Loading...
HomeMy WebLinkAbout20174243.tiffvt/ rtt,e-e) if, / / WELD COUNTY CODE ORDINANCE 2017-10 IN THE MATTER OF REPEALING AND REENACTING, WITH AMENDMENTS, CHAPTER 30 WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT ON -SITE WASTEWATER TREATMENT SYSTEM REGULATIONS, OF THE WELD COUNTY CODE BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF WELD, STATE OF COLORADO: WHEREAS, the Board of County Commissioners of the County of Weld, State of Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board of County Commissioners, on December 28, 2000, adopted Weld County Code Ordinance 2000-1, enacting a comprehensive Code for the County of Weld, including the codification of all previously adopted ordinances of a general and permanent nature enacted on or before said date of adoption, and WHEREAS, the Weld County Code is in need of revision and clarification with regard to procedures, terms, and requirements therein. NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of the County of Weld, State of Colorado, that certain existing Chapters of the Weld County Code be, and hereby are, repealed and re-enacted, with amendments, and the various Chapters are revised to read as follows. CHAPTER 30 WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT ON -SITE WASTEWATER TREATMENT SYSTEM REGULATIONS TABLE OF CONTENTS ARTICLE I Authority Sec. 30-1-10. Title. Sec. 30-1-20. Jurisdiction, severability, savings clause. Sec. 30-1-30. Effective date. ARTICLE II Scope and Purpose Sec. 30-2-10. Declaration. Sec. 30-2-20. Purpose. Sec. 30-2-30. Effluent discharged to surface waters. ARTICLE III Definitions Sec. 30-3-10. Definitions. Sec. 30-3-20. Abbreviations and acronyms. Table 30-3-1 Abbreviations and Acronyms ARTICLE IV Administration and Enforcement Sec. 30-4-10. General sanitation requirements. Sec. 30-4-20. Existing OWTS review. 1 2017-4243 ORD2017-10 Sec. 30-4-30. Sec. 30-4-40. Sec. 30-4-50. Sec. 30-4-60. Sec. 30-4-70. Sec. 30-4-80. Sec. 30-4-90. Sec. 30-4-100. Sec. 30-4-110. Sec. 30-4-120. Sec. 30-4-130. Sec. 30-4-140. Sec. 30-4-150. Sec. 30-4-160. Sec. 30-4-170. Permit application requirements and procedures. Determination of compliance of permit submission. Denial of permit application. Access to site. Notification and inspection stages. Final approval of OWTS permit. Systems employing new technology. Product Development Permit Systems contractor license. Regulations of systems cleaners. Variance procedure. General prohibitions. Prohibition of on -site wastewater treatment systems in unsuitable areas. Enforcement. Penalties. ARTICLE V Site and Soil Evaluation Sec. 30-5-10. Site and soil evaluation general requirements. Sec. 30-5-20. Preliminary investigation. Sec. 30-5-30. Reconnaissance. Sec. 30-5-40. Detailed soil investigation. Sec. 30-5-50. Marking of Soil Profile Pit Excavations or Percolation holes, profile holes and profile test pit excavations - marking. Sec. 30-5-60. Report and site plan. Sec. 30-5-70. Design document. Sec. 30-5-80. Site ProtectionAs-built drawings. Sec. 30-5-90. Qualifications for a Competent TechnicianSi e-zvotection-. Delete Sec. 30-5-100. ARTICLE VI Wastewater Flow and Strength Sec. 30-6-10. Wastewater flows. Table 30-6-1 Single -Family Residential Design Flows Table 30-6-2 Estimate of Average Daily Wastewater Flow and BOD5 Load Per Person Unless Otherwise Noted Sec. 30-6-20. Wastewater strength. Table 30-6-3 Treatment Levels Table 30-6-4 High Strength Wastewater ARTICLE VII Minimum Distances Between Components of an On -Site Wastewater Treatment System and Physical Features Sec. 30-7-10. Minimum horizontal distances. Sec. 30-7-20. Dry gulches, cut banks and fill areas. Sec. 30-7-30. On -site Wastewater Treatment System design consideration and treatment requirements - separation distances from soil treatment area. Table 30-7-1 Minimum Horizontal Distances in Feet Between Components of and On -Site Wastewater Treatment System Installed after November 15, 1973 and Water, Physical and Health Impact Features Table 30-7-2 On -site Wastewater Treatment System Design Consideration and Treatment Requirements — Separation Distances from Soil Treatment Area ARTICLE VIII Design Criteria - General Sec. 30-8-10. Performance. Sec. 30-8-20. Reliability. Sec. 30-8-30. Accessibility for inspection, maintenance and servicing. 2 2017-4243 ORD2017-10 Sec. 30-8-40. Plumbing codes. Sec. 30-8-50. Electrical equipment. Sec. 30-8-60. Indicators of failure or malfunctioning for systems utilizing mechanical apparatus. Sec. 30-8-70. Sampling access. Sec. 30-8-80. Component operating instructions. Sec. 30-8-90. Surface activity. Sec. 30-8-100 Floodplains. Sec. 30-8-110 Business, commercial, industrial, institutional or multi -family dwelling wastewater systems. ARTICLE IX Design Criteria - Components Sec. 30-9-10. Sec. 30-9-20. Tanks and vaults. Septic tanks. Table 30-9-1 Minimum Septic Tank Size Based on Number of Bedrooms Sec. 30-9-30. Abandonment of tank. Sec. 30-9-40. Pipe standards and bedding requirements. Sec. 30-9-50. Cleanoutshon box. Sec. 30-9-60. Distribution BoxDrop box. Sec. 30-9-70. Drop Box Sec. 30-9-80. Stepdown/Relief PipeWastewater pumping and dosing Sec. 30-9-90. Wastewater Pumping and Dosing Siphon SystemsEffluent screens. Sec. 30-9-100. Effluent ScreensGrease interceptor tanks. Sec. 30-9-110. Grease Interceptor Tanks ARTICLE X Design Criteria - Soil Treatment Area Sec. 30-10-10. General. Sec. 30-10-20. Calculation of infiltrative surface of soil treatment area. Table 30-10-1 Soil Treatment Area Long-term Acceptance Rates by Soil Texture, Soil Structure, Percolation Rate and Treatment Level Table 30-10-1A Design Criteria for Soils with High Rock Content (Type "R" Soils) 1, 2, 3, 4 Sec. 30-10-30. Allowable soil treatment area reductions and increases. Table 30-10-2 Size Ad Treatment Areas Table 30-10-3 Size Ad Soil Treatment Areas Sec. 30-10-40. Sec. 30-10-50. Sec. 30-10-60. Sec. 30-10-70. Sec. 30-10-80. Sec. 30-10-90. ustment Factors for Methods of Application in Soil ustment Factors for Types of Distribution Media in Design of distribution systems. Soil Treatment Area Requirements Storage/Distribution MediaDosing. Lift stations. Soil replacement. Repairs. ARTICLE XI Design Criteria - Higher Level Treatment Systems Sec. 30-11-10. General. Sec. 30-11-20. Treatment levels. Sec. 30-11-30. Sand filters. Sec. 30-11-40. Mound Systems. Sec. 30-11-50. Rock plant filter (constructed wetland) treatment before soil treatment area. ARTICLE XII Design Criteria - Other Facilities Delete Sec. 30-12-10. Wastewater rEstes. Sec. 30-12-210. Evapotranspiration and evapotranspiration/absorption systems. Table 30-12-1 Graduation of Wicking Sand for Evapotranspiration Beds. 3 equencing zone systems. 2017-4243 ORD2017-10 Delete Sec. 30-12-30. Wastewater ponds. Sec. 30-12-420. Vaults other thanand vault privies. Sec. 30-12-30. Vault Privies. Sec. 30-12-510. Incinerating, composting and chemical toilets. Sec. 30-12-650. Treatment systems other than those discharging through soil treatment area or sand filter system. ARTICLE XIII Operation and Maintenance Sec. 30-13-10. Responsibility. Sec. 30-13-20. Service label. Sec. 30-13-30. Monitoring and sampling. APPENDIX APPENDIX 30-A - TEXTURAL TRIANGLE DEFINING TWELVE TEXTURAL CLASSES OF THE USDA (ILLUSTRATED FOR A SAMPLE CONTAINING 37% SAND, 45% SILT AND 18% CLAY) APPENDIX 30-B - SOIL CLASSIFICATION SYSTEM (SOIL -SEPARATE SIZE LIMITS) APPENDIX 30-C - ANNUAL FREE WATER SURFACE EVAPORATION MAP OF WELD COUNTY ADAPTED FROM NOAA TR NWS 33 UNITS: INCHES/YEAR ARTICLE I - Authority ARTICLE I - AUTHORITY Amend Sec. 30-1-20. Jurisdiction, Severability, Savings Clause. A. thru E. — No change. F. Chapter coverage. These Regulations adopted by the Weld County Board of Public Health, pursuant to current On -site Wastewater Treatment System Regulations of the Colorado Department of Public Health and Environment, Water Quality Control Commission, Regulation #43 (5 CCR 1002-43) and adopted in compliance with Section 25-10-104, C.R.S., shall govern all aspects of permits, performance, location, construction, alteration, installation and use of On -site Wastewater Treatment Systems of less than or equal to two thousand (2,000) gallons per day design capacity. Site approval, design review and a discharge permit from the Water Quality Control Division are required for a system with design capacity greater than or equal to two thousand (2,000) gallons per day average flow. Amend Sec. 304-30. Effective date. Upon adoption, the Regulations shall become effective upon the first day of July, 2011. Until the first day of July, 2011, Chapter 30 Code provisions in effect prior to the changes contained in these Regulations shall remain in effect. ARTICLE II - Scope and Purpose Amend Sec. 30-2-10. Declaration. A. — No change. B. This regulation shallwill apply to On -site Wastewater Treatment Systems as defined in Article III of this Chapter. Amend Sec. 30-2-30. Effluent discharged to surface waters. Any system that will discharge into surface waters must be designed by a professional engineer. The discharge permit application must be submitted for preliminary approval to the 4 2017-4243 ORD2017-10 Board of Public Health. Once approved by the Board of Public Health, the application must be submitted to the Water Quality Control Division for review in accordance with the Water Quality Control Act, Section 25-8-101, et seq., C.R.S., and all applicable regulations of the Water Quality Control Commission. Compliance with such a permit shallwill be deemed full compliance with this Regulation. ARTICLE III - Definitions Amend Sec. 30-3-10. Definitions. The following definitions shall apply in the interpretation and enforcement of these Regulations. The word shall, as used herein, indicates a mandatory requirement. Accessible means easily reached, attained or entered by the necessary equipment or maintenance provider. Basal Area means the effective surface area available to transmit the treated effluent from the filter media in a mound system into the in -situ receiving soils. The perimeter is measured at the interface of the imported fill material and in -situ soil. On sloping sites, only the area down -gradient from the up -slope edge of the distribution media may be included in this calculation. Bed means a below -grade soil treatment area with a level sub -base, consisting of a shallow excavation greater than three (3) feet wide containing distribution media and more than one (1) lateral. Bedroom means, a room with an egress window, a closet, and/or is intended for sleeping purposes; or as defined by the local board of health, as stated in the local OWTS regulation. Cistern means an underground, enclosed unpressurized reservoir or tank for storing water as part of a potable water supply system. Colorado Plumbing Code means E Colorado State Plumbing Board (3 CCR 720-1). Competent technician means a person � is a -b e _o conc uct an- ii*srp-r t-fi e -salts—^= soti profile test oit excavations, prof tests and site evaluations who has the appropriate expertise and is able to conduct and interpret the results of soil profile test pit excavations, percolation tests, and site evaluations. This individual has also met the required competencies for a "Competent Technician" as defined in Section 30-5-90. Rules and Regulations of the Composting toilet means a self-contained waterless toilet designed to decompose non -water - carried human wastes through microbial action and to store the resulting matter for disposal. Consistence means the degree and kind of cohesion and adhesion that soil exhibits and/or the resistance of soil to deformation or rupture under an applied stress to an extent that the soil density would restrict soil permeability. Aspects of consistence are used to determine if the horizon will have permeability lower than that of the defined soil type. Additional insight to consistence cal be found in the USDA — NRCS Field book for Describing and Sampling Soils; Version 3.0, Sept. 2012. Cut -bank means a nearly vertical slope caused by erosion or construction that has exposed historic soil strata. 5 2017-4243 ORD2017-10 Deep gravel system means a soil treatment area for repairs only where the trenches utilize a depth of gravel greater than six (6) inches below th , distribution kn pipe and sidewall area is allowed according to a formula specified in this Regulation. Deficiency. See Malfunction. Distribution box means a watertight component that receives effluent from a septic tank or other treatment unit and distributes effluent via gravity in approximately equal portions to two (2) or more distributiontrenches-or two (2) or no-arenore-re laterals in the soil treatment area. Domestic wastewatersewage treatment works means a system or facility for treating, neutralizing, stabilizing or disposing of domestic wastewater, which system or facility has a designed capacity to receive more than two thousand (2,000) gallons of domestic wstewater per day or more. The term domestic wastewater treatment works also includes appurtenances to such system or facility, such as outfall sewers and pumping stations, and to equipment related to such appurtenances. Domestic wastewater treatment works does not include industrial wastewater treatment plants or complexes whose primary function is the treatment of industrial wastes, notwithstanding the fact that human wastes generated incidentally to the industrial process are treated therein. Section 25-8-103(5), C.R.S. Dosing, pressure soil treatment area for even distribution.means a uniform application of wastewater throughout the intended portion of the soil treatment area through smII diameter pipes and orifices, under pressure. For this definition, the term pressure indicates that the system is capaole of creating upward movement of effluent out of the distribution system piping. Effective size means the size of granular media such that not more than ten percent (10%) by weight of the media is finer than the size specified. Effluent pipeline means nonperforated pipe that conveys effluent from one (1) On -site Wastewater Treatment System component to the next. Failure means damage oxistinc within any component of an OWTS which prevents the system from functioning as intended, and which results in the discharge of untreated or partially treated wastewater onto the ground surface, into surface water or ground water, or which results in the back-up of sewage into the building sewer. Other conditions within an OWTS component that are deemed by a local public health agency to be a threat to public health and/or safety may also be deemed a failure. Floodplain, 100 -year means an area adjacent to a stream which is subject to flooding as the result of the occurrence of a one -hundred -year flood, and is so adverse to past, current or foreseeable construction or land use as to constitute a significant hazard to public or environmental health and safety or to property, or is designated by the i-ederal Emergency Management Agency (FEMA) or National Flood Insurance Program (NFIP). In the absence of FEMA/NFIP maps, a professional engineer s —must certify the floodplain elevations. Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one-half (1/4 foot (six [6] inches) at any point or as designated by the Federal Emergency Management Agency or National Flood Insurance Program. In the absence of FEMA/NFIP maps, a professional engineer shallmust certify the floodway elevation and location. a condition Flow, design means the estimated volume of wastewater per unit of time for which a component or system is designed. Design flow may be given in the estimated volume per unit, 6 2017-4243 ORD2017-10 such as person per unit time, that spa-ltmust be multiplied by the maximum number of units that a facility can accommodate over that time. Higher level treatment means designated treatment levels other than treatment level 1. (See Table 30-6-3). Holding tank. See vault. Infiltrative surface means designated interface where effluent moves from distribution media or a distribution € evice in--sail-product into treatment media or original soil. In standard trench or bed systems this will be the interface of the distribution media or product and in -situ soil. Two separate infiltrative surfaces will exist in a mound system and an unlined sand filter; one at the interface of the distribution media and fill sand, the other at the interface of the fill sand and in - situ soil. Lateral means a pipe, tubirigchamber or other conveyance used to carry and to distribute effluent. Delete Limiting condition_ means a layer with low permeability, gr- u face or other condition hat restricts the treatment capaDi ity of the soil. Limiting layer means a horizon or condition in the soil profile or underlying strata that limits the treatment capability of the soil or severely restricts the movement of fluids. This may include soils with low or high permeability, impervious or fractured bedrock, or a seasonal or current ground water surface. Linear Loading Rate means the amount of effluent applied per linear foot along the contour (gpd/linear ft.). Liner means an impermeable synthetic or natural material used to prevent or restrict infiltration and/or exfiltration. For the purposes of this regulation, the minimum thickness of a liner must be 30 ml. Long -Term Acceptance Rate (LTAR) means a design parameter expressing the rate that effluent enters the infiltrative surface of the soil treatment area at equilibrium, measured in volume per area per time, e.g. gallons per square foot per day (gal/ft 2/day). Malfunction means the condition in which a component is not performing as designed or installed and is in need of repair in order to function as originally intended. Manufactured media. See Media, other manufactured. Media, Enhanced Manufactured means an accepted proprietary manufactured distribution product, other than a chamber, wrapped in a specified fabric, and placed on a specified sand base or media that does not mask the infiltrative surface of the in -situ soil. Media, other manufactured means an accepted proprietary manufactured distribution product made of synthetic media for distribution of effluent that is placed directly on the in -situ soil. such Mound means a soil treatment area whereby the infiltrative surface is at or above original grade at any pointn--above-grade soil treatment area 4n n- to b -at '- s -Twelve a- c fl tilldistribution and includes a final cover of suitable soil to stabilize the surface and support veg- - growth. 7 2017-4243 ORD2017-10 Pressure distribution. See Dosing, pressure.pressure.