HomeMy WebLinkAbout20180732.tiffINVENTORY OF ITEMS FOR CONSIDERATION
Applicant Green River DevCo /Noble Energy Case Number USR17-0077
Submitted or Prepared
Prior to At
Hearing Hearing
1
Memorandum,
dated
March
Amendment
6, 2018
to
Planning
Commission
Draft Resolution
2
ete (trn
i
/pi?)
I hereby certify that the items identified herein were submitted to the Department of Planning Services at
or prior to the schee. le' ' banning Commissioners hearing.
Kim Ogle ji Pla er
To:
From:
Subject:
Date:
MEMORANDUM
Weld County Planning Commissioners
Kim Ogle, Planning Services
Amendment to Planning Commission Draft Resolution
USRI
Green River DevCo LP
Noble Midstream Services LLC
March 6, 2018
The Department of Planning Services is requesting a modification to the Planning
Commissioners Draft Resolution dated March 6, 2018
Development Standards 9, 10, and 11 shall be modified to reflect the following language
During construction, all liquid and solid wastes (as defined in the Solid Wastes Disposal
Sites and Facilities Act, 30-20-100.5, . R. 5 .) shall be stored and removed for final disposal
in a manner that protects against surface and groundwater contamination. (Department of
Public Health and Environment)
During construction, no permanent disposal of wastes shall be permitted at this site. This is
not meant to include those wastes specifically excluded from the definition of a solid waste in
the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. (Department of
Public Health and Environment)
During construction, waste materials shall be handled, stored, and disposed in a manner
that controls fugitive dust, blowing debris, and other potential nuisance conditions. The
facility shall operate in accordance with Chapter 14, Article 'l of the Weld County Code.
(Department of Public Health and Environment)
SERVICE, TEAMWORK, INTEGRITY, QUALITY
EXHIBIT
COLT TO CROSSROADS PIPELINE
USR17-0077
GREEN RIVER a 4+rto
WOO County
Planning Commission Hearing
March 6r 201S
TETRA TECH
INTRODUCTIONS
Applicant
Green River DevCo LP (Noble Mldt►eom Partners)
Robed Smetana, project Manager
Consultants
Tetra Tech
Pam Nara, Project Manager/Planner
Ryan Kattrek, Planner
COLT TO CROSSROADS PIPELINE
'VICINITY MAP
t.J,.s
= • XI"4 ate. ,—
au. ant=
r
F
r
I
Ai III VA
as I
-i
ta
In 1
•
„co,
a,—. .
trifles -14
I
t
r
■
a
3/6/2018
1
3/6/2018
COLT TO CROSSROADS PIPELINE
PIPELINE ROUTE
'd
I
e
'I
r
Mr
-r
- } .a
'r ' I.
alma . v animvsrS,asAma-els
I
t
i•
a
I
4
4
t it
—
lieln SAIfai INIVILdbe Ma I
COLT TO CROSSROADS PIPELINE
1 irtgre
it
u � t
• 1 ,
.:1
F
3• —ArItrt
1 .1 'r�4•
• I ` r - 1 r n C
r1
4 II
i�f�.�s> i. •' ^tali tarps J6 If9iai
' • I i
a >,
is
1
lir ._, ,, 4 8•8444p
n+{1. w: y_e [.wall •
Lgtni
NT— le7 -+7V+
a7T7Y
POSE garlil
el
It- ?
I
• r �9
I
COLT TO CROSSROADS PIPELINE
ROW CROSSINGS
Id
I II
A
r
I
Y al
z4•
eit
r
• rz• rA.f ta+r -
a 4
= 14 4
Rr
"•t
.3
Rif balbFa■anM alya
2
3/6/2018
COLT TO CROSSROADS PIPELINE
EASEMENT AND DISTURBED AREA
--
ar
P e
Mr
• 30' to 150' permanent easement
• xi' to d0' meted area
• Dort will be c onfroll .
• Surface will be receded and reue stated. as needed.
A
N
N
N
p
GP
,A Fis
� r
VI
,..a:it,im.
WEIS
SIM
42.
COLT TO CROSSROADS PIPELINE
PIPELINE SAFETY
sot4
COLORADO
.e. ...• L .abi�1 ti11 III f sec It'd Ill
9
COLT TO CROSSROADS PIPELINTE
ENVIRONMENTAL AWARENESS
SWCA
Gimbal Swlopei In
CMS Plias P t
%isca.crainio
f it }i Rani Inmi
I, . CTMIN
AISNE PrteL INS
3
3/6/2018
COLT TO CROSSROADS PIPELINE
NEIGHBORHOOD OUTREACH
1 1 Itt
Itienete.
... ' 'ly Q: i .4 UJ1i��ldli'
•
M r4
_sus
is_.
T
•
Y
f R
-•.-mai
WELD COUNTY CRI 1 bRIA
• Complies with the Weld County Code
• Agree with the Condition of Approval
changes outlined by staff.
• Agree with all of the Development
Standards.
REQUEST
RECOMMENDATION OF APPROVAL
We request
your recommendation of
approval of LJ Rt7-0077 to the
Board of County Commissioners
because the project meets the
requirements of
the Weld County Code.
4
3/6/2018
THANK YOU
GREEN RIVER Orrery
Litno hie
nip sir € A
PARTNER a
Erb
TETRA TECH
S