Loading...
HomeMy WebLinkAbout20181638.tiffUSE BY SPECIAL REVIEW (USR) APPLICATION DEPARTMENT OF PLANNING SERVICES* 1555 N. 17TH AVENUE * GREELEY, CO 80631 www.weldgov.com * 970-353-6100 EXT 3540 * FAX 970-304-6498 FOR PLANNING DEPARTMENT USE: AMOUNT $ APPLICATION RECEIVED BY DATE RECEIVED: CASE # ASSIGNED: PLANNER ASSIGNED: Parcel Number*: 0 9 6 9 _ 2 7 _ 4. 0 0 _ 0 0 2 Address of site: Legal Description: E2SE4 Zone District: A Acreage: 620 (*A 12 digit number on Tax I.D. information, obtainable at www.weldgov.com). Section: 27 Township: 5 N Range: 61 W Floodplain: NOICGeological Hazard: YEN® Airport Overlay: YcJ® FEE OWNER(S) OF THE PROPERTY: Name: Company: Circle B Land Company LLC Phone #: 303-392-8170 Email: kwonstolen@billbarrettcorp.com Street Address: 1099 18th Street, Suite 2300 City/State/Zip Code: Name: Denver, CO 80220 Company: Phone #: Email: Street Address: City/State/Zip Code: Name: Company: Phone #: Street Address: City/State/Zip Code: Email: APPLICANT OR AUTHORIZED AGENT: (See below: Authorization must accompany ail applications signed by Authorized Agents) Name: Doug Dennison Company: Bill Barrett Corporation Phone #: 970-353-0407 x6015 Street Address: 33105 WCR 33 Email: ddennison@billbarrettcorp.com City/State/Zip Code: Greeley, CO 80631 PROPOSED USE: Construction and operation of a compressor station consisting of up to 4 natural-gas powered compressors and associated equipment I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. f a c ration is the fee owner, notarized evidence must be included indicating that the signatory has to legal authori i thrporation. a 42/7 - Date Signature: Owner or Authorized Agent Date Print Name Print Name Rev 4/2016 UNANIMOUS CONSENT OF MANAGERS OF CIRCLE B LAND COMPANY LLC The undersigned, being all the managers of Circle B Land Company LLC, a Colorado limited liability company (the "Company"), waive any and all requirements for calling, giving notice of, and holding a meeting of the managers of the Company and, in lieu of such meeting and pursuant to the Colorado Limited Liability Company Act, hereby consent to, vote in favor of, and adopt the following resolutions by unanimous written consent without a meeting effective as of March 9, 2017 (the "Effective Date"): RESOLVED, that each of the following persons is hereby appointed to the office or offices set forth below opposite such person's name, such person to serve until each such person's successor is chosen by the Managers or until such person's earlier death, resignation, retirement, disqualification or removal by the Managers from office: Name R. Scot Woodall Terry R. Barrett David R. Macosko Kenneth A. Wonstolen Duane J. Zavadil William M. Crawford Troy L. Schindler William K. Stenzel Michele Vion Choka Jerry D. Vigil Title Chief Executive Officer and President Senior Vice President—Geosciences Senior Vice President —Accounting Senior Vice President —General Counsel; and Secretary Senior Vice President—EH&S, Regulatory and Government Affairs Senior Vice President —Treasury & Finance; and Treasurer Senior Vice President —Operations Senior Vice President Corporate Development and Planning Vice President —Human Resources Vice President Information Technology FURTHER RESOLVED, that the officers of the Company be, and each of them individually hereby is, authorized and directed to take or cause to be taken all such further action and to sign, execute, acknowledge, certify, deliver, accept, record and file all such further instruments, in the name and on behalf of the Company as in their judgment shall be necessary, desirable, or advisable in order to carry out the intent, and to accomplish the purposes, of the foregoing resolutions. [Signature page follows.] This Unanimous Consent of Managers is executed to be effective as of the Effect KenMeth A. Wonstolen R. Scot Woodall William M. Crawford * * * * * Page 2 of 2 DEPARTMENT OF PLANNING AND BUILDING DEPARTMENT OF PUBLIC HEALTH AND ENVIRONNMENT 1555 NORTH 17TH AVENUE GREELEY, CO 80631 AUTHORIZATION FORM FOR BUILDING, PLANNING AND HEALTH DEPARTMENT PERMITS AND SERVICES I, (We), Circle B Land Company, LLC give permission to Doug Dennison/Bill Barrett Corporation (Owner — please print) (Applicant/Agent — please print) to apply for any Planning, Building or Health Department permits or services on our behalf, for the property located at: Parcel 09692740002 Legal Description: E2SE4 of Section 27 , Township 5 N, Range 61 I/1/ Subdivision Name: Lot Block Property Owners Information: Phone: 303-312-8170 Applicant/Agent Contact Information: E-mail: kwonstolen@billbarrettcorp.com Phone: 970-353-0407 x6015 E_Mail: ddennison@billbarrettcorp.com Email correspondence to be sentto: Owner Applicant/Agent X Both Postal service correspondence to be sent to: (choose only one) Owner Applicant/Agent X Additional Info: Owner Signature: '' ` Date: g 11./ (7 g �"" Owner Signature: Date: HighPoint RESOURCES — March 20, 2018 Weld County 1555 N. 17th Avenue Greeley, CO 80631 Subject — Merger of Bill Barrett Corporation and Fifth Creek Energy To Whom it May Concern, Bill Barrett Corporation and Fifth Creek Energy have merged effective March 19, 2018, as documented in the enclosed Certificate of Merger, and the resulting company is HighPoint Resources. Therefore, any permit(s) issued as a result of applications submitted to Weld County should be issued in the name of HighPoint Resources. If you have any questions, please feel free to contact me as shown below or via email at ddennisonahpres.com. 7 f{ i _Qoug Dennison Director, Community Affairs Enclosures —,ated 33105 COUNTY ROAD 33 GREELEY, CO 80631 P 970.353.0407 X6015 F 970.353.0961 Delaware The First State Page 1 I, JEFFREY W. BULLOCK, SECRETARY OF STATE OF THE STATE OF DELAWARE, DO HEREBY CERTIFY THE ATTACHED IS A TRUE AND CORRECT COPY OF THE CERTIFICATE OF MERGER, WHICH MERGES: "FIFTH CREEK ENERGY OPERATING COMPANY, LLC", A DELAWARE LIMITED LIABILITY COMPANY, WITH AND INTO "BILL BARRETT CORPORATION" UNDER THE NAME OF "BILL BARRETT CORPORATION", A CORPORATION ORGANIZED AND EXISTING UNDER THE LAWS OF THE STATE OF DELAWARE, AS RECEIVED AND FILED IN THIS OFFICE ON THE NINETEENTH DAY OF MARCH, A.D. 2018, AT 12:23 O'CLOCK P.M. A FILED COPY OF THIS CERTIFICATE HAS BEEN FORWARDED TO THE NEW CASTLE COUNTY RECORDER OF DEEDS. 3519555 8100M SR# 20182013990 Authentication: 202347142 Date: 03-19-18 You may verify this certificate online at corp.delaware.gov/authver.shtml EXECUTION VERSION State of Delaware Secretary of State Division of Corporations Delivered 12:23 PM 03'19+2018 FILED 12:23 PM 03'19'2018 SR 20182013990 - FileNumber 3519555 CERTIFICATE OF MERGER of FIFTH CREEK ENERGY OPERATING COMPANY, LLC (a Delaware limited liability company) with and into BILL BARRETT CORPORATION (a Delaware corporation) March 19, 2018 Pursuant to Section 264(c) of the General Corporation Law of the State of Delaware (the "DGCL") and Section 18-209(c) of the Limited Liability Company Act of the State of Delaware (the "DLLCA"), Bill Barrett Corporation ("BBG"), a corporation organized and existing under the DGCL, hereby certifies the following information relating to the merger of Fifth Creek Energy Operating Company, LLC (the "Merging Entity"), a limited liability company organized and existing under the DLLCA, with and into BBG (the "Merger"), both direct wholly owned subsidiaries of HighPoint Resources Corporation (f/k/a Red Rider Holdco, Inc.): FIRST: The name and state of incorporation of each of the constituent entities (the "Constituent Entities") are Bill Barrett Corporation, a Delaware corporation, and Fifth Creek Energy Operating Company, LLC, a Delaware limited liability company. SECOND: BBG shall be the surviving corporation in the Merger (the "Surviving Corporation") under the name "Bill Barrett Corporation". THIRD: The Agreement and Plan Merger, dated as of March 19, 2018 (the "Merger Agreement"), between BBG and the Merging Entity, setting forth the terms and conditions of the Merger, has been approved, adopted, certified, executed and acknowledged by each of the Constituent Entities. FOURTH: The Merger is to become effective upon the filing of this Certificate of Merger with the Secretary of State of the State of Delaware. FIFTH: The Certificate of incorporation of BBG, as heretofore amended and/or restated, shall be the Certificate of Incorporation of the Surviving Corporation fromand after the Effective Time, until thereafter amended as provided therein and by applicable law. SIXTH: The executed copy of the Merger Agreement is on file at the executive offices of the Surviving Corporation at 1099 18th Street, Suite 2300, Denver, Colorado 80202. SEVENTH: A copy of the Merger Agreement shall be furnished by the Surviving Corporation, on request and without cost, to any stockholder or member of either Constituent Entities. [Remainder of Page Intentionally Left Blank] IN WITNESS WHEREOF, the Surviving Corporation .has caused this Certificate of Merger to be signed by an authorizedofficer as of the date first written above. BILL BARRETT CORPORATION arise: R, Scot Woodall. Title: Chief Executive Officer and President [Signature Page to Certificate of Merger (FCEOC — BBG)] USE BY SPECIAL REVIEW QUESTIONNAIRE Proposed Construction of BBC's CB Williams Compressor Station SE/4, Sec. 27, 5N -61W of the 6th Principal Meridian Weld County, CO Major USR Amendment—1MJUSR17-15-0078 December 22, 2017 Applicant: Bill Barrett Corporation 1099 18th Street, Suite 2300 Denver, CO 80202 Bill Barrett Corporation Bill Barrett Corporation Table of Contents Vicinity Map Section 1 1. Proposed Use of Property 2. Consistency with the Intent of the Comprehensive Plan 3. Consistency with the Intent of the Zoning and Zone District 4. Type of Uses Surrounding the Site 5. Planning Questions a. Hours of operation b. Number of people using the site c. Lot surface description d. Parking e. Landscaping f. Fencing g. Screening h. Reclamation i. Fire protection j. Improvements 6. Engineering Questions a. Kind of vehicles (type, size, weight) and how often b. Travel routes c. Drainage design 7. Environmental Health Questions a. Drinking water b. Sewage disposal c. Storage d. Waste management e. Air emissions f. Nuisance management 8. Building Questions a. Proposed structures and uses Bill Barrett Corporation Table of Contents Continued Section 2 1. Notification Requirements 2. Operational Standards 3. Required Permits 4. Traffic 5. Fire and Emergency Response 6. Spill Prevention, Control and Countermeasure 7. Noise Abatement Plan Vicinity Map for the CB Williams ompre or Station VICIN ITY MAP PROJECT LOCATION rsot fitY e c T5N eltii 46 ID R 61 w YAH!!EJ ?r■ UIH't0rCrEAPICUP flGUY7H• LIMII133W1113 0MCI OWL iLIPAI , LIA 717 mUZ, =A.ICU- 1,■t VICINITY M.AP LEGEND 3111. I CM:4 R1 iCJ3->> Mt. H'tPn r n 3:111 Qa, de d li HP iiH ..3, GUPPPLE 31Q1•3 Section 1 1. Proposed Use of Property Bill Barrett Corporation (BBC) is proposing to construct a compressor station in the Agriculture (A) zone district. This station will be located on property owned by Circle B Land Company, a wholly owned subsidiary of BBC. This station will be permitted for up to four natural-gas powered compressors; however, not all four compressors may be installed at the same time. Each compressor will be enclosed within a separate building. In addition, associated equipment such as a storage building, tanks, production equipment and meters will be installed at each station. The station will be fenced to keep livestock out and will be equipped with lights that can be controlled so that they are only on when personnel are present during night-time hours. This station is being built adjacent to an existing oil & gas storage yard that was permitted by Weld County under USR 15-0078, and this USR application is being submitted as a major amendment to the existing USR. The proposed facility is located in the SE corner of Section 27, Township 5N, Range 61W (see vicinity map). Ownership Information As seen on Assessor Record: Circle B Land Company, LLC c/o KE Andrews & Co. 1900 Dalrock Rd. Rowlett TX 75088 BBC Contact: Doug Dennison Bill Barrett Corporation 33105 WCR 33 Greeley, CO 80631 2. Consistency with the Intent of the Comprehensive Plan BBC has reviewed the Comprehensive Plan as outlined in Chapter 22 of the Weld County Code and believes this project is consistent with its guiding principles. Section 22-2- 10(D) emphasizes extraction of natural resources as an important part of the economy and should minimize impacts to agricultural lands. The proposed 3.9 -acre facility will he located on lands that are currently non -irrigated rangeland located in a rural area with existing oil and gas activity. The placement and size of the facility will allow for the current agricultural to persist. 