Loading...
HomeMy WebLinkAbout20173493.tiffDEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 December 20, 2017 To: Board of County Commissioners From: Toby Taylor Subject: 1401 Design — Change Order 1 (2017-3493) Weld County awarded the bid to perform design services for the Building 1401 remodel. During the design, it was discovered a more extensive remodel was needed to accommodate a 5 -year growth of the department. Because of this change in scope a change order is warranted to account for the additional time. Change Order #1 is for $4,500 to provide these complete design services. Buildings & Grounds is recommending approval of Change Order #1. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director eD7 64--ori) r/s0 apt? , /221/7 3coot9 VEr Change Order oc en 201 PROJECT: (name and address) 1401 N 17th Ave Remodel 1401 North 17th Avenue OWNER: (name and address) WC Dept of Buildings & Grounds 1105 H Street, P.O. Box 758 Greeley, CO 80632 CONTRACT INFORMATION: Contract For: Date: ARCHITECT: (name and address) C2D Architects, LLC P.O. Box 337733 Greeley, CO 80633 CHANGE ORDER INFORMATION: Change Order Number: 001 Date: CONTRACTOR: (name and address) Not App Not App Not App THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) The original (Contract Sum) (Guaranteed 1\ was $ 7 2 & OO The net change by previously authorized Change Orders $ -- The (Contract Sum) (Guaranteed Nprior to this Change Order was $ 7, 7 2.0-• Co The (Contract Sum) (Guaranteed Nwill be (increased) (by this Change Order in the amount of $ ) 500- t9 o The new (Contract Sum) (Guaranteed I✓, including this Change Order, will be $ k Z 2 20 •- 00 The Contract Time will be (increased) ((by ( o ) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time., that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Yl c2,:p �S L --c--- N. A ARCHITECT (Firm name) IG. ATURE of5F.? r 6'fO PRINTED NAME AND TITLE (9,20r7 DATE CONTRACTOR (Firm name) WELD COUNTY OWNER (firm name e SIGNATURE A URE PRINTED NAME AND TITLE DATE Julie A. Cozad, Chair BOCC PRINTED NAME AND TITLE DEC 2 7 2017 DATE AIA Document G701 TIM - 2017. Copyright © 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. UVARNONG: This AM® Document is protected by U.S. Copyright Law and Onternationai Treaties. Unauthorized reproduction or distribution of this 9A® Document, or any , .,� ;ri f • may result i severe as d �.. c,r yignina p e lt±ies and vim e prosecuted maximuma sent . , �� i ;_, �� ®®4Ca�tleC''U Otl. a�J,� any ,�v jj�. a�' � s' _ +r, .� �.>.y _U �-.... �1 ��� iil ..r! 'J � � �. , _ � :'� �?. 8g+',, � �� �9:�e. 3;"l .,�� fir_-��9�f; an, .� � U � .�-.��, e�� to the �.-_�`,�.�.��.� ;��.ti�����4� under the law. This document was created on 12/19/2017 14:38:42 under the terms of AIA Documents-on-DemandTM Order No. 2009853575 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. o/701-149.& (0 CHANGE Op DER 1 ® 1401 DESIGN, C2D ARCHITECTS, LLC ATTESTa a Weld t Clerk to the BY: Deputy C jerk tt the B oard APPROVED AS TO FUNDIN r Controller F ( Lin y ttorney �a APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO A. Cozad, Chair Ly- DEC 2 7 2017 OVED AS TO SUBSTANCE: ectid Official or Department Head 936) C2D Architects LLC P.O. Box 337733 Greeley, CO 80633=0629 December 1, 2017 RE: New Company Name Dear Valued Customers and Vendors, Effective November 21st, 2017 we are excited to announce we have changed our company name to: C2D Architects LLC Our new internet website will be: C2Darchitects.com Our new Internet domain will be: @C2Darchitects.com The company will continue to operate at our current location and your contacts will remain unchanged. Other than these visible changes, there is no change in ownership or staff. Our office location, phone number, mailing address and fax number will remain the same (as listed below). Location: 1703 61St Ave Suite 101 Greeley, CO 80634 Mailing Address: P.O. Box 337733 Greeley, CO 80633 Phone Number: 970-515-6675 Fax Number: 970-515-6675 With 14 years of business presence in the industry, we look forward to continuing to grow and serve with you under our new company name. If you should have any questions regarding the company name change, feel free to contact us. Sincerely, Robb R. Casseday, AIA, LEED-AP Architect/Planner C2D Architects LLC Architecture — Planning - Sustainable Development — LEED 970-515-6675 www.C2Darchitects.com RESOLUTION RE: APPROVE AGREEMENT FOR DESIGN SERVICES (1401 BUILDING REMODEL) AND AUTHORIZE CHAIR TO SIGN - CASSEDAY CREATIVE DESIGNS, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Agreement for Design Services (1401 Buildings Remodel) between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Buildings and Grounds, and Casseday Creative Designs, LLC, commencing upon full execution of signatures and ending December 15, 2017, with further terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Agreement for Design Services (1401 Building Remodel) between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Buildings and Grounds, and Casseday Creative Designs, LLC, be and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 11th day of October, A.D., 2017. BOARD OF COUNTY COMMISSIONERS WELD COU TY, COLORADO ATTEST: dayttA) .1,o%k. Weld County Clerk to the Board BY: APPRO Barbara Kirkmeyer ounty Attorney Date of signature: 10130 (17 J ozad, Chair Steve Moreno, P5em Sean P. Conway cc (2)GCTTISG) 1U/'1/I'T 2017-3493 BG0019 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 October 5, 2017 To: Board of County Commissioners From: Toby Taylor Subject: Design Services —1401 Remodel Through the informal bid process, Buildings and Grounds sought quotes from five vendors to perform design services for the 1401 remodel. The results of the informal bids are: Halcyon Design, 13,286.00 Markley Designs, 14,000.00, Hauser Architects, 13,240.00, Casseday Creative Designs, 7,720.00, RSAP, 10,480.00 The low bid was from Casseday Creative Designs LLC and meets specifications. Therefore, Buildings & Grounds is recommending the bid be awarded to Casseday Creative Designs LLC for $7,720.00. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director 2017-3493 rooici Init. I stAI A Document BIO4TM - 2017 Standard Abbreviated Form of Agreement Between Owner and Architect AGREEMENT made as of the 4th in the year 2017 (In words, indicate day, month and year) day of October BETWEEN the Architect's client identified as the Owner: (Name, legal status, address and other information) Weld County Department of Buildings & Grounds 1105 H Street, P.O. Box 758 Greeley, CO 80632 (970) 356-4000 x2023 and the Architect: (Name, legal status, address and other information) Casseday Creative Designs, LLC P.O. Box 337733 Greeley, CO 80633 (970) 515-6675 for the following Project: (Name, location and detailed description) 1401 Administration Building Remodel 1401 North 17th Avenue, Greeley, CO 80634 Remodel 4,600 sq. ft. to house administrative functions which will consist of private and open office areas, conference rooms. The Owner and Architect agree as follows. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document 8104T"' - 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. TABLE OF ARTICLES 1 INITIAL INFORMATION 2 ARCHITECT'S RESPONSIBILITIES 3 SCOPE OF ARCHITECT'S BASIC SERVICES 4 SUPPLEMENTAL AND ADDITIONAL SERVICES 5 OWNER'S RESPONSIBILITIES 6 COST OF THE WORK T COPYRIGHTS AND LICENSES 8 CLAIMS AND DISPUTES 9 TERMINATION OR SUSPENSION 10 MISCELLANEOUS PROVISIONS 11 COMPENSATION 12 SPECIAL TERMS AND CONDITIONS 13 SCOPE OF THE AGREEMENT ARTICLE 1 INITIAL INFORMATION § 1.1 This Agreement is based on the Initial Information set forth below: (State below details of the Project's site and program, Owner's contractors and consultants, Architect's consultants, Owner's budget for the Cost of the Work, and other information relevant to the Project.) See Attachments A, B and C § 1.2 The Owner and Architect may rely on the Initial Information. Both parties, however, recognize that such information may materially change and, in that event, the Owner and the Architect shall appropriately adjust the schedule, the Architect's services and the Architect's compensation. The Owner shall adjust the Owner's budget for the Cost of the Work and the Owner's anticipated design and construction milestones, as necessary, to accommodate material changes in the Initial Information. § 1.3 The parties shall agree upon protocols governing the transmission and use of Instruments of Service or any other information or documentation in digital form. The parties will use AIA