HomeMy WebLinkAbout20173405.tiffRESOLUTION RE: APPROVE PROJECT COMPLETION REPORT FOR WATTENBERG WATER SYSTEM IMPROVEMENTS PROJECT AND AUTHORIZE CHAIR TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Project Completion Report for the Wattenberg Water System Improvements Project from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, to the Colorado Department of Local Affairs, commencing upon full execution of signatures, with further terms and conditions being as stated in said report, and WHEREAS, after review, the Board deems it advisable to approve said report, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Project Completion Report for the Wattenberg Water System Improvements Project from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, to the Colorado Department of Local Affairs be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said report. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 2nd day of October, A.D., 2017. BOARD OF COUNTY COMMISSIONERS WELD CONTY, COLORADO ATTEST: ro �• '� Weld Cony Clerk to the Board BY: Deputy Civ}k to lhe Boar APRR-O County Attorney Date of signature: g e A. Cozad, Steve Moreno, Pro-Tem EXCUSED i��� i e Freeman i„ arbara Kirkmeyer cc : pc1(EN F1 (Dais.), AcT(ScIcD) 08/27/20 2017-3405 EG0074 EXHIBIT IX -C, Cont. WATTENBERG WATER SYSTEM IMPROVEMENTS PROJECT COMPLETION REPORT (Public Facilities and Economic Development Projects) GRANTEE NAME AND ADDRESS: Weld County Government 1150 O Street Greeley, CO 80632 CONTACT PERSON: Elizabeth Relford PHONE NUMBER: (970) 400-3748 EMAIL: erelford@weldgov.com PROJECT TITLE: Wattenberg Water System Improvements CONTRACT NUMBER: CDBG 15-504 A. PROJECT DESCRIPTION (as stated in Paragraph A in Scope of Services outlining Proposed Accomplishments): In 2015, Weld County received a Community Development Block Grant (CDBG) to replace the existing water storage tank with a larger tank and construct a new water treatment building in Wattenberg. Wattenberg is an unincorporated community in Weld County. There are approximately 71 households in the community which are all served by a well established in the 1970's. There are water pressure issues in the current system, so the grant was intended to improve the overall water system for the community. JVA Engineering was contracted to perform the design for the water system improvements, which was completed in August of 2016. Weld County Public Works received four bids on September 8, 2016 and awarded the low bid to Integrated Water Services, Inc and were issued a notice to proceed on September 21, 2016. There were many issues related to the design and as a result it required the county to work with the state on modifying the scope of work, budget, and schedule. The residents of Wattenberg were very involved in the project and extremely patient and helpful, while the improvements were being made. This project was completed within budget and the contract deadline. B) ACTUAL ACCOMPLISHMENTS: (Describe) Due to schedule, the majority of the project was constructed during the winter. Even with weather delays the contractor was able to complete the project within the contract deadline. It is a huge accomplishment to complete installation of a new water tank and construct a new water treatment building and relocated all the equipment from the old building to the new building during winter and spring weather. Weld County conducted a low -moderate income survey in order to receive the CDBG funding, and the HUD - provided tabulation sheet identified 69%.2 of the households. This project met the purpose and intent of the CDBG HUD requirements . C) REMAINING ACTIONS: Are there any remaining actions? If yes, please explain what remains to be done and supply the anticipated date of completion? Per this contract, there are no remaining actions needed for CDBG project 15-504. The Leona Avenue water line looping had to be removed from this scope of work due to a lack of funding. Going from a clog ' .,...P,i 2017-3405 Ix -c-1 DOLA revised 05/2013 water system would additionally help the community with their water pressure issues and this should be considered as a future project. D) NATIONAL OBJECTIVE SERVED: (Indicate the primary one — see contract if unsure) X Benefit to Low and Moderate Income Persons Prevention or Elimination of Slums or Blight; or Urgent Need. E) AUDIT(S) REQUIRED: (Include date and name of firm completing audit) F) TOTAL ACTUAL EXPENDITURES FOR THE ACTIVITY: (List CDBG actual expenditures for each activity and local expenditures, including sources and total. Refer to the proposed budget in the contract Scope of Services and compare. For new construction projects, the final cost certification can be submitted.) Activity #1 Architectural/Engineering Activity #2 Building Construction Activity #3 Construction/ Improvements Total CDBG $ $88,200 $250,400 $313,700 $652,300 Other $ Total $88,200 $250,400 $313,700 $652,300 G. RACE CATEGORIES TOTAL HISPANIC** White 15% Approx. 