-rneas application of effluent ov es and associated deg-ees and pumps, filters, Record Drawing means construction drawings provided to illustrate the progress or completion of the installation of an OWTS, or components of the OWTS; typically based on field inspections by the designer or local public health agency. Remediation system means a treatment system, chemical/biological additive or physical process that is proposed to restore the soil treatment area of an OWTS to intendedg-e-o-d performance. Repair means restoration of functionality and/or treatment by reconstruction, relocation, or replacement of an on -site sewage wastewater treatment system or any component thereof in order to allow the system to function as intended. Delete Restrictive layer Replacement System. See Repair. e- condition. Sand filter means an engineered designed OWTS system that utilizes a layer of specified sand as filter and treatment media and incorporates pressure distribution. Sand filter, lined means an engineered designed OWTS treatment that has an impervious liner and under -drain below the specified sand medial -ay -sr. Lined sand filters may be intermittent/single pass, where the effluent is distributed over the sand bed a single time before distribution to a soil treatment area, or recirculating, where part of the effluent is returned to an earlier component for additional treatment before distribution to a soil treatment area. Sand filter, unlined means an engineered designed OWTS that includes a layer of specified sand used as a treatment mediasand filter without a liner between the sand and the existing soil on which it is placed. Sequential distribution means a distribution method in which effluent is loaded into one (1) trench and fills it to a predetermined level before passing through a relief linepipe or device to the succeeding trench. The effluent does not pass through the distribution media before it enters succeeding trenches. Serial distribution means a distribution method in which effluent is loaded into one (1) trench and fills it to a predetermined level before passing through a relief pipeline or device to the succeeding trench. The effluent passes through the distribution media before entering succeeding trenches which may be connected to provide a single uninterrupted flow path. Delete Soil profile hole_ mea locate bedrock or groundwate , if resen Ob-servations of Soil treatment area means the physical location where final treatment and dispersal of effluent occurs. Soil treatment area includes drainfields, mounds and drip fields. Suitable soil means a soil which will effectively treat and filter effluent by removal of organisms and suspended solids which meets long-term acceptance rate requirements as defined in Table 30-10-1, and has the required vertical thickness below the infiltrative surface and above a limiting layer.befoFe the effluent reaches any highly permeable eh'tits in bedrock, g -ravels-- r— co —a e s-ofl s, and —w -h- locm-eels percolation test : or soil test pit 8 2017-4243 ORD2017-10 _ nd ha „etc -al th ness of at 's st four (4) feet below the bo tom -of -the soil treatment -area unless the treatment goal -is met -by other performance criteria._ volume, effective means the amount of effluent contained in a tank under normal operating conditions; for a septic tank, effective volume is determined relative to the invert of the outlet. F; for a dosing tank, the effective volume under normal conditions is determined relative to the invert of the inlet and the control off level. Wastewater, high strength means: 1 Wastewater from a structure Influen-t-having BOD 5 greater than three hundred (300) mg/L; and/or TSS greater than two hundred (200) mg/L; and/or fats, oils and grease greater than fifty (50) mg/L e-is defined by NSF/ANSI Sta dard 40 testing protocol); or and 2. Effluent from a septic tank or other pretreatment component (as defined by NSF/ANSI Standard 40 testing protocol) that has BOD 5 greater than one hundred eightyseventy (1780) mg/L; and/or TSS greater than eightysixty (680) mg/L; and/or fats, oils and grease greater than twenty-five (25) mg/L and is applied to an infiltrative surface. Amend Sec. 30-3-20. Abbreviations and acronyms. Table 30-3-1 Abbreviations and Acronyms Abbreviation/Acronym 4,3 Full Title AASHTO American Association of State Highway and Transportation Officials Individual Sewage Disposal System American National Standards Institute aaortiP a. American Society for Testing and Materials Biochemical Oxygen Demand C.R.S. Colorado Revised Statutes CBOD 49. IAPMO ISDS LTAR 1/4 Carbonaceous Biochemical Oxygen Demand Canadian Standards Association gallons per day International Association of Plumbing and Mechanical Officials Long-term Acceptance Rate a 9 2017-4243 ORD2017-10 EY mg/L milligrams per liter MPI Minutes per Inch NAWT National Association of Wastewater Technicians NODS Non -pressurized Drip Dispersal System NPCA NSF OWTS STA TSS National Precast Concrete Association ?he .OV._........web,:_. National Sanitation Foundation cc On -site Wastewater Treatment System Soil Treatment Area Treatment Level Total Nitrogen Total Suspended Solids UL Underwriters' Laboratories ARTICLE IV - Administration and Enforcement Amend Sec. 30-4-30. Permit application requirements and procedures. A. thru C.13. — No changes. 14. Other information, data, plans, specifications and tests as required by the Division, including but not limited to: a. Additional evaluation: When the Division representative has determined that the Division does not have sufficient information for evaluation of an application or a system, the Division representative may require additional tests or documentation. b. Additional hydrological, geological or engineering: When specific evidence suggests undesirable soil conditions exist, additional hydrological, geological, engineering or other information provided by a professional engineer or geologist may be required to be submitted by the applicant. This requirement willsha-!1 not prejudice the right of the Division to develop its own information from its own sources. c. Any expenses associated with additional information, data, plans, specifications and tests shall be the responsibility of the party obtaining the permit. 10 2017-4243 ORD2017-10 D. and E. — No change. F. Other fees. 1. Reinspection fee. The Division may assess a reinspection fee as established by the Board of County Commissioners for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not ready. 2. Surcharge. The Division must collect a fee of twenty-three dollars ($23.00) for each permit issued for a new, repaired or upgraded OWTS. Of that fee, the Division shallmust retain three dollars ($3.00) to cover the Division's administrative costs and twenty dollars ($20.00) shallmust be transmitted to the State Treasurer, who shallmust deposit that sum in the Water Quality Control Fund created in Section 25-8-502(1)(c), C.R.S. G. and H. — No change. I. A permit mustshall be required for the expanded use of an OWTS. The OWTS must be replaced or modified to handle the increased design flow unless it is determined that the existing system is adequately designed and constructed for the higher design flow rate. J. The issuance of a permit and specification of terms and conditions therein willshall not constitute assumption of liability nor create a presumption that the County or its officers, employees or agents may be liable for the failure or malfunctioning of any system. Permit issuance willshall not constitute a certification that the system, the equipment used in the system, or any component used for system operation will ensure continuous compliance with the provision of the OWTS Act, applicable sections of these Regulations adopted thereunder or any terms and conditions of a permit. Remainder of Section — No change. Amend Sec. 30-4-40. Determinatin of compliance of permit submission. A. and B. — No change. C No permits shall be issued for the following systems unless they are designed by a professional engineer and until they have been reviewed and approved by the Board of Public Health: 1. Product Development Permits.Experimenta systems; and 2. Treatment systems other than those discharging through a soil treatment area or a sand filter system. Amend Sec. 30-4-80. Final approval of OWTS permit. A. Final approval of the OWTS permit by the Division must include, but is not limited to: .AcT Receipt of letter from the professional engineer certifying construction of the OWTSsm- as per the approved designed, if the OWTS wasrequireo to be engineer - designed; 2.B. Receipt of as -built record drawing; which includes a scale drawing showing all components of the OWTS, including their location from known and findable points, dimensions, depths, sizes, manufacturers' names and models as available, and other information relative to locating and maintaining the OWTS components; 11 2017-4243 ORD2017-10 3.C Final inspection prior to backfilling the OVVTSsystem by the Division, confirming that itthe OWTS was installed according to the permit requirements and regulations or variances to the regulations; and 4.-D. Identification of the systems contractor. Amend Sec. 30-4-9®. Systems employing new technology. Systems employing new technology may be considered by the Division, provided they have been reviewed and accepted by the Water Quality Control Division according to Section 43.13 of On -site Wastewater Treatment System Regulation #43, as adopted in 20173. The Division prohibits the reduction of system size, or the reduction in vertical or horizontal separation when higher level treatment systems are used. Delete Sec. 30-4-100. - Experimental systems in its entirety and replace with the following: Sec. 30-4-100. Product Development Permit A. For products that have not received Colorado Water Quality Control Division acceptance, the manufacturer may apply to the local public health agency for a product development permit. Requirements for proprietary treatment component acceptance are in Regulation 43-5 OCR 1002-43. B. For products or types of systems which have not been otherwise accepted by the Colorado Water Quality Control Division pursuant to section 43.13.D of Regulation 43, the Board of Public Health may approve an application for product development permit only if the system has been designed by a professional engineer, and only if the application provides proof of the ability to install a replacement OWTS in compliance with all local requirements in a timely manner in the event of a failure or malfunction of the system installed. C. Before a product development permit is issued, the Water Quality Control Division must determine that the product to be tested qualifies for testing under the product development evaluation based on information submitted to the Division. 1. Applicant must provide evidence of nationally accepted third -party testing of the product to be evaluated, or 2. Provide test data from multiple single-family homes under normal working conditions that meet the following criteria: a. Test data must be provided from a minimum of four sites. b. Each system must be tested over a period of at least one year. c. Each system must be sampled at least three times during the year with at least one sample obtained during cold weather conditions. d. Laboratory results for all parameters for which acceptance is being requested must be submitted. 12 2017-4243 ORD2017-10 D. The board of health must not arbitrarily deny any person the right to consideration of an application for such a system and must apply reasonable performance standards in determining whether to approve such an application; 25-10-108 (2), C.R.S. E. A completed application for a product development permit must be submitted to the Division at least 30 days in advance of installation of the product. F. An application for a product development permit must include the following: 1. Proof of the ability to install a replacement OWTS in compliance with all local requirements in a timely manner in the event of a failure or malfunction of the system under testing; 2. A description of the product under development including performance goals; 3. Documentation signed by the owner of the proposed product development site allowing access to the local public health agency and Division for inspection of the site; and, 4. Design documents as required in section 30-5-70 of this regulation. 0. Other than the performance standards identified in section 30-4-100 C. 2 above, the division may stipulate additional requirements for the product development permit necessary to ensure that the system performs as intended. H. A product development permit is a site -specific permit. Product development testing at multiple sites requires a product development permit for each site. I. During the term of the product development permit, all data collected is to be submitted to the Water Quality Control Division and the Division. J. The Division may revoke or amend a product development permit, if the continued operation or presence of the product under development: 1. Presents a risk to the public health or environment; 2. Causes adverse effects on the proper function of the OWTS on the site; 3. Leaks or discharges effluent on the surface of the ground; or 4. If the developer of the product fails to comply with any requirements stipulated on the permit by the Division or the Water Quality Control Division. K. If the product development permit is revoked, the product developer must install the replacement system. L. Once the system is installed and approved the Division must su oaly the Water Quality Control Division with a copy of the completed OWTS permit. M. The Division prohibits the reduction of system size, or the reduction in vertical or horizontal separation when higher level treatment systems are used. 13 2017-4243 ORD2017-10 mend Sec. 30-4-130. Variance procedure. A. and B. — No changes. C. Variances for repair of failing systems. 1. — No change. 2. For the repair of or upgrade to an .we -veld -existing system where the existing system does not meet the required separation distances and where the size of the lotconditions other than lot size precludes adherence to the required distances, a variance to the separation distances may be requested. The repairs or upgrade mustshall be no closer to features requiring setbacks than the existing facilities. Variances requesting setbacks no closer than existing setbacks do not have to provide technical justification from a professional engineer or professional geologist. D. Prohibitions on the granting of variance requests. 1. and 2. — No change. 3. No variance will be issued which will result in setbacks to an offsite physical feature which do not conform to the minimum setbacks defined in Table 30-7-1 without the board of health considering any concernso-pdt of the owner of property containing said feature. Property lines are considered offsite features. The property owner containing said feature must be notified of the time and date of the hearing. 4. thru 6. — No change. 7. No variance shall be issued for the installation of a higher level treatment system based on sizing or separation reductions. Remainder of Section — No change. Amen •` Sec. 3 -4-140. General prohibiti ns, A. — No change. B. Use, construction or existence of cesspools, pit privies, slit trenches, and seepage pits, is prohibited. Remainder of Section o change. _mend Sec. 304-1Enforcement® A. — No change. Cease and desist orders. The Health Officer or his or her designee may issue an order to cease and desist from the use of any OWTS or sewage treatment works which is found by the Health Officer not to be functioning in compliance with these Regulations, the OWTS Act or with applicable regulations, or is found to constitute a hazard to public health or has not otherwise received timely repairs under the provisions of Section 25-10=106(1)0), C.R.S. Such an order may be issued only after a hearing which shall be conducted by the Health Officer not less than forty-eight (48) hours after written notice thereof is given to the owner or occupant of the property on which the system is located. The order shall require that the owner or occupant bring the system into compliance or eliminate the health hazard within thirty (30) days,a rea-s nable-pi-o -- , or thereafter cease and desist from the use of the system. A cease and desist order issued by the Health Officer shall be reviewable in the 14 2017-4243 OR®2017-10 district court for the County wherein the system is located and upon a petition filed not later than ten (10) days after the order is issued. Amend Sec. 30-4-170. Penalties. A. and B. — No change. C. Upon a finding by the local board of health that a person is in violation of this regulation the local board of health may assess a penalty of up to fifty dollars for each day of violation. In determining the amount of the penalty to be assessed, the local board of health shall consider the seriousness of the danger to the health of the public caused by the violation, the duration of the violation, and whether the person has previously been determined to have committed a similar violation. D. A person subject to a penalty assessed pursuant to section 30-4-170 B. may appeal the penalty to the local board of health by requesting a hearing before the appropriate body. The request must be filed within thirty days after the penalty assessment is issued. The local board of health shall conduct a hearing upon the request in accordance with section 24-4- 105, C.R.S. ARTICLE V - Site and Soil Evaluation Amend Sec. 30-5-10. Site and soil evaluation general requirements. A. A site and soil evaluation must be conducted for each property on which an OWTS is proposed, to determine the suitability of a location to support an OWTS and to provide the designer with a sound basis to select the most appropriate OWTS design for the location and application. Each site evaluation mustshall consist of: 1.A, Preliminary investigation; 2. B- Reconnaissance; 3.C Detailed soil investigation; and 4.07 Report and site plan. Amend Sec. 30-5-20. Preliminary investigation. A. A pPreliminary investigation: shall review documentedResearch of information relative to the site and anticipated conditions must be conducted. Information gathered as part of the preliminary investigation shallmust include, but is not limited to: 1.A- Property information: Address; _._ Legal description; c.3- Existing structures; and d./1. Location of existing or proposed wells on the property 2.8- Existing Division OWTS records. 3.C. Published site information: a.- Topography; and 15 2017-4243 ORD2017-10 b.a Soil data. 4.-D- Location of physical features, on and off the property, that will require setbacks, as identified in Table 30-7-1. 5.E. Preliminary soil treatment area size estimate based on information on existing or planned facility and local regulations. 6.- Other information required by the Division. 7.G. Additional information that may be useful to the specific evaluation, as available: at: Survey; b.2. Easements; c.3: Floodplain maps; d.4 Geology and basin maps and descriptions; e.5. Aerial photographs; f.6, Climate information; and g_ Delineated wetlands maps. Amend Sec. 30-5-30. Reconnaissance. A A— Rceconnaissance: A visit to the property toshall evaluate the topography and other surface conditions that will impact the selection and location and design of the OUTS must be conducted., including Information gathered as part of the site reconnaissance may include, but is not limited to: 1.A. Landscape position; 2.-B Topography; 3.C. Vegetation; 4.D- Natural and cultural features; and 5.E. Current and historic land use. Amend Sec. 30-540. Detailed soil investigation. A. Soil investigations to determine the long-term acceptance rate of a soil treatment area mustshall be eitherconducted per the following criteria: 1. Visual and tactile evaluation of two (2) or more soil profile test pit excavations must be conducted to determine soil type as well as to determine whether a limiting layer is encountered.; or 2. Perc-o-1c-re soil profile holes or one (1) or more soil profile test pit excavations.ln addition to the two soil profile test pit excavations, percolation testing may be conducted to obtain additional information regarding the long-term acceptance rate of the soil. 3. If the site evaluation includes both a visual tactile evaluation of soil profile test pit excavations and percolation tests, and the results from these two evaluations do not coincide with the same LTAR as noted in Table 30-10-1, the designer must use the more restrictive LTAR in determining the size of the soil treatment area. 16 2017-4243 ORD2017-10 B. If perco[afion�e�z erf^� ��, �t least ) soikpiofilo hole shall be eval whether current -groundwater levels and/or be - o-ok-i-s-e-ncountered i hin el -O14 -8 --feet of the r eg4•Ie ,��, . e.