3. Consistency with the Intent of the Zoning and Zone District The natural gas compressor station is classified by Weld County as an Oil and Gas Support and Services facility. Section 23-3-40.A.2 of the Weld County Code states that these facilities are uses allowed to be constructed, occupied, operated and maintained in the A (Agricultural) Zone District only upon approval of a Use by Special Review permit in accordance with the requirements and procedures set forth in Article II, Division 4 of Chapter 23. 4. Type of Uses Surrounding the Site The proposed Circle B Williams Compressor Station is surrounded by agricultural properties and is located in an area with existing oil and gas activity. The compression of natural gas is a necessary component of the oil and gas industry. 5. Planning Questions a. Hours of operation The facility will operate 24 hours a day, seven days a week. However, typical access in and out of the facility will occur during daylight hours except during maintenance situations in which the station is not operating at peak efficiency or other situations that could require immediate attention. b. Number of people using the site During the construction phase upwards of 20 personnel could be on site at peak construction. The construction phase is slated to last approximately eight (8) weeks. Upon completion of construction, the Circle B Williams Compressor Station will be operated remotely so there will be no full time personnel on site. During the operations phase, the site will be visited by up to two (2) people (pumper, mechanic) each day for maintenance for short periods. In addition, at least once a month, for a period of two to three days, the site would be visited by approximately three (3) trucks for a scheduled monthly maintenance. c. Lot surface description All access roads and the compressor site and associated equipment area will be graveled. d. Parking There will be sufficient parking at the facility for employee vehicles. This facility will not be open to the public, therefore, no additional parking is proposed. e. Landscaping Due to the remoteness of this site, no landscaping is required. Any disturbed areas that are not graveled will be revegetated with an appropriate seed mix. 1. Fencing The perimeter of compressor station and the adjacent well pad will be fenced with a minimum 6 -foot high chain -link fence to prevent cattle from entering the facilities and for site security. Gates and cattle guards will be placed at all vehicle entrances. g. Screening Due to the remoteness of this site, no landscaping is required. The exterior of all buildings and all exposed equipment will be painted in a color to match the surroundings. h. Reclamation When this facility is no longer needed in the future, all buildings and equipment will be removed and the location will be graded to match the natural contour of the land. The disturbed area will then be revegetated utilizing a seed mix specified by the surface owner. The location will be periodically monitored by qualified personnel to determine the effectiveness of reclamation efforts and to specify any remedial work needed until such time that the vegetation on this location is approximately 80% of the natural vegetation on adjacent, undisturbed land. i. Fire Protection This facility will be constructed with equipment that will detect conditions where fire or explosion could occur. This equipment includes LEL (lower explosive limit) meters and fire eyes that will be configured to immediately and automatically shut the facility down if a dangerous situation is present. Additionally, appropriate fire extinguishers will be installed throughout the facility and BBC personnel will receive regular training on the maintenance and. use of the extinguishers. The primary fire response agency for this facility will be the Wiggins Rural Fire Protection District. Prior to operation of the facility, BBC will provide an emergency response plan to the fire district and conduct a walk-through of the facility with district personnel to familiarize them with the facility. j. Improvements As noted elsewhere in this application, improvements at this facility will consist of the installation of the compressors, buildings and other associated equipment. Other improvements will include the gravel surfacing of the disturbed area of the facility and fencing the exterior of the facility to prevent livestock from entering the facility. 6. Engineering Questions a. Kind of vehicles and how often Construction Traffic Construction related traffic is expected during the construction phase of the compressor station. Pick-up trucks (3/4 ton) and large trucks (1 to 40 tons) will be utilized during this phase. Pick-up trucks are expected to contribute around eight trips per day. See the table below for detailed information on construction traffic. Type/Size Number of Daily Round Trips Weight Con struction Work Truck 8 % ton Semi Tractor -Trailer — Equipment and Component Delivery 20 total round trips 40 tons each Delivery Trucks 2 1 ton Delivery Trucks — with trailer 10 total round trips 3 tons Gravel Trucks 20 total round trips 25 tons each Operational Traffic The following vehicle summaries have been used to determine the anticipated traffic generation numbers: • Overall Employees — 2 per shift, one shift — 4 trips • Average Monthly Deliveries/Pickups (pick-up trucks) — 3 monthly (6 trips) • Average Daily Deliveries/Pickups (Semi -trucks) — 0 daily (0 trips) b. Travel routes The haul route for this location will primarily from US Highway 34 north via WCR's 87 and 89 and then east of WCR 89 on WCR 52 to the access to the compressor station. BBC has applied for an access permit at this location with Weld County Public Works. It is estimated that 80% of the traffic on WCR 89 will come from the south (i.e., US 34) with the remainder coming from the north via WCR 68. c. Drainage design The facility is located on a relatively flat parcel. All necessary grade work will be performed to prepare the site for its intended use. However, based on the layout of the site, it is not expected that this pad will require a large amount of grading work. The site will be surfaced with gravel. Please see the Drainage Memo included with this application. 7. Environmental Health Questions a. Drinking water No full time personnel are on site. No water source is required for this facility. Employees that use the site will use bottled drinking water. b. Sewage disposal system A sewage disposal system is not required. A portable toilet will be located on site and serviced at regular intervals. c. Storage There will be no outside storage of materials at the facility. Storage of smaller parts and equipment will take place within the storage building. d. Waste management BBC maintains a corporate Waste Management Plan that covers the management of wastes typically associated with our operations. This plan is used to determine how to manage common wastes. The objective of the plan is to ensure that generation of wastes is minimized and materials are reused or recycled whenever possible. When that is not possible, the plan is utilized to ensure that wastes are managed in accordance with all Local, State, and Federal regulations. BBC personnel are trained on waste management practices. BBC anticipates that the following wastes will be generated at the site: • Used oil • Used antifreeze (ethylene glycol) • Tank bottoms • Spent filters • Light bulbs • Spent batteries • Rags and absorbent socks and pads • Hydrocarbon impacted oil from minor leaks and vehicle traffic • Used packaging material, including cardboard, scrap lumber from crates, metal strapping, etc. A small dumpster will be placed on site and municipal solid waste will be managed by Redi Services, LLC or Waste Management Incorporated. The dumpster will be emptied weekly or bi-weekly. A RCRA Universal Waste program will be set up and managed by Clean Harbors Incorporated for the proper management or recycling of universal wastes such as spent batteries and light bulbs. Used oil, antifreeze, filters, and rags and pads will be managed by either January Environmental Services Incorporated or Tri-State Oil Reclaimers. When necessary, tank bottoms will be removed and sent to an authorized disposal facility. This activity will be coordinated by Clean Harbors Incorporated. In addition, Redi Services, LLC or Reck Flyers will provide portable toilet service on location. Spills and releases will be managed in accordance with the facilities SPCC Plan and BBC's Emergency Response Plan. Hydrocarbon impacted soils will be removed from the facility as needed and disposed of at Waste Management Incorporated's landfill in Ault, Colorado. In the event a change in contractors is necessary in the management or disposal of waste, a state authorized provider would be utilized. e. Air emissions This facility will be permitted through and subject to the regulations promulgated by the Colorado Department of Public Health and Environment (CDPHE). f. Nuisance management During the construction phase of the project, BBC will use water or magnesium chloride trucks for dust suppression. Soil erosion will be mitigated through the appropriate use of best management practices contained within BBC's Storm Water Management Plan. After construction is completed, BBC will gravel the access and the compressor pad location and water or magnesium chloride application will be applied on an as -needed basis. S. Building Questions a. Proposed structures • Up to (4) Waukesha 7044 compressors (or equivalent) • Up to (4) 32' x 40' metal buildings to house compressors • (6) 400 barrel oil tanks • (1) 40' x 40' storage building • (15) separators • (l) vapor recovery unit • (1) generator • (3) combustors • (1) heater treater • (4) Flare stacks (3 x 30') All necessary building permits will be obtained from Weld County prior to initiating construction. There are no existing structures at this location. Construction of the compressor pad is anticipated to commence upon the approval of this USR. The total construction time is expected to be eight (8) weeks. SECTION 2 1. Notification Requirements County Notices: Section 23-2-210(B)(1): Upon application completeness, agency notice submittal (28 day comment period). This step is completed by Weld County staff. Section 23-2-210(B)(6), a sign shall be posted by the County on this proposed site. This step is completed by Weld County staff Section 23-2-210(B)(4): Notice to owners of property within 500 feet of the parcel. As per 23-2-260(B)(9), the list attached was created from Assessor records of Weld County on December 22, 2017. 2. Operational Standards Noise Control: The operation of the facility shall comply with the noise standards enumerated in Section 25-12-101, C.R.S. The facility will adhere to all applicable COGCC noise regulations. Air and Water Quality: All activities will comply with the permit and control provisions of the Colorado Air Quality Control Program, Title 25, Article 7, and. C.R.S. as applicable. No wastewater will be discharged on the surface of the site. Human wastes will be contained to the portable toilet on site. Lighting: Lighting on the site will be downcast and shielded lighting will be provided on the proposed building. Lighting is for nighttime security and emergency work only. Lighting will be on a timer and motion detection. The nearest occupied residence to the compressor station is over 1 mile from the facility. Therefore, it is not anticipated that lighting will pose any nuisance to traffic on public roadways or adjacent properties. Weed Control: The facility will be kept free of weeds, rubbish, and other waste material. The area shall be treated if necessary and as practicable to prevent invasion of undesirable species and noxious weeds. 3. Required Permits Weld County: A Use by Special Review Permit requires approval by the Board of County Commissioners. Weld County Right -of -Way Use Permits will be obtained for any new pipelines connected to this facility that fall within a County ROW. A grading permit is expected to be required. Wiggins Rural Fire Protection District: The Site Plan and Use by Special Review Application will be referred to and reviewed by the Wiggins Rural Fire Protection District. Oversize Load. Permits: If necessary, oversize load permits will be obtained prior to moving any new equipment onto the site. BBC will submit any additional permits necessary for county approval prior to the commencement of construction. 