85% Asian Black or African American American Indian or Alaskan Native Native Hawaiian or Other Pacific Islander MUTIPLE RACE CATEGORIES American Indian or Alaska Native and White Asian and White Black or African American and White American Indian or Alaska Native and Black or African American Other Multi -Racial not listed Above TOTAL Physically Disabled * Female Head of Household * PERSONS BENEFITTING TOTAL PERSONS BENEFITTING Approximately 71 - This project served the entire subdivision. TOTAL LMI BENEFITTING Approximately 49 PROJECT BENEFICIARIES IX -C-2 DOLA revised 05/2013 % of LMI Persons Approximately 69% * Breakdown by Handicapped and Female Head of Household is required of all projects except those that serve all persons within a designated area. ** Hispanic or Latino is not a race, it is an ethnicity, and reporting families are either Hispanic or not Hispanic, therefore this category should count only those who have designated themselves Hispanic. REQUIRED OF ALL GRANTEES REGARDLESS OF TYPE OF PROJECT DO NOT PUT N/A H. ACTIONS TO AFFIRMATIVELY FURTHER FAIR HOUSING: Describe actions and results of actions to affirmatively further fair housing. PCR will not be accepted without this information. Attach separate sheet if more room is needed. Beyond posting the fair housing posters on the job site and at Weld County Public Works & Administration Building, we also provided fair housing materials at the neighborhood meetings conducted during the project. The purpose of these materials were to familiarize the citizens with the Weld County Housing Authority's program services. These materials include the "equal housing opportunity" slogan and where to get more Fair Housing Act information. In addition, to efforts made directly in this neighborhood, the Weld County Housing Authority conducts annual meetings (Weld Connects) to sponsor seminars to connect the minority community with fair housing information, including program goals and procedures for assistance. I. SECTION 3 REGULATIONS APPLY TO ALL PROJECTS Please attach Section 3 report (See Section V, Exhibit E) to PCR with information regarding: (If not sure, see contract scope of program.) 1) Any new hires from each "covered" subcontractor including name, address and telephone number of the subcontractor, number of new positions available by job class or description, number of applications filed by Section 3 residents by job class or description; gender, ethnicity and disability status of all new hires; 2) All of the new hires for any "covered" activity including the name and location of the project and all of the information listed above under 1. 3) In order to comply with the Section 3 Act and the Section 3 Regulations, the Developer, General Contractor or Subcontractor, as applicable, must implement an aggressive campaign to encourage participation of Section 3 Residents and Section 3 Business Concerns. Please describe the implementation strategies used. J. CITIZEN COMMENTS Date and location of post -award public hearing: (EXHIBIT IX -A) The post -award public hearing was conducted on October 2, 2017 at 9:00am. No public attended the hearing in person to comment on the project. No written citizen comments were received. Please include a summary of each written citizen comment received by the local governing body or the local CDBG administering unit from the date of the grant award to the date of this report should be attached to this report. The summary should include the grantee's assessment of the citizen comment and a description of any action taken in response to the comment. Copies of newspaper articles on the project should also be attached to this report. IX -C-3 DOLA revised 05/2013 