HomeMy WebLinkAbout20184154.tiff •
WELD COUNTY / Z / 9 /
CODE ORDINANCE 2018 - 10
A 462
C1
IN THE MATTER OF REPEALING AND REENACTING , WITH AMENDMENTS , CHAPTER 8
PUBLIC WORKS AND CHAPTER 12 LICENSES AND PERMITS , OF THE WELD COUNTY
CODE
BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF
WELD , STATE OF COLORADO :
WHEREAS , the Board of County Commissioners of the County of Weld , State of
Colorado . pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with
the authority of administering the affairs of Weld County , Colorado , and
WHEREAS , the Board of County Commissioners . on December 28 , 2000 . adopted Weld
County Code Ordinance 2000- 1 , enacting a comprehensive Code for the County of Weld ,
including the codification of all previously adopted ordinances of a general and permanent nature
enacted on or before said date of adoption , and
WHEREAS , the Weld County Code is in need of revision and clarification with regard to
procedures , terms , and requirements therein .
NOW, THEREFORE , BE IT ORDAINED by the Board of County Commissioners of the
County of Weld , State of Colorado , that certain existing Chapters of the Weld County Code be ,
and hereby are , repealed and re-enacted , with amendments , and the various Chapters are
revised to read as follows .
CHAPTER 12
LICENSES AND PERMITS
Delete ARTICLE IV — Right-of-Way Use Permit Policy , in its entirety , and move to Chapter
8 with amendments .
CHAPTER 8
PUBLIC WORKS
Add ARTICLE XIII — Right-of-Way Use Permit Policy .
Sec . 8 - 13- 10 . General .
The County strives to keep its right-of-way in a state of good repair and free from unnecessary
encumbrances . The Right-of-Way Use Permit is a tool to regulate and permit the use of Weld
County ' s public right-of-way by private companies , municipalities and/or special district
constructing and burying lines either crossing or running parallel within Weld County right-of-way .
PAGE 1
2018 -4154
ORD2018- 10
Crossings are allowed for all lines . Parallel installations are allowed for lines of " public utilities "
that are defined in C . R . S . § 40- 1 - 103 and are "domestic or foreign electric light power, gas , or
pipeline companies " holding current Certificates of Public Convenience and Necessity issued by
the Colorado Public Utilities Commission ; for water lines of municipalities , water districts , and
water and sewer districts ; for transmission lines or pipelines used solely for agricultural purposes ;
and for fresh water above-ground transfer pipelines ; and for lines in non-maintained right-of-way
if approved by Weld County based upon locational factors ; such as , surrounding population
density , topography , or providing access to a recorded exemption lot , and with Permittee ' s
agreement to move the line at its sole expense if Weld County or an annexing municipality intends
to improve the right-of-way . Public right-of-way subject to regulation by the Right-of-Way Use
Permit includes Weld County' s maintained and non -maintained right-of-way , and all public
drainage easements . A Right-of-Way Use Permit grants the Permittee and its Contractors
permission to occupy designated County right-of-way . The Permit authorizes excavation ,
surveying , and/or construction of facilities within the County right-of-way and provides for their
subsequent restoration upon completion of the Project . This Policy shall apply within all
unincorporated areas of the County .
Sec . 8 - 13 -20 . Purpose.
This Article recognizes the importance of protecting the health , safety and welfare of the
traveling public , maintaining efficient traffic flow and preserving the integrity of Weld County ' s
right-of-way .
Sec . 8 -13 -30 . Regulation of work in County right-of-way .
A . Issuance of Right-of-Way Use Permit . A Right-of-Way Use Permit shall be issued only in
compliance with the rules and regulations set forth in this Article . In no event shall construction
within the County right-of-way be allowed or permitted if it is detrimental to the public health ,
welfare and safety .
B . Right-of-Way Use Permit Necessary . A Right-of-Way Use Permit is required for occupying ,
constructing or excavating facilities within , and for encroaching upon , any County right-of-way .
