Loading...
HomeMy WebLinkAbout771150.tiff • RESOLUTION RE : APPROVAL OF UPGRADING AND CONSTRUCTION OF CERTAIN PORTIONS OF COUNTY ROAD NO. 29 IN SOUTH WELD COUNTY, COLORADO. WHEREAS , the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS , during the past several weeks , it has been brought to the attention of the Board of County Commissioners of Weld County, Colorado, that there is an urgent need to provide a North/South road in the Ft. Lupton , Weld County, Colorado area, in order to lessen the amount of school bus traffic and other traffic crossing certain railroad tracts in South Weld County, Colorado, and WHEREAS, the Weld County Engineer was directed by the Board of County- Commissioners to study the feasibility of a North/South road in the Ft. Lupton area, and make recommendations to the Board, and WHEREAS , the Weld County Engineer has reported to the Board of County Commissioners that the proposal, as set forth hereafter, would involve 35 to 40 working days for preliminary field work, engineering design and field survey staking, provided , however , current scheduled items to be performed by the Weld County Engineering Department be set back while this project is being constructed, and WHEREAS, after considering the recommendations presented to the Board of County Commissioners by the Weld County Engineer, it has been determined that extensive work must be instigated to totally alleviate the problem in the Ft. Lupton area, the feeling being that the work to be performed could span three to five years if the project was found to be feasibile, and WHEREAS , it has been agreed by the Board of County Commis- sioners, that due to the urgency created by the danger to the public safety, it would he advisable and in the best interest of Weld County to upgrade one half mile of the existing County Road No. 29 , and initiate new construction on the South one half of County Road No. 29 between County Roads No. 16 and 18. 197-t , It5o • The County Engineer has indicated to the Board that the required 35 to 40 working days for preliminary field work, engineering design and field survey staking could start in approximately 15 working days , with the provision that current scheduled items to be performed by the Engineering Department be set back, and construction could then start, weather permitting, in January of 1978, with a construction time of 30 working days , not in- cluding structures , if needed. The County Engineer further stated that a preliminary route survey could be run in one week to determine the feasibility of the opening of the South one half mile of County Road No. 29 . NOW, THEREFORE , BE IT RESOLVED by the Board of County Com- missioners of Weld County, Colorado, that said Board approves the upgrading of one half mile of the existing County Road No. 29 as well as new construction on the South one half of County Road No. 29 between County Roads No. 16 and 18 in Weld County, Colorado, and directs the Weld County Engineer to begin the necessary pro- cedures and functions , in order to provide immediate relief to school buses traveling to and from Aristocrat Ranchettes , and further, to eliminate some danger to the traveling public in the area. BE IT FURTHER RESOLVED by the Board of County Commissioners of Weld County, Colorado, that said Board understands that, in order to perform said upgrading and construction, $25 , 000 to $30 , 000 will be taken out of the 1978 appropriation, and, in addition, the construction to be performed on County Road No. 49 in Weld County, Colorado, will be delayed for a period of 30 to 45 working days . The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 31st day of October, A.D. , 1977. ATTEST: BOARD OF COUNTY COMMISSIONERS WELD\ COUNTY, COLORADQ Weld County Clerk and Recorder and Clerk to the Board gy. s Deputy County Clerk , � APPROVED AS TO FORM: ( County Attorney -2- Date Presented: November 7, 1977 Hello