��,,.� �� �.�o� ��.�. ;i - test .:t e.,�.�..,at;,.�, .�r' described °tears after and Environment, 6.4 E. bei f Water Quality Control Commission's Regulation #43, a vi; pre#-i-i'-e test -pit excavation shall be used instead of a soil profile hole when percolation tests are pe-rf d -o-dete r term accep allowed aftar B.C--1#Procedure for performing visual and tactile evaluations of soil are performed without percolation testsin order to determine a long-term acceptance rate: 1 The soils evaluation shall be performed by or under the supervision of a professional engineer, professional geologist, competent technician, or other similarly qualified professional as approved by the Division. 2. Evaluation of two (2) or more soil profile test pit excavations must be performed to determine soil types and stre -tuc res rctive, limiting layers, evidence of seasonal h, gh groundwater and best depth for the infiltrative surface. The total number of soil profile test pit excavations beyond the required two shall be based on the judgment of the competent technician. 3.2. At least one (1) of the soil profile test pit excavations must be performed in the portion of the soil treatment area anticipated to have the most limiting conditions. 4.3. .The minimum depth of the soil profile test pit excavation must be to any limiting layer, or four feet below the infiltrative surface of the in -situ soil, whichever is encountered first. 5. Layers and interfaces that interfere with the treatment and dispersal of effluent must be noted. Thus, any limiting soil characteristic such as consistence also needs to be evaluated. The evaluation of consistence may also include an evaluation of excavation difficulty, rupture resistance, and/or penetration resistance. 6. The soil observations must be conducted at or immediately adjacent to the location of the proposed soil treatment area, but if possible, not under the final location of a trench or bed. 7. Each soil profile test pit excavation observed at the proposed soil treatment area must be evaluated under adequate light conditions with the soil in an unfrozen state. 8. The soil observation method must allow observation of the different soil horizons that constitute the soil profile. 9. Soil profile test pit observations must be conducted prior to percolation tests to determine whether the soils are suitable to warrant percolation tests and, if suitable, at what depth percolation tests must be conducted. 10. The soil type at the proposed infiltrative surface of the soil treatment area or a more restrictive soil type within the treatment depth must be used to determine the long-term acceptance rate from Table 30-10-1 or Table 30-10-1A. The treatment depth is two to 17 2017-4243 ORD2017-10 four feet depending on the required thickness for the treatment level below the infiltrative surface from Item 4, Table 30-7-2. 11. Soils data, previously collected by others at the site can be used for the purposes of an OVVTS design at the discretion of the local public health agency. It is recommended that the data be verified, at a minimum, by performing an evaluation of a soil profile test pit excavation. C. Soil descriptions for determination of a limiting layer must include: 1. The depth of each soil horizon measured from the ground surface and a description of the soil texture, and structure of each soil horizon; 2. Depth to the bedrock; 3. Depth to the periodically saturated soil as determined by: a. Redoximorphic features and other indicators of water levels; or b. Deptn of standing water in the soil observation excavation, measured from the ground surface, if observed, unless redoximorphic features indicate a higher level. D. Procedure for performing percolation tests: 1. — No change. 2. Number of test holes; Location. a. Soil percolation tests shall be performed in at least three (3) test holes in the area in which the soil treatment area is to be located, spaced evenly over the proposed area. b. If the likely depth of a proposed infiltrative surface is uncertain, percolation tests shalimust be performed at more than one (1) depth to determine the depth of the infiltrative surface. 3. Dimensions. a. The percolation test hole mustshall have a diameter of eight (8) to twelve (12) inches and be terminated a minimum of six (6) inches and a maximum of eighteen (18) inches below the proposed infiltrative surface. 4. Change in soil. a. If a change of soil type, color or structure is present within those soils comprising the depth of soil below the infiltrative surface as required in Table 30-7-2 for vertical separation, a minimum of two (2) soil percolation holes mustshall be terminated in the changed soil and percolation tests musci:that4 be conducted in both holes. 5. Percolation tests. a. The percolation tests shallmust be conducted using the hole preparation, soil saturation and rate measurement procedures described below. b. — No change. 18 2017-4243 ORD2017-10 c. Presoak. i g. 1) The hole mustshalt be presoaked adequately to accomplish both saturation, which is filling the void spaces between the soil particles, and swelling, which is the intrusion of water into the individual soil particles. 2) — No change. d. Percolation rate measurement. 1) With the exception of sandy soils containing five percent (5%) or less particles passing through the #200 sieve, by weight, percolation rate measurements shallmust be made on the day following the presoak procedure. 2) If water remains in the percolation test hole after the swelling period, adjust the depth to approximately six (6) inches above the gravel in the bottom of the hole. From a fixed reference point, measure the drop in water level over a series of thirty -minute intervals. The drops are used to calculate the percolation rate. 3) — No change. e. Sandy soils. 1) In sandy soils or other soils in which the first six (6) inches of water seeps out of the hole in less than thirty (30) minutes, after the twenty-four- (24) hour swelling period, the time interval between measurements mustshall be taken as ten (10) minutes and the test conducted for one (1) hour. The drop that occurs during the final ten (10) minutes llmust be used to calculate the percolation rate. 2) If the soil is so sandy or coarse textured that it will not retain any water, then the infiltration rate shallmust be recorded as less than one (1) minute per inch. f. Percolation rate determination and reporting. 1) The field percolation rate shallwill be the average rate of the percolation rates determined for all percolation test holes observed in the proposed soil treatment area in minutes per inch. The average percolation rate determined by the tests shallmust be used in determining the long-term acceptance rate for the proposed system from Table 30-10-1. 2) The technician performing the percolation tests shall furnish an accurate scale drawing, showing the location of the soil profile holes or soil profile test pit excavations and/or percolation holes tied to lot corners or other permanent objects. The drawing mustshall meet the criteria in Paragraph 30-5-60.A.7. All holes musts-htt be clearly labeled to relate to the information provided for the profile test pits and percolation tests. Percolation test waiver. If the applicant demonstrates, to the satisfaction of the c n-- amt m is not depentn, -u n -s a4 so- p-tien, t r e!itof h- Alternate percolation testing. 1) Alternate percolation test procedures may be approved, provided that the test results of alternate procedures are substantially equivalent to those determined using the test procedures described in this Section. 19 2017-4243 ORD2017-10 2) Prior approval from the Division of alternate percolation test procedures is required. Delete E. and in its entirety. Amend Sec. 30-5-5C. PJla rnip] of SoH Proffra Test PO- Excavations or Percolation holes., profile hoe- pit exc a n n nar44ng" The soil profile test pit excavations or percolation holes, profile holes and profile test pit excavations must be flagged or otherwise marked to allow easy location by others. Percolation holes prof le holes must remain open until after evaluation by the Division. The soil profile test pit excavations may be backfilled after evaluation by the third party professional (professional engineer, geologist, competent technician or other similar professional). If the profile test pit excavation is backfilled prior to inspection by the Division, a monitoring port shall be installed prior to backfilling for evaluation by the Division. Soil test pit excavations that are left open must be suitably barricaded to prevent unauthorized access and to address safety concerns. Amend Sec. 30-5-60. Report and site plan. A. A written report shallmust describe the results of the preliminary investigation, reconnaissance and detailed evaluations. The report may be in text and/or tabular form and shallmust include a drawing locating features relative to the proposed OWTS location and test locations. The report may be included as part of the OWTS design document. The report must include, but is not limited to: 1.A-CompanyTh-e rya e, address, telephone number, e-mail address and name of individual, credentials and qualific=ations of the individual conducting the site evaluation; 2.W- Preliminary and detailed evaluations, providing information from the surface site characteristics assessment and soils investigation; 3. . Dates of preliminL ry and detailed evaluations; 4.a A graphic soil log, to scale, indicating depth of drill holethe soil test pit or excavation, soil description and classification, depth to any limiting layergroundwater encountered during drilling or excavation, type of equipment used to drill the profile hole or excavate the soil profile test pit, and date of soils investigationid-e--of—ins, tigator and 5.E. Setback distances to features listed in Table 30-7-1; 6.FSetback distances to features listed in Table 30-7-2, existing on the site or within applicable setback limits, whichever is greater; 7.G, A drawing created to a scale that provides the complete property boundary lines. The Mminimum drawing size challis --be eight and one-half (8.5) inches by eleven (11) inches. If the property is too large to adequately indicate and label the profile test pits and percolation test holes, a detail of the portion of the site containing the soil profile test pits and percolation test holes must be submitted. If the property is too large to adequately show site evaluation information, a detail drawing that includes the information required from the site and soil evaluation that will impact the location of the OWTS must be submitted. Drawings shallmust indicate dimensions, have a north arrow and graphic scale and include: Fixed, non -degradable temporary or permanent benchmark, Hhorizontal and vertical reference points of the proposed soil treatment area; soil observations; 20 2017-4243 ORD2017-10 percolation testing results and pertinent distances from the proposed OWTS to all required setbacks, lot improvements, easements, ordinary high water mark of a pond, creek, stream, lake, wetland or other surface waters and detention or retention ponds; and property lines; b.2. Contours or slope direction and percent slope; c.3- The location of any visible or known unsuitable, disturbed or compacted soils; d 4- The estimated depth of periodically saturated soils and bedrock or flood elevation, if applicable; and e.5. The proposed elevation of the infiltrative surface of the soil treatment area, from an established datum (either ground surface or a benchmark). 8.H- Anticipated construction -related issues, if applicable; 9. An assessment of how known or reasonably foreseeable land use changes are expected to affect the system performance, including but not limited to changes in drainage patterns, increased impervious surfaces and proximity of new water supply wells, if applicable; and 10.J, A narrative explaining difficulties encountered during the site evaluation, including but not limited to identifying and interpreting soil and landform features and how the difficulties were resolved, if applicable. Amend Sec. 30-5-70. Design document. A. The report and site plan may be attached to the design document or the report and site plan may be combined with the design information as a single document. B. The design document shalimust include a brief description of the facility and its proposed use, basis and calculations of design flow and influent strength. C. The design document must contain all plan detail necessary for permitting, installation and maintenance, including: 1. Assumptions and calculations for each component, including total dynamic head (TDH) and gallons per minute (GPM) for all dosing systems; 2. A fixed, non -degradable temporary or permanent benchmark, (North America Vertical Datum or assumed elevation is acceptable); 3.a A scale drawing showing the location of each OWTS component and distances to water supplies, surface water, physical and health impact features on both the subject and adeacent properties requiring setbacks; 4.3. Layout of soil treatment area, dimensions of trenches or beds, distribution method and equipment, distribution boxes, drop boxes, valves or other components used; 5.47 Elevation or Ddepth of infiltrative surface of the soil treatment area, depth of the septic tank invert, and allan-d oepth of other components of the OWTS; 6.5. Special structural design considerations, integrity of each component; tanks or oth weight or pie composition, such as high sulfate conditions e -xis as applicable to ensure the long-term ens for septic es -t elevation eft 21 specification if suGh 2017-4243 ORD2017-10 7.6. References to design manuals or other technical materials used; 8.7 Installation procedures, as applicable; 9.8. Operation and maintenance manuals or instructions; and 10.9. Other information that may be useful, such as photos and cross-section drawings. Delete Sec. 30-5-80. As -built drawings. Scale di Lion from knov names and models as -aa-!able and OWTS and components. Amend Sec. 30-5-980. Site protection. and maintaining -4-4e Prior to and Dduring construction, the proposed soil treatment area and replacement area, if any, must be protected from disturbance, compaction or other damage by means of staking, fencing, posting or other effective method. Amend Sec. 30-5 190. Qualifications for competent technician. A. — No change. B. Visual and tactile evaluation of soil. 1. Competencies needed: a. and b. — No change. c. Identify type and grade of soil structure; d. thru g. — No change. 2. Possible demonstrations of competence in visual and tactile evaluation of soil: a. — No change. b. Attendance at training or workshop for soil evaluation for OWTS, including both class and field work. (1) If the training or workshop includes an exam to verify acceptable completion of the course, a passing grade on the exam must be attained. 3. The Water Quality Control Division mustshall approve training for visual and tactile evaluation of soil. ARTICLE VI - Wastewater Flow and Strength Amend Sec. 30-6-10. Wastewater flows. A. — No change. B. Single-family residential homes. 1. Design flow per person must beshall be seventy-five (75) gallons per day (gpd). 2. The minimum design flow for a new home mustshall be for a two -bedroom house, unless otherwise noted in this regulation. The minimum design flow for the repair or replacement 22 2017-4243 ORD2017-10 of an OWTS of an existing one -bedroom home must be forshall be one -bedroom, unless bedrooms are added. 3. For homes up to and including three (3) bedrooms, the assumed number of persons per bedroom is shall be two (2) for design purposes. 4. For homes with more than three (3) bedrooms, the assumed number of persons ism be six (6) persons (first three [3] bedrooms x two [2] persons per bedroom), plus one (1) additional person for each bedroom more than three (3) bedrooms. 5. — No change. Table 30-6-1 — No change. C Auxiliary buildings. 1. — No change. 2. If the flow from the auxiliary building is only generated by residents of the home, it willshall be assumed that the OWTS for the home will be adequately sized to include the auxiliary building if the flows are combined. 3. — No change. 4. If the auxiliary building has a separate OWTS, the facility mustshall be sized on the basis of Table 30-6-2 and a septic tank detention time of forty-eight (48) hours. D. Multi -family and commercial on -site wastewater treatment systems. 1. Design flow values and strengths for multi -family and commercial systems mustshall be determined from: 1-a. Table 30-6-2; or 2b. An analysis of flows and strengths from at least three (3) comparable facilities or from the facility, if it is an existing facility, must be submitted to the Division for approval. The analysis mustshall include: ail} Metered water flows for inside use only for at least a year or, if the use is seasonal for a full season. If metered flows are less than full capacity, they mustshall be paired with actual use in units of persons present or meals served or other units as appropriate so that an actual daily rate per unit can be determined. The daily rate per unit times the number of units at full occupancy willshall be the design flow. b2)7 Total suspended solids and BOD 5 o CBOD 5 tests at times of full use. At least three (3) samples, taken at least one (1) week apart, are required. Sampling that provides equivalent and representative data through "composite sampling" may be allowed. c-1). Explanation and justification for the comparability of the tested facilities with the proposed facility. E. Flow equalization. 1. — No change. 2. The highest peak assumed mustshall be at least equal to the full capacity of the facility. 23 2017-4243 ORD2017-10 3. The stored flow mustshall be distributed to the soil treatment area before the next greater -than -average peak. 4. — No change. 5. Timed dosed pressure distribution or timed dosed NDDS mustshall be used. The soil treatment area reduction for timed pressure distribution mustshall not be used in addition to the flow equalization reduction. 6. — No change. Amend Table 30-6-2 Estimate of Average Daily Wastewater Flow and BOD 5 Load Per Person Unless Otherwise Noted Residential Wastewater Single-family dwellings :Y Sui+Aite.w.�Lr�ia+:w.w��.w�.e'MwulNw 75 BOD 5 in Pounds Per Day .20 OR Single-family dwellings or aAuxiliary buildings by fixture type Bath/shower Dishwasher LI Kitchen sink with garbage grinder Laundry washer Lavatory Water closet (toilet) Hotels and motels per roomTotal with kitchen sink garbage grinder Multiple -family dwellings or apartments baths .ar .. owe. -r- r• I 2 Boarding and rooming houses (users absent during working hours)Hotels and motels aer ro-or^ with private baths 14.7 1.8 5.8 19.5 8.4 . 014 . 002 . 052 . 037 . 021 24.8 75 7550 . 029 . 1520 . 2015 5075 .15 24 2017-4243 ORD2017-10 ,.....,,,..�...._+..+__....�m .,....n,.,...._�. _...�,<M...,.._...__.....,W..,,w,...,..,...� �..r...._{ Tiny Homes***, per unit'�i ply -dwellings or apartments oents Boarding and F Mobile home Mobile home park per space Commercial Wastewater Facilities with short-term or transient visitors Examples: Airports or bus stations per passenger; fairgrounds I per person attending; ball parks, race tracks, stadiums, theaters or auditoriums per seat "•^Y' D..,.�y..y...x...c^m...ari'Ni'rne.;v..,4_ imvpw.w•••••• ..