4. Traffic Weld County Public Works Department determined the traffic narrative above was sufficient for this facility. 5. Fire and Emergency Response There is adequate provision for the protection of the health, safety and welfare of the inhabitants of the neighborhood and the county. All roads leading to and those in the site area are designed and maintained to support fire apparatus. Sufficient turnaround room to accommodate fire apparatus is present. All storage tanks will be permanently mounted with foam nozzles according to API (American Petroleum Institute) standards. BBC support personnel in the field are on call at all times to provide technical assistance in fire prevention and suppression. Emergency Information General Information: The purpose of this document is to provide ownership information in case of an emergency at the proposed Circle B Williams Compressor Station. It may be used by outside agencies, company employees, and contract labor to help secure a safe and swift recovery from such emergencies: a. Name and Address Corporate Office Bill Barrett Corporation 1099 18th Street, Suite 2300 Denver, CO 80202 (303) 293-9100 Regional Office — DJ Operations Bill Barrett Corporation 33105 WCR 33 Greeley, CO 80631 (970) 353-0407 b. Type of Facility: Compressor station c. Location and Access: Located in the Southeast quarter of Section 27, Township 5 North, Range 61 West. Driving directions to the location are as follows — PROCEED IN AN EASTERLY, THEN SOUTHEASTERLY DIRECTION FROM GREELEY, COLORADO ALONG U.S. HIGHWAY 34 APPROXIMATELY 25.4 MILES TO THE JUNCTION OF THIS ROAD AND COUNTY ROAD 87 TO THE NORTH; TURN LEFT AND PROCEED IN A NORTHERLY, THEN EASTERLY DIRECTION APPROXIMATELY 3.0 MILES TO THE JUNCTION OF THIS ROAD AND COUNTY ROAD 89 TO THE NORTH; TURN LEFT AND PROCEED IN A NORTHERLY DIRECTION APPROXIMATELY 2.7 MILES TO JUNCTION OF THIS ROAD AND COUNTY ROAD 52 TO THE EAST; TURN RIGHT AND PROCEED IN AN EASTERLY DIRECTION APPROXIMATELY 2.0 MILES TO THE BEGINNING OF THE PROPOSED ACCESS ROAD TO THE NORTH. Emergency Contact List: The following is a list of Bill Barrett Corporation personnel and organizations that may be contacted in the event an emergency occurs at the facility. Contact Office Phone Cell Phone Brett Paben — Production Superintendent Dustin Watt — EHS Coordinator 24 -Hour Emergency Number 6. Containment/SPCC Plan 970-353-0407 x6003 970-319-4690 970-353-0407 x6005 303-656-1838 1-800-880-6359 If required, an SPCC plan will be created for the facility prior to commencing operations. It is BBC's policy to create and maintain SPCC plans at all of its non -transportation related facilities in accordance with 40 CFR Section 11. Upon completion of the SPCC plan, a signed copy will be provided, per the request of Weld County. 7. Noise Abatement Plan At the current time, no additional noise abatement is anticipated to be needed. There are no occupied structures within at least 1 mile of the location, and the location is surrounded by undeveloped grazing land. WELD COUNTY, COLORADO Drainage Report BILL BARRETT CORPORATION COMPRESSOR PAD SITE DRAINAGE REPORT SECTION 27, TOWNSHIP 5 NORTH, RANGE 61 WEST, 6TH P.M. COUNTY ROAD 52, WELD COUNTY, COLORADO Prepared For: Bill Barrett Corporation Contact: Doug Dennison 33105 WCR 33 Greeley, CO 80631 Phone: (970) 353-0407x6015 Prepared By: Uintah Engineering & Land Surveying, LLC Christopher J. Clark, PE 85 South 200 East Vernal, UT 84078 Phone: (435) 789-1017 V i NTAH EN! INEE 3IN G S. LANE] SIJRVEYIN'_1 Truck Sales and Service Facility Drainage Report TABLE OF CONTENTS Table of Contents i Certification ii I. INTRODUCTION _ 1 II. General Location and Description 1 A. Location and Existing Conditions 1 B. ProposddJevelopment 1 III. Drainage Basins and Subbasins 2 A. MajaasiLescriptian 2 B. Offsifkai nage Basins 2 IV. Drainage Design Criteria 3 V. Drainage Facility Design 4 A. On-si1@rainage —Western Pad Area 4 B. On-sif rainage — Eastern Pad Area 4 C. Wateuality and Detention 5 VI. Conclusion 6 VII. Appendix 7 Appendix A —Vicinity Map 7 Appendix B— Drainage Basin Plans 9 Appendix C— Flood Plain Map - FIRM Map Panel 12 Appendix D — Hydrologic Soil Group 14 Appendix E — NOAA Atlas 14 — Precipitation Values 19 Appendix F — Rational Method Runoff Calculations 24 Appendix G — Detention Pond Calculations 30 i Truck Sales and Service Facility Drainage Report CERTIFICATION I hereby affirm that this Drainage Report was prepared under my responsible charge for the owner's thereof and to my knowledge is accurate and adherent to the applicable standards and rules provided by Weld County, Colorado. Signature: Name Print: Company Name: Address: City, State, Zip: Phone: Fax: Email: Date: Ca 7? Chrisfopher J. Clark, PE UELS, LLC 85 South 200 East Vernal, Utah 84078 (435) 789-1017 (435) 789-1813 cclark@uintahgroup.com December 19, 2017 PE Stamp ii Truck Sales and Service Facility Drainage Report I. INTRODUCTION The purpose of this report is to present the proposed storm drainage improvements for the Bill Barrett Corporation's proposed Circle B 5-61-27 Compressor Pad located in the SE1/4 SE 1/4 of Section 27, T5N, R61W, 6th P.M. With the development of a site, it can be expected to increase the impervious ground cover and thus, an increase in peak storm water runoff. This report examines the undeveloped flow patterns of off - site and on -site drainage basins and the proposed storm water facilities designed to mitigate the downstream impact of increased storm water runoff. The contents of this report are prepared in accordance with the Weld County Code for a Drainage Report in conjunction with a Use By Special Review submittal. II. GENERAL LOCATION AND DESCRIPTION The proposed Circle B 5-61-27 Compressor Pad site is located on an approximately 75 Acre parcel located south of WCR 62 and north of WCR 52 in Weld County. A vicinity map is included in Appendix A. This parcel is owned by Circle B Land Company, LLC. This site is zoned Agricultural. The existing parcel currently operates as grazing land. There is a storage facility operated by Bill Barrett Corporation located west of the proposed compressor pad, as approved under USR#15-0078. Bill Barrett Corporation is seeking to permit this development to operate an oil and gas compressor facility as major amendment of the current Use by Special Review permit on the parcel. Drainage at the proposed site currently sheet flows to the southwest and southeast across the range land. A natural ridge runs from the northwest to the southeast through the site. South of the Compressor Pad Area the drainage historically has flowed into a drainage ditch that runs parallel to WCR 52 with flows in the ditch divided into east and west flows from a natural high point at the proposed access road intersection with WCR 52. The existing storage facility currently drains into an existing detention pond that drains into the road side ditch flowing west. Water flowing into the county road's drainage ditch has not posed a problem in the past. The historic and off -site drainage plan for the site is attached to this report in Appendix B. The improvements will include the development of a compressor site to the east of the existing storage facility. The proposed pad will be appr oximately 2.28 Acres in size and will include four compressors and ancillary equipment including scrubbers, filters and separators. A top soil stockpile will be located on north side of the pad. The site will include a new access road to the south ofihe pad that gives access onto WCR 52. The vehicle travel areas area of the site will be surfaced with gravel. There will be two detention ponds, located between the pad and the road right of way on the southwest and southeast corners of the proposed pad. The proposed facility will sit on the natural high spot. Generally, the flows on the east of the pad will be collected into a drainage ditches that will convey the water to Detention Pond -B on the southeast corner of the pad. While flows that are on the west side of the pad will flow into catchment ditches that will convey the runoff to Detention Pond -B that is on the southwest corner of the pad. The pad surface will be graded at a slope of one -percent toward the south edge of the pad. The detention ponds are sized to accommodate the 100 -year runoff volumes from the newly developed areas Truck Sales and Service Facility Drainage Report and will release the stormwater rate equivalent to the 5 -year historic (pre -development) runoff rate. The release rate will be managed by the use of an outlet structure with an orifice plate to treat and manage the Water Quality Capture Volume and then a second stage will discharge through an outlet pipe that is outfitted with a restrictor plate. Offsite basin runoff flows will be managed by diversion dtches to the north of the site. One diversion ditch along the north edge of the pad site will direct offsite flows around the site to the west and into natural drainage channels. The drainage along the north east edge of the pad natural flows parallel to the pad edge. The offsite drainage plan and developed drainage plan have been attached to this report in Appendix B III. DRAINAGE BASINS AND SUBBASINS The subject property is located in rural Weld County and is surrounded by agricultural land to the north, west, south, and east. There are a few individual residences on the agricultural land surrounding the property. Several oil and gas pads operate in nearby vicinity, including a facility (USR#13-0066) to the northwest of the proposed compressor facility. The project site lies in a FEMA designated area, Zone X: "areas determined to be outside the 0.2% annual chance floodplain". The development site is located in Flood Insurance Rate Map (FIRM), Community Panel No. 08123C 1850E, attached to this report as Appendix C. According to the NRCS Web Soil Survey, the off -site basin consists of Valent sand, 3 to 9 percent slopes. The on -site soils consist of Valent sand, 3 to 9 percent slopes. The Valent sand have high infiltration rates (low runoff potential) when thoroughly wet. The hydrologic soil group types at the compressor pad is Type A. Refer to the web soil survey reports located in Appendix D. The project site is located within two historic drainage basins. The location of the development site more or less naturally diverts the storm water around the site. The off -site basin has been designated as Offsite Basin 1 (OS -1). The basin is north of the site and the water runoff in the basin flows to the southwest. The second historic drainage basin that covers the east side of the pad will naturally divert off -site flows away from and around the pad. Runoff coefficients are calculated for each site soil type using the methods detailed in the Urban Storm Drainage Criteria Manual, Volume 1, Ch. 5. The Rational Method will be used to analyze the historic peak flows. The time of concentration for the basin was estimated using the methods detailed within the Urban Storm Drainage Criteria Manual, Volume 1, Ch. 5. Peak flows for the 5 -year and 100 -year storm events for the off -site drainage basin have been provided in the table below. Truck Sales and Service Facility Drainage Report Table 1 - Off -site Drainage Basin Peak Runoff Flows. Basin ID os-i Basin Size (Ac) 0.53 Peak Flow 5-Yr (cfs) Peak Flow 100-Yr (cfs) 0.0 0.8 Design Point A Drainage Plan is included with this report showing the boundary of the off -site Drainage Basin. Reference the Drainage Plan forthe Off -site Basins in Appendix B. IV. DRAINAGE DESIGN CRITERIA This report is prepared in compliance with the Urban Storm Drainage Criteria Manual, Volumes 1, 2, and 3; Weld County Code; and the Weld County Storm Drainage Criteria Addendum to the Urban Storm Drainage Criteria Manuals Volumes 1, 2, and 3. Based on this criterion, a 100 -year storm is used as the major storm event and a 5 -year storm is used as the minor storm event when evaluating existing and proposed drainage facilities. Runoff Calculations: For drainage basins less than 160 acres in area, the Rational Method was used to calculate the stormwater runoff. The time of concentraction forthe basins was estimated using the methods detailed within Urban Storm Drainage Criteria Manual, Volume 1, Ch. 5. The hydrologic runoff calculations and time of concentration calculations are included with this report in Appendix F. Rainfall Data: Site rainfall depth information was obtained from the National Oceanic and Atmospheric Administration (NOAA) Atlas 14, Volume 8, Version 2, Precipitation -Frequency Atlas of