Document E203Tm-2013, Building Information Modeling and Digital Data Exhibit, to establish the protocols for the development, use, transmission, and exchange of digital data. § 1.3.1 Any use of, or reliance on, all or a portion of a building information model without agreement to protocols governing the use of, and reliance on, the information contained in the model and without having those protocols set forth in AIA Document E203T" X2013, Building Information Modeling and Digital Data Exhibit, and the requisite AIA Document G202T"12013, Project Building Information Modeling Protocol Form, shall be at the using or relying party's sole risk and without liability to the other party and its contractors or consultants, the authors of, or contributors to, the building information model, and each of their agents and employees. AIA Document B1041" - 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. ARTICLE 2 ARCHITECT'S RESPONSIBILITIES § 2.1 The Architect shall provide the professional services set forth in this Agreement consistent with the professional skill and care ordinarily provided by architects practicing in the same or similar locality under the same or similar circumstances. The Architect shall perform its services as expeditiously as is consistent with such professional skill and care and the orderly progress of the Project. § 2.2 The Architect shall maintain the following insurance until termination of this Agreement. If any of the requirements set forth below are in addition to the types and limits the Architect normally maintains, the Owner shall pay the Architect as set forth in Section 11.8: (Idenon, types and limits of insurance coverage, and other insurance requirements applicable to the Agreement, if any.) .1 General Liability $1,000,000/ $2,000,000 State Farm Insurance . 2 Automobile Liability Personal Vehicles, State Farm Insurance . 3 Workers' Compensation $100,000/$100,000/$500,000 State Farm Insurance . 4 Professional Liability $1,000,000 USI Colorado LLC ARTICLE 3 SCOPE OF ARCHITECT'S BASIC SERVICES § 3.1 The Architect's Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services. § 3.1.1 The Architect shall coordinate its services with those services provided by the Owner and the Owner's consultants. The Architect shall be entitled to rely on (1) the accuracy and completeness of the services and information furnished by the Owner and (2) the Owner's approvals. The Architect shall provide prompt written notice to the Owner if the Architect becomes aware of any error, omission, or inconsistency in such services or information. § 3.1.2 As soon as practicable after the date of this Agreement, the Architect shall submit for the Owner's approval a schedule for the performance of the Architect's services. Once approved by the Owner, time limits established by the schedule shall not, except for reasonable cause, be exceeded by the Architect or Owner. With the Owner's approval, the Architect shall adjust the schedule, if necessary, as the Project proceeds until the commencement of construction. § 3.1.3 The Architect shall assist the Owner in connection with the Owner's responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project. § 3.2 Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect's services. Init. I AIA Document B104TM - 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. § 3.2.2 The Architect shall discuss with the Owner the Owner's program, schedule, budget for the Cost of the Work, Project site, and alternative approaches to design and construction of the Project. The Architect shall reach an understanding with the Owner regarding the Project requirements. § 3.2.3 The Architect shall consider the relative value of alternative materials, building systems and equipment, together with other considerations based on program, aesthetics, and any sustainable objectives, in developing a design for the Project that is consistent with the Owner's schedule and budget for the Cost of the Work. § 3.2.4 Based on the Project requirements, the Architect shall prepare Design Documents for the Owner's approval consisting of drawings and other documents appropriate for the Project and the Architect shall prepare and submit to the Owner an estimate of the Cost of the Work prepared in accordance with Section 6.3. § 3.2.5 The Architect shall submit the Design Documents to the Owner, and request the Owner's approval. § 3.3 Construction Documents Phase Services § 3.3.1 Based on the Owner's approval of the Design Documents, the Architect shall prepare for the Owner's approval Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Work. The Owner and Architect acknowledge that in order to construct the Work the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.4.4. § 3.3.2 The Architect shall incorporate the design requirements of governmental authorities having jurisdiction over the Project into the Construction Documents. § 3.3.3 The Architect shall submit the Construction Documents to the Owner, update the estimate for the Cost of the Work and advise the Owner of any adjustments to the estimate of the Cost of the Work, take any action required under Section 6.5, and request the Owner's approval. § 3.3.4 The Architect, following the Owner's approval of the Construction Documents and of the latest estimate of the Cost of the Work, shall assist the Owner in obtaining bids or proposals and awarding and preparing contracts for construction. § 3.4 Construction Phase Services § 3.4.1 General § 3.4.1.1 The Architect shall provide administration of the Contract between the Owner and the Contractor as set forth below and in AIA Document A 104TM_2017, Standard Abbreviated Form of Agreement Between Owner and Contractor. If the Owner and Contractor modify AIA Document A 1042017, those modifications shall not affect the Architect's services under this Agreement unless the Owner and the Architect amend this Agreement. § 3.4.1.2 The Architect shall advise and consult with the Owner during the Construction Phase Services. The Architect shall have authority to act on behalf of the Owner only to the extent provided in this Agreement. The Architect shall not have control over, charge of, or responsibility for the construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, nor shall the Architect be responsible for the Contractor's failure to perform the Work in accordance with the requirements of the Contract Documents. The Architect shall be responsible for the Architect's negligent acts or omissions, but shall not have control over or charge of and shall not be responsible for, acts or omissions of the Contractor or of any other persons or entities performing portions of the Work. § 3.4.1.3 Subject to Section 4.2, the Architect's responsibility to provide Construction Phase Services commences with the award of the Contract for Construction and terminates on the date the Architect issues the final Certificate for Payment. § 3.4.2 Evaluations of the Work § 3.4.2.1 The Architect shall visit the site at intervals appropriate to the stage of construction, or as otherwise required in Section 4.2.2, to become generally familiar with the progress and quality of the portion of the Work completed, and to determine, in general, if the Work observed is being performed in a manner indicating that the Work, when fully completed, will be in accordance with the Contract Documents. However, the Architect shall not be required to make exhaustive or continuous on -site inspections to check the quality or quantity of the Work. On the basis of the site visits, the Init. AIA Document B104TM' — 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. Architect shall keep the Owner reasonably informed about the progress and quality of the portion of the Work completed, and promptly report to the Owner (1) known deviations from the Contract Documents, (2) known deviations from the most recent construction schedule submitted by the Contractor, and (3) defects and deficiencies observed in the Work. § 3.4.2.2 The Architect has the authority to reject Work that does not conform to the Contract Documents and has the authority to require inspection or testing of the Work. § 3.4.2.3 The Architect shall interpret and decide matters concerning performance under, and requirements of, the Contract Documents on written request of either the Owner or Contractor. The Architect's response to such requests shall be made in writing within any time limits agreed upon or otherwise with reasonable promptness. § 3.4.2.4 When making such interpretations and decisions, the