of any kind shall be performed, and no person. equipment. machinery. tool(s). material(s) vehicle(s), or thing( s) shall be located. operated, placed. or stored within twenty-five (25) feet of any of Railroad's track(s) at any time. for any reason, unless and until a Railroad flagman is provided to watch for trains. Upon receipt of such thirty (30) -day notice, the Railroad Representative will determine and inform Contractor whether a flagman need be present and whether Contractor needs to implement any special protective or safety measures. If flagging or other special protective or safety measures are performed by Railroad Railroad will bill Contractor for such expenses incurred by Railroad. unless Railroad and a federal. state or local governmental entity have agreed that Railroad is to bill such expenses to the federal. state or local governmental entity. If Railroad will be sending the bills to Contractor. Contractor shall pay such bills within thirty (30) days of Contractor's receipt of billing. If Railroad performs any flagging, or other special protective or safety measures are performed by Railroad, Contractor agrees that Contractor is not relieved of any of its responsibilities or liabilities set forth in this Agreement. B. The rate of pay per hour for each flagman will be the prevailing hourly rate in effect for an eight -hour day for the class of flagmen used during regularly assigned hours and overtime in accordance with Labor Agreements and Schedules in effect at the time the work is performed. In addition to the cost of such labor, a composite charge for vacation, holiday. health and welfare, supplemental sickness. Railroad Retirement and unemployment compensation, supplemental pension, Employees Liability and Property Damage and Administration will be included- computed on actual payroll. The composite charge will be the prevailing composite charge in effect at the time the work is performed. One and one-half times the current hourly rate is paid for overtime. Saturdays and Sundays, and two and one-half times current hourly rate for holidays. Wage rates are subject to change. at any time, by law or by agreement between Railroad and its employees, and may be retroactive as a result of negotiations or a ruling of an authorized governmental agency. Additional charges on labor are also subject to change If the wage rate or additional charges are changed. Contractor (or the governmental entity. as applicable) shall pay on the basis of the new rates and charges C. Reimbursement to Railroad will be required covering the full eight -hour day during which any flagman is furnished, unless the flagman can be assigned to other Railroad work during a portion of such day, in which event reimbursement will not be required for the portion of the day during which the flagman is engaged in other Railroad work. Reimbursement will also be required for any day not actually worked by the flagman following the flagman's assignment to work on the project for which Railroad is required to pay the flagman and which could not reasonably be avoided by Railroad by assignment of such flagman to other work , even though Contractor may not be working during such time. When it becomes necessary for Railroad to bulletin and assign an employee to a flagging position in compliance with union collective bargaining agreements. Contractor must provide Railroad a minimum of five (5) days notice prior to the cessation of the need for a flagman. If five (5) days notice of cessation is not given. Contractor will still be required to pay flagging charges for the five (5) day notice period required by union agreement to be given to the employee. even though flagging is not required for that period. An additional thirty (30) days notice must then be given to Railroad if flagging services are needed again after such five day cessation notice has been given to Railroad Section 2. LIMITATION AND SUBORDINATION OF RIGHTS GRANTED A. The foregoing grant of right is subject and subordinate to the prior and continuing right and obligation of the Railroad to use and maintain its entire property including the right and power of Railroad to construct. maintain. repair. renew. use, operate. change. modify or relocate railroad tracks, roadways, signal, communication. fiber optics. or other wirelines, pipelines and other facilities upon. along or across any or all parts of its property. all or any of which may be freely done at any time or times by Railroad without liability to Contractor or to any other party for compensation or damages. Exhibit B Page 1 of 4 tr share dalien color:teio Ztt' ' IItthNIL h}22hw;t\ a; :if .tile cet►,0,tttl;-t! tt►I I t %IOC 4339963 