� Airport per employee • Barber and beauty shops per chair Bowling alleys per lane - toilet wastes only Country club per member SVC Country club per employee Dentist offices per non -wet chair 1507-5 5 100 50 Doctor offices per doctor 250 Factories and plants exclusive of industrial wastewater per employee per eight -hour shift - no showers .,r.W.. / v-....'•• 0)1W y,.....__::w�.,on:.....,.v<......•.Q.,r..r•a.f,..o...:. <tl....v... r.....vy..<.,,.a .... ... _. ...,l..o.tl..y�. a.. vri.,�:,...'s Factories and plants exclusive of industrial wastewater per employee per eight -hour shift - showers provided Kennels per dog Laundries, self-service per commercial washer co...... Office buildings per employee per 8 -hour shift 25 30 41. Y }a .02 .05 .08 2017-4243 ORD2017-10 Service stations per toilet fixture 250 s .50 * Stores and shopping centers per square foot of retail space .1 .01 .17 c.r-rve.,, v: air,wrwq"Y W ^/y` h % r M«..mw.utt runvn.nxn .-zvu Work __,,,w, w,r„+y r.. ...a ,r, or v.Jw, -,C construction ie P.,. camps , "env'•'•a_r..ka•-v...W..r,'. semi -permanent with flush toilets 50 rnm A(j'L'G' ! V' •. •jj oam Rlit 'es (fY1dL•iN�.Ma%WJ.w4J --------- a v. —v♦ , -- ,a. -. - ..... •. n - _ 35 Work r or construction camps toilets semi -permanent without flush .02 Food Service Establishment Restaurant open 1 or 2 meals per seat 50t-- .06/meal >, I 24 -hour restaurant per seat .07/meal 75 served Resr taurant n with t paper service only per seat 25 .01/meal served I Additional for bars and cocktail lounges per seat 30 .02 I Drive-in restaurant v.m..W.a per car _ __v.__ space 50 .02 Institutional Wastewater Without - Kitchens Unless Otherwise Noted -- Churches, per seat; without any food service, or other uses 3.5 .01 Churches, per seat; warming kitchen only, no ma or food 52-5O s erviceHos ait als be space.012-4 d per p 4 Churches, per seat; with food service, per meal served**** 4 .02 Hospitals per bed space 250 .20 Nursing homes; Group homes for developmentally disabled, 125O0 .2017 per bed space Schools, _.____- - .—m-a boarding -- per person 100 .17 Schools, day without cafeteria, gym or showers 15 .04 26 2017-4243 ORD2017-10 Schools, day with cafeteria, no gym or showers Schools, day with cafeteria, gym and showers Schools, day additional for school workers Camps, day, no meals served a Luxury resort Resort, night and day Campground per campsite ** Sr Recreational and Seasonal Wastewater Use et.. 0% a .. , M...0 ,5..m -Try..,,., we. .e—taM o,,,<, Public park flush toilet per fixture per hour when park is open Public park urinal per fixture per hour when park is open Public park shower per fixture per hour when park is open .............,.w..-,..•.. 5.....,...,.<.. ra.v./'.4..r..p...r.�..7.>;z..rr s�t.r,.Nr,<..>vmloa<,-w ya..,..y> tt,;>rF•..r V> Y .. .... Public park faucet per fixture per hour when park is open Swimming pools and bathhouses Travel trailer parks with individual water and sewage hookup per unit ** Travel trailer park without individual water and sewage hookup per unit ** 15 125 50 50 36 10 10050 50 .12 .04 lbs./fixture .01 lbs/fixture . 10 lbs./fixture . 04 lbs./fixture * BOD levels need further verification depending on the specific use of the facility. .12 **Laundry facilities are to be calculated on a per -commercial washer basis in accordance with other elements of this table. ***For the purpose of this Table, a "Tiny home" is a structure that has only one bedroom and has <400 sq.ft. of livable space, including lofts. In this instance, the OVVTS may be sized for only one bedroom. ****For churches with food service the 4 gal/meal must be added to the 3.5 gal/seat to determine projected design flows. 27 2017-4243 ORD2017-10 Amend Sec. 30-6-20. Wastewater strength. A. — No change. B. High strength waste must be reduced-CBOD 5_strength must oe reduced to at least Treatment Level TL1 quality or lower before applying to a soil treatment area. Waste strength levels defined in Tables 30-6-3 and 30-6-4 must be used to determine compliance. Amend Table 30-6-3 Treatment Levels TL 3N BOD5 (mg/L) 180 MOW CBOD51± (mg/L) 145= (Shading indicates higher treatment levels) Awl TSS (mglL) Total Nitrogen (mg/L) 80 SailiaMr:airnateAl 4 60-80 50% Litt! on N/A340 arg-a4 c material are submitted in BOD ewithout data in CBOD 5_, the data jrn BOO H! e_Ievels.Requirements for CBOD5 are only related to effluent samples from a higher level treatment system. Domestic septic tank effluent prior to soil treatment or higher level treatment has a wide range of concentrations. These values are typical, but values used for design must account for site specific information. 3 Total Nitrogen does not apply to Treatment Levels TL2 and TL3. Processes intended to reduce total nitrogen are addressed in Treatment Levels TL2N and TL3N. Any total nitrogen reductions that may be observed for TL2 and TL3 are as a result of the treatment process for BOD5 and TSS reductions. x**4 NSF/ANSI Standard 245 - Wastewater Treatment Systems - Nitrogen Reduction requires reduction of 50 percent rather than an absolute value. 28 2017-4243 ORD2017-10 Add Table 30-6-4 High Strength Wastewater BOD5 (mg/L) TSS (mg/L) Fats, Oils, Grease (FOG) (mq/L) Septic Tank Influent >300 >200 >50 Septic Tank Effluent >180 >80 >25 *High strength effluent prior to a septic tank has a wide range of concentrations. The values are typical, but values used for design purposes must account for site -specific information. ARTICLE VII - Minimum Distances Between Components of an On -Site Wastewater Treatment System and Physical Features Amend Sec. 30-7-20. Dry gulches, cut banks and fill areas. A. Separation distances to dry gulches, cut banks and fill areas in Table 30-7-1 mustshall apply unless the designer or design engineer determines, by observation of the exposed slope of the dry gulch or cut bank or by profile holes or soil profile test pit excavations, that a restrictivelimiting layer is present that will direct or allow the effluent from the soil treatment area to move laterally and surface. In this instance, a greater distance may be required. B. — No change. C. The separation distance between a component and the crest of a dry gulch or cut bank will be evaluated for potential erosion or slope instability if the components and the slope are too close together. If there is potential for erosion or instability, the separation distance mustshall be increased until the risk is minimized. Amend Sec. 30-7-30. - On -site Wastewater Treatment System design consideration and treatment requirements - separation distances from soil treatment area. A. and B. — No change. C. Item 4 in Table 30-7-2 addresses the required vertical separation distance between the infiltrative surface of the soil treatment area and the limitingrestrictive layer or the required depth of soil comprising the soil treatment area. 29 2017-4243 ORD2017-10 Amend Table 30-7-1 Minimum Horizontal Distances in Feet Between Components of an On -Site Wastewater Treatment System Installed After November 15, 1973 and Water, Physical and Health Impact Features Component Spring, Suction Well, ' Line Potable Water Potable Water Supply CisternStructure Structure Property Lines, Piped or Lined Irrigation Ditch - upslope . Subsurface Watercourse, Irrigation Lake, Dry Gulch, Cut Bank, Septic Tank Higher level without basement - crawlspace or footing Lateral, Ditch, Fill treatment unit Dosing Potable Supply w/basement drainsDwelling D ell Stream, Area Tank Vault or Privy Water Lines crawlspace or CccupiCd Stormwater Infiltration Structure Wetland (from Crest) Supply curtain Wilding- footing drains Cistern¢ drain • S Le Do ptic el ing Treatment Tank, Tank, Higher Vault Unit, or 50 2 10 2 25 5 10 1 10 I 50 10 { - Vault Privy ., wilding Sewer or 50 2 5610-2 025-2 0 10 2 10 2 50 2 10 2 - — Effluent - Lines — , ._, _ 25 50 3 25 5 1ST U lined Trench, Sand STA Filter, Bed, 100 3 25 2 2520 2-010 10 Su surface Dispersal System fined Sand Filter 60 10 2 2515 X10 10 10 25 10 5 E F apotranspiration Id Lined or Outside of 60 10 2 2.515 25 10 5 15 10 10 Berm astewater of Lined Pond UnI Soil R U } E inutes lined ned With e Slower apotranspiration Lined Sand a or Percolation per Partially than Filter Inch, in 60 100 25 2 2515 15 _ 10 25 25 15 10 S W Sys S O stem, erm stewater em her A ,.,,....,,.n., for of Not Treatment than Outside Unlined Pond, Relying Aerosol . ._....d,..a. of or on Vault Privy 50- 10 25 15- 10 25 a-0-- - - __ -- Sys em STA Not Relying for on 1003 102 50125 125 _.. ._..... _ - 10 ... ... 0 .., • a...asemmvavwmc- 253 10 4 10 Di persalTreatmen-t an Uti-liztng Aer-esa-l- Xrisp nw.:...u.. 'Li...;•.:'- ..w:w ..i./..Y ngwwMid" .. _ , -.. .. .... 30 2017-4243 ORD2017-10 Methods • _ • NOTE: The minimum distances shown above must be maintained between the OWTS components and the features described. Where soil, geological or other conditions warrant, greater distances may be required by the Board of Public Health or by the Water Quality Control Commission pursuant to Section 25-8-206, C.R.S., and applicable regulations. For repair or upgrading of existing OWTS where the size of lot precludes adherence to these distances, a repaired OWTS shall not be closer to setback features than the existing OWTS, as reviewed and approved by the Water Quality Control Division. Components that are not watertight should not extend into areas of the root system of nearby trees. 1 Includes potable wells, irrigation wells and monitoring wells set within a potable aquifer and infiltration galleries permitted as wells by the Division of Water Resources. 2 Crossings or encroachments may be permitted at the points as noted above, provided that the water or wastewater conveyance pipe is encased for the minimum setback distance on each side of the crossing. A length of pipe shall be used with a minimum Schedule 40 rating of sufficient diameter to easily slide over and completely encase the conveyance must be used. Rigid end caps of at least Schedule 40 rating must be glued or secured in a watertight fashion to the ends of the encasement pipe. A hole of sufficient size to accommodate the pipe mustshall be drilled in the lowest section of the rigid cap so that the conveyance pipe rests on the bottom of the encasement pipe. The area in which the pipe passes through the end caps mustshall be sealed with an approved underground sealant compatible with the piping used. Other methods of encasement that provide equal protection are allowed. These methods must be designed by a professional engineer and approved by the local public health agency. 3 Add 8 feet additional distance for each 100 gallons per day of design flows between 1,000 and 2,000 gallons per day, unless it can be demonstrated by a professional engineer or geologist by a hydrologic analysis or the use of a barrier, consisting of a minimum 30 mil PVC liner or equivalent, that contamination will be minimized. 4 5 All horizontal setbacks to a potable water supply cistern must be met unless a variance by the Board of Examiners of Water Well Construction and Plumb Installation Contractors is granted per section 11.4 of the Water Well Construction Rules, 2 CCR 402-2. The minimum horizontal setback that may be granted through a variance is to 25 feet. If the structure is not used as a habitable unit, the isolation may be reduced by the local board of health to no less than 50 feet. 6 Building sewer installations shall meet the design requirements of the Colorado Plumbing Code. 2017-4243 ORD2017-10 31 Amend Table 30-7-2 On -site Wastewater Treatment System Design Consideration and Treatment Requirements - Separation Distances from Soil Treatment Area Item OWTS Design Consideration All Treatment Levels Horizontal Separation Distances Distance from soil treatment area to on -site well vw 9 Greater than or equal to 100 feet Distance from soil treatment area to pond, creek, lake or other surface water feature Distance from soil treatment area to dry gulch or cut bank Greater than or equal to 50 feet —,s.__.._. Greater than or equal to 25 feet Vertical Separation Distances Treatment Ddepth in feet from treaty ent area -infiltrative 4 feet (3 feet with surface to a limitingrestrictive layer or groundwater pressure dosing) NOTE: Treatment levels are defined in Table 30-6-3. ARTICLE VIII - Design Criteria - General Amend Sec. 30-8-10. Performance. A. The OWTS for single-family homes shall be designed to accommodate the proposed flows from the structure as defined in 30-6-10.B. Flow estimates for multi -family or commercial OWTS must comply with 30-6-10.D.1. Expected waste strength as noted in Table 30-6-3 and Table 30-6-4 must also be addressed, where applicable. Installation of low flow fixtures or the separation of toilet waste or other sources of wastewater does not allow for the reduction in the size of an OWTS. B. OWTS shall be designed and constructed to achieve the treatment level specified by the design. Amend Sec. 30-8-20. Reliability. 0WTS mustshall be designed and constructed such that each component shall function, when installed and operated, in a manner not adversely affected by normal operating conditions, including erosion, corrosion, vibration, shock, climatic conditions and usual household chemicals. Each component mustshali be free of nonfunctional protrusions or sharp edges or other hazards, which could cause injury to persons, animals or properties. Design mustshall be such as to exclude flies and rodents and other vectors and to prevent the creation of nuisances and public health hazards and mustshall provide for efficient operation and maintenance. 32 2017-4243 ORD2017-10 Amend Sec. 30-8-30. Accessibility for inspection, maintenance and servicing. A. Septic tanks mustshall have watertight risers over each access manhole, and all risers mustshall extend to or above final grade. E. For new construction, the top of any septic tank, dosing tank or vault must be no deeper than four feet below finished grade. BC. Each treatment component of an OWTS, other than the septic tank and soil treatment area, shall be equipped with access manholes with risers that extend to or above final grade, located to permit periodic physical inspection, collection and testing of samples and maintenance of all components and compartments. GD. Riser lids. 1 Each riser lid must be watertight, brought to or above the surface, and must shalt have a secure closing mechanism, such as a lock, special -headed bolts or screws, or sufficient weight (defined as 59 pounds) to prevent unauthorized access. DE. Components that require access for maintenance mustshall include, but not be limited to, submerged bearings, moving parts, pumps, siphons, valves, tubes, intakes, slots, distribution boxes, drop boxes, cleanouts, effluent screens, filters, inlet and outlet baffles, aerators, treatment equipment and other devices. EF. Components mustshall be designed and constructed so that, when installed, they mustshall be easily maintained, sampled and serviced according to the manufacturer's recommendations. Easy physical access to treatment components by maintenance personnel and equipment mustshali be provided. Amend Sec. 30-8-40. Plumbing codes. Plumbing fixtures, building sewers, vents, sewer lines and other appurtenances mustshall be designed, operated and maintained so as to comply with the minimum requirements of the locally enforced plumbing code. In the absence of a local plumbing code, designs mustshalt adhere to the Colorado Plumbing Code (3 CCR 720-1). A local plumbing permit may be required. Amend Sec. 30-8-50. Electrical equipment. A. All electrical work, equipment and materials mustshali comply with the requirements of the locally enforced code. A local electrical permit may be required. B. Electrical components mustshall be protected from moisture and corrosive gases. Amend Sec. 30-8-60. Indicators of failure or malfunctioning for systems utilizing mechanical apparatus. A signal device mustshalt be installed which will provide a recognizable indication or warning to the user that the system or component is not operating as intendedor is operating but malfunctioning. This indication or warning mustsh-a-RR be a visual signal andor audible signal ---of th, and mustshati be located in a centralized area within visual and audible range of the system user. A signal or message may also be sent remotely to a maintenance provider. 33 2017-4243 ORD2017-10 Amend Sec. 30-8-70. Sampling access. A. If sampling for testing or as a requirement for a permit will be required of effluent from a component other than the soil treatment area, an accessible sampling point mustshall be provided. B. If sampling of the treated wastewater from the soil treatment area will be required for testing or as a requirement for a permit, a monitoring well or wells mustshall be constructed. Monitoring wells musts -` ; T1 be located down gradient from the soil treatment area, accessible and provided with a properly securable cover at or above the ground surface. Monitoring wells up gradient of the system may also be required. Lysimeters or other collection devices under the soil treatment area may be used instead of a monitoring well. Amend Sec. 30-8-80. Component operating instructions. A. The manufacturer of proprietary treatment units utilizing mechanical components mustshall provide clear, concise written instructions covering the components which, when followed, mustshall assure proper installation and safe and satisfactory operation and maintenance. B. If the OWTS uses public domain technology, the design engineer mustshall provide clear, concise written instruction covering the components which, when followed, musts -sue assure proper installation and safe and satisfactory operation and maintenance. Amend Sec. 30-8-90. Surface activity. Activity • r use on the surface of the ground over any part of the OWTS must be restricted, The soil treatment area must not be subject to damage or soil compaction from livestock, vehicular traffic, recreational use, or other site development activity. Construction equipment not necessary t0 install the OWTS must be kept off of the soil treatment area to prevent undesirable compaction of the soils. - _ i 1 • • • • • i • ent shalt be kept off of the compaction. If compaction occurs, the disturbed or compacted soil mustshall be reevaluated and/or new soil evaluationspercolation tests may be performed_ to the d -is ufbed or compacted -I] and tThe system must be redesigned if the soilparameters permeability hasve changed. Amend Sec. 30-8-100. Floodplains. A. ANnew, expanded or OWTS repair/replacement OWTS installed in a 100 -year floodplain mustshall meet or exceed the requirements of the Weld County Floodplain Management Ordinance contained in Chapter 23 and the Federal Emergency Management Agency. Repairs of an existing system musts -h -a14 meet the requirements as feasible. The system, as approved by the Division, mustshall be designed to minimize or eliminate infiltration of floodwaters into the system and discharge from the system into the floodwaters. The OWTS must be located to avoid impairment to floodwaters or contamination from them during flooding. The Division has available a floodplain guidance document. B. A No- new or expanded OWTS must notshall be installed in a floodway designated in a 100 - year floodplain where a conforming OWTS outside the floodway can be installed. For any new OWTS or system repair that may affect the floodway delineation, appropriate procedures must- be followed, including revision of the floodway designation, if necessary. 