Architect shall endeavor to secure faithful performance by both Owner and Contractor, shall not show partiality to either, and shall not be liable for results of interpretations or decisions rendered in good faith. § 3.4.2.5 The Architect shall render initial decisions on Claims between the Owner and Contractor as provided in the Contract Documents. § 3.4.3 Certificates for Payment to Contractor § 3.4.3.1 The Architect shall review and certify the amounts due the Contractor and shall issue certificates in such amounts. The Architect's certification for payment shall constitute a representation to the Owner, based on the Architect's evaluation of the Work as provided in Section 3.4.2 and on the data comprising the Contractor's Application for Payment, that, to the best of the Architect's knowledge, information and belief, the Work has progressed to the point indicated, the quality of the Work is in accordance with the Contract Documents, and that the Contractor is entitled to payment in the amount certified. § 3.4.3.2 The issuance of a Certificate for Payment shall not be a representation that the Architect has (1) made exhaustive or continuous on -site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and suppliers and other data requested by the Owner to substantiate the Contractor's right to payment, or (4) ascertained how or for what purpose the Contractor has used money previously paid on account of the Contract Sum. § 3.4.4 Submittals § 3.4.4.1 The Architect shall review and approve, or take other appropriate action, upon the Contractor's submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. Review of such submittals is not for the purpose of determining the accuracy and completeness of other information such as dimensions, quantities, and installation or performance of equipment or systems, which are the Contractor's responsibility. The Architect's review shall not constitute approval of safety precautions or any construction means, methods, techniques, sequences or procedures. § 3.4.4.2 If the Contract Documents specifically require the Contractor to provide professional design services or certifications by a design professional related to systems, materials or equipment, the Architect shall specify the appropriate performance and design criteria that such services must satisfy. The Architect shall review and take appropriate action on Shop Drawings and other submittals related to the Work designed or certified by the Contractor's design professional, provided the submittals bear such professional's seal and signature when submitted to the Architect. The review shall be for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Architect shall be entitled to rely upon, and shall not be responsible for, the adequacy and accuracy of the services, certifications, and approvals performed or provided by such design professionals. § 3.4.4.3 The Architect shall review and respond to written requests for information about the Contract Documents. The Architect's response to such requests shall be made in writing within any time limits agreed upon, or otherwise with reasonable promptness. § 3.4.5 Changes in the Work The Architect may order minor changes in the Work that are consistent with the intent of the Contract Documents and do not involve an adjustment in the Contract Sum or an extension of the Contract Time. Subject to Section 4.2.3, the Init. I AIA Document B104T"'' - 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. Architect shall prepare Change Orders and Construction Change Directives for the Owner's approval and execution in accordance with the Contract Documents. § 3.4.6 Project Completion The Architect shall conduct inspections to determine the date or dates of Substantial Completion and the date of final completion; issue Certificates of Substantial Completion; forward to the Owner, for the Owner's review and records, written warranties and related documents required by the Contract Documents and received from the Contractor; and issue a final Certificate for Payment based upon a final inspection indicating that, to the best of the Architect's knowledge, information, and belief, the Work complies with the requirements of the Contract Documents. ARTICLE 4 SUPPLEMENTAL AND ADDITIONAL SERVICES § 4.1 Supplemental Services are not included in Basic Services but may be required for the Project. The Architect shall provide the Supplemental Services indicated below, and the Owner shall compensate the Architect as provided in Section 11.2. Supplemental Services may include programming, site evaluation and planning, environmental studies, civil engineering, landscape design, telecommunications/data, security, measured drawings of existing conditions, coordination of separate contractors or independent consultants, detailed cost estimates, on -site project representation beyond requirements of Section 4.2.2, value analysis, interior architectural design, tenant related services, preparation of record drawings, commissioning, sustainable project services, and any other services not otherwise included in this Agreement. (Identffr below the Supplemental Services that the Architect is required to provide and insert a description of each Supplemental Service, if not further described in an exhibit attached to this document) N/A § 4.2 The Architect may provide Additional Services after execution of this Agreement without invalidating the Agreement. Upon recognizing the need to perform Additional Services, the Architect shall notify the Owner. The Architect shall not provide the Additional Services until the Architect receives the Owner's written authorization. Except for services required due to the fault of the Architect, any Additional Services provided in accordance with this Section 4.2 shall entitle the Architect to compensation pursuant to Section 11.3. § 4.2.1 The Architect shall provide services necessitated by a change in the Initial Information, changes in previous instructions or approvals given by the Owner, or a material change in the Project including size; quality; complexity; the Owner's schedule or budget for Cost of the Work; or procurement or delivery method as an Additional Service § 4.2.2 The Architect has included in Basic Services Four ( 4 ) visits to the site by the Architect during construction. The Architect shall conduct site visits in excess of that amount as an Additional Service. § 4.2.3 The Architect shall, as an Additional Service, provide services made necessary by a Contractor's proposed change in the Work. The Architect shall prepare revisions to the Architect's Instruments of Service necessitated by Change Orders and Construction Change Directives as an Additional Service. § 4.2.4 If the services covered by this Agreement have not been completed within 60 days ( 2 ) months of the date of this Agreement, through no fault of the Architect, extension of the Architect's services beyond that time shall be compensated as Additional Services. ARTICLE 5 OWNER'S RESPONSIBILITIES § 5.1 Unless otherwise provided for under this Agreement, the Owner shall provide information in a timely manner regarding requirements for and limitations on the Project, including a written program which shall set forth the Owner's objectives, schedule, constraints and criteria, including space requirements and relationships, flexibility, expandability, special equipment, systems and site requirements. § 5.2 The Owner shall establish the Owner's budget for the Project, including (1) the budget for the Cost of the Work as defined in Section 6.1; (2) the Owner's other costs; and, (3) reasonable contingencies related to all of these costs. The Owner shall update the Owner's budget for the Project as necessary throughout the duration of the Project until final completion. If the Owner significantly increases or decreases the Owner's budget for the Cost of the Work, the Owner shall notify the Architect. The Owner and the Architect shall thereafter agree to a corresponding change in the Project's scope and quality. AIA Document B104TM' — 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. § 5.3 The Owner shall furnish surveys to describe physical characteristics, legal limitations and utility locations for the site of the Project; a written legal description of the site; and services of geotechnical engineers or other consultants, when the Architect requests such services and demonstrates that they are reasonably required by the scope of the Project. § 5.4 The Owner shall coordinate the services of its own consultants with those