Pages: 28 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO eviPrcciirirwrilAfMk'hgtrlilfIl ki 11111 10 r Highway At -Grade ( rossing 03 tt 1 I ; 'standard F=orm Approved, -1VP-Lave B The foregoing grant is also subject to all outstanding superior rights (whether recorded or unrecorded and including those in favor of licensees and lessees of Railroad's property, and others) and the right of Railroad to renew and extend the same. and is made without covenant of title or for quiet enjoyment. Section 3. NO INTERFERENCE WITH OPERATIONS OF RAILROAD AND ITS TENANTS. A Contractor shall conduct its operations so as not to interfere with the continuous and uninterrupted use and operation of the railroad tracks and property of Railroad, including without limitation, the operations of Railroad's lessees, licensees or others. unless specifically authorized in advance by the Railroad Representative. Nothing shall be done or permitted to be done by Contractor at any time that would in any manner impair the safety of such operations. When not in use. Contractor's machinery and materials shall be kept at least fifty (50) feet from the centerline of Railroad's nearest track. and there shall be no vehicular crossings of Railroads tracks except at existing open public crossings B Operations of Railroad and work performed by Railroad personnel and delays in the work to be performed by Contractor caused by such railroad operations and work are expected by Contractor, and Contractor agrees that Railroad shall have no liability to Contractor, or any other person or entity for any such delays. The Contractor shall coordinate its activities with those of Railroad and third parties so as to avoid interference with railroad operations. The safe operation of Railroad train movements and other activities by Railroad takes precedence over any work to be performed by Contractor. Section 4. LIENS. Contractor shall pay in full all persons who perform labor or provide materials for the work to be performed by Contractor. Contractor shall not create, permit or suffer any mechanic's or maternalmen's liens of any kind or nature to be created or enforced against any property of Railroad for any such work performed Contractor shall indemnify and hold harmless Railroad from and against any and all liens. claims. demands. costs or expenses of whatsoever nature in any way connected with or growing out of such work done. labor performed. or materials furnished If Contractor fails to promptly cause any lien to be released of record. Railroad may. at its election, discharge the lien or claim of lien at Contractor's expense. Section 5. PROTECTION OF FIBER OPTIC CABLE SYSTEMS. A. Fiber optic cable systems may be buried on Railroad's property. Protection of the fiber optic cable systems is of extreme importance since any break could disrupt service to users resulting in business interruption and loss of revenue and profits Contractor shall telephone Railroad during normal business hours (7:00 a.m. to 9:00 p.m. Central Time, Monday through Friday. except holidays) at 1-800-336-9193 (also a 24 -hour, 7 -day number for emergency calls) to determine if fiber optic cable is buried anywhere on Railroad's property to be used by Contractor If it is., Contractor will telephone the telecommunications company(ies) involved, make arrangements for a cable locator and, if applicable. for relocation or other protection of the fiber optic cable. Contractor shall not commence any work until all such protection or relocation (if applicable) has been accomplished. In addition to other indemnity provisions in this Agreement. Contractor shall indemnify. defend and hold Railroad harmless from and against all costs, liability and expense whatsoever (including, without limitation. attorneys' fees, court costs and expenses) arising out of any act or omission of Contractor, its agents and/or employees, that causes or contributes to (1) any damage to or destruction of any telecommunications system on Railroad's property, and/or (2) any injury to or death of any person employed by or on behalf of any telecommunications company, and/or its contractor. agents and/or employees. on Railroad's property. Contractor shall not have or seek recourse against Railroad for any claim or cause of action for alleged loss of profits or revenue or loss of service or other consequential damage to a telecommunication company using Railroad's property or a customer or user of services of the fiber optic cable on Railroad's property Section 6. PERMITS - COMPLIANCE WITH LAWS. In the prosecution of the work covered by this Agreement. Contractor shall secure any and all necessary permits and shall comply with all applicable federal, state and local laws. regulations and enactments affecting the work including, without limitation. all applicable Federal Railroad Administration regulations. Exhibit B Page 2 of 4 g '.hare linen Colorado toy" -x_: ()LINK i:r de cu ..rng-t)it)i I.