the United States (2013). This data supersedes the default rainfall depth information provided in the Urban Storm Drainage Criteria Manual. The current NOAA data was used forthe determination of the point rainfall data. The NOAA data formed the basis of the inflow -duration -frequency (IDF) calculations for other storm frequencies and durations using Urban Drainage methods. Rainfall data is presented in Appendix E. Pipe and Culvert Sizing: Site storm infrastructure capacities have been evaluated using Manning's Equation. The culverts on -site were sized to convey the 5 -year storm event. The storm drain piping was also sized to convey the 5 -year storm event. Additionally, the outlet pipe from the detention pond is sized for a specific release rate of the 5 -year historic flow with the use of a restrictor plate. Erosion control devices will be provided at all culvert and swale outlets to protect against downstream erosion. Culvert sizes were determined using Culvert master software. Pipe sizing calculations were determined using Flowmaster software. The hydraulic calculations for Pipe and Culvert Sizing are included in this report in Appendix F. Drainage Channel Sizing: Irrigation ditch, diversion ditch, or swale capacities have been evaluated using Manning's Equation. The channels are sized to convey the 5 -year storm event runoff flows. The channel capacities were calculated using Hydraflow Express software. The hydraulic calculations for the Drainage Channels are included with this report in Appendix F. Detention Pond Sizing: The detention pond volume has been determined using the UDFCD's Detention Design - UD-Detention v2.34 spreadsheet. Detention Ponds A and B are sized to detain the 100 -year developed storm event runoff from the site's drainage basins (refer to the drainage basin plans in the appendix). The detention ponds will be configured to release no more than the 5 -year historic flow at the points of analysis in accordance with Weld County criteria. A minimum of one foot of freeboard will be Truck Sales and Service Facility Drainage Report provided for the detention pond. The required water quality capture volume will be contained within the detention volume for the detention pond. An emergency spillway, in the form of a concrete weir and armored slope, is proposed to convey the 100 -year flow rate under a plugged orifice condition. Detailed detention pond calculations have been provided in Appendix G. Water Quality Pond Sizing: Water quality ponds are required prior to releasing stormwater runoff from the development. The ponds will include a water quality orifice plate on the outlet structure in accordance with the Urban Storm Drainage Criteria Manual. The volume added to the detention pond to account for water quality was determined following UDFCD's Detention Design - UD Detention v2.34 spreadsheet. Detailed water quality pond sizing information is presented in Appendix G. V. DRAINAGE FACILITY DESIGN The compressor facilities stormwater management will include the construction of two detention ponds. Detention Pond -A is located at the southwest corner of the pad and will outlet into the side ditch on the north side of County Road 52. On -site drainage basin A-1 will be conveyed to the detention pond through a system of ditches. The following table provides peak runoff flow rates for the on -site drainage basins flowing to Detention Pond - A Table 2 - Detention Pond -A Drainage Basin A-1 Runoff Flows Basin ID Basin Size (Ac) A-1 1.47 Peak Flow 5-Yr (cfs) 0.9 Peak Flow 100-Yr (cfs) 3.6 Design Point 2 The 5 -year runoff flows were used to calculate the catchment ditch depths to convey the runoff to the Detention Pond -A. The site's second detention pond, Detention Pond -B is located at the southeast corner of the pad and will outlet into the side ditch of County Road 52. On -site drainage basin B-1 will be conveyed to the detention pond through a catchment ditch. The following table provides peak runoff flow rates for the on -site drainage basins flowing to Detention Pond - B Table 3 - Detention Pond -B Drainage Basin B-1 Runoff Flows Basin ID Basin Size (Ac) B-1 2.03 Peak Flow 5-Yr (cfs) 0.9 Peak Flow 100-Yr (cfs) 4.5 Design Point 3 The 5 -year runoff flows were used to calculate the catchment ditch depths to convey the runoff to the Detention Pond -B. 4 Truck Sales and Service Facility Drainage Report The proposed water quality feature for the site is a water quality capture pond. This water volume will be located within each of the respective Detention Ponds. The water quality for the detention pond was sized in accordance with the Urban Storm Drainage Criteria Manual, Volume 1, 2, and 3. The water quality feature is designed to handle the runoff from the developed portions of the site. Developed runoff flows are designed to route through the water quality feature. Per Urban Storm Drainage standards, 120% of the water quality volume will be provided. The proposed water quality volume drain time is 40 hours. An orifice plate is proposed as the water quality feature affixed to each of the pond's outlet structures. The WQCV is included in the detention pond volume for each of the drainage basins. WQCV calculations are presented in Appendix G. A storage volume summary is provided in the table below. As mentioned previously, there are two detention ponds designed to collect runoff from the developed site. Each of the detention ponds collects the runoff and discharges to each of the outfall points at a rate that does not exceed the 5 -year historic runoff rate. The following tables presents a summary of the Detention Pond sizing. Table 4 - Detention Pond -A Summary Detention Pond Calculations Drainage Area (acres) % Impervious of Drainage Area Time of Concentration (minutes) Water Quality Capture Volume (ac -ft) Total Required Storage (ac -ft) Total Storage (ac -ft) 1.47 30.76 12 0.02 0.11 0.13 Table 5 - Detention Pond -B Summary Detention Pond Calculations Drainage Area (acres) % Impervious of Drainage Area Time of Concentration (minutes) Water Quality Capture Volume (ac -ft) Total Required Storage (ac -ft) Total Storage (ac -ft) 2.03 23.94 13 0.02 0.17 0.19 Truck Sales and Service Facility Drainage Report Additional detention pond calculations, including WQCV orifice plate design, outlet pipe restrictor plate design, and emergency spillway design, are included in Appendix G of this report. VI. CONCLUSION This report was prepared in compliance with the Weld County Code and the Weld County Storm Drainage Criteria Addendum to the Urban Storm Drainage Criteria Manual Volumes, 1, 2, and 3. The proposed drainage system for the improvements to the WCR 52 site will provide detention for the developed section of the site. Releasing flows at the 5 -year historic rate. Releases are as near to the points of design as practical and are not expected to increase or cause adverse impacts on downstream property owners. This Drainage Report is being submitted to Weld County for review and approval. Truck Sales and Service Facility Drainage Report VII. APPENDIX 28 28 CO RD 52 (—\\\ 'Cs " ° 4� ,, CR52 CIRCLE B LAND COMPANY LLC t\\ 27 EXISTING POWER LINE 26 PROPOSED LOCATION: CIRCLE B 5-61-27 COMPRESSOR PAD 33 T5NJ GREELEY 33.0 MI. +1- c;?,OO raw R41w`34 SEE DETAIL "A" tot 26 4550 R 61 W sr 44 CO RD 52 35 4500 T4N L VAI Lel t n. NOTE: PARCEL DATA SHOWN HAS BEEN OBTAINED FROM VARIOUS SOURCES AND SHOULD BE USED FOR MAPPING, GRAPHIC AND PLANNING PURPOSES ONLY. NO WARRANTY IS MADE BY UINTAH ENGINEERING AND LAND SURVEYING (UELS) FOR ACCURACY OF THE PARCEL DATA. LEGEND: - - - - - - BILL BARRETT CORPORATION EXISTING ROAD Ii INSTALL CATTLE GUARD PROPOSED ROAD CIRCLE B 5-61-27 COMPRESSOR PAD EXISTING FENCE SE 1/4 SE 1/4, SECTION 27, TSN, R61 F, 6th P.M. EXISTING POWER LINE WELD COUNTY, COLORADO fist ENGINEERING at LAND SURVEYING UELS, LLC Corporate Office 85 South 200 East Vernal, UT 84078 * (435) 789-1017 SURVEYED BY CM., O.R. 11-16-17 SCALE DRAWN BY J.J. 12-05-17 1 : 4.001 ACCESS ROAD MAP TOPO B Truck Sales and Service Facility Drainage Report APPENDIX B - DRAINAGE BASIN PLANS .. Off -Site Historic Drainage Plan — D-1 2. On -site Drainage Plan — D-2 December 19, 2017 9 CIRCLE B 5-61-27 COMPRESSOR PAD SEC. 27, TSN, ROW, W, 6th P.M. WELD COUNTY, COLORADO ,C\NN NC1/41/2h J.,S\N\ N‘..\ \\\ N,‘.\ \\\\\t‘ X11 ist \U DETENTION POND -B 3:1 SIDE SLOPES DETENTION POND -A 6,900 CF 3:1 SIDE SLOPES 8,300 CF [EELS, LLC Corporate Office * 85 South 200 East Vernal, UT 84078 * (435) 789-1017 CIRCLE B 5-61-27 COMPRESSOR PAD 1MJUSR17-15-097 SEC. 27, T5N, ROW, 6th P.M. WELD COUNTY, COLORADO Truck Sales and Service Facility Drainage Report APPENDIX - FLOOD PLAIN MAP - FIRM MAP PANEL December 19, 2017 • 11.11 '. • 4- • 11 ;• Ir • Ia a;$ t 1 e1• rr ltr• 4 4 • I I. • ■ • a ■+ t I • • . JJJa 1 • Y ▪ • w I • • r*• a s 9 4. I • • r • la 4, 4 'I, sac r t ■•n •!•• a s s • , s•• •a e e. MI. v • r 1 • aa• I-IY• 4r •• •a s■■ 2.44 • •1 a e 1 e I I' ■ S e I•a*•1a•a all a••••S a ■ Y I•• I Y• r 11 ■ s 11.1•■IIar a■•■■ a•1 O 1111•02•• BRIEN_' MONI i.• •. w f. a 4 •. . 4 t 9 • • r • . • • F• a • •'- • ! r 4 4 • • a r i ■ • • a • • ■ e l • 4 ■ a ■ ■ • • ■ ■ • • ■ a ■ ■ t r • a a • a . • • . • A • - •. • • a • • • • • . • • •• • a s• I• • I • i• III • • aL•• l.a a a*• • a■4 ar•u •a• • II II • aa•s a e t t I I I a I I e I e L I I e 1■■ p a I• e I• i a ■� - • •r • • . `• • •• • . ••• r • • • • • • • • • ■ .a • . I• a La s 4. rn -I s ! • ■ L s • ■ • • r • a • I■ w ! •I •!-!• • III I • • Iraa rI I • • a • ! e • ■ • ■ • • ■ I •. 44 • a a- . A a a i a ii a L a■ L a 4 4 4• s a gas t I - - t I e l ▪ e• S 1.l•lsl 144 5 41 aL 4ln I. 5 ML.. 2i ll l• t• a aia, ■•••• •aS a4•/• a a 1• I - - 11 I RIO • t• • t 1 1 t a: —.I a t!! r I t t S t • • I_• a ■ • • a I ■ I M ■ • • ■ • 1 ■ • ■ ■ • L ■ ■ • • • 1 ••••• r • 4..a••-•.-------•--•------..•• • •• I Y I I I I- • r• ett••••2 I _ t o > I! W T I el e r! I I ■ I I I I I I I- I I I■ 'I I e In • c I ••• I •■ 1 1 • I 1 • I s . . . . . . i 1 ,. . . is. . • • . i • . • i . i 4 • . . r • 1 •• I • • L r • • • a ••••• ••• r 4 • • :a • ••• •••• • a I• • • ■ • ■ • • ■ ■ .•aa■ a• t ■ a a • ■ a 1• I••• ■ • .2 I- al a Its e ,1 - n ` -. • I.7/I1� .• I. 911 1 • ► . • r F+r 'I -'��d1•'. .°.Ir�••�.�a 8 •t•*. • ▪ r s • •. • • • • • • a • • • u•• ••• • • • • 11 1 ••• ••• 1&• ILI II ••• e • •I ••• •-•• •L• •• L L•••• 4r••_a i •■III•II•I•I I S re•- • a II a 4 444.4k a t 1 9 a 1 I■ 4••• 1•• 4 ! - 11 • - - ■ a • • I': • I • • I 1 L • • S I • •L11 • • •• I •• • • 'I p s - I s• p s 9 a a 1= • • • • a• • p• a L • • • • S ,/ y e t'1 _ I' ■ t T S r I r•It•I P t 1 r t 1 P'_• 1 i•'fIIF/ a • • ••• r I 4 4 s a • • ia • • - • s • • i • - •I nos • •a•■'I 11••11 a I •II •taeil S a•I• r • • • ■ .a.•r. G ■I••I LI DIXf •• • a•• r L S •• S • S r s r • n• r IF II 'I a ■ a l • G ■ • • • • ■ • • • a • aa:IYrl■.1•s i llL•a1, I41r1 •' L •alrr i •• I .••,I i s • •Ii. •Y ■ • a ■•• a•t,.t aw■�■ a a•I-a •ate• ■•a•.'. -I • I•■ a•I • • a • • • • • •' • • w • '• • n • • • o • M • -•Yrl•• G j M•I i •.- .••• ••• 1 1 a 594•" I a• • . a ■ • 4 s 411(115 ..1 14s ■ • • a• a••• a a a a s - a a a I• r •. a s a s a .a a •. • a • a • • . • a . • a . • . ••. • • I• • • ■ aa■ • • • • a . . . • r t• • I. •• ••• I 4 L f a p5 P• a P a• r • t•f• 4 Sr• r t e I I r°t'eti' .. - N IS a• • 4 1 1. 1-♦ 4 '1 1• i ✓ a t • • t a • -I • • •' ••�� i • • a • • • • • i If �,• • Na,,• S ir +'� - 1+r'4••ml' C1 • i FLOW iNSUR NC€ RATE MAP WELD COUNTY, COLORADO I INCORPOR ED AREA.S PANEL line OF 2250 (SFS MAP Mititec rcf knit) ;IMPS LAYOUT! * liOtrif V,,r TIK• Map hitinlbAR gikrMn qtr imol$d t son;i! MP orztri C Nuiflbfrf Wheal at&.t at tui0 4ae rtai si .n ttW a9p4ca'.Calii EDI that butaFeci 0t71•4riy MAP NUMBER 081231850E EFFECTIVE DATE JANUARY tar 2015 4 la •SO c 4 i s L''iiiifp a a FaNt cai tar ina' math rthhohoomi tact map IN •,a, sritract.rea Wattle r -MIT an-L1ot Ma ma or na FMK: hanott or ame dene-en wren mai runt rle* ► tomb Ittts chmt lA ro the mat on too Me dark For Ina Iatrft patchiest information about Nationat Flood lost rarwe Proprara $ ca Ibi opt aniatk rna FEiMIA Fre.oO Me Store or rrinnsir ruin tine Truck Sales and Service Facility Drainage Report APPENDIX D - HYDROLOGIC SOIL GROUP December 19, 2017 14 40° 22'0"N 40° 21' 51" N 0 T sr 5@9010 Hydrologic Soil Group —Weld County, Colorado, Southern Part %`9040 566980 39010 ,569040 569070 569100 59130 Map Scale: 1:1,360 if printed on A portrait (8.5" x 11") .fit. 0 20 40 80 6x9070 569100 Me4Ers 120 Feet 0 50 100 200 300 Map proJedion: Web Mercator Corner coordinates: WQS.34 Edge lies: UTM Zone 13N WGS 4 569130 5x9160 104° 11' 6" W 104° 11' 6" W 0 r 40° 22'0'N 44° 21' 51" N USDA Natural Resources a Web Soil Survey Conservation Service National Cooperative Soil Survey 12/19/2017 Page 1 of 4 Ct a L 43 •CJ] fl V fl ci F a �0ICD aLib L O ao fl 2 z Q O U- z 0 MAP LEGEND a E 2 Q C a IC r465 co co 0 a) c •a c a a) r 0 O O .v SD 0 cl) (6 C cn C OO co no a , Etat O E co a C C cm .o clo a) ?