services provided by the Architect. Upon the Architect's request, the Owner shall furnish copies of the scope of services in the contracts between the Owner and the Owner's consultants. The Owner shall require that its consultants and contractors maintain insurance, including professional liability insurance, as appropriate to the services or work provided. § 5.5 The Owner shall furnish tests, inspections and reports required by law or the Contract Documents, such as structural, mechanical, and chemical tests; tests for air and water pollution; and tests for hazardous materials. § 5.6 The Owner shall furnish all legal, insurance and accounting services, including auditing services, that may be reasonably necessary at any time for the Project to meet the Owner's needs and interests. § 5.7 The Owner shall provide prompt written notice to the Architect if the Owner becomes aware of any fault or defect in the Project, including errors, omissions or inconsistencies in the Architect's Instruments of Service. § 5.8 The Owner shall endeavor to communicate with the Contractor through the Architect about matters arising out of or relating to the Contract Documents. § 5.9 The Owner shall provide the Architect access to the Project site prior to commencement of the Work and shall obligate the Contractor to provide the Architect access to the Work wherever it is in preparation or progress. § 5.10 Within 15 days after receipt of a written request from the Architect, the Owner shall furnish the requested information as necessary and relevant for the Architect to evaluate, give notice of, or enforce lien rights. ARTICLE 6 COST OF THE WORK § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors' general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights -of -way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner. § 6.2 The Owner's budget for the Cost of the Work is provided in Initial Information, and shall be adjusted throughout the Project as required under Sections 5.2, 6.4 and 6.5. Evaluations of the Owner's budget for the Cost of the Work, and the preliminary estimate of the Cost of the Work and updated estimates of the Cost of the Work prepared by the Architect, represent the Architect's judgment as a design professional. It is recognized, however, that neither the Architect nor the Owner has control over the cost of labor, materials or equipment; the Contractor's methods of determining bid prices; or competitive bidding, market or negotiating conditions. Accordingly, the Architect cannot and does not warrant or represent that bids or negotiated prices will not vary from the Owner's budget for the Cost of the Work, or from any estimate of the Cost of the Work, or evaluation, prepared or agreed to by the Architect. § 6.3 In preparing estimates of the Cost of Work, the Architect shall be permitted to include contingencies for design, bidding and price escalation; to determine what materials, equipment, component systems and types of construction are to be included in the Contract Documents; to recommend reasonable adjustments in the program and scope of the Project; and to include design alternates as may be necessary to adjust the estimated Cost of the Work to meet the Owner's budget. The Architect's estimate of the Cost of the Work shall be based on current area, volume or similar conceptual estimating techniques. If the Owner requires a detailed estimate of the Cost of the Work, the Architect shall provide such an estimate, if identified as the Architect's responsibility in Section 4.1, as a Supplemental Service. § 6.4 If, through no fault of the Architect, construction procurement activities have not commenced within 90 days after the Architect submits the Construction Documents to the Owner the Owner's budget for the Cost of the Work shall be adjusted to reflect changes in the general level of prices in the applicable construction market. Init. AIA Document 8104Th' — 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. § 6.5 If at any time the Architect's estimate of the Cost of the Work exceeds the Owner's budget for the Cost of the Work, the Architect shall make appropriate recommendations to the Owner to adjust the Project's size, quality or budget for the Cost of the Work, and the Owner shall cooperate with the Architect in making such adjustments. § 6.6 If the Owner's current budget for the Cost of the Work at the conclusion of the Construction Documents Phase Services is exceeded by the lowest bona fide bid or negotiated proposal, the Owner shall .1 give written approval of an increase in the budget for the Cost of the Work; . 2 authorize rebidding or renegotiating of the Project within a reasonable time; . 3 terminate in accordance with Section 9.5; . 4 in consultation with the Architect, revise the Project program, scope, or quality as required to reduce the Cost of the Work; or . 5 implement any other mutually acceptable alternative. § 6.7 If the Owner chooses to proceed under Section 6.6.4, the Architect shall modify the Construction Documents as necessary to comply with the Owner's budget for the Cost of the Work at the conclusion of the Construction Documents Phase Services, or the budget as adjusted under Section 6.6.1. If the Owner requires the Architect to modify the Construction Documents because the lowest bona fide bid or negotiated proposal exceeds the Owner's budget for the Cost of the Work due to market conditions the Architect could not reasonably anticipate, the Owner shall compensate the Architect for the modifications as an Additional Service pursuant to Section 11.3; otherwise the Architect's services shall be without additional compensation. In any event, the Architect's modification of the Construction Documents shall be the limit of the Architect's responsibility under this Article 6. ARTICLE 7 COPYRIGHTS AND LICENSES § 7.1 The Architect and the Owner warrant that in transmitting Instruments of Service, or any other information, the transmitting party is the copyright owner of such information or has permission from the copyright owner to transmit such information for its use on the Project. § 7.2 The Architect and the Architect's consultants shall be deemed the authors and owners of their respective Instruments of Service, including the Drawings and Specifications, and shall retain all common law, statutory and other reserved rights, including copyrights. Submission or distribution of Instruments of Service to meet official regulatory requirements or for similar purposes in connection with the Project is not to be construed as publication in derogation of the reserved rights of the Architect and the Architect's consultants. § 7.3 The Architect grants to the Owner a nonexclusive license to use the Architect's Instruments of Service solely and exclusively for purposes of constructing, using, maintaining, altering and adding to the Project, provided that the Owner substantially performs its obligations under this Agreement, including prompt payment of all sums when due pursuant to Article 9 and Article 11. The Architect shall obtain similar nonexclusive licenses from the Architect's consultants consistent with this Agreement. The license granted under this section permits the Owner to authorize the Contractor, Subcontractors, Sub -subcontractors, and suppliers, as well as the Owner's consultants and separate contractors, to reproduce applicable portions of the Instruments of Service, subject to any protocols established pursuant to Section 1.3, solely and exclusively for use in performing services or construction for the Project. If the Architect rightfully terminates this Agreement for cause as provided in Section 9.4, the license granted in this Section 7.3 shall terminate. § 7.3.1 In the event the Owner uses the Instruments of Service without retaining the authors of the Instruments of Service, the Owner releases the Architect and Architect's consultant(s) from all claims and causes of action arising from such uses. The Owner, to the extent permitted by law, further agrees to indemnify and hold harmless the Architect and its consultants from all costs and expenses, including the cost of defense, related to claims and causes of action asserted by any third person or entity to the extent such costs and expenses arise from the Owner's use of the Instruments of Service under this Section 7.3.1. The terms of this Section 7.3.1 shall not apply if the Owner rightfully terminates this Agreement for cause under Section 9.4. § 7.4 Except for the licenses granted in this Article 7, no other license or