�pRAC�� October 31, 1978
Board of Weld County Commissioners,
Ed Dunbar, Chairman
P.O. Box 758
Greeley, Colorado 80631
Dear Sirs
RE: Allocated Conservation Trust
Fund Monies
Enclosed are two bids received for fencing to enclose
the playground area of the local town park. We
realize you requested three bids, however two were
all that responded to our request and submitted bids.
Due to the time element and the project cost, we
believe the two to be comparative of any third bid.
This is a difference of only $3. 37 of the two who did
submit bids. The Town Board recommends the bid of
Derr Brothers Fencing, which is a local company.
The itemized statement indicates costs of materials to
complete a Bocce Court in the park. Also, to place
sand around the playground equipment, which would be
a safety factor for the small children. This work
would be done by town employees and volunteer help.
For this reason we are submitting materials cost
only.
We sincerely hope the above information and enclosed
documents meet with your approval for receiving the
allocated funds in the amount of $2,000.00 for the
Town of Frederick.
Thank you,
' '
Mrs. Beulah Meeker,
Town Board member and
City Manager
780700
r,- . /,J/3)2S
Itemized statement for supplies to be used
to finish the Bocce Court located in the
park.
This statement reflects only the material
cost, as the labor will be in-kind service
from the town employees doing the labor.
Bocce Court $460.00
covers cost of 2 inches of
road sand and 2 inches of
road packing.
3 Pole Lights $450.00
two lights to be placed on
the Bocce court and one to
be placed in the playground
area
2 inches of Road Sand $450.00
to be placed in the
playground area to prevent
any serious injuries from
hard surface ground as now
exists, this would cover an
area of approximately
750 square feet
Town of Frederick
Allocated Conservation Trust Fund Monies
DERR BROTHERS FENCING
NAME fog ✓ ,ter< a, ;C/{ QUAN MATERIALS COST
COST
ADDRESS UNITS
UNIT
4, CORNER POST ‘,21,- //,an 4.4,op
GATE POST
N9 000010 FINAL BID Ct.5 z LINE POST o
6 ' OhA' L ; w/t G 5,�" Y.7-ov
// 6/4 ' vc re ..'ec FENCING
2 50 fi90//S go-opt A ao 7G ca
CORNER STAYS a 00 8.,0
2 o POST CLAMPS 3S loo
4, CAPS • a' 7.z4-
G LINE CAPS o
TOP RAIL az/ <<r74 ?.5-n 3C.75
TIEWIRES a O
NUTS, BOLTS too
4017r TENSION BAIS w,;re 3 oo
MISCELLANEOUS
/0 e-- cans a -71 .2 7.90
Q i\o\S /- o
* xnf QCC1\Qs p -c e m4S 3. 0a
_ 5 S Lai i.00 /A oo
/ Zo 'wblr Dr: ..c 6 o,rc nice /a1•_Pb .
TOTAL 3-;;,y o9
275 00
TAX
Iv TV
ci
• 63307
ANDERSON •co
`EXCE IX0USTq
Supply
i+.. •��..,,
and d31Xl "NO'
20 SOUTH SUNSET STREET 11181.1aKIWIUSLICO0MIL TELEPHONE 776-3055
LONGMONT, COLORADO
Quotation g �J
TO:ds/inn /1.7724.44.44Date p4,/ /9
-�Ta-c.c AAA:ea, red. Pesos
Job or
Prr000jjjeecctt: ale
We offer Tor your considerationconsideration the g proposal:
,Ana
ja atak. w,,.,,dCLe � / /y •� 44.4;1/4.
£��'"�. „�
and J- /o ' aGiNti, ol at FW, ppast)
s )
/94D .z
Jetic
Terms: eatettions
Conditions:
1. Prices quoted herein include all Labor, Equipment and Materials needed.
2. This Quotation may be withdrawn or modified by ANDERSON FENCE AND SUPPLY if not accepted within
30 days from date. Acceptance by the purchaser constitutes a valid contract.
3. Delivery of products or performance of services herein quoted are subject to delays occasioned by circumstances
beyond our control.
4. We accept no responsibility for property lines.
We hope our Quotation meets with your approval and we will appreciate your valued order.
Accepted ANDERSON NCE AND PLY
Date By • I.
By Position