K. CERTIFICATIONS AS CHIEF ELECTED OFFICIAL OF THE GRANTEE JURISDICTION, I CERTIFY THAT: • All project activities (including all related construction/rehabilitation activities), except required administration activities have been completed. • The results/objectives specified in the grant contract have been achieved; • All costs to be paid with CDBG funds have been incurred with the exception of any administrative costs related to project close-out (including audit costs) and any unsettled third party claims; • The information contained in this report is accurate to the best of my knowledge; • All records related to grant activities are available on request; and, • CDBG funds were not used to reduce the level of local financial support for housing and community development activities. f Signature of Chief Elected Offi Julie A. Cozad Typed Name/Title of Chief Elected Official OCT 0 2 2017 Date Weld County Name of Grantee 15-504 Project Monitor ;Inancial Management Contract Number ACCEPTANCE BY THE STATE OF COLORADO Date: Date: — BG Coordinator IX -C-4 Date: oZor7 34/7,6' DOIA revised 05/2013 NOTICE OF FINAL PAYMENT POST -AWARD HEARING Weld County will conduct a public hearing at 1150 O Street on October 2, 2017 at the Board of County Commissioners 9:00 a.m. meeting. The purpose of the hearing is to allow citizens to review and comment on the performance of the Weld County in carrying out the Wattenberg Water System Improvements, which was financed with federal Community Development Block Grant funds provided by the State of Colorado. Written comments are also welcome and must be received by September 29, 2017 , at 1150 O Street , Greeley, CO 80632; Attention: Elizabeth Relford. Information and records regarding the above described project are available at 1111 H Street, Greeley, CO 80632 during regular office hours. A public hearing to receive citizen views concerning the community's economic and community development needs will be held at 1150 O Street. Greeley, CO 80632 on October 2, 2017 at 9:00 a.m. For information concerning the public hearing contact Esther Gesick, Clerk to the Board, 1150 O Street, at (970) 400-4225. The public hearing is being conducted in a handicapped accessible location. Any handicapped person requiring an interpreter for the hearing impaired or the visually impaired should contact Esther Gesick, Clerk to the Board at (970) 400-4225, at least three (3) calendar days prior to the meeting and an interpreter will be provided. Any non-English speaking person wishing to attend the public hearing should contact Esther Gesick, Clerk to the Board, 1150 O Street, at (970) 400-4225 at least one (1) calendar days prior to the meeting and a language interpreter will be provided. To access a Telecommunication Device for Deaf Persons (TDD) please call (970) 400-4225. In compliance with the Americans with Disabilities Act, individuals needing special accommodations (including auxiliary communicative aids and services) during these hearings should notify Esther Gesick, Clerk to the Board at (970) 400-4225 at 1150 O Street. Greeley, CO 80632 at least three days prior to the hearing to be attended. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO DATED: September 22, 2017 PUBLISHED: September 27, 2017, in the Greeley Tribune IX -A-1 (Revised 07/11) Affidavit of Publication NOTE OF FINAL PAYMENT POST -AWARD HEARING Weld County will conduct a public hearing at 1150 O Street on October 2, 2017 at the Board of County Commissioners 9:00 a.m. meeting. The purpose of the hearing is to allow citizens to review and comment on the performance of the Weld County in carrying out the Wattenberg Water System Improvements, which was financed with federal Community Development Block Grant funds provided by the State of Colorado. Written comments are also welcome and must be received by September 29. 2017, at 1159 O Street . Greeley. O 80632; Attention: Elizabeth Relford. Information and records regarding the above described project are available at 1111 H Street, Greeley CO $0632 during regular office hours. A public hearing to receive citizen views concerning the commu- nity's economic and community development needs will be held at 1150 O Street. Greeley, CO 80632 on October 2. 