34 2017-4243 ORD2017-10 Amend Sec. 30-8-110. Business, commercial, industrial, institutional or multi -family dwelling wastewater systems. A. An OWTS that will serve a business, commercial, industrial or institutional property or a multi -family dwelling mustshall: Al. Be designed by a professional engineer; B2. Receive only such biodegradable wastes for treatment and distribution as are compatible with those biological treatment processes as occur within the septic tank, any additional treatment unit and the soil treatment area; and G3. Receive authorization by rule or a Class V underground injection permit from the United States Environmental Protection Agency (EPA) before an application for an OWTS permit is approved, if the system may receive nonresidential wastewater or is otherwise covered by the EPA underground injection control program. Subsequent to acceptance by the EPA, the Division may choose to also issue a permit for this type of use. ARTICLE IX - Design Criteria - Components Amend Sec. 30-9-10. Tanks and vaults. A. Watertightness. 1. Septic tanks, vaults, purm-pdosing tanks, other treatment components, risers and lids mustshall not allow infiltration of groundwater or surface water and mustshall not allow the release of wastewater or liquids through other than designed openings. 2. When the final compartment of a tank is being proposed for use as a pump or siphon chamber, the wall between this chamber and the previous chamber must be watertight except for the intended hydraulic opening. 23. Acceptable watertightness testing methods, performed at a manufacturer's site or in the field, include water filling the tank or vacuum testing. B. Tank anchoring. In locations where groundwater or floodwaters may cause instability problems to the septic tank, vault or other treatment unit in the OWTS due to flotation, the tank, vault or unit mustshall be anchored in a manner sufficient to provide stability when the tank is empty. Risers mustshall be included in the buoyancy calculations. 1. If a manufacturer provides recommendations for anchoring designs, they may be used if they meet the conditions present at the site. If a manufacturer does not provide recommendations for provisions to compensate for buoyancy or if the professional engineer chooses to provide his or her own designs, the anchoring system design mustshall- be prepared by the professional engineer. C. Identification and data marking. All tanks and treatment units mustshall be permanently and legibly marked in a location, for the purpose of inspection, that is readily visible when inspected before backfilling. The marking inscription mustshall include the following: 1. thru 5. — No change. 2017-4243 ORD2017-10 35 Amend Sec. 30-9-20. Septic tanks. A. The manufacturer mustshall provide sufficient information to demonstrate that the tank will meet the design specification. B. Sizing requirements: 1. Sizing for residential capacity for new installations mustshall be based upon the number of bedrooms according to Table 30-9-1: Table 30-9-1 - No change. 2. For multi -family and nonresidential applications, a septic tank mustshall be sized to permit detention of incoming wastewater design flows for a minimum of forty-eight (48) hours. 3. and 4. — No change. C. Inspection and Testing of septic tank watertightness. 1. Testing of septic tanks must be performed and evaluated as specified in Section 9 of ASTM C1227-123 (Standard Specification for Precast Septic Tanks) for concrete tanks or in Standard IAPMO/ANSI Z1000-200713 (American Standards for Prefabricated Septic Tanks) for other prefabricated septic tanks. 2. Each unit mustshall be inspected in the field for conditions that may compromise its watertightness. 3. The inspection in the field musts -I- be conducted by the Division and be performed after the tank installation but before backfilling. 4. — No change. D. Septic tank design and dimension criteria. 1. A septic tank mustshall have two (2) or more compartments or more than one (1) tank may be used in a series. The first compartment of a two -compartment tank or the first tank in a series mustshall hold no less than one-half (1/2) of the required effective volume. 2. Inlet invert mustshal4 be at least two (2) inches higher than the outlet invert. 3. Inlet tee or baffle mustshall extend above the surface of the liquid at least five (5) inches and mustshall extend a minimum of eight (8) inches below the liquid surface. However the inlet tee or baffle must not extend to a depth of more than 40 percent of the liquid depth measured from the liquid surface. 4. Outlet tee or baffle mustshaR extend at least five (5) inches above and fourteen (14) inches below the outlet invert, however, it must not extend to more than 40 percent of the liquid depth measured from the liquid surface and, if accommodate an ef¢ n. The outlet tee or baffle that accommodates an effluent screen must be located so that the effluent screen has sufficient clearance to be removed through the access opening with a riser in place. 5. The distance from the outlet invert to the underside of the tank top mustshall be at least ten (10) inches. 6. Liquid depth shalimust be a minimum of thirty (30) inches and the maximum depth mustsha-l4 not exceed the tank length. 36 2017-4243 ORD2017-10 7 The transfer of liquid from the first compartment to the second or successive compartment musts -hall be made at a liquid depth of between thirty-five percent (35%) and forty-five percent (45%) of the liquid depth measured from the liquid surface. 8 At least one (1) access openinqmanhole no less than twenty (20) inches across must! -4 be provided in each compartment of a septic tank. 9. A septic tank mustshall have a minimum of twenty-five (25) square feet of liquid surface area and have at least a six-foot separation between inlets and outlets. Septic tanks in series, combined, mustshall have a minimum of twenty-five (25) square feet of liquid surface area and the sum of the distances between inlets and outlets of all tanks must be at least six (6) feet. The requirements for liquid surface area and separation between inlet and outlet may be waived for tanks with less than seven -hundred -fifty -gallon effective volume. E. Concrete septic tank structural design. 1. Concrete septic tanks mustshall comply with the structural design criteria of ASTM C1227-123 (Standard Specification for Precast Septic Tanks). 2. and 3. — No change. 4. Tank slab lids, or mid -seam tanks, and the connections between the tank and risers musty -4 be designed to providesealed to be for a watertight seal. tertight. F. Fiberglass, fiberglass -reinforced polyester and plastic tanks. 1. All fiberglass, fiberglass -reinforced polyester and plastic tanks musts -h i1 meet the minimum design and structural criteria of IAPMO/ANSI 21000-209-713 (American Standards for Prefabricated Septic Tanks) and be certified by a professional engineer as meeting these standards. The professional engineer certifying the criteria must be registered or licensed in the United States but need not be registered in Colorado. 2. All tanks mustshall be sold and delivered by the manufacturer or manufacturer's designated representative, preferably completely assembled. On -site tank assembly will be allowed on an as -needed basis. 3. Tanks mustshall be structurally sound and support external forces, as specified in the standard referenced above, when empty, and internal forces when full. Tanks mustshall not deform or creep, resulting in deflection of more than five percent (5%) in shape as a result of loads imposed. 4. All tanks mustshall be constructed of sound, durable materials and not be subject to excessive corrosion, decay, frost damage or cracking. 5. All seams or connections, including to risers, mustshall be sealed to be watertight. G. Metal tanks are prohibited. Amend Sec. 30-9-30. Abandonment of tank. A. The contents of a tank shall be pumped by a County licensed systems cleaner and properly disposed by methods specified in SectionParagraph 30 -4 -120.B.3. -of th1s p z B. — No change. C. If the tank will remain in place. (see Subsection A. above): 37 2017-4243 ORD2017-10 1. The bottom of the tank mustshall be broken so that the tank neither floats nor fills with water; 2. — No change. 3. The remaining void mustshall be filled with gravel, sand or compacted soil; and Remainder of Section - No change. Amend Sec. 0-9-40. Pipe standards and bedding requirements. A. Pipe standards. 1. All wastewater pipeslines used in portions of an OWTS that are pressurized mustshall be constructed of compatible pipe, primer, bonding agent and fittings. Flexible couplings to connect pipes may only be used in portions of an OWTS that are intended for gravity flow of the wastewater. 2. Where unperforated plastic pipe and fittings are used for gravity flow, the minimum wall thickness of the pipe mustshall conform to ASTM Standard D 3034 or equivalent or greater strength. Schedule 40 pipe is preferred. 3. Perforated distribution pipe surrounded by rock within a soil treatment area mustshall have a minimum wall thickness and perforations conforming to ASTM Standard D 2729 or equivalent or greater strength. Corrugated polyethylene pipe with smooth interior that meets ASTM F405 or AASHTO M252 specifications or equivalent may be used. 4. Schedule 40 or pipe of equivalent or greater strength mustshall be used for the placement of piping under driveways or roadways and in instances where sewer line setback distances are granted a variance for any reason. 5. and 6. — No change. B. Bedding. All system piping, except for distribution laterals within the soil treatment area, mustshall be bedded with select material before final inspection by the Division. Select bedding material mustshall consist of loose, granular material free from stones, clods, frozen soil or other deleterious material. Select material may consist of on -site job -excavated or imported material. Bedding material must be mechanically compacted to support piping. Remainder of Section — No change. Add Section 3 -9-50. Cleanouts. A. Cleanouts required between the building and the septic tank: 1. Cleanouts must have a secure cap and a riser extending to or easily accessible from grade. The installation of a straight tee or sanitary tee is acceptable. 2. Cleanouts must be provided within five (5) feet of the outside of the building. 3. Where a sewer has a change of horizontal direction greater than 45 degrees, a cleanout must be installed at the change of direction unless a cleanout already exists within 40 feet upstream of this fitting. Where more than one change of direction greater than 45 degrees occurs within 40 feet of a developed length of piping, the cleanout for the first change of direction may serve as the cleanout for all changes within that 40 feet of developed length of pipe. 38 2017-4243 ORD2017-10 4. Cleanouts must be provided at intervals within the building sewer from the structure to the tank of not more than 100 feet. The effluent pipe between the septic tank and soil treatment area is exempt from this requirement. Amend Sec. 30-9-560. Distribution box. A A distribution box, if used, mustshall be of sufficient size to distribute effluent equally to the laterals of a trench or absorption bed system. The box must shall be constructed with the inlet invert at least one (1) inch above the level of the outlet inverts. Flow equalizers or similar devices mustshall be used to adjust the flow between lateralslines. Access to the box mustshall be provided with a manhole riser with access lid at or above grade if the top of the box does not reach final grade. Al. Each lateral shall be connected separately to the distribution box. 82. The distribution box shall be watertight and all pipes shall be grouted or cemented. The box shall be located a minimum of five (5) feet from the septic tank. C. Oull r min on box to the laterals ipe for a -D3. In the event that treatment tank effluent is discharged to the distribution box by a pump, a baffle shall be installed in the distribution box. The baffle shall be secured to the bottom of the box, extending vertically to a point level with the crown of the inlet pipe and shall be perpendicular to the inlet. In lieu of a baffle, the inlet pipe may have a ninety -degree bend which diverts effluent downwards into the distribution box. Amend Sec. 30-9-670. Drop box. In sequential or serial distribution, a watertight box may be used to transfer the effluent to the following trench when the effluent in a trench has received the designed level for overflow to the next trench. A drop box shall have a riser at or above final grade if the top of the box does not reach final grade. Outlet pipeslines in a sequential distribution mustshall be designed and installed so that they may be capped off for resting periods. Amend Sec. 30-94:0. Stepdown/relief .P p&tne. In sequential or serial distribution, an unperforated pipe may be used to transfer the effluent to the following trench when the effluent in a trench has received the designed level for overflow from that trench. Amend Sec. 30-9-890. Wastewater pumping and dosing siphon systems. A. Pumps. 1. Non -clog pump opening mustshall have at least two-inch diameter solids handling capacity where raw wastewater is pumped. A pump opening mustshall not have more than three -fourths -inch diameter solids handling capacity if previously settled effluent is pumped. 2. and 3. — No change. B. Floats and switches. 1. — No change. 39 2017-4243 ORD2017-10 2. Floats must be mounted on a stem separate from the pump discharge piping to allow for removal, adjustment and replacement of the float from grade without removing the pump. 3. — No change. 4. Dosing siphons for pressure dosing and higher level treatment systems must provide for a means of determining the number of dosing events. C. Location of pump or siphon. 1. A pump may be, or a siphon mayshall be, installed in a separate tank following the septic tank_ and The tank must be of sufficient volume to allow pump or siphon cycling commensurate with the design capacity. T sized to prov-i-d- bte . 2. The second compartment of thea two -compartment septic tank may onlys-h-all not be used as the pump tank unlesswhen the tank is specifically designed for this purpose and it can be demonstrated, to the satisfaction of the Division, that the minimum forty -eight - hour detention time will not be decreased. The and the pump ismust be screened or provided with an approved filtering device to assure that only liquid effluent will be discharged. The transfer of liquid from the first to the second compartment must be at an elevation that is between the inlet and outlet invert elevations, and through a standard tee designed and located as per the requirements of section 30-9-20.D.4. Siphons must not be installed in the second compartment of a two compartment tank. 3 The use of a three -compartment septic tank, sized to provide the required effective volume in the first two compartments with the pump or siphon in the third compartment is acceotable for tanks specifically designed for this purpose. The transfer of liquid from the second to the third compartment must be at an elevation that is between the inlet and outlet invert elevation, and through a standard tee designed and located as per the requirements of section 30-9-20.D.4. D. Pump or siphon discharge piping. 1. The discharge pipeline from the pumping or siphon chamber mustshall be protected from freezing by burying the pipe below frost level or sloping the pipe to allow it to be self -draining. Drainage mustshall be provided through the bottom of the pump or through a weep hole located in the discharge pipeline prior to exiting the tank. 2. The pump discharge piping mustshall have a quick disconnect that is accessible from grade r to allow for easy pump access and removal. 3. The pipe mustshall be sized to maintain a velocity of two (2) or more feet per second. 1 i 4 yo where lines. Pressure pipes must be designed to prevent air or vacuum locking and allow self draining of the pipes. s etk f E. Access. r 1. The pump or dosing system tank, chamber or compartment mustshall have a minimum twenty -four -inch diameter access riser, made of corrosion -resistant material, extending to or above ground level. A smaller diameter riser may only be installed if it is accepted 40 2017-4243 ORD2017-10 by the Water Quality Control Division as an integral component of a specific product during the product review process. 2. The access riser must have a watertight connection to the pump or dosing chamber/compartment to prevent infiltration or exfiltration. All other intrusions to the riser for electrical or other component access must also be watertight. F. Splice box. 1. Splice boxes mustshall be located outside the pump system access riser and be accessible from the ground surface. 2. No wWire splices mad are prohibited inside the tank, dosing chamber or riser. Wire splicing mustshall be completed with corrosion -resistant, watertight connectors. G. Controls. 1. Control panels or other electrical boxes used to control the functions of an OWTS must comply with the following, as appropriate: 1-a. The pump system mustshall have an audible and visual alarm notification in the event an excessively high water condition occurs. 2b. The pump mustshall be connected to a control breaker separate from the high water alarm breaker and from any other control system circuits. An electrical disconnect must be provided within the line of sight of the pump chamber. 3c. The pump system !l -ha e -sue must be provided with a means that will allow so the pump tocan be manually operated. 4d. The pump system for pressure dosing and higher level treatment systems mustshall have a mechanism for tracking bottle1-1 r the amount of time the pump runs Grand the number of cycles the pump operates. 5e. Control cITMust bear the seal of a Nationally Recognized Testing Laboratory (NRTL), such as UL or ETL. Amend Sec. 30-9-91 00. Effluent screens. A. If a pump or dosing siphon is used to remove septic tank effluent from the final compartment of the septic tank, a-nthe effluent screen must be filtered- ; mod- prior to the pump or siphon -i-nletdispersal into the soil treatment area. An effluent screen, pump vault equipped with a filter cartridge, or a filter on the discharge pipe, would all -may be considered equivalent to an effluent screensci acceptable. B. The effluent screen, if used, mustshall be cleaned at manufacturer -recommended intervals or more often, if use patterns indicate. C. An alarm may be installed on an effluent screen indicating need for maintenance. D. Where an ejector pump, grinder pump or non -clog pump is proposed for use prior to the septic tank, an effluent screen must be installed on the outlet of the septic tank. E. The handle of the effluent screen must extend to within 12 inches of grade. Amend Sec. 30-9-1 10. Grease interceptor tanks. A. and B. — No change. C. The grease interceptor must have a minimum of two compartments and must be sized 41 2017-4243 ORD2017-10 proportionate to the amount of fats, oils and grease it receives, the peak flow rate through the tank, and the expected cleaning frequency. D. The inlet and outlet tees or baffles must extend into the bottom 1/3 of the liquid volume, but must be at least 12 inches off the inside floor of the interceptor. E. The inlet and outlet tees or baffles must extend at least 5 inches above the liquid level and must provide for a free vent area across the liquid surface. ARTICLE X - Design Criteria - Soil Treatment Area Amend Sec. 30-10-10. _ Soil Treatment Area General. A. The size and design of the soil treatment area mustshall be based on the results of the site and soil evaluation, design criteria and construction standards for the proposed site and OWTS selected. B. At proposed soil treatment area locations where any of the following conditions are present, the system mustshall be designed by a professional engineer and approved by the Division: 1. ForThe soil =f.