-CO c am— 0 acct c > C • CD - =COO a o fl 41104 a L L a co E = 2 It c fl 75- 0 E a} E L fl c c a v c' fl ai W C tt3 E ,c 8 8 0 fl co Co C O L eci O ® • O O L 0 co tn 3 Q C Soil Rating Polygons C Water Features co O eta CO E Er Transportation L fl O L al co co cL) a '- M O (10 a)U � -o E . . a CO .C 2 Cr) o Co . CD fl o a U En CO fl • c co = co E U ft c 03 L o t L .C V) L 'fl a fl" co co 0 U 2J Ca C fl co U 4e o 4a fl f N :�.to cp C o fl a) c fl U U = co fly p fl op a '^ CO GI) 0a ai cis ,o >.� n ccD c o c c cii •C COLO v •,C 2 Et 0 C o co= 0 cr cu o C� C � O fl cn u) 0 L a c' u) m scs = .a O O..° CO o= CD i3 fl fl a co 2 n aE w U 2a-cca Cf nterstate Highways o O 0 O C W W 0 co 8 ai Co Not rated or not ava V C a u ro m Soil Rating Lines Aerial Photography c!) co O no a, CO Ct a att CD -o 3 fl 4- a c fl o •L o 5 a s isted below. o ca o Q Q DD m co 0 L v CON- -aa 152 a 0- 0 0 ...E° . CC)C O 2 -a 12 Cid id o L 0 '- aC 01 a) •fl D (C 0 a 17) E 0 Cn CIO a t) ▪ C = Ca CO Ea ' stn (O Q 0 17, 2015 —Sep images were photographed: co co co C� c Cs •J co CO co 0 C O -v Co ad z Soil Rating Points ) G L C L aC E .cal L 0 a -C Aar Ej L C cn -v 2 CO 0 C 12 fl w E>%CD to cU ED E ,4) C L o fl C a .C = C L + •C O C}q) v =v 4a0, ICZ5 O 1O L C' I13 C Ft a., co O Fla) C 4) c 1- O ._ O co0 Q m a ® ■ ■ Resources Conservation Service Hydrologic Soil Group Weld County, Colorado, Southern Part Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AQI Percent of AOI 70 Valent sand, 8 to 9 percent slopes A 8.3 100.0% Totals for Area of Interest 8.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (ND, BID, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, BID, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff- None Specified USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 12/19/2017 Page 3 of 4 Hydrologic Soil Group —Weld County, Colorado, Southern Part Tie -break Rule: Higher USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/19/2017 Page 4 of 4 Truck Sales and Service Facility Drainage Report APPENDIX E - NOAA ATLAS 14 - PRECIPITATION VALUES December 19, 2017 12/15/2017 Precipitation Frequency Data Server NOAA Atlas 14, Volume 8, Version 2 Location name: Orchard, Colorado, USA Latitude: 40.3661e, Lon€gitude: -104.1811 Elevation: 4544.07 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffery Rennin NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF cgraphical I Maps & aerials PF tabular PD -based point precipitation frequency estimates with 90% confidence intervals (in inches )1 Duration 5 -min 10 -min 15 -rain 30 -min 60 -min 2 -hr 3 -hr 6 -hr 12 -hr 24 -hr 2 -day 3 -day 4 -day 7 -day 10 -day 20 -day 30 -day 45 -day 60 -day Average recurrence interval (years ) 1 0.256 (0.203-0.326) 0.375 (0.298-0.477) 0.458 (0.363-0.582) 0.621 (0.492-0.789) 0.767 (0.609-0.976) 0.914 (0.732-1.15) 0.992 (0.799-1.24) 1.13 (0.919-1.40) 1.31 (1.07-1.61) 1.55 (1.29-1.89) 1.79 (1.50-2.15) 1.97 (1.65-2.35) 2.10 (1.77-2.50) 2.39 (2.03-2.81) 2.64 (2.26-3.10) 3.42 (2.95-3.96) 4.07 (3.54-4.69) 4.89 (4.28-5.59) 5.58 (4.90-6.35) 0.308 (0.244-0.393) 0.452 (0.358-0.575) 0.551 (0.437-0101) 0.744 (0.590-0.947) 0.915 (0.726-1.17) 1.09 (0.869-1.37) 1.18 (0.945-1.47) 135 (1.10-1.67) 1.57 (1.28-1.92) 1.81 (1.50-2.20) 2.08 (1.74-2.50) 2.25 (1.89-2.69) 2.39 (2.02-2.84) 2.73 (2.32-3.22) 3.03 (2.58-3.55) 3.89 (3.36-4.51) 4.62 (4.01-5.32) 5.55 (4.85-6.35) 6.35 (5.57-7.23) 5 0.405 (0.320-0.516) 0.593 (0.468-0.756) 0.723 (0.571-0.922) 0.973 (0.768-1.24) 1.20 (0.944-1.53) 1.42 (1.13-1.79) 1.53 (1.23-1.92) 1.76 (1.43-2.19) 2.03 (1.65-2.49) 2.28 (1.88-2.78) 2.59 (2.15-3.12) 2.76 (2.31-3.30) 2.90 (2.44-3.46) 3.30 (2.80-3.90) 3.66 (3.11-4.30) 4.65 (4.00-5.40) 5.49 (4.75-6.33) 6.58 (5.73-7.55) 7.54 (6.59-8.61) r 10 _ 0.495 (0.389-0.634) 0.725 (0.569-0.928) 0.884 (0.694-1.13) 1.19 (0.932-1.52) 1.46 (1.15-1.87) 1.74 (1.38-2.21) 1.88 (1.50-2.37) 2.16 (1.73-2.69) 2.45 (1.99-3.03) 2.71 (2.22-3.32) 3.04 (2.52-3.68) 3.21 (2.67-3.86) 3.36 (2.81-4.02) 3.79 (3.19-4.50) 4.18 (3.54-4.93) 5.26 (4.50-6.14) 6.18 (5.32-7.16) 7.39 (6.40-8.52) 8.47 (7.36-9.71) 25 0.635 (0.488-0.856) 0.929 (0.715-1.25) 1.13 (0.872-1.53) 1.52 (1.17-2.05) 1.88 (1.45-2.55) 2.25 (1.75-3.02) 2.44 (1.92-3.27) 2.78 (2.19-3.66) 3.09 (2.45-4.00) 3.37 (2.70-4.31) 3.72 (2.99-4.68) 3.89 (3.15-4.87) 4.04 (3.29-5.02) 4.50 (3.67-5.51) 4.92 (4.02-5.97) 6.09 (5.02-7.27) 7.10 (5.88-8.41) 8.45 (7.03-9.91) 9.65 (8.05-11.2) 50 0.755 (0.564-1.02) 1.11 (0.825-1.51) 1.35 (1.0.1-1.83) 1.60 (1.35-2.45) 2.25 (1.68-3.06) 2.70 (2.0i4-3.64) 2.94 (2.23-3.95) 3.32 (2.54-4.40) 3.64 (2.81-4.75) 3.92 (3.06-5.06) r 4.28 (3.36-5.44) 4.45 (3.52-5.63) 4.60 (3.65-5.79) 5.06 (4.03-6.28) 5.49 (4.39-6.75) 6.71 (5.41-8.13) 7.78 (6.31-9.35) 9.21 (7.50-11.0) 10.5 (8.57-12.4) 100 0.885 (0.637-1.23) 1.30 (0.933-1.80) 1.58 (1.14-2.19) 2.11 (1.52-2.93) 2.65 (1.91-3.68) 3.19 (2.33-4.39) 3.49 (2.56-4.78) 3.91 (2.89-5.29) 4.22 (3.14-5.63) 4.52 (3.40-5.96) 4.87 (3.69-6.33) 5.05 (3.85-6.53) 5.20 (3.98-6.68) 5.64 (4.34-7.16) 6.06 (4.68-7.62) 7.32 (5.71-9.07) 8.43 (6.61-10.4) 9.93 (7.82-12.1) 11.3 (8.90-13.6) 200 1.03 (0.709-1.46) 1.51 (1.04-2.13) 1.84 (1.27-2.60) 2.45 (1.69-3.48) 3.10 (2.14-4.40) 3.74 (2.61-5.27) 4.10 (2.88-5.74) 4.57 (3.23-6.32) 4.86 (3.47-6.63) 5.17 (3.72-6.97) 5.51 (4.00-7.34) 5.69 (4.16-7.54) 5.84 (4.29-7.69) 6.25 (4.62-8.13) 6.65 (4.93-8.57) 7.92 (5.93-10.1) 9.07 (6.82-11.4) 10.6 (8.02-13.3) 12.0 (9.08-14.9) 500 1.23 (0.817-1.79) 1.81 (1.20-2.62) 2.20 (1.46-3.19) 2.94 (1.95-4.27) 3.74 (2.48-5.43) 4.54 (3.04-6.54) 5.00 (3.37-7.15) 5.52 (3.75-7.81) 5.76 (3.95-8.05) 6.09 (4.22-8.42) 6.40 (4.47-8.74) 6.60 (4.64-8.95) 6.74 (4.76-9.10) 7.08 (5.03-9.44) 7.43 (5.30-9.84) 8.70 (6.26-11.4) 9.87 (7.15-12.8) 11.4 (8.33-14.7) 12.8 (9.36-16.4) 1000 1.40 (0.899-2.04) 2.05 (1.32-2.99) 2.51 (1.60-3.64) 3.34 (2.14-4.86) 4.27 (2.74-6.22) 5.20 (3.37-7.50) 5.74 (3.74-8.22) 6.30 (4.14-8.94) 6.50 (4.32-9.12) 6.84 (4.59-9.51) 7.12 (4.83-9.80) 7.33 (5.00-10.0) 7.46 (5.12-10.2) 7.73 (5.34-10.4) 8.03 (5.58-10.8) 9.27 (6.51-12.3) 10.5 (7.40-13.8) 12.0 (8.56-15.8) 13.4 (9.57-17.5) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PCB). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https:'lhdsc.nws.noaa.govlhdsv/pfds/'pfds_printpage.html?lat=40.3661 &lon=-104.1811 &data=depth&units=english&series=pds 1/4 12/15/2017 Precipitation Frequency Data Server PF graphical Precipitation depth (in) 14 8 6 4 2 PDS-based depth -duration -frequency (DDF) curves Latitude: 40.366r I Longitude: -104.1811° C Uri C rn C 5 10 NOAA Atlas 140 Volume 8, Version 2 N Duration Sc 1 N � � ft ru ru tt -aio r4 0 r4 25 50 100 200 Average reLurreoceinterval (years) rti IT fora O D t d d t3 O N t CI 500 1000 Created (GMT) : Fri Dec 15 17:14:21 2017 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years} 1 2 5, 10 25 50 100 200 500 1000 Duration 5 -min Dernin 15 -min 3O -min 6D -min 2 -hr 3 -hr b -r 12 -hr 24 -hr 2 -day 3 -day 4 -day 7 -day 1 D-day 20 -day 30-ciay 45 -day 60 -day https://hdsc.nws.noaa.gov/hdscipfds/pfds_printpage.html?lat=40.3661 &len=-104.1811 &data=depth&units=english&series=pds 2/4 12/15/2017 Precipitation Frequency Data Server 4 i i II Iy 3km ! 2mi I Or ch ar ci, —014 0 tit *i 77. Longs 4345+- Bloul tier, o11 L 1 • 7 r,. —savors e I.Iation S infect , tit z LoT „art ---'a,, �'�S-e i'a C.43L,-_ isegL. Large scale terrain • Cheyenne c reeie I • a Longmont I •Denver Fort-CoiIrrs Large scale map Cheyenne Greeley I c.) Longmont Boulder n er V 100km I 6 mi I. N Large scale aerial https://hdsc.nws.noaa.gov/hdscipfds/pfds_printpage.html?lat=40.3661 &Ion= -104.1811 &data=depth&units=english&series=pds 3/4 12/15/2017 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic an€1 Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: H DS C .Questions noaa. qov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=40.3661&Ion=-104.1811&data=depth&units=english&series=pds 4/4 Truck Sales and Service Facility Drainage Report APPENDIX F - RATIONAL METHOD RUNOFF CALCULATIONS 1. Drainage Basin Runoff Calculations December 19, 2017 /Nit U NT.e.H ifriWCWI i.lfri{fii.INSa S I $tN17 "44.16/76 Y Mut_/ WeldCounty Engineering & Construction Criteria Table 5-3 Recommended Percentage Imperviousness Values IJDFCD Vol. 1 - Table 6-3 Recommended Percentage Imperviousness Values 'Yo Impervious WEIGHTED IMPERVIOUS SURFACE CALCULATIONS LI ndevel{sped Areas Streets Historic Flow Analysis Greenbelts, Agricultural Off -site flow analysis (Land Use Not Defined) Paved 2% 2% 45% 100'., Gravel Recycled Asphalts Developed Areas Concrete Driveways Sidewalks 40% 75% 90% 90% M ISC. Single -Family Res. Roofs 0.75-2.5 Acres Parks Playgrounds Berms/ Cut/Fill Slopes/ Landscaping 90% 20% 10% 25% 2% 12/19/2017 Basin Area (Ac) Area (Ac) Area (Ac) Area (Ac) Area (Ac) Area (Ac) Area (Ac) Area (Ac) Area (Ac) Area (Ac) Area (Ac) Area (Ac) Area (Ac) Total Area (Ac) Percent Imperv. OS- I 0.53 0.53 2.00"4, A l . l I 0.36 I A7 30.69% B 1.17 0.86 2.03 23.90% H -A 1.47 147 2..00% H -B 2.(13 2.M3 2.00% 0.00 0.00% 0.000 0.00% 0.000 0.00% 0.000 0.{00% 0.000 0.00% 0.0(10 0,00% . 0.000 0.00% 0.000 0.00% 0.000 0.00% 0.000 0.0(}% Total: 7.53 USD M Vol 1 - Section 6.0 Runoff Page leNt. UIhITA1H rwnnurrniran R LAitMn 494 ERVVVunc WEIGHTED RUNOFF COEFFICIENT VERSUS WATERSHED HED IMPERVIOUSNESS METHOD AS DETAILED IN URBAN STORM DRAINAGE CRITERIA MANUAL VOL. 1 (COLORADO) CA = KA + (1.31i 3 - 1.44i ` + 1.135i - 0.12) for CA > or = 0, otherwise CA = 0 CB = (CA + CeD)/2 Cc D = Ken + (0.858i 3 - 0.786i 2 + 0.774i + 0.04) i = % imperviousness/100 expressed as a decimal A = Correction factor for Type A soils K1'1) = Correction factor for Type C and 'l ype D soils (RO-6) (1(0-7) Correction Factors, KA & K(.D Soil Type Storm Return Period 2 -Year 5 -Year 10-Yr 100 -Year A 0.00 C', or D 0.00 - 0.08i + 0.09 -0.14i +0.17 - 0.25i + 0.32 - 0.101 + 0.11 -0.18i + 0.21 - 0.39i + 046 12/19/2017 Basin ID % Imperv. i Soil Type Correction Factors, KA & Ken Runoff Coefficients, C Basin Area (Ac) Total Area (A►c) Weighted Runoff Coefficients, C I Soil Type 5 -Year 10 -Year 100 -Year 2 -Year 5 -Year I 10 -Year 100 -Year 2 -Year 5 -Year 10 -Year I 100 -Year I % +CAS -1 2.00% 0.02 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.45 0.00 0.03 0.06 0.00 0.08 0.16 0.07 0.17 0.26 0.22 0.36 0.51 0.53 0.00 0.00 0.53 0.00 0.00 0.07 100% 0.22 0% A 30.69% 0.31 A B C or D 0.07 - 0.08 0.13 - 0.15 0.24 - 0.34 0.13 0.18 0.23 0.20 0.25 0.31 0.26 0.32 0.38 0.37 0.47 0.57 1.47 0.00 0.00 1.47 0'.13 0.20 0.26 100% 0.37 0% B 23.90% 0.24 A B C or 0 0.07 - 0.09 0.14 - 0.17 0.26 - 0.37 0.09 0.14 0.19 0.16 0.22 0.28 0.22 0.29 036 0.35 0.45 0.56 2.03 0.00 0.00 2.03 0.09 0.16 0.22 100% 0.35 0% H -A 2.00% 0.02 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.45 0.00 0.03 0.06 0.00 0.08 0.16 0.07 0.17 0.26 0.22 0.36 0.51 0.00 1.47 0.00 1.47 0.03 0.08 0.17 0.36 100% H -B 2.00% 0.02 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.45 0.00 0.03 0.06 0.00 0.08 0.16 0.07 0.17 0.26 0.22 0.36 0.51 2.03 0.00 0.00 2.03 0.00 0.00 0.07 100% 0.22 0.00% 0.00 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.46 0.05 0.05 0.04 0.05 0.10 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 10U% 0.00% 0.00 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.46 0.00 0.02 0.04 0.00 0.08 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 0.00% 0.00 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.46 0.00 0.02 0.04 0.00 0.08 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 101 0.00% 0.00 A B C" or D 0.09 - 0.11 0.17 - 0.2.1 0.32 - 0.46 0.00 0.02 0.04 0.00 0.08 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 I . is ; J 0.00% 0.00 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.46 0.00 0.02 0.04 0.00 0.08 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 100% 0.00% 0.00 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.46 0.00 0.02 0.04 0.00 0.08 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 0.00% 0.00 A B C or O 0.09 - 0.11 0.17 - 0.21 0.32 - 0.46 0.00 0.02 0.04 0.00 0.08 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 100% 0.00% 0.00 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.46 0.00 0.02 0.04 0.00 0.08 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 100% 0% 0.00% 0.00 A B C or D 0.09 - 0.11 0.17 - 0.21 0.32 - 0.46 0.00 0.02 0.04 0.00 0.08 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 100% 0'�. 