right shall be deemed granted or implied under this Agreement. The Owner shall not assign, delegate, sublicense, pledge or otherwise transfer any license granted herein to another party without the prior written agreement of the Architect. Any unauthorized use of the Instruments of Service shall be at the Owner's sole risk and without liability to the Architect and the Architect's consultants. § 7.5 Except as otherwise stated in Section 7.3, the provisions of this Article 7 shall survive the termination of this Agreement. AIA Document B104TM' - 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. ARTICLE 8 CLAIMS AND DISPUTES § 8.1 General § 8.1.1 The Owner and Architect shall commence all claims and causes of action against the other and arising out of or related to this Agreement, whether in contract, tort, or otherwise, in accordance with the requirements of the binding dispute resolution method selected in this Agreement and within the period specified by applicable law, but in any case not more than 10 years after the date of Substantial Completion of the Work. The Owner and Architect waive all claims and causes of action not commenced in accordance with this Section 8.1.1. § 8.1.2 To the extent damages are covered by property insurance, the Owner and Architect waive all rights against each other and against the contractors, consultants, agents, and employees of the other, for damages, except such rights as they may have to the proceeds of such insurance as set forth in AIA Document A 104-2017, Standard Abbreviated Form of Agreement Between Owner and Contractor. The Owner or the Architect, as appropriate, shall require of the contractors, consultants, agents, and employees of any of them, similar waivers in favor of the other parties enumerated herein. § 8.1.3 The Architect and Owner waive consequential damages for claims, disputes or other matters in question, arising out of or relating to this Agreement. This mutual waiver is applicable, without limitation, to all consequential damages due to either party's termination of this Agreement, except as specifically provided in Section 9.6. § 8.2 Mediation § 8.2.1 Any claim, dispute or other matter in question arising out of or related to this Agreement shall be subject to mediation as a condition precedent to binding dispute resolution. If such matter relates to or is the subject of a lien arising out of the Architect's services, the Architect may proceed in accordance with applicable law to comply with the lien notice or filing deadlines prior to resolution of the matter by mediation or by binding dispute resolution. § 8.2.2 Mediation, unless the parties mutually agree otherwise, shall be administered by the American Arbitration Association in accordance with its Construction Industry Mediation Procedures in effect on the date of this Agreement. The parties shall share the mediator's fee and any filing fees equally. The mediation shall be held in the place where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof § 8.2.3 If the parties do not resolve a dispute through mediation pursuant to this Section 8.2, the method of binding dispute resolution shall be the following: (Check the appropriate box.) H Arbitration pursuant to Section 8.3 of this Agreement Litigation in a court of competent jurisdiction Other: (Spec) Weld County Court Weld County, Colorado If the Owner and Architect do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, the dispute will be resolved in a court of competent jurisdiction. § 8.3 Arbitration § 8.3.1 If the parties have selected arbitration as the method for binding dispute resolution in this Agreement, any claim, dispute or other matter in question arising out of or related to this Agreement subject to, but not resolved by, mediation shall be subject to arbitration which, unless the parties mutually agree otherwise, shall be administered by the American Arbitration Association in accordance with its Construction Industry Arbitration Rules in effect on the date of the Agreement. § 8.3.1.1 A demand for arbitration shall be made no earlier than concurrently with the filing of a request for mediation, but in no event shall it be made after the date when the institution of legal or equitable proceedings based on the claim, AIA Document 61047m - 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. Init. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible / under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. dispute or other matter in question would be barred by the applicable statute of limitations. For statute of limitations purposes, receipt of a written demand for arbitration by the person or entity administering the arbitration shall constitute the institution of legal or equitable proceedings based on the claim, dispute or other matter in question. § 8.3.2 The foregoing agreement to arbitrate, and other agreements to arbitrate with an additional person or entity duly consented to by parties to this Agreement, shall be specifically enforceable in accordance with applicable law in any court having jurisdiction thereof. § 8.3.3 The award rendered by the arbitrator(s) shall be final, and judgment may be entered upon it in accordance with applicable law in any court having jurisdiction thereof § 8.3.4 Consolidation or Joinder § 8.3.4.1 Either party, at its sole discretion, may consolidate an arbitration conducted under this Agreement with any other arbitration to which it is a party provided that (1) the arbitration agreement governing the other arbitration permits consolidation; (2) the arbitrations to be consolidated substantially involve common questions of law or fact; and (3) the arbitrations employ materially similar procedural rules and methods for selecting arbitrator(s). § 8.3.4.2 Either party, at its sole discretion, may include by joinder persons or entities substantially involved in a common question of law or fact whose presence is required if complete relief is to be accorded in arbitration, provided that the party sought to be joined consents in writing to such joinder. Consent to arbitration involving an additional person or entity shall not constitute consent to arbitration of any claim, dispute or other matter in question not described in the written consent. § 8.3.4.3 The Owner and Architect grant to any person or entity made a party to an arbitration conducted under this Section 8.3, whether by joinder or consolidation, the same rights of joinder and consolidation as the Owner and Architect under this Agreement. § 8.4 The provisions of this Article 8 shall survive the termination of this Agreement. ARTICLE 9 TERMINATION OR SUSPENSION § 9.1 If the Owner fails to make payments to the Architect in accordance with this Agreement, such failure shall be considered substantial nonperformance and cause for termination or, at the Architect's option, cause for suspension of performance of services under this Agreement. If the Architect elects to suspend services, the Architect shall give seven days' written notice to the Owner before suspending services. In the event of a suspension of services, the Architect shall have no liability to the Owner for delay or damage caused the Owner because of such suspension of services. Before resuming services, the Owner shall pay the Architect all sums due prior to suspension and any expenses incurred in the interruption and resumption of the Architect's services. The Architect's fees for the remaining services and the time schedules shall be equitably adjusted. § 9.2 If the Owner suspends the Project, the Architect shall be compensated for services performed prior to notice of such suspension. When the Project is resumed, the Architect shall be compensated for expenses incurred in the interruption and resumption of the Architect's services. The Architect's fees for the remaining services and the time schedules shall be equitably adjusted. § 9.3 If the Owner suspends the Project for more than 90 cumulative days for reasons other than the fault of the Architect, the Architect may terminate this Agreement by giving not less than seven days' written notice. § 9.4 Either party may terminate this Agreement upon not less than seven days' written notice should the other party fail substantially to perform in accordance with the terms of this Agreement through no fault of the party initiating the termination. § 9.5 The Owner may terminate this Agreement upon not less than seven days' written notice to the Architect for the Owner's convenience and without cause. § 9.6 In the event of termination not