C . No Work Without Right-of-Way Use Permit . No person or entity may occupy , construct or
excavate within any County right-of-way or easement , or encroach upon any County
rights-of-way or easement , without first having obtained a Right-of-Way Use Permit from the
Department of Public Works . In addition , no person or entity may excavate , construct or
occupy the County right-of-way beyond the date or dates specified in the permit unless : ( 1 )
the person or entity requests a written extension before the expiration of the initial permit , and
(2 ) a new permit or extension is granted .
Sec . 8 - 13-40 . Definitions .
For the purpose of this Article , the following terms , phrases , words and their derivations shall
have the meanings given herein :
PAGE 2
2018-4154
ORD2018- 10
Contractor means any party performing the installation and construction for a Permittee
who obtains a permit pursuant to this Article A Contractor may be a Permittee under this
definition
Lines means all underground and overhead cable, telephone, electric power, wire, gas
and irrigation lines, appurtenances, structures or pipelines
Permittee means the owner, operator, person and/or entity constructing, excavating or
occupying the County right-of-way who has obtained a permit pursuant to this Article
Right-of-Way means a portion of land that is dedicated or granted to and accepted by
Weld County for transportation purposes, such as a roadway or highway whether maintained
or not-maintained by Weld County The term is used as both singular and plural
Sec 8-13-50 Right-of-Way Use Permit application
Complete Application Required Applicants shall file a complete application for a Right-of-
Way Use Permit Based upon the information provided in the application, additional submittals
may be required by the Department of Public Works if sufficient information was not provided for ,
review of the application An application shall be considered complete if it is submitted in the
required form, includes all mandatory information, including all supporting materials specified by
application, and is accompanied by the applicable fee If an application is determined to be
incomplete, the Department of Public Works shall provide notice to the applicant, along with an
explanation of the application's deficiencies No further processing of the application shall occur
until the deficiencies are corrected in a future resubmittal An application which is determined to
be incomplete may or may not retain its same processing cycle The Right-of-Way Use Permit
and Application are found in Appendix 8-P, the terms and conditions of which are incorporated
into this Article
Sec 8-13-60 Application review, Right-of-Way Use Permit issuance, permit expiration and
permit extension
A Review Process The application and other data filed by an applicant for a Right-of-Way Use
Permit shall be reviewed by the Department of Public Works The application may also be
reviewed by other departments or agencies to verify compliance with any applicable laws If
the Department of Public Works finds that the work described in an application for a Right-of-
Way Use Permit conforms to the requirements and regulations set forth in this Article, meets
the requirements defined in the Department of Public Works Design Standards and Criteria
or other pertinent laws regulations or ordinances, and that all required fees have been paid, a
Right-of-Way Use Permit shall be issued to the applicant Criteria upon which the Right-of-
Way Use Permit shall be considered include, but are not limited to, the following
1 Safety Occupation within the County right-of-way must not create a safety hazard to the
travelling public
2 Constructability All construction or excavation within the County right-of-way must be able
to be performed according to general construction practices
PAGE 3
2018-4154
ORD2018-10
B Changes in Approved Permit An approved Right-of-Way Use Permit shall not be changed,
modified or altered without written authorization from the Department of Public Works All work
shall be done in conformance with the approved Permit
C Permit Limitations An approved Right-of-Way Use Permit requires the Permittee to meet
certain permit specifications and general engineering standards when working within the Weld
County right-of-way The Department of Public Works shall be responsible for ensuring
compliance with such specifications and standards Reasonable care should be used to avoid
damaging the existing roadway The issuing and granting of the Right-of-Way Use Permit
shall not be construed to be a permit for, or an approval of, any violation of any of the
provisions of this Article or of any regulations of the County
D Indemnification The Permittee, its agents, employees, subcontractors, Contractors and
assigns, hereby agrees to hold Weld County, Colorado, the agencies thereof and their officers
and employees harmless from any and all loss and damage or any claims which may arise
out of, or be connected with, the construction, installation, maintenance, alteration, removal
or presence of the lines installed and/or constructed herein referred to or any work or facility
connected therewith, within the area covered by this permit, excluding any such loss and
damage or any claims (including consequential damages) which may be caused solely by the
negligence of the County, the agencies thereof or its officers and employees The Permittee
fully understands that all line installation, construction and relocation will be performed at no
expense whatsoever to the County
E Permit Expiration Every approved Right-of-Way Use Permit shall expire if the work authorized
by the permit is not substantially begun within three (3) months from the date of the permit
issuance or if the construction of work authorized by the permit is suspended or abandoned
for a period of one (1) year at any time after the work has begun Before work can begin or be
resumed, the permit must be reissued by the Weld County Department of Public Works
F Permit Extension Any Permittee with an unexpired Right-of-Way Use Permit may apply, in
writing, for an extension of the time within which work may begin under that permit if the
Permittee is unable to begin work within the time required for good cause, and that the cause
is acceptable to the Weld County Department of Public Works There shall be an extension
fee assessed to cover administrative costs
'Sec 8-13-70 County authority.