+ Jot 4339963 Pages: 29 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III Mcflikliki'‘'Illit:Nigf Pill li:ifidlilliAlV.1411.4 II II Highway At -tirade ( rossing t); u! I Standard Fonn Apf)ru%red. ,rVP-1 avb Section 7. SAFETY. A. Safety of personnel, property, rail operations and the public is of paramount importance in the prosecution of the work performed by Contractor. Contractor shall be responsible for initiating, maintaining and supervising all safety, operations and programs in connection with the work. Contractor shall at a minimum comply with Railroad's safety standards listed in Exhibit D, hereto attached, to ensure uniformity with the safety standards followed by Railroad's own forces. As a part of Contractor's safety responsibilities, Contractor shall notify Railroad if Contractor determines that any of Railroad's safety standards are contrary to good safety practices. Contractor shall furnish copies of Exhibit D to each of its employees before they enter the job site. B. Without limitation of the provisions of paragraph A above, Contractor shall keep the job site free from safety and health hazards and ensure that its employees are competent and adequately trained in all safety and health aspects of the job. C. Contractor shall have proper first aid supplies available on the job site so that prompt first aid services may be provided to any person injured on the job site. Contractor shall promptly notify Railroad of any U.S. Occupational Safety and Health Administration reportable injuries. Contractor shall have a nondelegable duty to control its employees while they are on the job site or any other property of Railroad, and to be certain they do not use, be under the influence of, or have in their possession any alcoholic beverage, drug or other substance that may inhibit the safe performance of any work. D. If and when requested by Railroad, Contractor shall deliver to Railroad a copy of Contractor's safety plan for conducting the work (the "Safety Plan"). Railroad shall have the right, but not the obligation, to require Contractor to correct any deficiencies in the Safety Plan. The terms of this Agreement shall control if there are any inconsistencies between this Agreement and the Safety Plan. Section 8. INDEMNITY. A. To the extent not prohibited by applicable statute, Contractor shall indemnify. defend and hold harmless Railroad, its affiliates, and its and their officers, agents and employees (individually an "Indemnified Party" or collectively "Indemnified Parties") from and against any and all loss, damage, injury, liability, claim. demand, cost or expense (including, without limitation, attorney's. consultant's and expert's fees, and court costs), fine or penalty (collectively, "Loss") incurred by any person (including, without limitation, any Indemnified Party. Contractor, or any employee of Contractor or of any Indemnified Party) arising out of or in any manner connected with (i) any work performed by Contractor, or (ii) any act or omission of Contractor, its officers, agents or employees, or (iii) any breach of this Agreement by Contractor. B. The right to indemnity under this Section 8 shall accrue upon occurrence of the event giving rise to the Loss, and shall apply regardless of any negligence or strict liability of any Indemnified Party. except where the Loss is caused by the sole active negligence of an Indemnified Party as established by the final judgment of a court of competent jurisdiction. The sole active negligence of any Indemnified Party shall not bar the recovery of any other Indemnified Party. C. Contractor expressly and specifically assumes potential liability under this Section 8 for claims or actions brought by Contractor's own employees. Contractor waives any immunity it may have under worker's compensation or industrial insurance acts to indemnify the Indemnified Parties under this Section 8. Contractor acknowledges that this waiver was mutually negotiated by the parties hereto. D. No court or jury findings in any employee's suit pursuant to any worker's compensation act or the Federal Employers' Liability Act against a party to this Agreement may be relied upon or used by Contractor in any attempt to assert liability against any Indemnified Party. E. The provisions of this Section 8 shall survive the completion of any work performed by Contractor or the termination or expiration of this Agreement. In no event shall this Section 8 or any other provision of this Agreement be deemed to limit any liability Contractor may have to any Indemnified Party by statute or under common law. Exhibit B 4339963 Pages: 30 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, Co w � 11i�1�►''i�l �Mti�. N. 1111 IIHiighwa,fi :fit -grade ('rosttn;4 01 0i 1 5 Standard Form Approved. \VP-I.