0.00% 0.00 A B C or 13 0.09 - 0.11 0.17 - 0.21 0.32 - 0.46 0.00 0.02 0.04 0.00 0.08 0.15 0.05 0.15 0.25 0.20 0.35 0.50 0.00 0.00 0.00 0.00 100% USDCM Vol 1 - Section 6.0 Runoff Paget "It UI'_ ._H 1sh4G1h1EERING a LAS N0 SUficdeYIRI13 STANDARD FORM SF -2 TIME OF CONCENTRATION METI IOD AS DETAILED IN URBAN STORM DRAINAGE CRITERIA MANUAL VOL. 1 (COLORADO) NRCS Conveyance Factors, K I leavy. Meadow 2.50 Short Grass Pasture & Lawns TiIIage/ Field 5.00 Nearly Bare Ground 7.00 Grassed Waterway 15.00 10.00 Paved Area 8, Shallow Gutter 20.00 Is the basin Urban or Non -Urban? Non -Urban ME - 12/19/2017 Sub -Basin Data Non -Urban Initial/Overland Time T(i) Non -Urban Travel Time T(t) Non -Urban Urbanized Basin T(c) Check Flow Length (Overland) Design Point Drainage Basin Area (Ac) C(5) Length (11) Slope (%) T(i) min Length (Il) Slope (t:) Coen'. (K) Velocity (fps) T(t) (min) Comp. T(c) Total Length L/180110 Final T(c) (min) 1 OS -1 0.53 0.00 353 20.8 0 10.00 1.10 0.0 20.8 353 12.0 12.0 � =_ y� ] 1 ' , -L 1 2 A 1.47 0.20 26.8 140 10.00 0.71 3.3 30.1 410 12.3 12.3 3 B 2.03 0.16 10.8 560 10.00 3.16 3.0 13.7 600 13.3 13.3 4 14-A 1.47 0.0S 15.3 1 65 10.00 2.00 1.4 16.7 365 12.0 12.0 5 II -B 2.03 0.00 16.5 190 7.00 1.40 2.3 18.8 390 12.2 12.2 6 0.00 190 7.00 390 10.0 7 0.00 10.00 550 10.0 $ 0.00 7.00 300 10.0 9 0.00 10.00 400 10.0 10 0.00 10.00 400 10.0 11 0.00 10.00 400 10.0 12 0.00 10.00 400 10.0 13 0.00 10.00 400 10.0 14 0.00 10.00 '100 10.0 15 0.00 10.00 400 10.0 USDCM Vol 1 - Section 6.0 Runoff Page 3 sol,qt U I NTAI-I CNGIN[CFUMNC :ff. LAND StilWrVIMAc3 STANDARD FORM SF -3 -YR RUNOFF - RATIONAL METHOD METHOD AS DETAILED IN URBAN STORM DRAINAGE CRITERIA MANUAL VOL. 1 (COLORADO) 5-Yr Rainfall Depth -Duration -Frequency (1 -hr) = 1.2 inlhr 12/19/2017 Design Storm: 5 Year BASIN INFORMATION DIRECT RUNOFF TOTAL RUNOFF Design Runoff T(c 1 Q T(c) Sum I Q Point Drainage Basin Area (Ac) Coeff. (min) C x A(117%ilr} (cfs) (min)Cx (in/br) (cfs) REMARKS I OS -1 0.53 0.00 12.0 0.00 3.02 0.0 2 A 1.47 0.20 123 0.29 2.98 0.9 3 B 2.03 0.16 133 0.32 2.88 0.9 4 H -A 1.47 0.08 12.0 0.12 3.01 0.4 5 H -B 2.03 0.00 12.2 0.00 2.99 0.0 6 0.00 70.00 8 0.00 9 0.00 10 0.00 11 0.00 12 0.00 13 0.00 14 0.00 15 0.00 USDCM Vol 1 - Section 6.0 Runoff Page 4 sol,qt U I NTAI-I CNGIN[CFUMNC :ff. LAND StilWrYIMAc3 STANDARD FORM SF -3 100-YR RUNOFF - RATIONAL METHOD METHOD AS DETAILED IN URBAN STORM DRAINAGE CRITERIA MANUAL VOL. 1 (COLORADO) 100-Yr Rainfall Depth -Duration -Frequency (1 -hr) = 2.65 inlhr 12/19/2017 Design Storm: 100 Year BASIN INFORMATION DIRECT RUNOFF TOTAL RUNOFF Design Runoff T(c 1 Q T(c) Sum I Q Point Drainage Basin Area (Ac) Coeff. (min) A(117%Ilr} (cfs) (min)Cx (in/br) (cfs) REMARKS S I OS -1 0.53 0.22 12.0 0.12 6.66 0. ?c 2 A 1.47 037 123 0.55 6.59 3.6 3 B 2.03 0.35 133 0.70 6.35 4.5 4 H -A 1.47 0.36 12.0 0!,53 6.65 3.5 5 H -B 2.03 0.22 122 0.44 6.61 2.9 6 0.00 70.00 g 0.00 9 0.00 10 0.00 11 0.00 12 0.00 13 0.00 14 0.00 15 0.00 USDCM Vol l - Section 6.0 Runoff Page 5 Truck Sales and Service Facility Drainage Report APPENDIX — DETENTION POND CALCULATIONS 1. Detention Pond -A 2. Detention Pond -B December 19, 2O17 30 DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Circle B 5-51-27 Compressor Pad Basin ID: Detention Pond - A (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Determination of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness la = 30.76 percent Catchment Drainage Imperviousness la = 30.76 percent Catchment Drainage Area A = 1.470 acres Catchment Drainage Area A = 1.470 acres Predevelopment NRCS Soil Group Type = A A. 6, C. or D Predevelopment NRCS Soil Gmup Type = A A, B, C, or D Return Period for Detention Control T = 5 years (2. 5, 10, 25, 50_ or 100) Return Period for Detention Control T = 100 years (2. 5, 10 25, 50, or 100) Time of Concentration of Watershed Tc = 12 minutes Time of Concentration of Watershed Tc = 12 minutes Allowable Unit Release Rate q = 0.27 cfs/acre Allowable Unit Release Rate q = 0.27 cfs?acre One -hour Precipitation P1 = 1.20 inches One -hour Precipitation P1 = 2.6.5 inches Design Rainfall IDF Formula i = Cis' P11{C2+T.}"C3 Design Rainfall IDF Formula i = C1* f 1!(C2+T,}"C3 Coefficient One C1 = 28.50 Coefficient One C1 = 28.50 Coefficient Two C2 T. 10 Coefficient Two C2 = 10 Coefficient Three C, = 0,789 Coefficient Three C-, = 0.789 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.37 Runoff Coefficient C = 0.20 Inflow Peak Runoff Op -in = 0.87 cfs Inflow Peak Runoff Op -in = 3.55 efs Allowable Peak Outflow Rate Op -out = 0.40 cfs Allowable Peak Outflow Rate Cp-out = 0.40 Os Mod. FAA Minor Storage Volume = 480 cubic feat Mod. FAA Major Storage Volume = 4;795 cubic feet Mod. FAA Minor Storage Volume = 0.011 acre -ft Mod. FAA Major Storage Volume = 0.118 acre -ft 5 c.- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5 -Minutes} Rainfall Duration minutes (input) Rainfall Intensity inches/ hr (output) Inflow Volume acre -fit (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre -fact {output) Storage Volume acro-fcot (output) Rainfall Duration m intltos (input) Intensity inches (output) Rainfall 1 hr Inflow Volume acro-foot (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acro-fort (output) Storage Volume acro-foct (output) 0 0.00 0.000 0.00 0.00 0.000 0.000 0 0.00 0,000 0.00 0.00 0.000 0.000 5 4.04 0-008 1.00 0.40 0.003 0:005 5 8.92 0.033 1-00 0.40 0.003 0-[131 10 3.22 0.013 1.00 0.40 0.006 0.008 10 7,11 0.053 1.00 0.40 0.006 0.048 15 2.70 0.016 0.91 0.36 0.008 0.009 15 5,96 0,067 0.91 0.36 0.008 0.059 20 2.34 0-019 0-81 0.32 0-009 0.010 20 5.16 0.077 0.6.1 0.32 0.009 0.068 25 2.07 0.021 0.75 0.30 0.010 0.011 25 4.57 0,086 0.75 0.30 0.410 0.075 30 1,86 0.023 0.71 0.28 0.012 0.011 30 4.11 0,092 0.71 0.28 0.012 0.081 35 1.70 0.024 0.68 0.27 0.013 0.011 35 3.75 0.098 0-68 0.27 0-013 0:085 40 3.45 0.103 0.65 0.26 0-014 0.089 40 1.56 0.025 0.65 0.26 0.014 0.011 45 1.45 0.025 0.64 0.25 0.016 0.011 45 3,20 0.108 D.64 0.2.5 0.016 11092 50 1.35 0.027 0.62 0.25 0.017 0.010 50 2.99 0.112 0.62 0.25 0.017 0-095 55 1.27 0.028 0;61 0.24 0.019 0.010 55 2.80 0.116 0.61 0.24 0.019 0.097 6D 1.20 0.029 0,60 0,24 0.020 0,009 60 2.64 0.119 0.60 0.24 0.020 0.099 65 1.13 0.030 0.59 0-24 0.021 0-009 65 2.50 0.122 0-59 0.24 0-021 0.101 70 2.38 0.125 0.59 0.24 0.023 0.102 70 1.08 0.031 0.59 0.24 0.023 0.008 75 1.03 0.031 0.58 0.23 0,024 0.007 75 2,27 0.127 D.58 0.23 0.024 11103 80 0-98 0-032 0.56 0.23 0.025 0.006 80 2.17 0.130 0.56 0.23 0.025 0.105 85 0.94 0.032 0.57 0.23 0.027 0.006 85 2.08 0.132 0.57 0.23 0.027 0.106 90 0.90 0.033 0..57 0,23 0.028 0.005 90 2.00 0.135 0.57 0.23 0.028 0.106 95 0-87 0.033 0.56 0.23 0.030 0.004 95 1.92 0.137 0.56 0-23 0.030 0-107 100 1.85 0.139 0.56 0.22 0.031 0.108 100 0.64 0.034 0.56 0.22 0.031 0.003 105 0.81 0.034 0.56 0.22 0,032 0.002 105 1.79 0.141 0,56 D.22 0,032 D,108 110 0.76 0-035 0.56 0-22 0.034 0-001 110 1.73 0.142 0-56 0.22 0-034 0.109 115 0.76 0.035 0.55 0.22 0.035 0.000 115 1.67 0.144 0.55 0.22 0.035 0.109 120 0.73 0.036 0,55 0,22 0.036 -0.00'1 120 1,62 0.145 D.55 0.22 D.036 0.109 125 0.71 0-036 0.55 0.22 0.038 -0.002 125 1.57 0.147 0.55 0-22 0.036 0-110 130 1.53 0.149 0.55 0.22 0.039 0.110 130 0.69 0.036 0.55 0.22 0.039 -0.003 135 0.57 0.037 0.55 0.22 0,041 -0,014 135 149 0.151 0,55 0.22 0.041 0.110 140 0.66 0-037 0.54 0.22 0.042 -0.005 140 1.45 0.152 0.54 0.22 0.042 0-110 145 0.64 0.038 0.54 0,22 0.043 -0.006 145 1.41 0.153 0.54 222 0.043 0.110 150 0.62 0.038 0,54 0.22 0,045 -0,007 150 1.38 0.155 0.54 D.22 0,045 0.110 155 0.61 0-038 0.54 0.22 0.046 -0.008 155 1.34 0.156 0.54 0-22 0.046 0-110 160 1.31 0.157 0.54 0.22 0,047 0.110 160 0.59 0.039 0.54 0.22 0.047 -0.009 165 0.58 0.039 0.54 0.21 0,049 -0.010 165 1.28 0.159 0,54 0.21 0.049 0.110 170 0.57 0-039 0.54 0.21 0.050 -0.011 170 1.26 0.160 0.54 0-21 0.050 0-110 175 0.56 0.039 0.54 0.21 0.052 -0.012 175 1.23 0.161 0.54 0.21 0.052 0.109 1811 0.54 0.040 0.53 0,21 0.053 -0.013 180 1.20 0.162 0.53 D.21 0.053 0.109 185 0-53 0.040 0.53 0.21 0.054 -0.014 185 1.16 0.163 0.53 0-21 0.054 0-109 190 1.15 0.164 0.53 0.21 0.056 0.109 190 0.52 0.040 0.53 0.21 0.056 -0.015 195 0.51 0.041 0.53 0.21 0.057 -0,017 195 1.13 0.165 0.53 0.21 0,057 0,108 200 0.50 0-041 0-53 0.21 0-058 -0.018 200 1.11 0.167 0.53 0.21 0.058 0.108 205 0.49 0.041 0.53 0.21 0.060 -0.019 205 1.09 0.168 0.53 4.21 0.060 0.108 210 0.49 0.041 0..53 021 0.061 -0.020 210 1.07 0.169 0.53 0.21 0.051 0.107 215 0.48 0.041 0.53 0.21 0.063 -0.021 215 1.05 0.170 0.53 0-21 0.063 0-107 220 1.03 0.170 0.53 0.21 0.064 0.106 220 0.47 0.042 0.53 0.21 0.064 -0.022 225 0.46 0.042 0.53 0.21 0,065 -0,023 225 1.02 0.171 0.53 D.21 0,065 2.106 230 0.45 0.042 0.53 0.21 0.067 -0.025 230 1.00 0.172 0.53 0.21 0.067 0.106 235 0.45 0.042 0.53 0.21 0.068 -0.026 235 0.98 0.173 0.53 0.21 0.068 0.105 240 0.44 D.043 0.53 0,21 0.070 -0,027 240 0.97 0.174 0.53 0,21 0,070 0,105 245 0.43 0-043 0-53 0.21 0-071 -0.028 245 0-95 0.175 0.53 0.21 0.071 0.104 250 0.94 0.176 0.52 0.21 0.072 0.104 250 0.43 0.043 0.52 0.21 0.072 -0.029 255 0.42 0.043 0.52 0.21 0,074 -0.030 255 0.93 0.177 0.52 D.21 0.074 0.103 260 Q.41 0.043 0.52 0.21 0.075 -0.032 26Q 0-91 0.170 0.52 0-21 0.075 0-103 265 0.41 0.044 0.52 0.21 0.076 -0.033 265 0.90 0.178 0.52 0.21 0,076 0.102 27D 0.40 0.044 0.52 0,21 0.078 -0,034 270 0.89 0.179 0,52 D,21 0.078 0,101 275 0.40 0-044 0.52 0.21 0-079 -0.035 275 0-87 0.180 0.52 0.21 0.079 0.101 280 0.39 0.044 0.52 0.21 0.081 -0.036 280 0.86 0.181 0.52 0.21 0.081 0,100 285 0.38 0.044 0.52 0.21 0.082 -0,037 285 0.8.5 0.181 0,52 0.21 0,082 0.100 290 0.38 0.045 0.52 0.21 0033 -0.039 290 0.81 0.182 0.52 0.21 0.083 0.099 295 0.53 0.183 0.52 0.21 0.085 0.098 295 0.37 0.045 0.52 0.21 0.085 -0.040 300 0.37 0.045 0.52 0.21 0.085 -0,041 300 0.82 0.184 0.52 0,21 0,086 D.098 Mod. FAA Minor Storage Volume (cubic ft.) = 480 Mod. FAA Major Storage Volume Icubic ft.) _ Mod. FAA Minor Storage Volume (acre -ft.) = 0.0110 Mod. FAA Major Storage Volume (acre -ft.) UIJFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013 4,796 0.1101 UD-Detention_v2.34-A, Modified FAA 12119/2017, 11:21 AM DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Circle B 5-51-27 Compressor Pad Basin ID: Detention Pond - A Inflow and Outflow Volumes vs. Rainfall Duration 0.2 0.18 0.16 0.14 0.12 4-77 C) vir a) C) 0.1 a) E 0.08 0.06 0.04 0.02 4 50 100 150 200 250 300 — "le .., Duration (Minutes) -4- multi' Stchn Infldar Volumt --dr.. retinae StOrul Outflow Vbtumr Miridr attire' Staragfi volumt majdr SWIM Inflow Value* —i— tlfiirjOr Storvf Outflow %%lumd • MJOr' SIOnd Storayt Yalurd4 350 UDFOD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013 UD-Detention_v2.34-A, Modified FAA 12119/2017, 11:21 AM STAGE -STORAGE SIZING FOR DETENTION BASINS Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - A Site Slope Z 4 re> -4 Side Slope 2 Design Information (Input): Width of Basin Bottom, W = Length of Basin Bottom, L = Dam Side -slope (IH:V), Zci = Stage -Storage Relationship: Dant W .t 3.00 ft ft ftift Side Slope Z Sigh lsoscele Circ Flow Side Slope Z { Check Basin Shape t Triangle Triangle tectangle e I Ellipse Irregular X Storage Requirement from Sheet 'Modified FAA': Storage Requirement from Sheet 'Hyd rograph': Storage Requirement from Sheet 'Full -Spectrum': L OR... OR... OR... OR... (Use Overide values in cells G32:G52) MINOR MAJOR 0.01 0.11 acre -ft. acre -ft. acre -ft. Labels for WQCV, Minor, & Major Storage Stages (input) Water Surface Elevation ft (input) Side Slope (H:V) ft/ft Below El. (input) Basin Width at Stage ft (output) Basin Length at Stage ft (output) Surface Area at Stage ft2 (output) Surface Area at Stage ft2 User Overide Volume Below Stage ft3 (output) Surface Area at Stage acres (output) Volume Below Stage acre -ft (output) Target Volumes for WOCV, Minor, & Major Storage Volumes (for goal seek) 4509.70 0 0.000 0.000 4509.80 0.00 0.00 253 13 0.006 0.000 4509.90 0.00 0.00 874 69 0.020 0.002 4510.00 0.00 0.00 1,279 177 0.029 0.004 4510.10 0.00 0.00 1,339 308 0.031 0.007 4510.20 0.00 0.00 1,386 444 0.032 0.010 4510.30 0.00 0.00 1,432 585 0.033 0.013 4510.40 0.00 0.00 1,480 730 0.034 0.017 4510.50 0.00 0.00 1,528 881 0.035 0.020 4510.60 0.00 0.00 1,576 1,036 0.036 0.024 4510.70 0.00 0.00 1,625 1,196 0.037 0.027 4510.80 0.00 0.00 1,675 1,361 0.038 0.031 4510.90 0.00 0.00 1,725 1,531 0.040 0.035 4511.00 0.00 0.00 1,776 1,706 0.041 0.039 4511.10 0.00 0.00 1,827 1,886 0.042 0.043 4511.20 0.00 0.00 1,879 2,072 0.043 0.048 4511.30 0.00 0.00 1,932 2,262 0.044 0.052 4511.40 0.00 0.00 1,985 2,458 0.046 0.056 4511.50 0.00 0.00 2,039 2,659 0.047 0.061 4511.60 0.00 0.00 2,093 2,866 0.048 0.066 WQCV 4511.70 0.00 0.00 2,147 3,078 0.049 0.071 4511.80 0.00 0.00 2,203 