�a=�^mac ^re Ttypes 0, 3A, 4, 4A,_ and 5, R-0, R-1 and R-2, as specified in Table 30-10-1 and 30-10-1A of this Regulation; 2. The maximum seasonal level of the groundwater surface is less than four (4) feet below the bottom of the proposed infiltrative surface 3. A limitingrestrictive layer exists less than four (4) feet below the bottom of the proposed infiltrative surface absorption system; 4. The ground slope is in excess of thirty percent (30%); or 5. Pressure distribution is used. Amend Sec. 30-10-20. Calculation of infiltrative surface of soil treatment area. A. — No change. B. Long-term acceptance rates (LTARs) are shown in Table 30-10-1 and 30-10-1A. C. - No change. D. The required area for a soil treatment area is determined by the following formula: Soil treatment area in feet required = Design flow (in gallons per day) LTAR (in gallons per day per square foot) 1. and 2. — No change. 3. Size adjustment factors for types of storage/distribution media are in Table 30-10-3. 4. and 5. — No change. 42 2017-4243 ORD2017-10 Amend Table 30-10-1 Soil Treatment Area Long -Term Acceptance Rates by Soil Texture, Soil Structure, Percolation Rate and Treatment Level Soil Type @R 1 2A 3 3A Soil Type, Texture, Structure and Percolation Rate Range USDA Soil Texture Soil Type 1 with more than 35% Reek - than 50% Rock (> 2mm) >35% Rock (>2mm): See Table 30-10-1A Sand, Loamy Sand Sandy Loam, Loam, Silt Loam Sandy Loam, Loam, Silt Loam Sandy Clay Loam, Clay Loam, Silty Clay Loam Sandy Clay Loam, Clay Loam, Silty Clay Loam Sandy Clay, Clay, Silty Clay 4A Sandy Clay, Clay, Silty Clay 5 USDA Soil Structure - SfapeTmpe Long -Term Acceptance Rate (LTAR); Gallons per day per square foot USDA Soil Structure - Grade >35% Rock I Single Grain (0)>35% Rock (>2mm): See (>2mm): See Table 30 -10 - Table 30-10- 1A 1A Single Grain PR (Prismatic) BK (Blocky) 2 (Moderate) I 3 (Strong) GR (Granular) Single Grain (0)_ (Structureless) PR, BK, GR 0- (none)Massive 1 (Weak) Ma-ssive0 (Structureless) PR, BK, GR 2, 3 PR, BK, GR @Massive PR, BK, GR PR, BK, GR Massive Soil Types 2-4A Platy 1 Massive° (Structureless) 2, 3 1 Massive0 (Structureless) 1,2,3 Shaded areas require system design by a professional engineer. 1 Treatment levels are defined in Table 30-6-3. 2 Unlined sand filters in these soil y -p -e -s 11 30.B.3., Unlined sand filters. 43 Percolation Rate (MPl) 5>35% Rock (>2mm): See Table 30-10-1A All Treatment Levels 11/ 3 foot -deep unlined sand f -Sze -r -re ,�„, a- 1.0 LTAR>35% Rock (>2mm): See Table 30-10-1A a idalai 'aY.`n tAWMefY[ ••IM. e4 k0r.M'rtz(('.'extt"tt .t Y.... 0.50 0.35 0.30 0.20 Design shall conform to Paragraph 30 2017-4243 ORD2017-10 Add Table 30-10-1A Design Criteria for Soils with High Rock Content (Type "R" Soils) 1,2,3,4 Soil Type, Percentage of Rock, LTAR, Distribution Required Sand or Media Depth Relative to the Quality of Effluent Applied to the Distribution System Soil Type Percentage and Maximum LTAR Type of Distribtion Treatment -- Level 16 . Size of Rocks Lgal/sq ft/day Required R-0 Soil Type7 1 with Unlined Sand Filter: Pressure Minimum 3 -foot more than 35% 1.0 for "Preferred Distsribution8 deep Unlined Sand Filter Rock (>2mm) Sand Media:, 0.8 for "Secondary Sand Media" R-1; Option 1 Soil Types 2-5, Use TL1 LTAR from Pressure Minimum 2 -foot >35%-65% Rock Table 30-10-1 for the Distribution8 deep Unlined Sand (>2mm); With >50% soil type Filter of the Rock <20 mm corresponding to the 13/4 inch) soil matrix with a maximum LTAR of 0.8 R-1; Option 2 Soil Types 2 and 2A, The allowable LTAR's Pressure Remove, mix, >35%-65% Rock are defined in each Distribution8 replace 4 feet of (>2mm); With >50% individual treatment existing material; of the Rock <20 mm levelcolumn in this with a maximum (3/4 inch) table LTAR R-2 Soil Types 2-5, Use TL1 LTAR from Timed, Minimum 3 -foot >65% Rock (>2mm), Table 30-10-1 for the Pressure deep Unlined Sand OR >50% of Rock soil type Distribution8 Filter >20mm (3/4 inch) corresponding to the soil matrix, with a maximum LTAR of 0.8 1. General guidance for Table 30-10-1A: The intent of the soil type R-0 is to define a material that consists of a high percentage of rock, or rock fragments, and has a percolation rate of less than 5 mpi. Soil types R-1 and R-2 consist of a high percentage of rock or rock fragments, but have a percolation rate of greater than 5 mpi. Soil types R-0 and R-2 are considered to be a "limiting layer". 2. No sizing adjustments are allowed for systems placed in type "R" soils. The maximum LTAR's are provided in this table 3. The design of type "R" soil treatment systems must conform to sections 30-11-30.B and C. 4. All systems installed in a type "R" soil must be designed by a professional engineer. 5. The percentage of rock may be determined by a gradation conducted per ASTM standards, or an appropriate field evaluation by volume. 6. Type "R" soil treatment systems that are designed per the criteria noted in the Treatment Level 1 column of this table do not require O/M oversight by the LPHA. 7. The "Percentage and Size of Rock" column references the soil types noted in Table 30-10-1. 8. Design of the pressure distribution system for type "R" soils shall comply with the requirements of sections 30- 11-30 B. 2. a, b, c, d, and e. 44 2017-4243 ORD2017-10 Amend Sec. 30-10-30. Allowable soil treatment area reduce cn& c-reas es. izin d use 'ents. A. The soil treatment area size, determined by dividing the design flow rate by the long-term acceptance rate, may be adjusted by factors for soil treatment area design and type of distribution media. B. For the purpose of the table, a "baseline system," i.e., adjustment factor of 1.00, is considered to be Treatment Level 1 (TL1) applied by gravity to a gravel -filled trench. Delete C. percent (50% Table 30-10-2 — No change. all combine required for a Amend Table 30-10-3 Size Adjustment Factors for Types of Distribution Media in Soil Treatment Areas Type of Soil Treatment Area Trench or bed Type of Storage/Distribution Media Used in Soil Treatment Area Category 1 Rock or Tire Chips 1.0 rx +-y' Category 2 Other Manufactured Media Other Than Chambers 0.9 r than fifty Category 3 Chambers or Enhanced Manufactured Media 0.7 1. All proprietary distribution products must receive acceptance and the applicable reduction through Colorado Water Quality Control Division review per the applicable requirements of Regulation 43 section 43.13. Amend Sec. 30-10-40. Design of distribution systems. A. General. 1. The infiltrative surface and distribution lateralslines must be level. 2. The infiltrative surface must be no deeper than four (4) feet below grade. uni tre ► -a a --deep � �l se demonstrated and is approved by the Division The depth of the infiltrative surface will be measured on the up-downslope side of the trench or bed. 3. thru 6. — No change. 7. Backfilling and compaction of soil treatment areas mustsh be accomplished in a manner that does not impair the intended function and performance of the storage/distribution media and soil and distribution laterals, allows for the establishment of vegetative cover, minimizes settlement and maintains proper drainage. 45 2017-4243 ORD2017-10 8. Dosing may be used for soil treatment area distribution. The dose must be sized to account for the daily flow and the dosing frequency. B. Distribution linesLaterals; Must meet the requirements of Section 30-90-40, as applicable. 1. Distribution between lateralslines in a soil treatment area must be as leveleven as possible. Uneven settling of portions of the distribution system following construction must be addressed by provisions in the design to adjust flows between lateralslines. 2. nistrib3 3%on lines sh be aThe maximum length of distribution laterals must not exceedof one hundred fifty (150) feet_e-ng. 3. Distribution lateralsl-in-e longer than one hundred (100) feet mustshall be pressure dosed or the application of the effluent mustshatt be at the center of the linelateral through a distribution box. 4. For absorption beds, the separating distance between parallel gravity distribution laterals must not exceed six feet (center -to -center), and a distribution lateral must be located within three feet of each sidewall and endwall. 45. The end of a distribution pipe must be capped unless it is in a bed or trenches in a level soil treatment area, where the ends of the lines may be looped. 6. To promote equal distribution to the soil treatment area, the forcemain or effluent pipe must be connected to as near to the middle of the distribution header as possible. However it must be offset from any distribution lateral to prevent preferential flow. 7. Orifices must be oriented downward unless pressure distribution is used and provision for pipe drainage is included. C. Pressure Distribution. 1. Design of pressure distribution systems must include: a. Dose size and frequency for either proposed flows and soil type, or media long-term acceptance rate; b. Pipe diameter and strength requirements; c. Orifice size and spacing; d. A 30 — 72 inch operating head at the distal end orifice; e. Pump/siphon information; Total Dynamic Head; gallons/minute; f. Drain -back volume from forcemain; and p. Calculations, or a design software reference, that indicates the selected component sizing will provide equal flow within each active zone of the distribution system, and provide no more than a 10% flow differential from the initial orifice to the most distal end orifice within each zone. 2. The separating distance between parallel distribution pipes in a pressure distribution absorption bed must not exceed four feet, and the outer distribution pipe must be located within two feet of each sidewall and endwall. Specific requirements for the design of sand filters are noted in section 30-11-30.B. 3. Flushing assemblies must be installed at the distal end of each lateral and be accessible from finished grade. A sweeping 90 degree or bends limited to 45 degree must be provided. 46 2017-4243 ORD2017-10 Delete 5. Inspection ports. a----nn-i-n s pes on -port accessible from g -re end of each -tine. - it 1V VI 11 sh-ambers may be i-nsta I led a-ccocdi-ng to C. its -connected to distrib the -terminal 4; valve box for a lawn irrigation system. Add and Amend Sec. 30-10-50. Soil Treatment Area Requirements A.& Trenches. -a1. Trenches must be three (3) feet wide or less. b2. The separating distance between trenches must be a minimum of fours (64) feet, sidewall:to:sidewall. d ewa l l_to_s i d ewa l I. c3. -rnzted-dDistribution pipelaterals used in a trench must be as close to the center of the trench as possible. Delete d. Perforations must be oft__ provision for pipe drainage is i-nctu-ded. B7 Beds. al. Maximum width for a bed shall be twelve (12) feet, unless the bed receives effluent meeting Treatment Level 2 quality or better. b2. The separation distance between beds must be a minimum of six (6) feet, sidewall to sidewall. each sid ser-lion bed. C8. Serial and sequential distribution. al . A serial or sequential distribution system may be used where the ground slope does not allow for suitable installation of a single level soil treatment area, unless a distribution box or dosing chamber is used. §2. The horizontal distance from the side of the absorption system to the surface of the ground on a slope must be adequate to prevent lateral flow and surfacing. c3. Adjacent trenches or beds must be connected with a stepdown/relief line or a drop box arrangement such that each trench fills with effluent to the top of the gravel or chamber outlet before flowing to succeeding treatment areas. Delete C. Storage/distribution media. _'I----Ro€l and pipe. a. _ y, which may inch to two and one-half 47 2017-4243 ORD2017-10 permeabl-e -ge,otex4ile mee--4- ,g--a--r , : Am square- ar of -quivaleRt pervious m used. 2. Ire chips. a. _ c. across. The--tp of the e chips meeting a ma -'74 equivalent pe rvi t u s mats i-ai Ch —ambers. a h . . Id _ s4a4aa �. Efflu Manufactured media. use a. M -a -n-, b. Pressure distribution. n-- -t o -co -r -e- h es above-- e4o-p-o -he l a. round the pipe The top of the p4ac--rgraves or such mate 4A ! d must be cove -red -with nonwoven, oness rating-0f-t,e o'nees per covering nn usn-o-t- la must be 9! e may - -e r o p; one -h -al -f r+. ape de geotextile io (2.0) 01.140/1/4; ous covering must not b- used. lye surface. ] a aaGturer's instr uction- — M- .o -r -pressure dosing. on the in ce. ecording to rnanufacturer's i ac- ion Design of pressure disc stems -must include 1-) ®°se size aid -frequency for fl. 6. p nes. cing; and naked-at-theendofeachI a. The iofilfra -v-e u a a for the sit Driplines must -be ins4 c. Drainback must be provt P s i -n s MU -St -be e -a- - o -m i-ntr iz -ref valves and- -n- ,- -I- s FP cia Io-�-�-per rate; re ne. be ca- !-afed u -n seirvat-ive value if r e. Provisions must be m -d r e rate ndecei by the m -an 4-act-u-rer. d --on en- - u �s-s° - ai-ng re co m e 48 2017-4243 ORD2017-10 Delete Sec. 30-10-50. - Alternating and sequencing zone systems. AD. Alternating systems. 1. An alternating system must have two (2) or more zones that must be alternated on an annual or more frequent basis. 2. For repairs, eachEach section must be a minimum of fifty percent (50%) of the total required soil treatment area. -SL f -effluent application or t ^� �s�r-b ton media ha not--.,. allowed. For new installations, each separate soil treatment area must meet the minimum sizing requirements of this regulation. 3. A diversion valve or other approved diversion mechanism that requires the owner or operator to manually alternate zones of the OWTS may be installed on the septic tank effluent line allowing soil treatment area sections to be alternated. 4. The diversion mechanism must be readily accessible from the finished grade. BE. Sequencing zone systems. 1. Sequencing zone systems have M than two (2) or more soil treatment area sections that are dosed on a frequent rotating basis. 2. Where soil conditions are similar between the sections, each section area mustshall be the same size. If soil conditions are such that long-term acceptance rates are different, each section may be sized for the same dose, but different long-term acceptance rates. 3. and 4. — No change. F. Inspection Ports. 1. A 4 -inch inspection port accessible from ground surface must be installed at the terminal end of each lateral in a trench system and at each corner of a bed system. The bottom of the inspection port tube must extend to the infiltrative surface and not be connected to the end of the distribution pipe. 2. Inspection ports in chambers may be installed according to manufacturer's instructions if the infiltrative surface is visible and effluent levels can be observed from the inspection port. 3. Additional inspection ports connected to distribution pipes may be installed. 4. The top of the inspection ports may be terminated below the final grade if each is housed in a component such as a valve box for a lawn irrigation system and has a removable cover at the ground surface. Am And S c. 30-10-60. Storage/Distribution Media A. Rock and Pipe. 1. The perforated pipe must be surrounded by clean, graded gravel, rock, or other material of equal efficiency which may range in size from 1/2 inch to 2 1/2 inches. AASHTO M 43 size No. 3 coarse aggregate meets this specification. 2. At least six inches of gravel, rock or other material must be placed below the pipe. The gravel, rock or other material must fill around the pipe and be at least two inches above the top of the distribution pipe. 49 2017-4243 ORD2017-10 3. The top of the placed gravel or such material used must be covered with non -woven permeable geotextile meeting a maximum thickness rating of 2.0 ounces per square yard or equivalent pervious material. An impervious covering must not be used. B. Chambers. 1. Chambers must be installed with the base of the unit on in -situ soil or, if placed on acceptable media, the manufacturer's installation instructions must be followed so as to prevent chambers from settling into the media. 2. Installation must be according to manufacturer's instructions. 3. Effluent may be distributed by gravity, pump or siphon. 4. If the width of a proprietary manufactured distribution product is within 90 percent of the width of the excavation, it may be approved as being equivalent to the full width of the excavation, if information is provided that demonstrates distribution of the full width. Thus, the product must cover at least 90 percent of the excavated area in either a trench or bed configuration in order to receive sizing adjustments provided in Table 30-10-3. C. Media, Enhanced, or Other Manufactured 1. Manufactured media must be installed with the base on the in -situ soil or placed on acceptable media meeting the manufacturer's specifications for proprietary distribution products or combined treatment/distribution products. 2. Installation must be according to manufacturer's instructions. 3. Pressure distribution is required for TL2-TL3N effluent, unless otherwise noted in this regulation. D. Driplines. 1. The infiltrative surface area must be calculated using the long-term acceptance rate for the site or a more conservative value if recommended by the manufacturer. 2. Driplines must be installed on manufacturer's spacing recommendations. 3. Drainback must be provided for all driplines, pipes and pumps. 4. Provisions must be made to minimize freezing in the distribution pipes, driplines, relief valves, and control systems. 5. Provisions must be made for filtering, back -flushing, or other cleaning. E. Tire Chips. 1. The pipe may be surrounded with clean, uniformly -sized tire chips. 2. Tire chips must be nominally two inches in size and may range from 1/2 inch to a maximum of four inches in any one direction. 3. Wire strands must not protrude from the tire chips more than 0.75 inches. 4. Tire chips must be free from balls of wire and fine particles less than two mm across. 5. The top of the tire chips used must be covered with non -woven permeable geotextile meeting a maximum thickness rating of 2.0 ounces per square yard or equivalent pervious material. An impervious covering must not be used. 50 2017-4243 ORD2017-10 Dosing may be -used for soil treatment area distribution. The dose must be sized to -account for f h-e--dam-i ly flow and --the das4n-g--free e n cy. D-oe-ingsystem-s must b engineer. Amend Sec. 30-10-70. Lift stations. Lift stations intended solely for the purpose of delivering sewage to a septic tank, or septic tank effluent to a standard \ -gyred soil treatment area that is located such that it is not possible to provide gravity flow from the septic tank to the soil treatment area, are not required to be designed by a professional engineer. The systems installer shall submit to the Division a pump information form, provided by the Division, for documentation. Amend Sec. 30-10-80. Soil replacement. A. Soil replacer soil must meet the specifica of t ed soil must be cornpletely-s-ettled prior to kistallatiro nd filters must -be used. Pres used. The construction of a soil replacement system is permitted to bring the soil treatment area into compliance with the requirements of this regulation. 