%IV Section 9. RESTORATION OF PROPERTY. In the event Railroad authorizes Contractor to take down any fence of Railroad or in any manner move or disturb any of the other property of Railroad in connection with the work to be performed by Contractor. then in that event Contractor shall. as soon as possible and at Contractor's sole expense, restore such fence and other property to the same condition as the same were in before such fence was taken down or such other property was moved or disturbed. Contractor shall remove all of Contractor's tools, equipment. rubbish and other materials from Railroad's property promptly upon completion of the work. restoring Railroad's property to the same state and condition as when Contractor entered thereon. Section 10. WAIVER OF DEFAULT. Waiver by Railroad of any breach or default of any condition, covenant or agreement herein contained to be kept. observed and performed by Contractor shall in no way impair the right of Railroad to avail itself of any remedy for any subsequent breach or default. Section 11. MODIFICATION - ENTIRE AGREEMENT. No modification of this Agreement shall be effective unless made in writing and signed by Contractor and Railroad. This Agreement and the exhibits attached hereto and made a part hereof constitute the entice understanding between Contractor and Railroad and cancel and supersede any prior negotiations, understandings or agreements. whether written or oral. with respect to the work to be performed by Contractor Section 12. ASSIGNMENT - SUBCONTRACTING. Contractor shall not assign or subcontract this Agreement. or any interest there€n, without the written consent of the Railroad Contractor shall be responsible for the acts and omissions of all subcontractors Before Contractor commences any work, the Contractor shall. except to the extent prohibited by law: (1) require each of its subcontractors to include the Contractor as "Additional Insured" in the subcontractor's Commercial General Liability policy and Business Automobile policies with respect to all liabilities arising out of the subcontractor's performance of work on behalf of the Contractor by endorsing these policies with ISO Additional Insured Endorsements CG 20 26. and CA 20 48 (or substitute forms providing equivalent coverage: (2) require each of its subcontractors to endorse their Commercial General Liability Policy with "Contractual Liability Railroads" ISO Form CG 24 17 10 01 (or a substitute form providing equivalent coverage) for the lob site: and (3) require each of its subcontractors to endorse their Business Automobile Policy with "Coverage For Certain Operations In Connection With Railroads" ISO Form CA 20 70 10 01 (or a substitute form providing equivalent coverage) for the job site. 4339963 Pages: 31 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO EnAllr �1' � � i ��rwch� r�f', OCN AII4, liii Exhibit 8 Page 4 of 4 ..h ire %fallen 0,€oratb% ;057 K1 putht, htghw n ,it grade rt)S%ltlg-(00€ I ; dot i Isa;tiway .•fit -l" save , n,s,lilu (►Z .) I I 1 Standard Form Appro ed. NA P -tale EXHIBIT ( TO (TON TRACTOR'S RIC;IIT OF EN►TRV AGREEMENT t. nion Pacific Railroad Company Insurance Provisions For Contractor's Richt of Finn Agreement Contractor shall. at its sole cost and expense, procure and maintain during the course of the Project and until all Project work on Railroad's property has been completed and the Contractor has removed all equipment and materials from Railroad's property and has cleaned and restored Railroad's property to Railroad's satisfaction, the following insurance coverage: A. Commercial General Liability insurance. Commercial general liability (CGL) with a limit of not less than $5,000.000 each occurrence and an aggregate limit of not less than $10,000,000. CGL insurance must be written on ISO occurrence form CG 00 01 12 04 (or a substitute form providing equivalent coverage). The policy must also contain the following endorsement, which must be stated on the certificate of insurance: • Contractual Liability Railroads ISO form CG 24 17 10 01 (or a substitute form providing equivalent coverage) showing "Union Pacific Railroad Company Property" as the Designated Job Site. • Designated Construction Project(s) General Aggregate Limit ISO Form CG 25 03 03 97 (or a substitute form providing equivalent