3,295 0.051 0.076 4511.90 0.00 0.00 2,259 3,518 0.052 0.081 4512.00 0.00 0.00 2,315 3,747 0.053 0.086 4512.10 0.00 0.00 2,372 3,981 0.054 0.091 4512.20 0.00 0.00 2,430 4,221 0.056 0.097 4512.30 0.00 0.00 2,488 4,467 0.057 0.103 4512.40 0.00 0.00 2,547 4,719 0.058 0.108 4512.50 0.00 0.00 2,606 4,977 0.060 0.114 4512.60 0.00 0.00 2,666 5,240 0.061 0.120 100-YR WSEL 4512.70 0.00 0.00 2,726 5,510 0.063 0.126 4512.80 0.00 0.00 2,787 5,785 0.064 0.133 4512.90 0.00 0.00 2,849 6,067 0.065 0.139 4513.00 0.00 0.00 2,911 6,355 0.067 0.146 4513.10 0.00 0.00 2,973 6,649 0.068 0.153 4513.20 0.00 0.00 3,037 6,950 0.070 0.160 4513.30 0.00 0.00 3,100 7,257 0.071 0.167 4513.40 0.00 0.00 3,165 7,570 0.073 0.174 4513.50 0.00 0.00 3,230 7,890 0.074 0.181 4513.60 0.00 0.00 3,295 8,216 0.076 0.189 4513.70 0.00 0.00 3,358 8,549 0.077 0.196 #N/A ##N/A #N/A ##NVA #N/A ##N/A U D -Detention v2.34 -A, Basin 12/19/2017, 11:21 AM U) STAGE -STORAGE SIZING FOR DETENTION BASINS Project: Basin ID: 1 STAGE -STORAGE CURVE FOR THE POND 4514.20 4513.70 4513.20 4512.70 4512.20 4511.70 4511.20 4510.70 4510.20 4509.70 � 0.00 0.05 0.10 0.15 0.20 0.25 Storage (acre-feet) I U D -Detention v2.34 -A, Basin 12/19/2017, 11:21 AM STAGE -DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Project Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - A WQCV Design Volume (Input): Catchment Imperviousness, la = Catchment Area, A = Depth at WQCV outlet above lowest perforation. H = Vertical distance between rows, h = Number of rows, NI. = Orifice discharge coefficient, Co = Slope of Basin Trickle Channel, S = Time to Drain the Pond = Watershed Design Information (Input): Percent Soil Type A Percent Soil Type B Percent Soil Type CID = Outlet Design Information (Output): 3 31.0 1.47 2 8.00 3.00 0.67 0.004 72 100 percent acres feet inches ft? ft hours Diameter of holes, O = Number of holes per row, N = Height of slot. H Width of slot, W = Water Quality Capture Volume, WQCV = Water Quality Capture Volume (WQCV) _ Design Volume (WQCV 1 12 * Area * 1.2) Vol = Outlet area per row, A0 Total opening area at each row based an user -input above. A0 Total opening area at each row based on user -input above, A0 = 0.317 1 OR inches inches inches 0.148 watershed inches 0.018 acre-feet 0.022 acre-feet 0.08 square inches 0.08 square inches 0.001 square feet o a 0 0 O O O O O O O O D a 0 O 0 a O00O O O 0 a ° O O ° O O C O ° o a a 0 0 Perforated Plate Examples Central Elevations of Rows of Holes in feet II Flow Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 1.00 1'.67 � 2.33 I I I I I I I I Collection Capacity for Each Row of Holes in cfs 4509.70 0.1984 0.1984 0,1984 0.60 4509.80 0.1984 0.1984 0,1984 0.60 4509.90 0.1984 0.1984 0.1984 0.60 4510.00 0.1984 0.1984 0.1984 0.60 4510.10 0 198 0.1984 0.1984 0.60 4510.20 0.1985 0.1.984 0.1984 I I 0.60 4510.30 0.1985 0.1984 0.1984 0.60 4510.40 0.1985 0.1984 0.1984 0.60 4510.50 I 0.1985 I 0.1984 I 0.1984 I I II I IIII I II 0.60 4510.60 0.1985 0.1984 0.1984 0.60 4510.70 0.1985 0.1984 0.1984 0.60 4510.80 0.1985 0.1985 0.1984 D.60 4510.90I 0.1985 0.1985 0.1984 IIII IIII II 0.60 4511.00 0.1985 0.1985 0.1984 0.60 4511.10 0.1985 0.1985 0.1984 0.60 4511.20 0.1985 0.1985 0.1984 0.60 4511.30 0.1985 0.1985 0.1984 0.60 4511.40 0.1985 0.1985 0.1985 0.60 4511.50 0.1985 0.1985 0.1985 0.60 4511.60 0.1985 0.1985 0.1985 0.60 4511.70 0.1985 0.1985 0.1985 0.60 4511.80 I 0.1985 0.1985 0.1985 _ 0.60 4511.90 0.1985 0.1985 0.1985 0.60 4512.00 0.1985 0.1985 0.1985 0.60 4512.10 0.1985 0.1985 0.1985 0.60 4512.20 0.1985 0.1985 0.1985 0.60 4512.30 0.1985 0.1985 0.1985 0.60 4512.40 0.1985 0.1985 0.1985 0.60 4512.50 0.1985 0.1985 0.1985 0.60 4512.60 0.1985 0.1.985 0.1985 0.60 4512.70 0.1985 0.1985 0.1985 0.60 IIN/A #N?A h'INI/A MIA UN?A UN?A UUN?A #N!A #N?A MIA f1N?A MA 'NIA UN?A UN?A MIA f!N?A MIA ftN?A MIA MIA UN?A UN IA #14/A UN?A UN?A MIA #N/A MIA ftN?A MIA #QUA #N?A UN?A UN?A #N/A #N?A #N/A UtN?A MIA MIA MIA #N?A #N!A tfN?A f1N?A I OM#N!A MIA t1N?A f1N?A MIA Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 1.6 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 UD-Detention v2.34 -A, WQCV 1211912017, 1121 AM STAGE -DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - A STAGE -DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE 4513.00 45'12.50 45 12.00 4511.50 Stage (feet, elev.} 4511.00 4510.50 4510.00 4509.50 4509.00 0.60 0.60 0.60 Discharge (cfs) 0.60 0.60 0.60 UD-Detention v2.34 -A, WQCV 12/1912011, .11:21 AM RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - A Did. To _ X C Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Water Surface Elevation at Design Depth Pipe/Vertical Orifice Entrance Invert Elevation Required Peak Flow through Orifice at Design Depth Pipe/Vertical Orifice Diameter (inches) Orifice Coefficient Full -flow Capacity (Calculated) Full -flow area Half Central Angle in Radians Full -flow capacity Calculation of Orifice Flow Condition Half Central Angle (0cThetac3.1416) Flow area Top width of Orifice (inches) Height from Invert of Orifice to Bottom of Plate (feet) Elevation of Bottom of Plate Resultant Peak Flow Through Orifice at Design Depth Elev: WS = Elev: Invert = Dia = C0- Af = Theta - Of = Percent of Design Flow = Theta = A0 T�= Y0= Elev Plate Bottom Edge = QO _ Width of Equivalent Rectangular Vertical Orifice Equivalent Width = Centroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroid El. = #1 Vertical Orifice #2 Vertical Orifice 4,512.70 4,509/0 0.40 6,0 0.55 0.20 3.14 1.4 360% 1.19 0.05 5.58 0.16 4,509.86 0.4 0.31 4,509.78 feet feet cfs inches sq ft rad cfs rad sgft inches feet feet cfs feet feet LID -Detention v2.34 -A, Restrictor Plate 12/19/2017, 11:21 AM STAGE -DISCHARGE SIZING OF THE SPILLWAY Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - A Design Information (input): Bottom Length of Weir Angle of Side Slope Weir Elev. for Weir Crest Gaef. for Rectangular Weir Coef. for Trapezoidal Weir Calculation of Spillway Capacity (output): L= Angle = EL. Crest = `w 't 5.00 75.96 4,512.70 3.0 0 3.00 Water Surface Elevation ft. (linked) Rect. Weir Flowrate cfs (output) Triangle Weir Flowrate cfs (output) Total Spillway Release cfs (output) Total Pond Release cfs (output) 4509.70 0.00 0.00 0.00 0.00 4509.80 0.00 0.00 0.00 0.00 4509.90 0.00 0.00 0.00 0.00 4510.00 0.00 0.00 0.00 0.00 4510.10 0.00 0.00 0.00 0.00 4510.20 0.00 0.00 0.00 0.00 4510.30 0.00 0.00 0.00 0.00 4510.40 0.00 0.00 0.00 0.00 4510.50 0.00 0.00 0.00 0.00 4510.60 0.00 0.00 0.00 0.00 4510.70 0.00 0.00 0.00 0.00 4510.80 0.00 0.00 0.00 0.00 4510.90 0.00 0.00 0.00 0.00 4511.00 0.00 0.00 0.00 0.00 4511.10 0.00 0.00 0.00 0.00 4511.20 0.00 0.00 0.00 0.00 4511.30 0.00 0.00 0.00 0.00 4511.40 0.00 0.00 0.00 0.00 4511.50 0.00 0.00 0.00 0.00 4511.60 0.00 0.00 0.00 0.00 4511.70 0.00 0.00 0.00 0.00 4511.80 0.00 0.00 0.00 0.00 4511.90 0.00 0.00 0.00 0.00 4512.00 0.00 0.00 0.00 0.00 4512.10 0.00 0.00 0.00 0.00 4512.20 0.00 0.00 0.00 0.00 4512.30 0.00 0.00 0.00 0.00 4512.40 0.00 0.00 0.00 0.00 4512.50 0.00 0.00 0.00 0.00 4512.60 0.00 0.00 0.00 0.00 4512.70 0.00 0.00 0.00 0.00 4512.80 0.47 0.04 0.51 0.51 4512.90 1.34 0.21 1.56 1.56 4513.00 2.46 0.59 3.06 3.06 4513.10 3.79 1.21 5.01 5.01 4513.20 5.30 2.12 7.42 7.42 4513.30 6.97 3.35 10.32 10.32 4513.40 8.78 4.92 13.70 13.70 4513.50 10.73 6.87 17.60 17.60 4513.60 12.81 9.22 22.03 22.03 4513.70 15.00 12.00 27.00 27.00 #N/A #NIA #NIA #N/A #NIA► #N/A #N/A #N/A #N/A #N/A ttNIA #NIA #N/A #N/A #N/A feet degrees feet UD-Detention_ x2.34 -A, Spillway 12/19/2017, 11:21 AM STAGE -DISCHARGE SIZING OF THE SPILLWAY Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - A STAGE -STORAGE -DISCHARGE CURVES FOR THE POND 0 4514.2 _ 4513.7 4513.2 0 4512.7 ecD 4512.2 O) s 4511/ 4511.2 4510.7 4510.2 4509.7 Storage (Acre -Feet) 0.05 0.1 0.15 0.2 0.25 • 5 10 15 Pond Discharge (cfs) 20 25 30 I UTA_ UISC-A1Ca Sris cRY uISCHAKCL UD-Detention_ x2.34 -A, Spillway 12/19/2017, 11:21 AM DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Circle B 5-51-27 Compressor Pad Basin ID: Detention Pond - B (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Determination of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness la = 24.00 percent Catchment Drainage Imperviousness la = 24.00 percent Catchment Drainage Area A = 2.020 acres Catchment Drainage Area A = 2.020 acres Predevelopment MRCS Soil Group Type = A A. B; C. or D Predevelopment NRCS Soil Gmup Type = A A, B, C; or D Return Period for Detention Control T = 5 years (2. 5, 10, 25, 50_ or 100) Return Period for Detention Control T = 100 years (2. 5, 10 25, 50, or 100) Time of Concentration of Watershed Tc = 13 minutes Time of Concentration of Watershed Tc = 13 minutes Allowable Unit Release Rate q = 0.15 cfs/acre Allowable Unit Release Rate q = 0.15 cfs?acre One -hour Precipitation P1 = 1.20 inches One -hour Precipitation P1 = 2.65 inches Design Rainfall IDF Formula i = Cis' P11{C2+T.}"C3 Design Rainfall IDF Formula i = C1* f i1(C2+T,}"C3 Coefficient One C1 = 28.50 Coefficient One C1 = 28.50 Coefficient Two C2= 10 Coefficient Two C2 = 10 Coefficient Three C.,!= 0.769 Coefficient Three C, = 0.789 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.35 Runoff Coefficient C = 0.16 Inflow Peak Runoff Op -in = 0.94 cfs Inflow Peak Runoff Op -in = 4.55 cfs Allowable Peak Outflow Rate Op -out = 0.30 cfs Allowable Peak Outflow Rate Qp-out = 0.30 Os Mod. FAA M inor Storage Volume = 747 cubic feat Mod. FAA Major Storage Volume = 7;600 cubic feet Mod. FAA Minor Storage Volume = 0.017 acre -ft Mod. FAA Major Storage Volume = 0.174 acre -ft 5 c- Enter Rainfall Duration Incremental Increase Value Here ie.g. 5 for 5 -Minutes} Rainfall Duration minutes (input) Rainfall Intensity inches/ hr (output) Inflow Volume am -foot (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre -font {output) Storage Volume acro-fcot (output) Rainfall Duration Al intltos (input) Intensity inches (output) Rainfall t hr Inflow Volume acro-foot (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acro-foot (output) Storage Volume acro-foct (output) 0 0.00 0.000 200 0.00 2000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000 5 4.04 0-009 1.00 0.30 0.002 0-007 5 8.92 0.043 1.00 0.30 0.002 0.041 10 3.22 0.014 1.00 0.30 0.004 0.010 10 7.11 0.069 1.00 0.30 0.004 0.065 15 2.70 0.018 0.92 0.28 0.006 0.012 15 5.95 0.087 0.92 0.28 0.006 0.081 20 2.34 0-021 0.82 0.25 0-007 0.014 20 5.16 0.100 0.82 0.25 0-007 0.094 25 2.07 0.023 0.75 0.23 0.008 0.015 25 4.57 0.111 0.75 0.23 0.008 0.103 30 1.86 0.025 0.71 0.21 0.009 0.016 30 4.11 0.120 0.71 0.21 0.009 0.111 35 1.70 0.026 0.66 0.20 0.010 0.017 35 3.75 0.128 0-68 0.20 0.010 0.118 40 3.45 0.134 0.66 0.20 0.011 0.123 40 1.56 0.028 0.66 0.20 0.011 0.017 45 1.45 0.029 0.64 0.19 0,012 0.017 45 3.20 0.140 0.64 1119 0.012 11.128 50 1.35 0-030 0.63 0.19 0.013 0.017 50 2.99 0.145 0.63 0.19 0013 0.132 55 1.27 0.031 0.62 0.18 0.014 0.017 55 2.80 0.150 0.62 0.18 0.014 0.136 60 1.20 0.032 0,61 0.18. 