HomeMy WebLinkAbout20173670.tiffDEPARTMENT OF PLANNING SERVICES
1555 N 17th AVE
GREELEY, CO 80631
PHONE: (970) 353-6100 EXT. 3540
FAX: (970) 3044498
September 21, 2017
NOTICE TO REFERRAL AGENCIES
CASE NUMBER: USR17-0040
There will be a Public Hearing before the Weld County Planning Commission on Tuesday, October 17, 2017
at 12:30pm. A subsequent hearing will be held on November 15, 2017 at 10:00 a.m. with the Board of County
Commissioners. Both hearings will be held in the Hearing Room, Weld County Administration Building,
1150 0 Street, Greeley, Colorado, 80631.
NAME: Green River DevCo, LP
FOR: A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -inch high
pressure natural gas pipeline connecting into the Green River DevCo, LP natural gas pipeline
(USR17-0034) in two segments, the north segment is approximately one (1.0) miles in length and the
south segment is approximately four and one-half (4.5) miles in length in the A (Agricultural) Zone
District
LEGAL DESCRIPTION: SOUTH SEGMENT: ORIGINATING IN SECTION 35, T2N, R64W HEADING WEST
INTO SECTION 34, HEADING NORTHWESTERLY INTO SECTION 27 THEN NORTH
INTO SECTION 22, T2N, R64W AND TERMINATING.
NORTH SEGMENT: ORIGINATING IN SECTION 11, T2N, R64W HEADING WEST
INTO SECTION 10 T2N, R64W AND► TERMINATING, ALL IN THE 6TH P.M., WELD
COUNTY, COLORADO
LOCATION: Two pipeline segments, generally located south of County Road 24; west of County Road 55; north of
County Road 14 and east of County Road 59
Submit by Email
Weld County Referral
August 17, 2017
The Weld County Department of Planning Services has received the following item for review:
Applicant: Green River DevCo, LP Case Number: USR17-0040
Please Reply By: September 14, 2017 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -inch
high pressure natural gas pipeline connecting into the Green River DevCo, LP natural gas pipeline
(USR17-0034) in two segments, the north segment is approximately one (1.0) miles in length and the
south segment is approximately four and one-half (4.5) miles in length in the A (Agricultural) Zone
District
Location: Two pipeline segments, generally located south of CR 24; west of CR 55; north of CR 14 and
east of CR 59
Parcel Number: Multiple Parcels
Legal: The Preferred Pipeline Route are split into two segments with the North Segment commencing in
the Northeast Quarter of Section 11, T2N, R64W heading in a westerly direction into Section 10, T2N,
R64W and terminating into the Green River DevCo LP (USR17-0034) natural gas pipeline. The South
Segment commences near the terminus of the Green River DevCo, LP natural gas pipeline
(USR17-0034) in Section 22, T2N, R64W heading south into Section 27, T2N, R64W heading
southeasterly into Section 34, T2N, R64W then heading easterly into Section 35, T2N, R64W and
terminating all in the 6th P.M., Weld County Colorado
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
We have reviewed the request and find no conflicts with our interests.
See attached letter.
BPascoe 08/17/2017
Signature Date
Agency
Zoning Compliance
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 353-6100 ext,3540 (970) 304-6498 fax
Submit by Email
Weld County Referral
August 17, 2017
The Weld County Department of Planning Services has received the following item for review:
Applicant: Green River DevCo, LP Case Number: USR17-0040
Please Reply By: September 14, 2017 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -inch
high pressure natural gas pipeline connecting into the Green River DevCo, LP natural gas pipeline
(USR17-0034) in two segments, the north segment is approximately one (1.0) miles in length and the
south segment is approximately four and one-half (4.5) miles in length in the A (Agricultural) Zone
District
Location: Two pipeline segments, generally located south of CR 24; west of CR 55; north of CR 14 and
east of CR 59
Parcel Number: Multiple Parcels
Legal: The Preferred Pipeline Route are split into two segments with the North Segment commencing in
the Northeast Quarter of Section 11, T2N, R64W heading in a westerly direction into Section 10, T2N,
R64W and terminating into the Green River DevCo LP (USR17-0034) natural gas pipeline. The South
Segment commences near the terminus of the Green River DevCo, LP natural gas pipeline
(USR17-0034) in Section 22, T2N, R64W heading south into Section 27, T2N, R64W heading
southeasterly into Section 34, T2N, R64W then heading easterly into Section 35, T2N, R64W and
terminating all in the 6th P.M., Weld County Colorado
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
We have reviewed the request and find no conflicts with our interests.