coverage) showing the project on the form schedule. B. Business Automobile Coverage insurance. Business auto coverage written on ISO form CA 00 01 10 01 (or a substitute form providing equivalent liability coverage) with a combined single limit of not less $5,000,000 for each accident and coverage must include liability arising out of any auto (including owned, hired and non -owned autos). The policy must contain the following endorsements, which must be stated on the certificate of insurance: • Coverage For Certain Operations In Connection With Railroads ISO form CA 20 70 10 01 (or a substitute form providing equivalent coverage) showing "Union Pacific Property" as the Designated Job Site. • Motor Carrier Act Endorsement - Hazardous materials clean up (MCS-90) if required by law. C Workers' Compensation and Employers' Liability Insurance. Coverage must include but not be limited to: • Contractor's statutory liability under the workers' compensation laws of the state where the work is being performed. • Employers' Liability (Part B) with limits of at least $500,000 each accident, $500,000 disease policy limit $500,000 each employee. If Contractor is self -insured, evidence of state approval and excess workers compensation coverage must be provided. Coverage must include liability arising out of the U. S. Longshoremen's and Harbor Workers' Act, the Jones Act, and the Outer Continental Shelf Land Act, if applicable. The policy must contain the following endorsement, which must be stated on the certificate of insurance: • Alternate Employer endorsement ISO form WC 00 03 01 A (or a substitute form providing equivalent coverage) showing Railroad in the schedule as the alternate employer (or a substitute form providing equivalent coverage). D Railroad Protective Liability insurance. Contractor must maintain "Railroad Protective Liability" (RPL) insurance written on ISO occurrence form CG 00 35 12 04 (or a substitute form providing equivalent coverage) on behalf of Railroad as named insured, with a limit of not less than $2.000,000 per occurrence and an aggregate of $6,000,000. The definition of "JOB LOCATION" and "WORK" on the declaration page of the policy shall refer to this Agreement and shall describe all WORK or OPERATIONS performed under this agreement. Contractor shall provide this Agreement to Contractor's insurance agent(s) and/or broker(s) and Contractor shall instruct such agent(s) and/or broker(s) to Exhibit C Page 1 t. share t&filen Loloratt++ .'-M; public Iiwlpo..ln ,St "tide criEssing-0 I)I I i dos. 4339963 Pages: 32 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III kirdMiliVid MUT, 11111 0 • Highway At -(Grads: Crossing 0 0 I I : Standard Form Approved. \VP -1.a%% procure the insurance coverage required by this Agreement. A BINDER STATING THE POLICY IS IN PLACE MUST BE SUBMITTED TO RAILROAD BEFORE THE WORK MAY COMMENCE AND UNTIL THE ORIGINAL POLICY IS FORWARDED TO UNION PACIFIC RAILROAD. E. Umbrella or Excess insurance. If Contractor utilizes umbrella or excess policies, these policies must "follow form" and afford no less coverage than the primary policy. F Pollution Liability insurance. Pollution liability coverage must be included when the scope of the work as defined in the Agreement includes installation. temporary storage, or disposal of any "hazardous" material that is injurious in or upon land, the atmosphere, or any watercourses: or may cause bodily injury at any time. If required, coverage may be provided in separate policy form or by endorsement to Contractors CGL or RPL. Any form coverage must be equivalent to that provided in ISO form CG 24 15 "Limited Pollution Liability Extension Endorsement" or CG 28 31 "Pollution Exclusion Amendment" with limits of at least $5,000,000 per occurrence and an aggregate limit of $10,000,000. If the scope of work as defined in this Agreement includes the disposal of any hazardous or non -hazardous materials from the job site, Contractor must furnish to Railroad evidence of pollution legal liability insurance maintained by the disposal site operator for losses arising from the insured facility accepting the materials, with coverage in minimum amounts of $1,000.000 per loss, and an annual aggregate of $2,000,000. Other Requirements G All policy(ies) required above (except worker's compensation and employers liability) must include Railroad as "Additional Insured" using ISO Additional Insured Endorsements CG 20 26, and CA 20 48 (or substitute forms providing equivalent coverage). The coverage provided to Railroad as additional insured shall, to the extent provided under ISO Additional Insured Endorsement CG 20 26, and CA 20 48 provide coverage for Railroad's negligence whether sole or partial, active or passive, and shall not be limited by Contractor's liability under the indemnity provisions of this Agreement. H. Punitive damages exclusion, if any, must be deleted (and the deletion indicated on the certificate of insurance), unless the law governing this Agreement prohibits all punitive damages that might arise under this Agreement. 