0,015 0.017 60 2.64 0.155 0.61 0.18 0.015 0.139 65 1.13 0-033 0.60 0-18 0.016 0-017 65 2.50 0-159 0-60 0.18 0-016 0.142 70 2.38 0.162 0.59 0.18 0.017 0.145 70 1.08 0.034 0.59 0.18 0.017 0.016 75 1.113 0.034 0.56 0.18 0.018 0.016 75 2.27 0.166 0.58 4.18 0.018 11.148 80 0-90 0-035 0.56 0.17 0.019 0.016 80 2.17 0-169 0.56 0.17 0.019 0.150 85 0.94 0.036 0.57 0.17 0.020 0.015 85 2.08 0.172 0.57 0.17 0.020 0.152 90 0.90 0.036 0.57 0,17 0.021 0.015 90 2.00 0.175 0.57 0.17 0.021 0.154 95 1.92 0.176 0.57 0.117 0.022 0-155 95 0.8.7 0-037 0.57 0.17 0.022 0.015 100 1.85 0.180 0.56 0.17 0.023 0.157 100 0.64 0.037 0.56 0.17 0.023 0.014 105 0.51 0.038 0.56 0.17 0.024 0.014 105 1.79 0.183 0.56 0.17 0.024 0.158 110 0.78 0-036 0.56 0.17 0.025 0-013 110 1.73 0_185 0-56 V.17 0-025 0.160 115 0.76 0.039 0.56 0.17 0.026 0.012 115 1.67 0.187 0.56 0.17 0.026 0.161 120 0.73 0.039 0.55 0.17 0,027 0.012 120 1.62 0.190 0.55 0.17 0.027 0.162 125 0.71 0.040 0.55 0.17 0.028 0.011 125 11.57 0.192 0.55 0.17 0.028 0.163 130 1.53 0.194 0.55 0.16 0.029 0.164 130 0.69 0.040 0.55 0.16 0.029 0.011 135 0.57 0.041 0.55 0.15 0.031 0.010 135 1.49 0.195 0.55 0.16 0.031 0.165 140 0-66 0.041 0.55 0.16 0.032 0.009 140 1.45 0.198 0.55 0A6 0.032 0.160 145 0.64 0.041 0.54 0.16 0.033 0.009 145 1.41 0.199 0.54 O16 0.033 0.167 150 0.62 0.042 0.54 0.16 0.034 0.008 150 1.38 0.201 0.54 0.15 0.034 0.165 155 0.61 0-042 0-54 0.16 0-035 0.007 155 1.34 0.203 0.54 0-46 0.035 0-168 160 1.31 0.205 0.54 0.16 0.036 0.169 160 0.59 0.042 0.54 0.16 0.036 0.007 165 0.58 0.043 0.54 0.15 0.037 0.006 165 1.28 0.205 0.54 0.16 0.037 0.169 170 0.57 0.043 0.54 0.16 0.038 0.005 170 1.26 0-208 0.54 0-16 0.036 0-170 175 1.23 0.209 0.54 0.16 0.039 0.171 175 0.56 0.043 0.54 0.16 0.039 0.005 180 0.54 0.044 0.54 0.16 0.040 0.004 180 1.20 0.211 0.54 0.15 0.040 0.171 1185 0.53 0.044 0.53 0.16 0.041 0.003 185 1.16 0.212 0.53 0.16 0.041 0.171 190 0.52 0.044 0.53 0.16 0.042 0.002 190 1.15 0.214 0.53 0.16 0.042 0.172 195 0.51 0.045 0.53 0.16 0.04.3 0.002 195 1.13 0.215 0.53 0.15 0.043 0.172 200 0-50 0-045 0-53 0.16 0-044 0.001 200 1.11 0.216 0.53 0.16 0.044 0.173 205 0.49 0.045 0.53 0.16 0.045 0.000 205 1.09 0.218 0.53 0.16 0.045 0.173 210 0.49 11.045 0.53 0.16 0.046 -0.001 210 1.07 0219 0.53 0.16 0.046 0.173 215 0.48 0.046 0.53 0.16 0.047 -0.001 215 1.05 0.220 0.53 0-16 0.047 0-1173 220 1.03 0.222 0.53 0.16 0.048 0.174 220 0.47 0.046 0.53 0.16 0.048 -0.002 225 0.46 0.046 0.53 0.16 0.049 -0.003 225 1.02 0.223 0.53 0.15 0.049 0,174 230 0.45 0-046 0-53 0.16 0-050 -0.004 230 1.00 0-224 0.53 0.16 0.050 0.174 235 0.45 0.047 0.53 0.16 0.051 -0.005 235 0.98 0.225 0.53 0.16 0.051 0.174 240 0.44 0.047 0.53 0.16 0.052 -0.005 240 0.97 0.226 0.53 0.15 0.052 0.174 245 0.43 0-047 0-53 0.16 0-053 -0.006 245 0-95 0.227 0.53 0.16 0.053 0.174 250 0.94 0.229 0.53 0.16 0.054 0.174 250 0.43 0047 0.53 0.16 0.054 -0.007 255 0.42 0.048 0.52 0.16 0.055 -0.008 255 0.93 0.230 0.52 0.16 0,055 0.174 260 0.41 0.048 0.52 0.16 0.056 -0.009 260 0-91 0.231 0.52 0-16 0.056 0.174 265 0.41 0.048 0.52 0.16 0.057 -0.009 265 0.90 0.232 0.52 0.16 0.057 0.174 270 0.40 0.048 0.52 0.16 0.058 -0.010 270 0.8.9 0.233 0.52 0.15 0.058 0.174 275 0.40 0-048 0.52 0.16 0-059 -0.011 275 0.67 0.234 0.52 0.16 0.059 0.174 280 0.86 0.235 0.52 0.16 0.060 0.174 280 0.39 0.049 0.52 0.16 0.060 -0.012 285 11.38 0.049 0.52 0.16 0.1162 -0.013 285 0.86 0.236 0.52 0.16 0.062 0.174 290 0.38 0.049 0.52 0.16 0.063 -0.014 290 0.64 0.237 0.52 0.16 0.063 0.174 295 0.83 0.238 0.52 0.16 0.064 0.174 295 0.37 0.049 0.52 0.16 0.064 -0.014 300 0.37 0.049 0.52 0.16 0.065 -0.015 300 0.8.2 0.239 0.52 0.15 0.065 0,174 Mod. FAA Minor Storage Volume (cubic ft.) = 747 Mod. FAA Major Storage Volume (cubic ft.) _ Mod. FAA Minor Storage Volume (acre -ft.) = 0.0171 Mod. FAA Major Storage Volume (acre -ft.) a UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013 7,600 0.1745 UD-Detention_v2.34-8. Modified FAA 12119/2017, 11;10AM DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Circle B 5-51-27 Compressor Pad Basin ID: Detention Pond - B Inflow and Outflow Volumes vs. Rainfall Duration 0.3 0.25 0.2 0.1 0.05 •• , ••••••••••••••• t t ►••••�••••�•• I • 0 • 0 L i t -' J - - r,r 1f -, ' 11`I `:I CD C00 l!''}} n 50 100 150 200 Duration (Minutes) 250 300 —:- Minor Storm Inflow Volume --a—Minor Storm Outflow Volume o MInorStorn Storage Volumo —' MajorSwmr Inflow Volume —e— Major Storm Outflow Volume • Major Storm Storage. Volume 350 UDFOD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013 UD-Detention_v2.34-B, Modified FAA 12119/2017, 11:10 AM STAGE -STORAGE SIZING FOR DETENTION BASINS Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - B Dam Design Information (Input): Width of Basin Bottom, W = Length of Basin Bottom, L re - Darn Side -slope (I-l:V), Zd _ Stage -Storage Relationship: Dam 2000 110.00 3.00 Side Slope Z ft ft ft/ft L ( Side Slope Z Rig h Isosceles F Ciro Flow 4 Check Basin Shape t Triangle i Triangle Zectangle e / Ellipse X Irregular Storage Requirement from Sheet 'Modified FAN: Storage Requirement from Sheet 'Hyd rograph' : Storage Requirement from Sheet 'Full -Spectrum'. MINOR L OR... OR_.. OR... OR_.. (Use Overide values in cells G32:G52) MAJOR 0.02 0.17 acre -ft. acre -ft. acre -ft. Labels for WQCV, Minor, & Major Storage Stages (input) Water Surface Elevation ft (input) Side Slope (H:V) ftlft Below El. (input) Basin Width at Stage ft (output) Basin Length at Stage ft (output) Surface Area at Stage re (output) Surface Area at Stage ft2 User Overide Volume Below Stage ft3 (output) Surface Area at Stage acres (output) Volume Below Stage acre -ft (output) Target Volumes for WQCV, Minor, & Major Storage Volumes (for goal seek) 4507.50 20.00 110.00 2,200.0 0.051 0.000 4507.60 2000 110.30 2,206.0 220 0.051 0.005 4507.70 20.00 110.60 2,212.0 441 0.051 0.010 4507.80 20.00 110.90 2,218.0 663 0.051 0.015 4507.90 20.00 111.20 2,224.0 885 0.051 0.020 4508.00 20,00 111.50 2,230.0 1,108 0.051 0.025 4508.10 20.00 111.80 2,236.0 1,331 0.051 0.031 4508.20 20,00 112.10 2,242.0 1,555 0.051 0.036 4508.30 20.00 112.40 2,248.0 1,779 0.052 0.041 WQCV 4508.40 20.00 112.70 2,254.0 2,004 0.052 0.046 4508.50 20.00 113.00 2,260.0 2,230 0.052 0.051 4508.60 20.00 113.30 2,266.0 2,456 0.052 0.056 4508.70 20.00 113.60 2,272.0 2,683 0.052 0.062 4508.80 20.00 113.90 2,278.0 2,911 0.052 0.067 4508.90 20.00 114.20 2,284.0 3,139 0.052 0.072 4509.00 20,00 114.50 2,290.0 3,368 0.053 0.077 4509.10 20.00 114.80 2,296.0 3,597 0.053 0.083 4509.20 20.00 115.10 2,302.0 3,827 0.053 0.088 4509.30 20.00 115.40 2,308.0 4,057 0.053 0.093 4509.40 20.00 115.70 2,314.0 4,288 0.053 0.098 4509.50 20.00 116.00 2,320.0 4,520 0.053 0.104 4509.60 20.00 116.30 2,326.0 4,752 0.053 0.109 4509.70 20.00 116.60 2,332.0 4,985 0.054 0.114 4509.80 20.00 116.90 2,338.0 5,219 0.054 0.120 4509.90 20.00 117.20 2,344.0 5,453 0.054 0.125 4510.00 2000 117.50 2,350.0 5,688 0.054 0.131 4510.10 20.00 117.80 2,356.0 5,923 0.054 0.136 4510.20 20.00 118.10 2,362.0 6,159 0.054 0.141 4510.30 20.00 118.40 2,368.0 6,395 0.054 0.147 4510.40 20.00 118.70 2,374.0 6,632 0.054 0.152 100-YR WSEL 4510.50 20.00 119.00 2,380.0 6,870 0.055 0.158 4510.60 20.00 119.30 2,386.0 7,108 0.055 0.163 4510.70 20.00 119.60 2,392.0 7,347 0.055 0.169 4510.80 2000 119.90 2,398.0 7,587 0.055 0.174 4510.90 20.00 120.20 2,404.0 7,827 0.055 0.180 4511.00 20.00 120.50 2,410.0 8,068 0.055 0.185 4511.10 20.00 120.80 2,416.0 8,309 0.055 0.191 4511.20 20.00 121.10 2,422.0 8,551 0.056 0.196 4511.30 20.00 121.40 2,428.0 8,793 0.056 0.202 4511.40 20.00 121.70 2,434.0 9,036 0.056 0.207 4511.50 20.00 122.00 2,440.0 9,280 0.056 0.213 #N/A #N/A #N/A #N/A #N}A #N/A U D -Detention v2.34 -B, Basin 12/19/2017, 11:10 AM STAGE -STORAGE SIZING FOR DETENTION BASINS Project: Basin ID: STAGE -STORAGE CURVE FOR THE POND 4512.00 4511.50 4511.00 4510.50 a) 4510.00 a) rem bisess CD 0 CES 4509.50 ime 4509.00 4508.50 4508.00 4507.50 # _ 0.00 0.05 0.10 0.15 Storage (acre-feet) 0.20 0.25 U D -Detention v2.34 -B, Basin 12/19/2017, 11:10 AM STAGE -DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Project Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond B WQCV Design Volume (Input): Catchment Imperviousness, la = Catchment Area, A = Depth at WQCV outlet above lowest perforation. H = Vertical distance between rows, h = Number of rows, NI. = Orifice discharge coefficient. Co = Slope of Basin Trickle Channel, S = Time to Drain the Pond = Watershed Design Information (Input): Percent Soil Type A Percent Soil Type B Percent Soil Type CID = Outlet Design Information (Output): 3 24.0 2.02 2 12.00 2.00 0.67 0.004 72 100 percent acres Diameter of holes, D = feet Number of holes per row, N = inches ftlft hours Height of slot, H Width of slot, W = Water Quality Capture Volume, WQCV = Water Quality Capture Volume (WQCV) _ Design Volume (WQCV 1 12 * Area * 1.2) Vol = Outlet area per row, A0 =- Total opening area at each row based an user -input above. A0 =- Total opening area at each row based on user -input above, A0 = 0.397 1 OR inches inches inches 0.114 watershed inches 0.019 acre-feet 0.023 acre-feet 0.12 square inches 0.12 square inches 0.001 square feet o 0 0 0 O O O O 0 O O O O a o O O o a O00O O O o a o O O ° O O O O o o 0 0 0 0 Perforated Plate Examples Central Elevations of Rows of Holes in feet II Flow Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 1.00 2.00 I I I I I I I I I Collection Capacity for Each Row of Holes in cfs 4507.50 0.3110 0.3110 0.62 4507.60 0.3110 0.3110 0.62 4507.70 0.3110 0.3110 0.62 4507.80 0.3110 0.3110 0.62 4507.90 0.3110 0.3110 U.62 4508.00 0.3111 0.3110 0.62 4508.10 0.3111 0.3110 0.62 4508.20 0.3111 0.3110 0.62 4508.30 I 0.3111 0.3110 I 0.62 4508.40 0.3111 0.3110 0.62 4508.50 0.3111 0.3110 0.62 4508.60 0.3111 0.3110 0.62 4508.70 0.3111 0.3110 0.62 4508.80 0.3111 0.3110 0.62 4508.90 0.3111 0.3110 0.62 4509.00 0.3111 0.3111 0.62 4509.10 0.3111 0.3111 0.62 4509.20 0.3111 0.3111 0.62 4509.30 I 0.3111 0.3111 0.62 4509.40 0.3111 0.3111 0.62 4509.50 0.3111 0.3111 0.62 4509.60 0.3111 0.3111 0.62 4509.70 0.3111 0.3111 0.62 4509.80 0.3111 0.3111 0.62 4509.90 0.3111 0.3111 0.62 4510.00 0.3111 0.3111 0.62 4510.10 0.3111 0.3111 0.62 4510.20 0.3111 0.3111 0.62. 4510.30 0.3111 0.3111. 0.62 4510.40 0.3111 0.3111 0.62 4510.50 0.3111 0.3111 0.62 MLA #NIA #NIA #NIA #NIA #NIA MIA MIA #NIA MIA #(NIA #N/A #NIA f'tNIA #NIA /MIA #NIA #N/A MA OVA #N/A #NIA #/NIA #N/A #NIA #NIA MA 'MIA #NIA PEA #N/A #NIA #NIA #NIA tIN/A I I I I I I OVA MIA #NIA MIA Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 1.6 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 UD-Detention v2.34 -B, WQCV 12/1912017, 11:10 AM STAGE -DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond B STAGE -DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE 4511.00 4510.50 - 4510.00 4509.50 Stage (feet, elev.} 4509.00 4508.50 4508.00 4507.50 4507.00 0.62 0.62 0.62 0.62 0.62 Discharge (cfs) 0.62 0.62 UD-Detention v2.34 -B, WQCV 1211912011,11:10 AM RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - B Dla. - Tn- X Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Water Surface Elevation at Design Depth Pipe/Vertical Orifice Entrance Invert Elevation Required Peak Flow through Orifice at Design Depth Pipe/Vertical Orifice Diameter (inches) Orifice Coefficient Full -flow Capacity (Calculated) Full -flow area Half Central Angle in Radians Full -flow capacity Calculation of Orifice Flow Condition Half Central Angle (0<Theta<3.1416) Flow area Top width of Orifice (inches) Height from Invert of Orifice to Bottom of Plate (feet) Elevation of Bottom of Plate Resultant Peak Flow Through Orifice at Design Depth Elev. WS = Elev: Invert = = Dia = Cn _ Af Theta = ON = Percent of Design Flow = Theta = T4 = = Elev Plate Bottom Edge = Width of Equivalent Rectangular Vertical Orifice Equivalent Width = Cerebroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroidl El. = #1 Vertical Orifice #2 Vertical Orifice 4510.50 4,507.50 0.30 6.0 0.55 0.20 3.14 1.4 480% 1.06 0.04 5.24 0.13 4:50.63 0.3 0.31 4,507.57 feet feet cfs inches sq ft rad rad sg ft inches feet feet Gfs feet feet U D -Detention v2.34 -D, Restrictor Plate 12/19/2017, 11:10 SAM STAGE -DISCHARGE SIZING OF THE SPILLWAY Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - B Design Information (input): Bottom Length of Weir Angle of Side Slope Weir Elev. for Weir Crest Gaef. for Rectangular Weir Coef. for Trapezoidal Weir Calculation of Spillway Capacity (output): L= Angle = EL. Crest = `w 't 5.00 75.96 4,510.50 3.00 3.00 Water Surface Elevation ft. (linked) Rect. Weir Flowrate cfs (output) Triangle Weir Flowrate cfs (output) Total Spillway Release cfs (output) Total Pond Release cfs (output) 4507.50 0.00 0.00 0.00 0.00 4507.60 0.00 0.00 0.00 0.00 4507.70 0.00 0.00 0.00 0.00 4507.80 0.00 0.00 0.00 0.00 4507.90 0.00 0.00 0.00 0.00 4508.00 0.00 0.00 0.00 0.00 4508.10 0.00 0.00 0.00 0.00 4508.20 0.00 0.00 0.00 0.00 4508.30 0.00 0.00 0.00 0.00 4508.40 0.00 0.00 0.00 0.00 4508.50 0.00 0.00 0.00 0.00 4508.60 0.00 0.00 0.00 0.00 4508.70 0.00 0.00 0.00 0.00 4508.80 0.00 0.00 0.00 0.00 4508.90 0.00 0.00 0.00 0.00 4509.00 0.00 0.00 0.00 0.00 4509.10 0.00 0.00 0.00 0.00 4509.20 0.00 0.00 0.00 0.00 4509.30 0.00 0.00 0.00 0.00 4509.40 0.00 0.00 0.00 0.00 4509.50 0.00 0.00 0.00 0.00 4509.60 0.00 0.00 0.00 0.00 4509.70 0.00 0.00 0.00 0.00 4509.80 0.00 0.00 0.00 0.00 4509.90 0.00 0.00 0.00 0.00 4510.00 0.00 0.00 0.00 0.00 4510.10 0.00 0.00 0.00 0.00 4510.20 0.00 0.00 0.00 0.00 4510.30 0.00 0.00 0.00 0.00 4510.40 0.00 0.00 0.00 0.00 4510.50 0.00 0.00 0.00 0.00 4510.60 0.47 0.04 0.51 0.51 4510.70 1.34 0.21 1.56 1.56 4510.80 2.46 0.59 3.06 3.06 4510.90 3.79 1.21 5.01 5.01 4511.00 5.30 2.12 7.42 7.42 4511.10 6.97 3.35 10.32 10.32 4511.20 8.78 4.92 13.70 13.70 4511.30 10.73 6.87 17.60 17.60 4511.40 12.81 9.22 22.03 22.03 4511.50 15.00 12.00 27.00 27.00 ##N/AA IiN/A #N/A #N/A UN/A #N/A #N/A #N/A #N/A #N/A ttNIA #NIA #N/A #N/A #N/A feet degrees feet UD-Detention_ x2.34 -B, Spillway 12/19/2017, 11:10 AM STAGE -DISCHARGE SIZING OF THE SPILLWAY Project: Circle B 5-61-27 Compressor Pad Basin ID: Detention Pond - B STAGE -STORAGE -DISCHARGE CURVES FOR THE POND 0 4512 _ 4511.5 4511 4510.5 4510 4509.5 4509 4508.5 4508 4507.5 5 10 15 20 Storage (Acre -Feet) 0.05 0.1 0.15 0.2 0.25 Pond Discharge (cfs) 25 30 ■ -OTAL DISC-lARGE SPILLWAY DISCHARGE a POND S -ORAL= a UD-Deteration_v2.34-B, Spillway 12/19/2017, 11:10 AM Hello