2017 at 9:00 am. For information concerning the public hearing contact Esther Gesick, Clerk to the Board, 1150 O Street, at (970) 400-4225. The public hearing is being conducted in a handicapped acces- sible location. Any handicapped person requiring en interpreter for the hearing impaired or the visually Impaired should contact Esther Gesick. Clerk to the Bqard at (970) 400-4225, at least th e 3 calendar days prior to the meeting and an interpreter via t be provided. Any non-Engllsn speaking person wwishin to attend the public hearing should contact Esther_Gesick, Clerk to the Board. 1150 O Street,. at (970) 400-4225 at least one ( 1) cal- endar days prior to the meeting and a language interpreter wilt be provided. To access a Telecommunication Device for Deaf Persons (TOO) please call 970 400-4225. In compliance with the Americans with Disabilities Act, individuals needing special accommodations (including auxiliary communicative aids and services) during these hearings should notify Esther Gesick Clerk to, the Board at (970) 400-4225 at 1150 O Street, Greeley, CQ, 80632 at least three days prior to the hearing to be attend- ed. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO DATED: September 22, 2017 PUBLISHED: September 27. 2017, in the Greeley Triune The Tribune September 27. 2017 STATE OF COLORADO County of Weld, I Kelly Ash of said County of Weld, being duly sworn, say that I am an advertising clerk of THE GREELEY TRIBUNE, SS. that the same is a daily newspaper of general circulation and printed and published in the City of Greeley, in said county and state; that the notice or advertisement, of which the annexed is a true copy, has been published in said daily newspaper for consecutive (days): that the notice was published in the regular and entire issue of every number of said newspaper during the period and time of publication of said notice, and in the newspaper proper and not in a supplement thereof; that the first publication of said notice was contained in the Twenty -Seventh day of September A.D. 2017 and the last publication thereof: in the issue of said newspaper bearing the date of the Twenty -Seventh day of September A.D. 2017 that said The Greeley Tribune has been published continuously and uninterruptedly during the period of at least six months next prior to the first issue thereof contained said notice or advertisement above referred to; that said newspaper has been admitted to the United States mails as second-class matter under the provisions of the Act of March 3,1879, or any amendments thereof; and that said newspaper is a daily newspaper duly qualified for publishing legal notices and advertisements within the meaning of the laws of the State of Colorado. September 27, 2017 Total Charges: $16.08 27th day of September 2017 My Commission Expires 2/14/2019 JERILYN L. MARTINEZ NOTARY PUBLIC STATE OF COLORADO NOTARY ID 2OO74OO67O8 MY COMMISSION EXPIRES FEBRUARY 14, 2019 HEARING CERTIFICATION RE: HEARING TO ALLOW PUBLIC INPUT ON THE PERFORMANCE OF WELD COUNTY IN CARRYING OUT THE WATTENBERG WATER SYSTEM IMPROVEMENT PROJECT WHICH WAS FINANCED WITH FEDERAL COMMUNITY DEVELOPMENT BLOCK GRANT FUNDS A public hearing was conducted on October 2, 2417, at 9:00 a.m., with the following present: Commissioner Julie A. Cozad, Chair Commissioner Steve Moreno, Pro -Tern Commissioner Sean Conway - EXCUSED Commissioner Mike Freeman Commissioner Barb Kirkmeyer Also present: Acting Clerk to the Board, Stephanie Frederick County Attorney, Bruce Barker Controller, Barb Connolly The following business was transacted: El I hereby certify that pursuant to a notice dated September 22, 2017, and duly published September 27, 2017, in the Greeley Tribune, a public hearing was conducted to allow citizen input on the performance of Weld County in carrying out the Wattenberg Water System improvements Project which was financed with federal Community Development Block Grant (CDBG) funds. Bruce Barker, County Attorney, made this a matter of record. El No public testimony was offered concerning this matter. Mr. Barker indicated nb action is required by the Board. IR Commissioner Kirkmeyer recapped the details of Community Development Block Grant funds. There being no further discussion, the hearing was completed at 9:18 a.m. GG F'S/GtCTCOWIBC.) law c ER) twit./ I 1 2017-3406 EG0074 HEARING CERTIFICATION - PERFORMANCE OF WELD COUNTY - WATTENBERG WATER SYSTEM IMPROVEMENTS PROJECT PAGE 2 This Certification was approved on the 4th day of October, 2017. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLOf3QDO ATTEST: da p; vk Weld County Clerk to the Board BY: • f \f e Depu y Clerk to the Board ��- d l_2 Julie A Qzad, Chair Steve Moreno, Pro-Tem EXCUSED DATE OF APPROVAL 2017-3406 EG0074 EXHIBIT V -E SECTION 3 REPORTING FORM FOR APRIL 1, 2015 THROUGH MARCH 31, 2017 Recipient Name and Address: Weld County 15-504 Wattenberq Water System Improvements 1111 H Street, CO 80632 Contact Person: Elizabeth Relford Telephone number: 970-400-3748 Project #: 15-504 Total Project Cost (Include grant funds and all other funding sources): $652,300 Source of Grant Funds (Check whichever is applicable and include $ amount per funding source: CDBG X HOME $ 652.300 $ Part I: Employment & Traininq (**Include new hires in columns E& F, A. Job Category B. Number of New Hires C. Number of New Hires that are Sec. 3 Residents D. % o of Aggregate Number of Staff Hours of New Hires that are Sec 3 Residents E** "%6 of Total Staff Hours for Section 3 Employees and Trainees F.** Number of Section 3 Employees and Trainees Professionals 0 Technicians 0 Office/Clerical 0 Construction by Trade (List) 0 Earthwork 0 Concrete 0 Carpenter 0 Pipe Fitters 0 Electrician 0 Laborer 0 Other (List) Total 0 V -E-1 revised 04/2013 Part II. Contracts Awarded 1. Construction Contracts: A. Total dollar amount of all contracts awarded on the project: B. Total dollar amount of contracts awarded to Section 3 businesses: C. Percentage of the total dollar amount that was awarded to Section 3 businesses: D. Total number of Section 3 businesses receiving contracts: 2. Non -Construction Contracts: A. Total dollar amount of all non -construction contracts awarded on the project/activity: B. Total dollar amount of non -construction contracts awarded to Section 3 businesses: C. Percentage of the total dollar amount that was awarded to Section 3 businesses: D. Total number of Section 3 businesses receiving non -construction contracts: $652,300 SO 0'%« 0 $N./A. S N/A 0`%,j Part III. Summary Indicate the efforts made to direct the employment and other economic opportunities generated by HUD financial assistance for housing and community development programs, to the greatest extent feasible, toward low- and very low-income persons, particularly those who are recipients of government assistance for housing. (Check all that apply) Attempted to recruit low-income residents through: local advertising media, signs prominently displayed at the project site, contacts with community organizations and public or private agencies operating within the metropolitan area (or nonmetropolitan county) in which the Section 3 covered program or project is located, or similar methods. Participated in a HUD program or other program which promotes the training or employment of Section 3 residents, Participated in a HUD program or other program which promotes the award of contracts to business concerns which meet the definition of Section 3 business concerns. Coordinated with YouthBuild Programs administered in the metropolitan area in which the Section 3 covered project is located. Other, describe below: Part III: SUMMARY OF EFFORTS (Describe efforts taken to provide jobs and other economic opportunities to Section 3 residents and business concerns on Section 3 covered projects and activities. Include any impediments which you have encountered. (Check all that apply.) X Attempted to recruit low-income residents through local advertising media, signs prominently displayed at the project site, contacts with community organizations and public or private agencies operating within the metropolitan area or nonmetropolitan county in which the Section 3 covered project/program is located. Participated in a HUD program or other program which promotes the training or employment of Section 3 residents. Participated in a HUD program or other program which promotes the award of contracts to business concerns which met the definition of Section 3 business concerns. Coordinated with Youthbuild Programs administered in the metropolitan area in which the Section 3 covered project is located. Other: describe below. Integrated Water Services, Inc, is a locally owned business. They advertised the projects and tried to recruit local residents. V -E-2 DOLA revised 05/2413 Hello