the fault of the Architect, the Architect shall be compensated for services performed prior to termination, Reimbursable Expenses incurred, and all costs attributable to termination, including the costs attributable to the Architect's termination of consultant agreements. AIA Document B104T"" - 2017. Copyright ® 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. § 9.7 In addition to any amounts paid under Section 9.6, if the Owner terminates this Agreement for its convenience pursuant to Section 9.5, or the Architect terminates this Agreement pursuant to Section 9.3, the Owner shall pay to the Architect the following fees: (Set forth below the amount of any termination or licensing fee, or the method for determining any termination or licensing fee.) .1 Termination Fee: N/A .2 Licensing Fee if the Owner intends to continue using the Architect's Instruments of Service: N/A § 9.8 Except as otherwise expressly provided herein, this Agreement shall terminate one year from the date of Substantial Completion. ARTICLE 10 MISCELLANEOUS PROVISIONS § 10.1 This Agreement shall be governed by the law of the place where the Project is located excluding that jurisdiction's choice of law rules. If the parties have selected arbitration as the method of binding dispute resolution, the Federal Arbitration Act shall govern Section 8.3. § 10.2 Terms in this Agreement shall have the same meaning as those in AIA Document A 104-2017, Standard Abbreviated Form of Agreement Between Owner and Contractor. § 10.3 The Owner and Architect, respectively, bind themselves, their agents, successors, assigns and legal representatives to this Agreement. Neither the Owner nor the Architect shall assign this Agreement without the written consent of the other, except that the Owner may assign this Agreement to a lender providing financing for the Project if the lender agrees to assume the Owner's rights and obligations under this Agreement, including any payments due to the Architect by the Owner prior to the assignment. § 10.4 If the Owner requests the Architect to execute certificates or consents, the proposed language of such certificates or consents shall be submitted to the Architect for review at least 14 days prior to the requested dates of execution. The Architect shall not be required to execute certificates or consents that would require knowledge, services or responsibilities beyond the scope of this Agreement. § 10.5 Nothing contained in this Agreement shall create a contractual relationship with, or a cause of action in favor of, a third party against either the Owner or Architect. § 10.6 The Architect shall have no responsibility for the discovery, presence, handling, removal or disposal of, or exposure of persons to, hazardous materials or toxic substances in any form at the Project site. § 10.7 The Architect shall have the right to include photographic or artistic representations of the design of the Project among the Architect's promotional and professional materials. However, the Architect's materials shall not include information the Owner has identified in writing as confidential or proprietary. The Owner shall provide professional credit for the Architect in the Owner's promotional materials for the Project. This Section 10.7 shall survive the termination of this Agreement unless the Owner terminates this Agreement for cause pursuant to Section 9.4. § 10.8 The invalidity of any provision of the Agreement shall not invalidate the Agreement or its remaining provisions. If it is determined that any provision of the Agreement violates any law, or is otherwise invalid or unenforceable, then that provision shall be revised to the extent necessary to make that provision legal and enforceable. In such case the Agreement shall be construed, to the fullest extent permitted by law, to give effect to the parties' intentions and purposes in executing the Agreement. Init. AIA Document 8104Th — 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. ARTICLE 11 COMPENSATION § 11.1 For the Architect's Basic Services described under Article 3, the Owner shall compensate the Architect as follows: . 1 Stipulated Sum (Insert amount) $7,720.00 . 2 Percentage Basis (Insert percentage value) N/A percent ( %) of the Owner's budget for the Cost of the Work, as calculated in accordance with Section 11.6. . 3 Other (Describe the method of compensation) N/A § 11.2 For Supplemental Services identified in Section 4.1, the Owner shall compensate the Architect as follows: (Insert amount of, or basis for, compensation. If necessary, list specific services to which particular methods of compensation apply.) N/A § 11.3 For Additional Services that may arise during the course of the Project, including those under Section 4.2, the Owner shall compensate the Architect as follows: (Insert amount of, or basis for, compensation.) If Additional Services are required, hourly rates apply per those in Attachment D. § 11.4 Compensation for Supplemental and Additional Services of the Architect's consultants when not included in Section 11.2 or 11.3, shall be the amount invoiced to the Architect plus Ten percent ( 10 %), or as follows: N/A § 11.5 Where compensation for Basic Services is based on a stipulated sum or percentage of the Cost of the Work, the compensation for each phase of services shall be as follows: Init. Design Phase Construction Documents Phase Construction Phase Twenty percent ( 20 %) Seventy percent ( 70 %) Ten percent ( 10 %) Total Basic Compensation one hundred percent ( 100 %) § 11.6 When compensation identified in Section 11.1 is on a percentage basis, progress payments for each phase of Basic Services shall be calculated by multiplying the percentages identified in this Article by the Owner's most recent budget for the Cost of the Work. Compensation paid in previous progress payments shall not be adjusted based on subsequent updates to the Owner's budget for the Cost of the Work. AIA Document B104T"' - 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. § 11.6.1 When compensation is on a percentage basis and any portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent services are performed on those portions. The Architect shall be entitled to compensation in accordance with this Agreement for all services performed whether or not the Construction Phase is commenced. § 11.7 The hourly billing rates for services of the Architect and the Architect's consultants, if any, are set forth below. The rates shall be adjusted in accordance with the Architect's and Architect's consultants' normal review practices. (If applicable, attach an exhibit of hourly billing rates or insert them below) See Attachment D Employee or Category Rate § 11.8 Compensation for Reimbursable Expenses § 11.8.1 Reimbursable Expenses are in addition to compensation for Basic, Supplemental, and Additional Services and include expenses incurred by the Architect and the Architect's consultants directly related to the Project, as follows: . 1 Transportation and authorized out-of-town travel and subsistence; . 2 Long distance services, dedicated data and communication services, teleconferences, Project web sites, and extranets; . 3 Permitting and other fees required by authorities having jurisdiction over the Project; . 4 Printing, reproductions, plots, and standard form documents; . 5 Postage, handling, and delivery; . 6 Expense of overtime work requiring higher than regular rates if authorized in advance by the Owner; . 7 Renderings, physical models, mock-ups, professional photography, and presentation materials requested by the Owner or required for the Project; . 8 Expense of professional liability insurance dedicated exclusively to this Project or the expense of additional insurance coverage or limits requested by the Owner in excess of that normally maintained by the Architect and the Architect's consultants; .9 All taxes levied on professional services and on reimbursable expenses; . 10 Site office expenses; and . 