1. Contractor waives all rights of recovery, and its insurers also waive all rights of subrogation of damages against Railroad and its agents. officers, directors and employees. This waiver must be stated on the certificate of insurance. J. Prior to commencing the work, Contractor shall furnish Railroad with a certificate(s) of insurance, executed by a duly authorized representative of each insurer, showing compliance with the insurance requirements in this Agreement. K. All insurance policies must be written by a reputable insurance company acceptable to Railroad or with a current Best's Insurance Guide Rating of A- and Class VII or better. and authorized to do business in the state where the work is being performed. L. The fact that insurance is obtained by Contractor or by Railroad on behalf of Contractor will not be deemed to release or diminish the liability of Contractor, including, without limitation, liability under the indemnity provisions of this Agreement. Damages recoverable by Railroad from Contractor or any third party will not be limited by the amount of the required insurance coverage. Exhibit C Page 2 „tuare llltlteii to l,,C;itl.t 'l$' ' `' sni �t Il,a�lt�4.s. It ,_I.tllt,' nft►��i1iL 11�1i� ��,. 4339963 Pages: 33 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, Co III rjl:'! Ii1k Vff%Kfak''iIi P"AIWiv.k l III IIH}uhwat, •fit -(,rack.• ( ros;Ing t►• tl t 4 1 Standard Form &1t}Prtn ccl. A VP -I. am. EXHIBIT D TO CONTRACTOR'S RIGHT OF ENTRY AGREEMENT MINIMUM SAFETY REQUIREMENTS The term "employees" as used herein refer to all employees of Contractor as well as all employees of any subcontractor or agent of Contractor. 1. Clothing A. All employees of Contractor will be suitably dressed to perform their duties safely and in a manner that will not interfere with their vision, hearing, or free use of their hands or feet. Specifically, Contractor's employees must wear- (i) Waist -length shirts with sleeves. (ii) Trousers that cover the entire leg. If flare -legged trousers are worn, the trouser bottoms must be tied to prevent catching. (iii) Footwear that covers their ankles and has a defined heel. Employees working on bridges are required to wear safety -toed footwear that conforms to the Amencan National Standards Institute (ANSI) and FRA footwear requirements. B. Employees shall not wear boots (other than work boots), sandals, canvas -type shoes, or other shoes that have thin soles or heels that are higher than normal. C Employees must not wear loose or ragged clothing, neckties, finger rings. or other loose jewelry while operating or working on machinery. 11. Personal Protective Equipment Contractor shall require its employees to wear personal protective equipment as specified by Railroad rules, regulations, or recommended or requested by the Railroad Representative. (i) Hard hat that meets the American National Standard (ANSI) Z89.1 - latest revision. Hard hats should be affixed with Contractor's company logo or name. (ii) Eye protection that meets American National Standard (ANSI) for occupational and educational eye and face protection, Z87.1 - latest revision. Additional eye protection must be provided to meet specific job situations such as welding, grinding, etc. (iii) Hearing protection, which affords enough attenuation to give protection from noise levels that will be occurring on the job site. Hearing protection, in the form of plugs or muffs, must be worn when employees are within: • • 100 feet of a locomotive or roadway/work equipment 15 feet of power operated tools 150 feet of jet blowers or pile drivers 150 feet of retarders in use (when within 10 feet, employees must wear dual ear protection - plugs and muffs) (iv) Other types of personal protective equipment. such as respirators, fall protection equipment, and face shields. must be worn as recommended or requested by the Railroad Representative. Exhibit D Page 1 of 3 pages .twin Ala l}�» �, #�„ad<I ;11" v }��sl,}�. il�ylt«s� �s .r.x}k L:ri t W 0 i 339963 Pages: 34 of 36 9/28/2017 03:47 PM R Fee:$0.00 arly Koppes, Clerk and Recorder, Weld County, CO 1111 )rjp i iu R. t Highsa> -\t-(trade ( rt.