a
A Right-of-Way Use Permit is considered to be a license for use of the County right-of-way
The Department of Public Works shall have the authority to suspend work, wholly or in part,
because of the failure of the Permittee to properly execute the work in accordance with this Article
Weld County, notwithstanding the issuance of any permit or construction in Weld County right-of-
way, reserves the right to make any changes, additions, repairs or required relocation of any
facilities within the dedicated right-of-way at any time including, but not limited to, in connection
with the relocation, reconstruction, widening and maintaining roads or right-of-way, without
'compensating the owner
PAGE 4
2018-4154
ORD2018-10
Sec 8-13-80 Permittee 's general responsibilities
The Permittee is responsible to comply with all of the terms and conditions set forth in the
Right-of-Way Use Permit found in Appendix 8-P
Sec 8-13-90 Inspections
A Inspection of work performed within Weld County right-of-way, pursuant to an approved Right-
of-Way Use Permit, is required Inspections during the construction period will be made by
the Weld County Department of Public Works to ensure that work is progressing in compliance
with the Permit It shall be the responsibility of the Permittee to provide safe access to the
work site for the Department and to all others, as authorized by law, for inspection at all
reasonable times during the execution and upon completion of the work At the time of
inspection, the Department may order the immediate termination of any work which poses a
serious threat to the life, health, safety or well-being of the public
B It shall be the responsibility of the Permittee to notify the Department of Public Works when
work is ready for inspection The Department requires that every request for inspection be
received at least forty-eight (48) hours before such inspection Such requests may be made
by telephoning, emailing or faxing the Department The presence of Department employees
on-site shall not guarantee or qualify the Permittee's performance The approved permit must
be available on-site for review by Department staff Failure to comply will result in suspension
of the Permit
C The Department of Public Works may make or require other inspections or testing of any work
as deemed necessary to ascertain compliance with the provisions of this Article Any work
performed without the required inspections shall be subject to removal and replacement at
the Permittee's expense, regardless of the quality of the work Any inspection hours required
outside of the normal working hours will be paid by the Permittee Certain types of work may
have continuous inspection and when large-scale projects exceed the ability of the
Department to provide inspection, the Permittee will incur the cost of a private inspection firm
This third-party inspector will be appointed by the Department prior to issuance of the Permit
Sec 8-13-100 Administrative fee
All required fees shall be paid in full at the time of the permit application The fee schedule for
Right-of-Way Use Permits shall be as determined by resolution of the Board of County
Commissioners and shall be shown on the permit If the applicant objects to the denial of a permit
application by the Weld County Department of Public Works, or objects to any of the terms or
conditions of a permit thereby placed by the Department, the applicant has the right to appeal the
decision to the Board of County Commissioners, in accordance with the procedures detailed in
Section 12-4-110, below
Sec 8-13-110 Appeal of denial of Right-of-Way Use Permit.