11 Other similar Project -related expenditures. § 11.8.2 For Reimbursable Expenses the compensation shall be the expenses incurred by the Architect and the Architect's consultants plus Ten percent ( 10 %) of the expenses incurred. § 11.9 Payments to the Architect § 11.9.1 Initial Payment An initial navment of N/A ($ 0.00 ) shall be made upon execution of this Agreement and is the minimum payment under this Agreement. It shall be credited to the Owner's account in the final invoice. § 11.9.2 Progress Payments § 11.9.2.1 Unless otherwise agreed, payments for services shall be made monthly in proportion to services performed. Payments are due and payable upon presentation of the Architect's invoice. Amounts unpaid Thirty ( 30 i days after the invoice date shall bear interest at the rate entered below, or in the absence thereof at the legal rate prevailing from time to time at the principal place of business of the Architect. (Insert rate of monthly or annual interest agreed upon.) Init. 8 Eight AIA Document B104T"' — 2017. Copyright CO 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. § 11.9.2.2 The Owner shall not withhold amounts from the Architect's compensation to impose a penalty or liquidated damages on the Architect, or to offset sums requested by or paid to contractors for the cost of changes in the Work unless the Architect agrees or has been found liable for the amounts in a binding dispute resolution proceeding. § 11.9.2.3 Records of Reimbursable Expenses, expenses pertaining to Additional Services, and services performed on the basis of hourly rates shall be available to the Owner at mutually convenient times. ARTICLE 12 SPECIAL TERMS AND CONDITIONS Special terms and conditions that modify this Agreement are as follows: (Include other terms and conditions applicable to this Agreement.) N/A ARTICLE 13 SCOPE OF THE AGREEMENT § 13.1 This Agreement represents the entire and integrated agreement between the Owner and the Architect and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both the Owner and Architect. § 13.2 This Agreement is comprised of the following documents identified below: . 1 AIA Document B 104TH -2017, Standard Abbreviated Form of Agreement Between Owner and Architect .2 AIA Document E203T"4-2013, Building Information Modeling and Digital Data Exhibit, dated as indicated below: (Insert the date of the E203-2013 incorporated into this agreement.) October 4, 2017 . 3 Exhibits: (Clearly ident fy any other exhibits incorporated into this Agreement, including any exhibits identified in Section 4.1.) Exhibit A Exhibit B Exhibit C Exhibit D; Item Price List - 2018 . 4 Other documents: (List other documents, if any, including additional scopes of service forming part of the Agreement.) N/A Init. This Agreement entered into as of the day and year first written above. i (Signature) OCT 1 1 2017 _Julie A. Cozad, Chair, Board of (Printed name and title) County Commissioners HITECT (Se y natur Rq,5b R Casseday, AI ) (Printed name, title, nd license number, if required) AIA Document 8104" — 2017. Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 10/04/2017 11:21:55 under the terms of AIA Documents on Demand® Order No. 2009754839 , and is not for resale. This document is licensed by The American Institute of Architects for one-time use only, and may not be reproduced prior to its completion. do/7 -- 33 93 WELD COUNTY 1401 ADMINISTRATION BUILDING REMODEL OVERVIEW Weld County is seeking quotes to provide full design services for the 1401 building, which is located at 1401 North 17th Avenue, Greeley, CO. It consists of a 17,323 -square foot one story building. Weld County intends to remodel 4,600 square feet to house administrative functions which will consist private and open office areas, conference rooms. The project consists of a general remodel to an existing office building to include the following: • Modifying the building to convert into, general offices, conference rooms and general administrative areas. • Floor finishes will be included with carpet provided by owner. • Demolition of existing interior walls, electrical and plumbing, HVAC and data connections. • Signage as required. • Include appropriate HVAC design with appropriate/multiple zoning and will operate on the County's control system (Set Point Systems). • Removal of Liebert Air Conditioning unit from former data center • Building must meet compliance with American's with Disability Act standards • There may be a delay during design to bring in Weld County's furniture designer to determine if furniture will fit. Cost of furniture designer will be at Weld County's expense. • Proposals are due Sep 28, 2017. • Design completion estimated December 15, 2017 Fee Proposal Lump Sum Design Fee: $ Other (describe) $ • • e. • It • • L Ow 44,4 • • • • . • .• 1 • • • • • • ♦ / • • • • . I _•• r •./ • ♦ • I • • • / • . - • r"— I • • 14 • • • .. C r ♦ • • . • 1 • y F. 40.4 • • • i • S 4 , • I • .t - •6 • U 1 �.M• • $14. .y �ti• • • • \ al 7.x • r • — w • • • r: w • 1 • ii . • •!s i•• J a- •. • • • 1-: • • ... • • r- • • •, . • • • 4-: • • a. 0 I r • r • • .• b ' i • I . • • 1 .- • t • • • /. • •. • • • .. • • i AI • 4. • • • 4 • . • L . ♦.. • c • . l c , L •r` ••a tip • • 4113lersj i • • • • r•- 7 • • • . • •• • • •♦ .5 . • se • / M t v• I 1 / le • WELD COUNTY 1401 ADMINISTRATION BUILDING REMODEL OVERVIEW Weld County is seeking quotes to provide full design services for the 1401 building, which is located at 1401 North 17th Avenue, Greeley, CO. It consists of a 17,323 -square foot one story building. Weld County intends to remodel 4,600 square feet to house administrative functions which will consist private and open office areas, conference rooms. The project consists of a general remodel to an existing office building to include the following: • Modifying the building to convert into, general offices, conference rooms and general administrative areas • Floor finishes will be included with carpet provided by owner. • Demolition of existing interior walls, electrical and plumbing, HVAC and data connections. • Signage as required. • Include appropriate HVAC design with appropriate/multiple zoning and will operate on the County's control system (Set Point Systems). • Removal of Liebert Air Conditioning unit from former data center • Building must meet compliance with American's with Disability Act standards • There may be a delay during design to bring in Weld County's furniture designer to determine if furniture will fit. Cost of furniture designer will be at Weld County's expense. • Proposals are due Sep 28, 2017. • Design completion estimated December 15, 2017 Fee Proposal Lump Sum Design Fee (CCD): $ 3,500.00 Other (MEP): $ 4,220.00 TOTAL FEE: $ 7,720.00 • • y f - I • •e • • • • ♦ • • • • • • • • • • • . • 1 e • • • ♦ - ` E41 • • • • I. • • • • • • • • ♦ • I - • • • ♦ ♦ ♦ ♦ r- • • I • • `" ` fatir � -o• • ••♦ 4.-. • :i • • • • - • t ••-r-- • • I IIY _• •_. .. - ♦ -r • '. ♦ • • • • •4 40 C • • • • • - ♦ • . . r .qr.• .- •• • at.C • I .. • • • • Y I — r a • 1 • i _ • I • . • • I • 1 far V•b•-. ,• . ••• • i 1 y i $ rat • I V C. -. 1 40 • • • et r.t • 4 .,. • ► r • 40-1- CNA Inr • ♦g s r • � G • i • • •. ler 0. r•tf• • h • • v • •••••••••••••• • L ti • • 1 • • - • W A.; •. ♦ ♦ • I. • - • r • • I ! • ktd • i 1 • • ft • • • a— east . S • • • •• • .414 • 4 • • 3 91 • • 441 •- • • ♦ • • I • 4 • • ♦ • • • ♦ •• ••• •• ••• Exhibit C contingent upon funds for that purpose being appropriated, budgeted and otherwise made available. Execution of this Agreement by County does not create an obligation on the part of County to expend funds not otherwise appropriated in each succeeding year. Employee Financial Interest/Conflict of Interest - C.R.S. §§24-18-201 et seq. and §24-50-507. The signatories to this Agreement aver that to their knowledge, no employee of Weld County has any personal or beneficial interest whatsoever in the service or property which is the subject matter of this Agreement. County has no interest and shall not acquire any interest direct or indirect, that would in any manner or degree interfere with the performance of Contract Professional's services and Contract Professional shall not employ any person having such known interests. During the term of this Agreement, Contract Professional shall not engage in any in any business or personal activities or practices or maintain any relationships which actually conflicts with or in any way appear to conflict with the full performance of its obligations under this Agreement. Failure by Contract Professional to ensure compliance with this provision may result, in County's sole discretion, in immediate termination of this Agreement. No employee of Contract Professional nor any member of Contract Professional's family shall serve on a County Board, committee or hold any such position which either by rule, practice or action nominates, recommends, supervises Contract Professional's operations, or authorizes funding to Contract Professional. Public Contracts for Services C.R.S. §8-17.5-101. Contract Professional certifies, warrants, and agrees that it does not knowingly employ or contract with an