►s,itt,: 01 t)! ! ; Standard Fot-ni \ppro'ted. \L Play. III. On Track Safety Contractor is responsible for compliance with the Federal Railroad Administration's Roadway Worker Protection regulations - 49CFR214. Subpart C and Railroad's On -Track Safety rules. Under 49CFR214. Subpart C, railroad contractors are responsible for the training of their employees on such regulations. In addition to the instructions contained in Roadway Worker Protection regulations, all employees must: (I) Maintain a distance of twenty-five (25) feet to any track unless the Railroad Representative is present to authorize movements. (ii) Wear an orange. reflectorized workwear approved by the Railroad Representative. (iii) Participate in a job briefing that will specify the type of On -Track Safety for the type of work being performed. Contractor must take special note of limits of track authority. which tracks may or may not be fouled, and clearing the track. Contractor will also receive special instructions relating to the work zone around machines and minimum distances between machines while working or traveling. IV. Equipment A. It is the responsibility of Contractor to ensure that all equipment is in a safe condition to operate. If, in the opinion of the Railroad Representative, any of Contractor's equipment is unsafe for use, Contractor shall remove such equipment from Railroad's property. In addition. Contractor must ensure that the operators of all equipment are properly trained and competent in the safe operation of the equipment. In addition, operators must be: • Familiar and comply with Railroad's rules on lockout/tagout of equipment. Trained in and comply with the applicable operating rules if operating any by -rail equipment on -track. Trained in and comply with the applicable air brake rules if operating any equipment that moves rail cars or any other railbound equipment. B All self-propelled equipment must be equipped with a first -aid kit. fire extinguisher. and audible back-up warning device. C Unless otherwise authorized by the Railroad Representative, all equipment must be parked a minimum of twenty-five (25) feet from any track. Before leaving any equipment unattended, the operator must stop the engine and properly secure the equipment against movement. Cranes must be equipped with three orange cones that will be used to mark the working area of the crane and the minimum clearances to overhead powerlines. V. General Safety Requirements A. Contractor shall ensure that all waste is properly disposed of in accordance with applicable federal and state regulations. B Contractor shall ensure that all employees participate in and comply with a job briefing conducted by the Railroad Representative, if applicable. During this briefing, the Railroad Representative will specify safe work procedures. (including On -Track Safety) and the potential hazards of the job. If any employee has any questions or concerns about the work, the employee must voice them during the job briefing. Additional job briefings will be conducted during the work as conditions. work procedures. or personnel change. C All track work performed by Contractor meets the minimum safety requirements established by the Federal Railroad Administration's Track Safety Standards 49CFR213. D All employees comply with the following safety procedures when working around any railroad track: (I) Always be on the alert for moving equipment. Employees must always expect movement on any track. at any time, in either direction. Exhibit 0 Page 2 of 3 pages cur .i:�{Irtt .4 dot,+Aitt set , , ,uat'j t `ilo", as j( �r tilt I1'\.Iztg•1Of1I 1 +.}th 4339963 Pages: 35 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO III FACIAMINVI I ID c Higb cal. At-Gradc Crossing 01 0! 13 Standard Furni .Appro .d. AVP-C a« (ii) Do not step or walk on the top of the rail, frog, switches, guard rails, or other track components. (iii) In passing around the ends of standing cars, engines, roadway machines or work equipment, leave at least 20 feet between yourself and the end of the equipment. Do not go between pieces of equipment of the opening is less than one car length (50 feet). (iv) Avoid walking or standing on a track unless so authorized by the employee in charge. (v) Before stepping over or crossing tracks, look in both directions first. (vi) Do not sit on, lie under, or cross between cars except as required in the performance of your duties and only when track and equipment have been protected against movement. All employees must comply with all federal and state regulations concerning workplace safety. Exhibit D Page 3 of 3 pages %ILtltft t isLtt.t;ttt Z11 " K (llih�k. 'YYL'hte.t� .Y! _f,itlt . ''''' !tt; tl;uI 1 ; ,Ittt, 4339963 Pages: 36 of 36 09/28/2017 03:47 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO VIII PilaflLn� ■, �`)I$ Fa KOHN ti 1 III Hello