See attached letter.
Capt Alan Caldwell 082517
Signature Date
Agency
WCSO
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 353-6100 ext,3540 (970) 304-6498 fax
Submit by Email
Weld County Referral
August 17, 2017
The Weld County Department of Planning Services has received the following item for review:
Applicant: Green River DevCo, LP Case Number: USR17-0040
Please Reply By: September 14, 2017 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -inch
high pressure natural gas pipeline connecting into the Green River DevCo, LP natural gas pipeline
(USR17-0034) in two segments, the north segment is approximately one (1.0) miles in length and the
south segment is approximately four and one-half (4.5) miles in length in the A (Agricultural) Zone
District
Location: Two pipeline segments, generally located south of CR 24; west of CR 55; north of CR 14 and
east of CR 59
Parcel Number: Multiple Parcels
Legal: The Preferred Pipeline Route are split into two segments with the North Segment commencing in
the Northeast Quarter of Section 11, T2N, R64W heading in a westerly direction into Section 10, T2N,
R64W and terminating into the Green River DevCo LP (USR17-0034) natural gas pipeline. The South
Segment commences near the terminus of the Green River DevCo, LP natural gas pipeline
(USR17-0034) in Section 22, T2N, R64W heading south into Section 27, T2N, R64W heading
southeasterly into Section 34, T2N, R64W then heading easterly into Section 35, T2N, R64W and
terminating all in the 6th P.M., Weld County Colorado
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
We have reviewed the request and find no conflicts with our interests.
See attached letter.
Thomas Beach, Fire Chief 8/17/2017
Signature Date
Agency
Southeast Weld Fire District
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 353-6100 ext,3540 (970) 304-6498 fax
** INBOUND NOTIFICATION ; FAX RECEIVED SUCCESSFULLY "y`
TIME RECEIVED
August 23, 2017 at 8;09;04 AM MDT 3037320599
REMOTE CSID
DURATION PAGES STATUS
37 1 Received
0812312017 07:37 Town0fKeenesburg
TA)l)3037320599
P.001/001
Weld County Referral
August 17, 2017
The Weld County Department of Planning Services has received the following item for review:
Applicant: Green River DevCo, LP Case Number: USR17-0040
Please Reply By: September 14, 2017 Planner: Kim Ogle
Project: A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -inch
high pressure natural gas pipeline connecting into the Green River DevCo, LP natural gas pipeline
(USR17-0034) in two segments, the north segment is approximately one (1.0) miles in length and the
south segment is approximately four and one-half (4.5) miles in length in the A (Agricultural) Zone
District
Location: Two pipeline segments, generally located south of CR 24; west of CR 55; north of CR 14 and
east of CR 59
Parcel Number: Multiple Parcels
Legal: The Preferred Pipeline Route are split into two segments with the North Segment commencing in
the Northeast Quarter of Section 11, T2N, R64W heading in a westerly direction into Section 10, T2N,
R64W and terminating into the Green River DevCo LP (USR17-0034) natural gas pipeline. The South
Segment commences near the terminus of the Green River DevCo, LP natural gas pipeline
(USR17-0034) in Section 22, T2N, R64W heading south into Section 27, T2N, R64W heading
southeasterly into Section 34, T2N, R64W then heading easterly into Section 35, T2N, R64W and
terminating all in the 6th P.M., Weld County Colorado
The application is submitted to you for review and recommendation_ Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding. the application, please „call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services,
E
We have reviewed the request and find that doe' does not comply with our Comprehensive
Plan because;
We have reviewed the request and find no conflicts with our interests.
See attar ed letter.
Signature
Agency
-T(Oth ® ieeliesbc1
Date
8�2�zai7
Wald County Planning Dapt. 1555 N 17th Ave, Greeley, CO. 80831 (970) 353-510D axt.3540 (970) 304-6498 fax