1. When a soil type "R" is removed, the following requirements must be met: a. All added soil must comply with the following specifications: 1) Added soil must meet the specifications of either "preferred" or "secondary" sand filter media, as specified in section 30-11-30 B.4. 2) The long-term applicable rates as specified in Table 30-10-1A must be used. No additional sizing adjustments are allowed. 3) The depth of the added media must comply with the requirements of Table 30-10- 1A. 7 p 4) A gradation of the sand media used must be provided. The gradation must be dated no more than one month prior to the installation date. However, a gradation of the actual material placed in the excavation is recommended. 5) All added soil must be completely settled prior to installation of components as specified and approved by the design engineer. 6) Pressure distribution must be used. 2. The removal and reinstallation of in -situ soil may only be allowed where the soils are determined to be a soil type "R-1" (Option 2). The design must comply with the requirements for this soil type noted in Table 30-10-1A (Soil Type R-1, Option 2). 3. When a sand media is added to soil treatment area or to an excavation where a soil type 1-5 (Table 30-10-1) is the underlying soil, the following requirements must be met: a. Added soil must meet the specifications of either "preferred" or "secondary" sand filter media, as specified in section 30-11-30 B.4. b. Unless the design follows the criteria for a sand filter or mound system design as required in section 30-11-30, the TL1 long-term acceptance rate for the receiving soil must be used. 2017-4243 ORD2017-10 51 c. A gradation of the sand media used must be provided. The gradation must be dated no more than one month prior to the installation date. However, a gradation of the actual material placed in the excavation is recommended. d. All added soil must be completely settled prior to installation of components. Amend Sec. 30-10-90. Repairs. A. When space is not available or if there are other site limitations that preclude other soil treatment area options for OWTS repairs, wide beds, deep beds and deep gravel trenches may be considered for repairs only. Other options are vaults (in accordance with Section 30- 12-40 of this Chapter) or higher level treatment systems. B. Repairs to failing systems must conform to setbacks identified in Table 30-7-1 when possible. When this is not possible using all available methods described above, the jurisdiction with authority may permit reductions to setbacks. At no point will a setback reduction be approved by the jurisdiction less than what the existing separation is to existing OWTS. In maximizing this setback distance, all methods available in section 30-10-90 A. must be utilized including but not limited to the use of Higher Level Treatment, wide beds, etc., where allowed. Any setback reduction beyond what the existing failing system presents must be approved by the local board of health as outlined in section 30-4-140. BC. Wide beds. For repairs, beds may be wider than twelve (12) feet without being required to receive effluent meeting Treatment Level 2 quality or better. D. Deep Beds: For repairs, the infiltrative surface of a bed may be no deeper than five feet. Size adjustments as provided for in Tables 30-10-2 and 30-10-3 must not be applied. System sizing will be based strictly on the soil type and corresponding LTAR. GE. Deep gravel trenches. 1. The length of an absorption trench or bed may be calculated by allowance for the sidewall area of additional depth of gravel in excess of six (6) inches below the bottom of the distribution pipe, according to the following formula: Adjusted length = L x (W+2) (W+1+2D) Where: L = Length of trench prior to adjustment for deep gravel W = Width of trench or bed in feet D = Additional depth in feet of gravel in excess of the minimum required 6 inches of gravel below the distribution pipe 2. Maximum allowable additional depth is five (5) feet. 3. Percolation tests and soil profile hole or soil profile test pit excavations test pit evauations must be performed at the proposed infiltrative surface depth. Soil profile borings w 4. use -of - -m rsSize adjustments as provided for in Table 30-10-2 and 30-10-3 must not be applied to deep gravel trenchessystems. F. Wastewater Ponds. 52 2017-4243 ORD2017-10 1. Construction of new wastewater ponds is prohibited. 2. For repairs of an existing wastewater pond, the potential for risk to public health and water quality may be evaluated by the local public health agency. If risk is low in the determination of the local public health agency, the repair of a wastewater pond may be permitted, however the following criteria must be followed: a. A septic tank must precede the wastewater pond. b. The depth of the design volume of the wastewater pond must be at least five fee₹. c. A wastewater pond must have two feet of free board above the design volume of the pond. d. A wastewater pond must be fenced to keep out livestock, pets, vermin, and unauthorized people. e. Wastewater ponds must be designed on the basis of monthly water balance including desicn flow, preci citation, evaporation, and see cage. f. Wastewater ponds must be constructed so the seepage out of the bottom or sides does not exceed 1/32 of an inch per day. If this limit cannot be achieved using compacted natural soil materials including soil additives, an impermeable synthetic membrane liner must be used. g. If the evapotranspiration does not exceed the rate of inflow of effluent from the structure, a soil treatment area meeting the requirements of this regulation must be installed to accept the excess flow. h. Maintenance must include preventing aquatic and wetland plants from growing in or on the edge of the pond, protecting sides from erosion, and mowing grasses on the berm and around the pond. i. Wastewater ponds must be designed by a professional engineer. PG. Vaults. The allowable use of vaults for repairs must meet the criteria specified in Section 30-12-420 of this Chapter. EH. Higher level treatment options. 1. Design criteria for higher level treatment systems are in Article XI below. ARTICLE XI a Design Criteria - Higher Level Trey tmnt Systems Sec. 3'y 41-20. Treatment ley 4110; 4i Ism The treatment levels identified in Table 30-6-3 are specified in this Section for public domain technology, and proprietary systems wills a - be assigned to a treatment level approved by the Water Quality Control Division. Adequate maintenance and operation plan as required by the Water Quality Control Division must be submitted to the Division. 53 2017-4243 ®RD2017-10 end sec. 30-1140. Sand filters. A. S-a-nd = r , h- A lined or unlined intermittent sand filter or recirculating sand filter, may be used as a prehigher level -treatment system- 3R -:o h effi--n d and c : -e-d-to a prior to dispersing the effluent into a soil treatment area or te-eand-i-tions require imp or a mounded -system. B. Intermittent (single -pass) sand filters; General Requirements. Delete 1. General. a. The fad erin SS ► use FSd o ' r g fo u -r -y be -ten -g-,-2.5 and 0.60 -mm. The uniformity coeff - -n—t-m-u-st0-or 4 e -s&4 Jane filter, a soil rop-;-asemen-t j have- n- ffe fl-n-pcent (1%) 200 mesh sieve may be used. b. The sapid below- h -imust-beat l ---a s m . distribution system for equal distribution. Pipes used to dIspe fi or mK . e by a p essi s uirounde of the gravel or Sr inch screen and mu-st e retained on a %-inch screen 3) Ma n -t --may i-a-e ) The sep- tlista-a�nce between parallel di-st (6) feet and -a distribution l -in sidewals. in t ravel or stone. 4'- aez- -comae 2 t- -ot-e-x-ce e ch filter 1 The treatment level for intermittent sand filters is considered TL3. 2. General Design Parameters: Not all combinations of the variables noted below will result in a proper distribution system design. The design engineer must justify through calculations or design software that the selected values will concur with industry standards. a. Distribution pipe size: 314 inch - 1.5 inches (PVC Class 200, min.) (1) 2 inch distribution pipe may only be used where other design modifications cannot overcome a greater than 10% variation in the pressure head between the initial and distal orifices. (2) Distribution pipe spacing: 18 inches — 48 inches (3) Orifice size: 1/8 inches — 3/8 inches (Also see section 30-11-30 E.1. belowl (4) Orifice spacing: 18 inches — 48 inches (5) ; operating head at the distal end of distribution pipes: 30 inches — 72 inches (60 inches typ.). Larger orifices allow for an operating head at the lower end of this range, while smaller orifices will necessitate an operating head at the higher end of this range. 3. Dosing: 54 2017-4243 ORD2017-10 a. Pressure distribution is required. The design of the distribution system must also comply with the requirements of 30-10-40 0.1. b. Number of cycles/day: Will vary with design (Short, frequent doses are preferred.) c. Proposed dose volume: Will vary with design (0.25 — 1.0) gallons/orifice/dose, or 3-5 times distribution pipe volume d. Timed dosing is recommended where design considerations allow. 4. Sand Filter Treatment Media a. The depth of the sand media below the distribution system must be at least 24 inches unless otherwise noted in Table 30-10-1A for type "R" soils. b. "Preferred" sand media requirements: (1) Effective size: 0.25-0.60 mm (2) Uniformity coefficient: ≤ 4.0 (3) Percent fines passing #200 sieve: ≤ 3.0 c. "Secondary" sand media requirements: (1) Effective size: 0.15-0.60 mm (2) Uniformity coefficient: ≤7.0 (3) Percent fines passing #200 sieve: ≤ 3.0 d. A gradation of the sand media used must be provided. The gradation must be dated no more than one month prior to the installation date. However, a gradation of the actual material placed in the excavation is recommended. 5. Gravel Requirements a. Clean, graded gravel, or rock, must range in size from 1/2 inch to 2 1/2 inches. AASHTO M 43 size No.3 coarse aggregate meets this specification. (1) Tne gravel must surround the distribution pipes used to disperse the effluent and must be at least 6 inches below and 2 inches above the pipes. (2) Water Quality Control Division accepted manufactured media may be used as an alternative to specified gravel. 6. Alter Fabric Requirements a. The top layer of gravel must be covered with a non -woven permeable geotextile fabric meeting a maximum thickness rating of 2.0 ounces per square yard or equivalent pervious material. 7. Final Cover Material a. 8 inches — 10 inches of Type 1 or 2 soil with an additional 2 inches top soil 8. Size adjustment factors provided in Tables 30-10-2 and 30-10-3 are not applicable for sand filters. 9. Sand filters must not be used to treat wastewater that does not conform to TL1 treatment level or better. Delete d. Application rates. 55 2017-4243 ORD2017-10 2 -must be used. 2) An intermi..en. sane used to treat wastewater that does--n-ot conform to TL1 treatment level or better. Delete 2. Lined sand filters. ides and bottom of the filter. ivalent. must be surrounded by washed coarse screen gravel or crushed stone. All of the rav i_-erstone mi st ► ass '��/ inch screen ^nom be r eta - -Red on a 3/4 -inch screen. Tel or stone. Under -drain effluent -collected b, teatment area. C3._Unlined (open bottom) sand filters. a1. water L io taisd the soil.All requirements for 30-11-30 B. 1-9 will apply to unlined sand filters. 2. Application rates: a. Maximum hydraulic loading rate for TL1 effluent applied to "Preferred Sand Media" in an unlined sand filter is 1.0 gal./sq.ft./day, or the long-term acceptance rate of the receiving soil for TL1 (Table 10-1) whichever results in the larger area. b. Maximum hydraulic loading rate for TL1 effluent applied to "Secondary Sand Media" in an unlined sand filter is 0.8 gal./sq.ft./day, or the long-term acceptance rate of the receiving soil for TL1 (Table 10-1) whichever results in the larger area. c. Maximum hydraulic loading rate for TL2, TL2N, TL3, or TL3N effluent applied to "Preferred" or "Secondary" Sand Media in an unlined sand filter must be the long- term acceptance rate of the receiving soil for TL1, (Table 10-1). . 1. d (1 yabeve-ar the LIAR of the receiving soil, whichever is greater.The upper infiltrative surface of an unlined sand filter receiving TL1 — TL3N effluent must be at least three (3) feet above a limiting layer. D. Lined Sand Filters 1. All requirements of 30-11-30 B.1-9 will apply to unlined sand filters. 2. Application rates: a. Hydraulic loading rate for TL1 effluent applied to "Preferred Sand Media" in a lined sand filter is 1.0 gal./sq.ft./day. b. Hydraulic loading rate for TL1 effluent applied to "Secondary Sand Media" in a lined sand filter is 0.8 gal./sq.ft./day. 56 2017-4243 ORD2017-10 3. The minimum depth of the sand media in a lined sand filter must be two feet. 4. An intermediate layer of pea gravel, two inches in thickness, must be placed between the sand filter media and the coarse under -drain media to prevent the migration of sand into the lower layer of under -drain gravel. ASTM C 33, No. 8, coarse aggregate meets this specification. 5. A minimum four -inch diameter slotted SCH40 PVC under -drain pipe must be used to collect the treated effluent. The under -drain pipe must be installed in the center of a 5 inches thick bed of washed, graded gravel, or rock ranging in size from 1/2 inch to 2 1/2 inches. AASHTO M 43, No.3 coarse aggregate meets this specification. Lined sand filters must have an impervious liner on the sides and bottom of the filter. The liner must consist of a minimum 30 mil thick PVC material or equivalent. 6. Effluent collected by the under -drain must be dispersed to a soil treatment area. The soil treatment area may be sized with a maximum long-term acceptance rate of the receiving soil for TL1 effluent. Delete 4. Mounded sand filters (mound systems). filter. ... b. l -o -u -Rd sand filters. end surface, the sys media receiving wastewater effluent -is c. The basal area and l+nsar loading rate must be determine the soil type under the mounc and th d. The final slope one (1) foot vertical. e. Th Delete C. Recirculating sand filters. _1. 1\--reciroul-a-ting sand filter must have an im f al-te=. ah screen and mu as a effective size (D10) must range-fr (D -6-01O10) must be less than 4.0. F one percent (1%). 3. Sal be a minimum 4 Typeal-lead -r- t-ee-fe-5-� 2-. Rate must -n- 5. Design recirculation rations may be 3:1 to 5:1. 6. Effluent collected from the sand i4t4- s di D. Recirculating Sand Filter, Minimum Requirements: men bottom) ntal to e tie cover. ewes and bottom of the The under -drain pipe inch screen. rter media 4 -the uniformity coefficient 57 2017-4243 ORD2017-10 1. Treatment level: a. Treatment level provided within recirculating sand filters is TL3. 1) General Design Parameters: Not all combinations of the variables noted below will result in a proper distribution system design. Engineer must ustify through calculations or design software that the selected values will concur with industry standards. b. Distribution pipe size: 3/4 inch — 2 inches (PVC Class 200, min.) c. Distribution pipe spacing: 18 inches — 36 inches (24 inches typ.) d. Orifice size: 1/8 inch — 1/4 inch a Orifice spacing: 18 inches — 36 inches (24 inches typ.) f. Pressure head at end of distribution pipe: 24 inches — 72 inches (60 inches typ.) 2. Dosing: a. Timed dosed, pressure distribution is required. The design of the distribution system must comply with the requirements of section 30-10-40 C.1. b. Recirculation ratio: 3:1 - 5:1 c. Gallons/orifice/dose: 1 — 3 (2.0 typ.) d. Hydraulic loading: 3 - 5 gal./sq.ft./day (4 — 5 typ.) e. Dosing time "ON"; <2.5 min. (<2.0 typ.) f. Number of cycles/day: 18 — 120 3. Top gravel requirements: a. Washed, graded gravel, or rock, must range in size from 1/2 inch to 2 1/2 inches. AASHTO M 43, No.3 coarse aggregate meets this specification. b. The gravel must surround the distribution pipes used to disperse the effluent and must be at least 6 inches below and 2 inches above the pipes. c. State accepted manufactured media may be used as an alternative to specified gravel. d. Soil cover is prohibited. The upper gravel layer must be open to the atmosphere. 4. Filter media requirements: a. Effective size: 1.5 — 2.5 m b. Uniformity coefficient: ≤ 3 58 2017-4243 ORD2017-10 c. Fines passing #200 sieve: ≤ 1.0 d. Media depth (min.): ≥24 inches 5. Intermediate gravel layer: a. An intermediate layer of pea gravel, two inches in thickness, must be placed between the coarse under -drain media and the sand filter media to prevent the migration of sand into the lower layer of under -drain gravel (ASTM C 33, No. 8, coarse aggregate). 6. Under -drain requirements: a. A minimum four -inch diameter slotted SCH40 PVC under -drain pipe must be used to collect the treated effluent. The under -drain pipe must be installed in the center of a 5 inches thick bed of washed, graded gravel, or rock ranging in size from 1/2 inch to 2 1/2 inches. AASHTO M 43, No.3 coarse aggregate meets this specification. 7. PVC liner requirements: a. Lined sand filters must have an impervious liner on the sides and bottom of the filter. The liner must consist of a 30 mil thickness PVC material or equivalent. b. Effluent collected from the recirculating sand filter must be discharged to a soil treatment area. The soil treatment area may be sized with a maximum long-term acceptance rate of the receiving soil for TL1 effluent. Add Sec. 30-11-40. Mound Systems. A. When the infiltrative surface area of the media receiving wastewater effluent is at or above the natural ground surface at any point, it shall be considered a mound system. Mound systems that provide a minimum of 24 inches of sand treatment media may use the application rates for the in -situ receiving soil for TLI effluent (Table 10-1). Size adustment factors within Table 30-10-3 may be applied if TL1 application rates are used. C. Mound systems must conform to the design requirements of sections 30-11-30 C.1-5 for unlined (open bottom) sand filters, with the following exceptions. 1. A mound system may include less than 24 inches of imported sand media on a site where a lesser depth of sand media is sufficient to meet vertical separation requirements above a limiting layer. Application rates for the in -situ receiving soil for TL1 effluent must be used when less than 24 inches of sand media is used, unless higher level treatment is provided prior to dispersal into the mound system. 2. For the design of a mound system where less than 24 inches of sand media is proposed, and application rates for TL1 are used, the size adjustment factors within Table 30-10-3 may be used. D. The basal area must be determined using the LTAR from Table 30-10-1 for the in -situ 59 2017-4243 ORD2017-10 receiving soil under the mound. E. Linear loading rates must be determined. The evaluation of many factors is required for an accurate determination of the linear loading rate. While application rates for the in -situ receiving soil under the mound is a main component, placement on the slope, and percent of the slope must also be addressed when defining the linear loading rate. If the movement of the effluent is primarily vertical, then the linear loading rate is not as critical. However, if the movement of the effluent will be primarily horizontal, as would be expected in soil types 3A through 5 (Table 30-10-1), then the linear loading rate is extremely important and long narrow mounds are strongly recommended. 