illegal alien who will perform work under this contract. Contract Professional will confirm the employment eligibility of all employees who are newly hired for employment in the United States to perform work under this Agreement, through participation in the E -Verify program or the State of Colorado program established pursuant to C.R.S. §8-17.5- 102(5)(c). Contract Professional shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or enter into a contract with a subcontractor that fails to certify with Contract Professional that the subcontractor shall not knowingly employ or contract with an illegal alien to perform work under this Agreement. Contract Professional shall not use E -Verify Program or State of Colorado program procedures to undertake pre -employment screening or job applicants while this Agreement is being performed. If Contract Professional obtains actual knowledge that a subcontractor performing work under the public contract for services knowingly employs or contracts with an illegal alien Contract Professional shall notify the subcontractor and County within three (3) days that Contract Professional has actual knowledge that a subcontractor is employing or contracting with an illegal alien and shall terminate the subcontract if a subcontractor does not stop employing or contracting with the illegal alien within three (3) days of receiving notice. Contract Professional shall not terminate the contract if within three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. Contract Professional shall comply with reasonable requests made in the course of an investigation, undertaken pursuant to C.R.S. §8-17.5- 102(5), by the Colorado Department of Labor and Employment. If Contract Professional participates in the State of Colorado program, Contract Professional shall, within twenty days after hiring an new employee to perform work under the contract, affirm that Contract Professional has examined the legal work status of such employee, retained file copies of the documents, and not altered or falsified the identification documents for such employees. Contract Professional shall deliver to County, a written notarized affirmation that it has examined the legal work status of such employee, and shall comply with all of the other requirements of the State of Colorado program. If Contract Professional fails to comply with any requirement of this provision or of C.R.S. §8-17.5-101 et seq., County, may terminate this Agreement for breach, and if so terminated, Contract Professional shall be liable for actual and consequential damages. Except where exempted by federal law and except as provided in C.R.S. § 24-76.5-103(3), if Contract Professional receives federal or state funds under the contract, Contract Professional must confirm that Exhibit C Termination. County has the right to terminate this Agreement, with or without cause on thirty (60) days written notice. Furthermore, this Agreement may be terminated at any time without notice upon a material breach of the terms of the Agreement. However, nothing herein shall be construed as giving Contractor the right to provide materials (or services) under this Agreement beyond the time when such materials (or services) become unsatisfactory to the County. If this Agreement is terminated by County, Contractor shall be compensated for, and such compensation shall be limited to, (1) the sum of the amounts contained in invoices which it has submitted and which have been approved by the County; (2) the reasonable value to County of the materials which Contractor provided prior to the date of the termination notice, but which had not yet been approved for payment; and (3) the cost of any work which the County approves in writing which it determines is needed to accomplish an orderly termination of the work. County shall be entitled to the use of all material generated pursuant to this Agreement upon termination. Upon termination, County shall take possession of all materials, equipment, tools and facilities owned by County which Contractor is using, by whatever method it deems expedient; and, Contractor shall deliver to County all drawings, drafts or other documents it has completed or partially completed under this Agreement, together with all other items, materials and documents which have been paid for by County, and these items, materials and documents shall be the property of County. Copies of work product incomplete at the time of termination shall be marked "DRAFT -INCOMPLETE." Upon termination of this Agreement by County, Contractor shall have no claim of any kind whatsoever against the County by reason of such termination or by reason of any act incidental thereto, except for compensation for work satisfactorily performed and/or materials described herein properly delivered. Extension or Modification. Any amendments or modifications to this agreement shall be in writing signed by both parties. No additional services or work performed by Contractor shall be the basis for additional compensation unless and until Contractor has obtained written authorization and acknowledgement by County for such additional services. Accordingly, no claim that the County has been unjustly enriched by any additional services, whether or not there is in fact any such unjust enrichment, shall be the basis of any increase in the compensation payable hereunder. Ownership. All work and information obtained by Contractor under this Agreement or individual work order shall become or remain (as applicable), the property of County. In addition, all reports, data, plans, drawings, records and computer files generated by Contractor in relation to this Agreement and all reports, test results and all other tangible materials obtained and/or produced in connection with the performance of this Agreement, whether or not such materials are in completed form, shall at all times be considered the property of the County. Contractor shall not make use of such material for purposes other than in connection with this Agreement without prior written approval of County. Examination of Records. To the extent required by law, the Contractor agrees that any duly authorized representative of County, including the County Auditor, shall have access to and the right to examine and audit any books, documents, papers and records of Contractor, involving all matters and/or transactions related to this Agreement. The Contractor agrees to maintain these documents for three years from the date of the last payment received. Governmental Immunity. No term or condition of this contract shall be construed or interpreted as a waiver, express or implied, of any of the immunities, rights, benefits, protections or other provisions, of the Colorado Governmental Immunity Act §§24-10-101 et seq., as applicable now or hereafter amended. Fund Availability. Financial obligations of the County payable after the current fiscal year are Casseday Creative Designs, LLC Item Price List - 2018 Item Principal Planner Principal Architect Principal Environmental Consul. Principal Graphic Designer Project Planner Project Architect Project Environmental Technician Project Graphic Technician CADD Drafter Certificate of Conveyance Color Copies Drawings Mylars of Drawings Photocopies Drawings Mileage Photocopies Faxing Contractor Consulting Services Direct Project Expenses Postage or Delivery Finance Charges Description Principal Planner Architect Services Principal Environmental Consultant Graphic Design Consultant Project Planner Project Architect Project Environmental Technician Project Graphic Design Technician Computer Aided Design Drafter Title Company Color Copies of Drawings (24"x36") Mylars of Drawings (24"x36") Photocopies Drawings (24"x36") Mileage Reimbursable Photocopies Printing and Faxing Expenses Services of Outside Consultants Other Project Expenses Postage and Delivery Expenses Finance Charges on Overdue Balance Price $130.00 $130.00 $130.00 $130.00 $90.00 $90.00 $90.00 $80.00 $80.00 $200.00 $10.00 $12.00 $2.50 $0.565 $0.15 $0.15 $0.10 $0.10 $0.00 $0.08 per hour per hour per hour per hour per hour per hour per hour per hour per hour each per sheet per sheet per sheet per mile per copy per copy percent percent varies percent Architecture Planning Enz'l r H i lllt'U tal Compliance ia,ice — (31"17/ it i c Design RE: AGREEMENT FOR 1401 REMODEL DESIGN SERVICES - CASSEDAY CREATIVE DESIGNS, LLC APPROVS...TO SUBSTANCE: Elected Official or Department Head APPROVED AS TO FUNDING: ' id Controller APPROVED AS TO FORM: County Attorney Apheareasamie Hello