HomeMy WebLinkAbout20180746.tiffMEMORANDUM
TO: Kim Ogle, Planning Services
DATE: January 31, 2018
FROM: Evan Pinkham, Public Works
SUBJECT: USR17-0070 Discovery DJ
The Weld County Department of Public Works has reviewed this proposal. Staff comments made during
this phase of the application process may not be all-inclusive, as other issues may arise during the
remaining application process.
COMMENTS
GENERAL PROJECT INFORMATION/LOCATION
Project description: A Site Specific Development Plan and a Special Review Permit for Mineral Resource
Development, Oil and Gas Support and Service including oil and gas processing facilities ( Four (4) gas
compressors) and related equipment in the A (Agricultural) Zone District
This project is east of and adjacent to CR 29 and is north of and adjacent to CR 6.
Parcel number 147121000041.
Access is from CR 29.
ACCESS
This project accesses onto the Municipality of Fort Lupton. Please contact the Municipality for access
requirements.
Per Chapter 12, Appendix 12A.4.1 of the Weld County Code, an access approach that is gated shall be
designed so that the longest vehicle (including trailers) using the access can completely clear the traveled
way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled surface
be less than 35 feet.
For shared accesses, Public Works strongly recommends the property owner establish an access road
maintenance agreement so future owners of the properties will be aware of their requirements for shared
maintenance of the access road. This is not a requirement, but is recommended to avoid property owner
conflicts in the future.
ROADS AND RIGHTS -OF -WAY
County Road 6 is a gravel road and is designated on the Weld County Functional Classification Map (Code
Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way. The applicant shall delineate
on the site map or plat the future and existing right-of-way and the physical location of the road. If the right-
of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County
Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-
way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained
by Weld County.
This portion of County Road 29 is under the jurisdiction of the City or Town (municipality) of Fort Lupton.
The municipality has jurisdiction over access to the road. Please contact the municipality to verify the
access permit or for any additional requirements that may be needed to obtain or upgrade the permit.
Per Chapter 12, Article 4, Section 12-4-30.B, a Weld County Right -of -Way Use Permit is required for any
project that will be occupying, constructing or excavating facilities within, and/or encroaching upon, any
County rights -of -way or easement. Right -of -Way Use Permit instructions and application can be found at
https://www.weldgov comldepartmentslpublicworks/permits/.
Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate
existing utilities within the County right-of-way.
TRAFFIC
Latest ADT on CR 6 counted 283 vpd with 26% trucks.
The traffic information submitted with the application materials indicated that during construction, semi -
tractor trailers will be used to haul equipment and materials to the site, along with passenger cars/trucks for
site workers and construction management. Following construction of the facility, during normal operation,
only an operator will make a daily site visit. A service truck will access the site twice per week.
Drainage Requirements:
Please contact Department of Planning Services/Engineering Development Review for questions or
assistance for drainage requirements at 970-353-6100.
URBANIZING VS NON -URBANIZING DRAINAGE AREA:
This area IS within an Urbanizing Drainage Area:
Urbanizing Drainage Areas typically require detention of runoff from the 1 -hour, 100 -year, storm falling on
the developed site and release of the detained water at the historic runoff rate of the 1 -hour, 5 -year storm
falling on the undeveloped site for URBANIZING areas.
The applicant's engineer has submitted a preliminary drainage report. In that report, the engineer indicates
that the proposed detention facility will release at the 10 year, 1 -hour storm rate. This site is in the urbanizing
area and will be required to release at the 5 year, 1 -hour storm rate
Detention Pond summarized in a Drainage Report:
A drainage report and detention pond design shall be completed by a Colorado Licensed Professional
Engineer and adhere to the drainage related sections of the Weld County Code. The drainage report must
include a certification of compliance stamped and signed by the PE which can be found on the engineering
website. General drainage report checklist is available on the engineering website. More complete
checklists are available upon request.
Grading Permit
A Weld County Grading Permit will be required if disturbing more than 1 acre. Grading Permit applications
are accepted after the planning process is complete (plan recorded). An Early Release Request Form may
be entertained only after the applicant and Planning Department have reviewed the referral and surrounding
property owner comments. The Early Release Request may or may not be granted depending on referral
comments and surrounding property owner concerns. Contact an Engineering representative from the
Planning Department for more information.
A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact:
Colorado Department of Public Health and Environment, Water Quality Control Division, Rik Gay, 303-692-
3575.
Geologic Hazard Area:
This area IS NOT in a Geologic Hazard Area.
Floodplain:
This area IS NOT in a FEMA regulatory floodplain.
CONDITIONS OF APPROVAL
A. A Final Drainage Report and Certification of Compliance stamped and signed by a Professional
Engineer registered in the State of Colorado is required. (Department of Public Works)
B. The plan shall be amended to delineate the following:
1. County Road 6 is a gravel road and is designated on the Weld County Functional Classification
Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall
delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge
of right-of-way. This road is maintained by Weld County. (Department of Public Works)
2. Show the approved Municipality of Fort Lupton access(es) on the site plan and label with the
approved access permit number if applicable. (Department of Public Works)
3. The applicant shall show and label the accepted drainage features and drainage flow arrows. Water
quality features or stormwater ponds should be labeled as "Water Quality Feature/Stormwater
Detention, No -Build or Storage Area" and shall include the calculated volume. (Department of
Planning Services -Engineer)
4. Show and label the parking and traffic circulation flow arrows showing how the traffic moves around
the property. (Department of Public Works)
Prior to Construction:
A. If more than one (1) acre is to be disturbed, a Weld County Grading Permit will be required.
(Department of Public Works)
DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN)
1. The property owner shall control noxious weeds on the site. (Department of Public Works)
2. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire
an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works)
3. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Public
Works)
4. Weld County is not responsible for the maintenance of onsite drainage related features. (Department
of Public Works)
WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org
Memorandum
To: Kim Ogle
From: Ben Frissell, Environmental Health Services
Date: January 29, 2018
Re: USR17-0070 Discovery DJ Services Fort Lupton
Compressor Station
Environmental Health Services has reviewed this proposal for a Site Specific
Development Plan and a Special Review Permit for Mineral Resource Development, Oil
and Gas Support and Service including oil and gas processing facilities ( Four (4) gas
compressors) and related equipment in the A (Agricultural) Zone District
There will be no permanent employees on the site. Portable toilets and bottle water are
proposed once construction has been completed, which is acceptable. SPCC
requirements do not apply to the containment of Natural Gas. However, if a natural gas
operation contains or generates sufficient oil to meet the regulatory thresholds, then the
facility would be subject to SPCC requirements.
Environmental Health has no objections to the proposal; however, we recommend that
the following requirements be incorporated into the permit as development standards:
1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and
Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal
in a manner that protects against surface and groundwater contamination.
2. No permanent disposal of wastes shall be permitted at this site. This is not
meant to include those wastes specifically excluded from the definition of a solid
waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.
3. Waste materials shall be handled, stored, and disposed in a manner that controls
fugitive dust, blowing debris, and other potential nuisance conditions. The facility
shall operate in accordance with Chapter 14, Article 1 of the Weld County Code.
4. Fugitive dust should attempt to be confined on the property. Uses on the
property should comply with the Colorado Air Quality Commission's air quality
regulations.
Health Administration
Vital Records
lot: 9/0 304 6410
Fax: 9/0-301-64 I'2
Public Health &
Clinical Services
cic: 9/0 304 6420
Fax: 910-304-64 16
Environmental Health
Services
Tele:970-304-6415
Fux: 970-304-6411
Communication,
Education & Planning
Tele: 970-.304-6470
Fox: 970-304-6452
Emergency Preparedness
8 Response
Te le: 970-304-6470
Fax: 970-304-6462
Public Health
5. The applicant shall submit an Air Pollution Emission Notice (A.P.E.N.) and
Emissions Permit Application and obtain a permit from the Air Pollution Control
Division, Colorado Department of Public Health and Environment, as applicable.
6. Adequate drinking, handwashing and toilet facilities shall be provided for
employees and patrons of the facility, at all times. As employees or contractors
are on site for less than 2 consecutive hours a day portable toilets and bottled
water are acceptable. Records of maintenance and proper disposal for portable
toilets shall be retained on a quarterly basis and available for review by the Weld
County Department of Public Health and Environment. Portable toilets shall be
serviced by a cleaner licensed in Weld County and shall contain hand sanitizers.
7. All potentially hazardous chemicals must be handled in a safe manner in
accordance with product labeling. All chemicals must be stored secure, on an
impervious surface, and in accordance with manufacturer's recommendations.
8. Secondary containment shall be constructed around tanks to provide
containment for the largest single tank and sufficient freeboard to contain
precipitation. Secondary containment shall be sufficiently impervious to contain
any spilled or released material. Secondary containment devices shall be
inspected at regular intervals and maintained in good condition. All secondary
containment will comply with the Colorado Oil and Gas Conservation (COGCC)
Commission Rule 604 and/or the provisions of the State Underground and Above
Ground Storage Tank Regulations.
9. The facility shall be constructed and operated to ensure that contamination of soil
and groundwater does not occur.
10.Any contaminated soils on the facility shall be removed, treated or disposed of in
accordance with all applicable rules and regulations. All spills will be reported to
local, state and federal agencies in accordance with all state and federal
regulations.
11.The facility shall adhere to the maximum permissible noise levels allowed in the
Residential Zone as delineated in 25-12-103 C.R.S.
12. The applicant shall obtain a Colorado Discharge Permit System or CDPS permit
from the Colorado Department of Public Health and Environment (CDPHE),
Water Quality Control Division, as applicable.
13. The facility shall notify the County of any revocation and/or suspension of any
State issued permit.
14. The applicant shall notify the County upon receipt of any compliance advisory or
other notice of non-compliance of a State issues permit, and of the outcome or
disposition of any such compliance advisory or other notice of non-compliance.
15. The operation shall comply with all applicable rules and regulations of State and
Federal agencies and the Weld County Code.
Submit by Email
Weld County Referral
January 04, 2018
The Weld County Department of Planning Services has received the following item for review:
Applicant: George Sack, clo Discovery DJ Services, LLC Case Number: USR17-0070
Please Reply By: February 1, 2018 Planner: Kim Ogle
Project: A Site Specific Development Plan and a Special Review Permit for Mineral Resource
Development, Oil and Gas Support and Service including oil and gas processing facilities (Four (4) gas
compressors) and related equipment in the A (Agricultural) Zone District
Location: APPROXIMATELY 0.5 MILES NORTH OF CR 6 AND EAST OF AND ADJACENT TO CR 29
Parcel Number: 147121000041-R8740400 Legal: LOT A, RECX17-0205 BEING PART SW4
SECTION 21, T1 N, R66W of the 6th P.M., Weld County, Colorado.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
We have reviewed the request and find no conflicts with our interests.
See-attached--let#er.See Comments Below
s/Alyssa Knutson 2/5/2018
Signature Date
Agency
City of Fort Lupton
Due to County Road 29 being designated as a future arterial, we are requesting that a 120
foot Right of Way be taken into consideration. Area East of County Road 29 is also
designated as future residential development, so we are requesting a landscape buffering
plan be submitted for review. Lastly, we request a pre -annexation agreement also be
completed.
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 353-6100 ext.3540 (970) 304-6498 fax