1. When 11.1 effluent is applied to the distribution media of a mound system installed above in -situ soil types 1 through 3 (Table 30-10-1) and R-0 through R-2 (Table 30-10-1A), the suggested linear loading rate is between 6 gpd/lin.ft. and 12 gpd/lin.ft. The maximum width of the distribution media in a mound system installed above these soil types is 12 feet when TL1 effluent is applied to the distribution media of a mound system. 2. When TL2 through 3N effluent is applied to the distribution media of a mound system installed above in -situ soil types 1 through 3 (Table 30-10-1) and R-0 through R-2 (Table 30-10-1A), the linear loading rate may exceed 12 gpd/lin.ft.; subsequently the mound may be wider than 12 feet. 3. When TL1 through TL3N effluent is applied to mound systems installed above in -situ soil types 3A through 5 (Table 30-10-1), the suggested linear loading rate is between 3 gpd/lin.ft. and 5 gpd/lin.ft. The maximum width of the distribution media in a mound system placed above these soil types is 12 feet. F. The final cover over a mound system must extend at least twelve inches horizontally beyond the perimeter of the distribution media prior to sloping down to existing grade. The final slope of the mound must be no greater than three feet horizontal to one foot vertical. O. The surface of the mounded area must be planted with a suitable vegetative cover. H. A suggested reference for the design and installation of mound systems is, "The Wisconsin Mound Soil Absorption System: Siting, Design, and Construction Manual, January 2000". Note that this is suggested guidance, and where the requirements of this regulation differ from those in the referenced mound document, the requirements of this regulation will govern in those cases. Amend Sec. 30-11-450. - Rock plant filter (constructed wetland) treatment before soil treatment area. Remainder of Section - No change. ARTICLE XII - Design Criteria - Other Facilities fete Sec. 30-12-10. - Wastewater remaining after separation of toilet wastes. 60 2017-4243 ORD2017-10 heastel, d GUo-n stand ohs -raster of wastes for-the-fi-��-es and the rsons to be serve -d. Amend Sec. 30-12-210. - Evapotranspiration and evapotranspiration/absorption systems. A. Non -Pressurized Drip Dispersal System (NDDS): 1. An NDDS is considered a type of evapotranspiration/absorption system. However as specific design criteria is provided for an NDDS, they are exempt from the additional requirements of section 30-12-10 B, C and D. 2. The Colorado Professionals in Onsite Wastewater Guidelines for the Design and Installation of Non -Pressurized Drip Dispersal Systems (NDDS), September, 2016 is the procedural guideline in the design of a NDDS and must be followed when an NDDS is proposed. 3. The width of an NDDS system may be wider than 12 feet. S. The following section provides general criteria which must be followed when an evapotranspiration or evapotranspiration/absorption bed is proposed. 1. The design may only be permitted in arid climates where the annual evaporation rate exceeds the annual precipitation rate by more than 20 percent, and where site characteristics dictate that conventional methods of effluent dispersal are not appropriate. 2 The design may only be designed to consider evaporation permitted in soil types 3A- 4, 4A and 5, absorption may also be considered.. 3. 4, The system a€p 6 i otra___S_ l_ '-'G m must be designed by a professional engineer. 4. If data for the Pan Evaporation Rate is provided, it must be multiplied by 0.70, or less, to obtain the equivalent Lake Evaporation Rate. 5. The width of the bed may be wider than 12 feet. 6. The required capillary or wicking sand must meet the gradation requirements in Table 12- 1 and be approved by the design engineer. This sand is to be covered by a crowned, thin layer of loamy -sand mix and appropriate vegetation that will assist in drawing the water to the surface. 7. Adjustment factors as provided in Tables 30-10-2 and 30-10-3 must not be used. Add Table 30=124 Gradadon icking Sand .: �: r Evapotranspiration Beds (Fine Sand) Sieve Size Percent Passing 4 100 40 50-70 61 2017-4243 ORD2017-10 200 <15 C. For systems designed strictly as an evapotranspiration bed, the following criteria must be met: B1 Design data to be furnished must include, but shall not be limited to: system dimensions;„ distribution system design; specifications of graveldistribution media and wicking sand if used, liner material if used, and bedding; properties of the soil under the system„ and provision for vegetative cover, and a water balance calculation including annual precipitation and storage requirements for periods of the year when evapotranspiration does not occur. G2. The following formula mustmay be used as a guide for determining the minimum area necessary for total evapotranspiration of septic tank effluent: Area (in square feet)* = Design flow (in gallons per day) x 586 Lake evaporation rate at the site (in inches per year) * Additional area may be required based on the annual water balance calculations. 3. Designs will include a rock and pipe, or other Water Quality Control Division approved proprietary distribution product, with the centerline of the distribution system 6 to 8 feet on center. A thin non -woven fabric may be placed above the distribution system. Capillary wicking of the effluent is accomplished by a uniform depth layer of the specified sand media (capillary wicks), no more than 24 inches deep, placed between and above the distribution media. The base of the evapotranspiration bed may be no more than 30 inches below finished grade. 4. Capillary wicks which penetrate between the distribution system to the bottom of the bed, must be at least 15 percent of the bed surface area. The wicks must be uniformly spaced throughout the system. balance for the syst flows for all periods in which evapa#ra-ns-pira#ion is �a .L ge daily h ich penetrate 'through rock media to the 0 0 1 - _. - - - -- .+ beds for wicks must meet -the gradation requirements in Table 30-12-1 and be approved by the design en ,oar. Table 30-12 Percent Passing n piratlon Est z u ' 62 2017-4243 ORD2017-10 4- 200 Ad I 100 5G -70 - <15 G. Adequate surfac dai J _ the y H. If the system is desig absorbed by th --arm a 15. Except for dwellings, if the system is designed for summer use only, the surface area may be multiplied by 0.6 to obtain the required area. to -eve e a equivalent to local net lake evaporation, including over the wart of e volume of effluent twelve (12) feet. D. For systems designed as an evapotranspiration/absorption bed, the following criteria must be met. 1 Data to be furnished must include, but is not limited to: system dimensions, distribution system design, specifications of wicking sand, properties of the soil under the evapotranspiration/absorption bed, provision for vegetation cover, and a water balance calculation including annual preci itation and storage requirements for periods of the year when evapotranspiration does not occur. 2. Design will include a rock and pipe, or other Water Quality Control Division approved proprietary distribution product, with the centerline of the distribution system 6 to 8 feet on center. A thin non -woven fabric may be placed above the distribution media. Capillary wicking of the effluent is accomplished by a uniform depth layer of the specified sand media (capillary wicks) no more than 24 inches deep placed between and above the distribution media. The infiltrative surface may be no more than 30 inches below finished grade. 3. Capillary wicks which penetrate between the distribution system to the bottom of the bed, must be at least 15 percent of the bed surface area. The wicks must be uniformly spaced throughout the bed. 4. Amount of storage and evapotranspiration capacities may be reduced by the volume of effluent absorbed by the underlying soil based on the long-term acceptance rate for that soil type and the formulas provided in section 30-12-10 D.5. below. 5. The following formula must be used for determining the minimum area necessary for evapotranspiration/absorption of septic tank effluent: (1) Area (sq. ft.)* = Flow (gpd) (LTAR + ETR) 63 2017-4243 ORD2017-10 a. LTAR refers to the long-term acceptance rate of the underlying soil as provided in Table 30-10-1 for TL1 effluent. b. ETR refers to the evapotranspiration rate derived from the following formula: ETR (gal./day sq. ft.) = Lake Evaporation Rate at the Site (in inches per year) 586 * Additional area may be required based on the annual water balance calculations. Delete Sec. 30-12-30. - Wastewater ponds. A. _ re -family homes -is prohibited. U pond. E. A wastewater pond must be fenced to ke people. ds must be d - sig ned c flow, orecipita e-g-e-eff- e pond, proter+ the pond. d ly water balance, i-ncluding design om growing in or on the secti Amend Sec. 30-12-420. Vaults other than vault privies. A. and B. — No change. C. A vault must have a minimum five -hundred -gallon effective volume or be capable of holding a minimum of the two day18 hour design wastewater flow, whichever is larger. D. thru F. — No change. Amend Sec. 30-12-30G. Vault priviesy. --A►. Effective volume of the vault privy must be no less than four hundred (400) gallons, and it must be constructed of concrete or plastic. The vaults for privies must meet the structural and watertightness standards of vaults. 2B. A vault privy must be built to include: fly- and rodent -tight construction, a superstructure affording complete privacy, an earth mound around the top of the vault and below floor level that slopes downward away from the superstructure base, a floor and a riser of concrete or other impervious materials with hinged seats and covers of easily cleanable, impervious material. All venting must be fly -proofed with No. 16 or tighter mesh screening. 64 2017-4243 ORD2017-10 3C. A signal device is not required for a vault privy. HD. A permit fee, as set by the Board of County Commissioners, shall be required of applicants for any system that requires only a vault or holding tank. An application for an OVVTS permit must be completed by the owner and a final inspection must be made by the Division with proper notice as specified in Section 30-4-70 of this Chapter. Amend Sec. 30-12- m Incinerating, composting and chemical toilets. A. The use of an incinerating, composting or chemical toilet will not reduce the required size of the OVVTS as noted in Section 30-8-10. S. 0r4y- Incinerating and composting toiletsFeJi- reviewca-nd ace he Water -u-a' Division -may be permitted. Incinerating and composting toilets shall bear the seal of approval of the NSF or an equivalent test and certification program. C.P., Permitting of an incinerating or composting toilet may also be subject to the jurisdiction of a local agency regulating plumbing or the Colorado Plumbing Board, whichever has jurisdiction over plumbing in the location. D.C An incinerating or composting toilet may be used for toilet waste where an OVVTS is installed for treating wastewater remaining after removal of toilet waste. Subject to Board of Public Health or other applicable regulations or codes (e.g., Colorado Plumbing Code if a local code does not exist), the compartment may be located within a dwelling or building, provided that the unit complies with the applicable requirements of this Regulation and provided that the installation will not result in conditions considered to be a health hazard as determined by the Division. Compartment and appurtenances related to the unit must include fly -tight and vector -proof construction and exterior ventilation. E.- Incinerating toilets. An approved incinerating toilet must be designed and installed in accordance with all applicable federal, state and local air pollution requirements and manufacturer's instructions. 1. Incinerating Toilets Acceptance Requirements a. Incinerating toilets must meet the requirements of the NSF Protocol P157 and bear the seal of approval of the NSF or an equivalent testing and certification program. b. Incinerating toilets must be operated according to manufacturer's specifications. F.& Composting toilets. 1. Composting toilets must meet the requirements of NSF/ANSI Standard 41 and bear the seal of approval of the NSF or an equivalent testing and certification program. 2. An approved composting toilet must treat deposits of feces, urine and readily decomposable household garbage that are not diluted with water or other fluids and are retained in a compartment in which aerobic composting will occur. 3.2. The effective volume of the receptacle must be sufficient to accommodate the number of persons served in the design of the unit installed. The effective volume of the unit must include sufficient area for the use of composting materials, which must not be toxic to the process or hazardous to persons and which must be used in sufficient quantity to assure proper decomposition. 65 2017-4243 ORD2017®10 i 4.3. Residue from the composting toilet must be removed when it is filled to seventy-five percent (75%) of capacity. Residue from the unit must be properly disposed of by methods recommended by the manufacturer and acceptable to the Division. Disposal methods must prevent contamination of water and not cause a public health nuisance. Disposal using solid waste practices is recommended. 5.4. If a system will be installed where low temperature may be a factor, design and installation must address the effects of the low temperature. 6.5. Composting toilets must be operated according to manufacturer's specifications. G.S Portable chemical toilets. 1. A portable chemical toilet may be used by permit from the Division. 2. Use of a portable chemical toilet in permanently occupied buildings is prohibited except during construction or under emergency circumstances as determined by the Division. Proper ventilation of a chemical toilet used inside must be required. Amend Sec. 30-12-60. Treatment systems other than those discharging through soil treatment area or sand filter system. A. — No change. B. Systems that discharge other than through a soil treatment area or a sand filter system must: 1. Be designed by a professional engineer; 2. Be reviewed by the Board of Public Health; and 3. Not pose a potential health hazard or private or public nuisance or undue risk of contamination. 4. Not allow drainage of effluent off of the property of origin. C. — No change. D. The following minimum performance criteria must be required for all permitted systems pursuant to this Section: 1. If effluent discharge is made into areas in which the possibility exists for occasional direct human contact with the effluent discharge, the effluent at the point of discharge must meet the minimum treatment criteria of TL3 effluent and specifically adhere to each of the following standards: a. The geometric mean of the fecal coliformE.coli density must not exceed fifteen twenty-five (125) per one hundred (100) milliliters when averaged over any five (5) consecutive samples, and no single sample result for fecal coliformE.coli can exceed one hundred twenty-sixtwo hundred (200126) per one hundred (100) milliliters. b. and c. — No change. 2. If the effluent discharge is made into an area so restricted as to protect against the likelihood of direct human contact with the discharged effluent, the effluent, at the point of discharge, must meet the treatment criteria of TL2 effluent and specifically adhere to each of the following standards: a. The geometric mean of the fecal coliformE.coli density must not exceed one hundred twenty-sixfive hundred- (5-0-0126) per one hundred (100) milliliters when 66 2017-4243 ORD2017-10 averaged over any five (5) consecutive samples and no single sample can exceed three hundred twenty-fivefive thousand- (5000325) fecal cc ifo- �mE.coli per one hundred (100) milliliters. b. and c. — No change. E. To determine compliance with the standards contained in this section, the required sampling frequency for fecal coliformmtcoli, CBOD 5 and total suspended solids levels must be performed at least once per month when the system is in operation and the results submitted to the Division for compliance with the permit requirements. F — No change. 67 2017-4243 ORD2017-10 Amend APPENDIX 30-B SOIL CLASSIFICATION SYSTEM (SOIL -SEPARATE SIZE LIMITS) SOURCE: USIPA NRCS Field Book (pages 2-45) e 3 a1$er - - t Was t agate ttme FINE EARTH ROCK FRAGMENTS150 380 600 mm channers i flagst stones ' boulders USDA Clay j Silt Sand Gravel Cob - tiles Stones Boulders fine co. fine co. v.fi. if med. co. fine medium coarse millimeters: U.S. Standard Sieve No. 0.0002 .002 (opening): mm .02 .05 .1 .25 300 140 60 .5 1 35 18 2 mm 5 20 76 250 mm 600 mm 10 4 (3/4") (30) (10') (25") International Clay Silt Sand Gravel Stones fine coarse millimeters: U.S. Standard Sieve No. .002 (opening): mm .02 .20 2 mm 20 mm 10 (3/4') Unified Silt or Clay Sand ( Gravel Cobbles Boulders fine medium co. fine coarse millimeters: U.S. Standard Sieve No. (opening): .074 200 .42 40 2 mm 4.8 19 76 300 mm 10 4 (3/4") (30) AASHTO Clay Silt ' Sand Gravel or Stones Broken Rock (angular), or Boulders (rounded) fine coarse fine med. co. millimeters: .005 U.S. Standard Sieve No. (opening): mm .074 200 .42 40 2 mm 9.5 25 75 mm 10 (3/8') (1, (3O) phi #: 12 10 9 8 7 6 5 4 3 2 1 0 -1 -2 -3 4 -5 -6 -7 -8 -9 -10 -12 Modified I i I c °bbfoSsiA I Wentworth clay b® i silt 1.4 sand pebbles L 1 boulders -� 1\40- millimeters: .00025 .002 .004 .008 .016 .031 .062 .125 .25 .5 1 2 4 8 16 32 64 128 256 U.S. Standard Sieve No.: 230 120 60 35 18 10 5 4092 mm 68 2017-4243 ORD 2017-10 BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is, directed to arrange for Municode to supplement the Weld County Code with the amendments contained herein, to coincide with chapters, articles, divisions, sections, and subsections as they currently exist within said Code; and to resolve any inconsistencies regarding capitalization, grammar, and numbering or placement of chapters, articles, divisions, sections, and subsections in said Code. BE IT FURTHER ORDAINED by the Board, if any section, subsection, paragraph, sentence, clause, or phrase of this Ordinance is for any reason held or decided to be unconstitutional, such decision shall not affect the validity of the remaining portions hereof. The Board of County Commissioners hereby declares that it would have enacted this Ordinance in each and every section, subsection, paragraph, sentence, clause, and phrase thereof irrespective of the fact that any one or more sections, subsections, paragraphs, sentences, clauses, or phrases might be declared to be unconstitutional or invalid. The above and foregoing Ordinance Number 2017-10 was, on motion duly made and seconded, adopted by the following vote on the 29th day of January, A.D., 2018. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: Julie A. Cozad, Chair Weld County Clerk to the Board Steve Moreno, Pro-Tem BY: Deputy Clerk to the Board Sean P. Conway APPROVED AS TO FORM: Mike Freeman County Attorney Barbara Kirkmeyer Date of signature: 69 2017-4243 ORD2017-10 Publication: First Reading: December 18, 2017 Publication: December 27, 2017, in the Greeley Tribune Second Reading: January 8, 2018 Publication: January 17, 2018, in the Greeley Tribune Final Reading: January 29, 2018 Publication: February 7, 2018, in the Greeley Tribune Effective: November 8, 2017 February 12, 2018 70 2017-4243 ORD2017-10 WELD COUNTY CODE ORDINANCE 2017-10 IN THE MATTER OF REPEALING AND REENACTING, WITH AMENDMENTS, CHAPTER 30 WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT ON -SITE WASTEWATER TREATMENT SYSTEM REGULATIONS, OF THE WELD COUNTY CODE Audio Part 2 — Beginning at ARTICLE XI — Design Criteria — Higher Level Treatment Systems Hello