If an application for an Right-of-Way Use Permit is denied by the Weld County Department of
Public Works, or if the applicant objects to any of the terms or conditions of a permit thereby
placed by the Department, the applicant has the right to appeal the decision to the Board of
PAGE5
2018-4154
ORD2018-10
County Commissioners, in writing, utilizing the appeal procedures set forth in Section 2-4-10 of
this Code
Sec 8-13-120 Failure to comply
A The issuance of the Right-of-Way Use Permit based on plans, specifications or other data
shall not prevent the Weld County Department of Public Works from requiring the correction
of errors in the plans, specifications and other data or from stopping excavation or construction
operations being conducted in violation of this Article or any other regulations of the County
Failure of the applicant to comply with any of the terms and conditions of the Permit shall be
sufficient cause for cancellation of the permit
B The Permittee shall correct any unsatisfactory work including, but not limited to, defects in
removal, replacement or patching If the Permittee fails to restore the Weld County right-of-
way in the manner and to the condition required by the Weld County Department of Public
Works or fails to satisfactorily and timely complete all restorations required by the Department,
the County shall have the right to perform the restorations at the expense of the Permittee
C Weld County reserves the right to require relocation of any facilities within the dedicated right-
of-way at any time without compensating the owner If the Contractor or Permittee does not
perform the required relocation within four (4) months of notification from the Weld County
Department of Public Works, no new permits will be issued from the Department of Public
Works for the contractor until the relocation has been accomplished
Sec 8-13-130. Permit suspension or revocation
A The Weld County Department of Public Works may deny, revoke or suspend any Right-of-
Way Use Permit to protect the public health, safety, welfare and safe function of Weld County
roads The grant of the Right-of-Way Use Permit to the Permittee is a privilege, not a right
The County reserves its right to revoke any Right-of-Way Use Permit without a fee refund
whenever the Permit is issued in error or on the basis of incorrect information supplied by the
Permittee, or whenever the Permit may have been issued in violation of any provisions of this
Article
B If the Weld County Department of Public Works determines that the Permittee has committed
a substantial breach of a term or condition of any statute, ordinance, rule, regulation or any
term or condition of the Permit, the Department shall notify the Permittee of its suspension by
either a phone call or a written demand, and the Permittee must then remedy the violation
The demand shall state that continued violations may be cause for revocation of the permit
Further, a substantial breach shall allow the Department to place additional or revised
conditions on the Permit
C Within twenty-four (24) hours of receiving notification of the suspension, the Permittee shall
contact the Weld County Department of Public Works with a plan of correction which must be
accepted by the Department The Permittee's failure to contact the Department, failure to
submit an acceptable plan or failure to reasonably implement the approved plan, shall be
cause for immediate revocation of the permit and termination of work Upon revocation of the
PAGE 6
2018-4154
ORD2018-10
permit the Permittee will be required to re-apply for a new permit and will be charged for any
additional fees that may be applicable
Sec 8-13-140 Enforcement
A Violations and Penalties Weld County, through the Weld County Department of Public Works
or other departments so authorized, may enforce this Article through methods included in this
Article or through other methods adopted by the Board of County Commissioners
B Criminal Penalties
1 It is unlawful to occupy, construct or excavate within any Weld County right-of-way or
encroach upon any County right-of-way, unless a Right-of-Way Use Permit is first issued
Any person, firm or corporation violating any provision of this Article is guilty of a Class 2
petty offense, which, upon conviction thereof, shall be punishable by a fine of three
hundred dollars ($300 00) or by imprisonment in the County jail for not more than ten (10)
days, or by both such fine and imprisonment, for each separate violation Each day during
which such violation continues shall be deemed a separate offense
2 Whenever the Weld County Department of Public Works,through one(1) of its employees,
has personal knowledge of any violation of this Article, it shall give written notice to the
violator to correct such violation within seven (7)days after the date of such notice Should
the violator fail to correct the violation within such seven-day period, the department may
request that the Sheriffs Office issue a summons and complaint to the violator, stating the
nature of the violation with sufficient particularity to give notice of said charge to the
violator The summons and complaint shall require that the violator appear in court at a
definite time and place stated therein to answer and defend the charge One (1) copy of
said summons and complaint shall be served upon the violator by the Sheriffs Office in
the manner provided by law for the service of a criminal summons One (1) copy each
shall be retained by the Sheriffs Office and the Department and one (1) copy shall be
transmitted to the Clerk of the Court The County may remove any obstruction or work not
conforming to this Article during the pendency of the enforcement action
3 It is the responsibility of the County Attorney to enforce the provisions of this Section In
the event the Board of County Commissioners deems it appropriate, the Board of County
Commissioners may appoint the District Attorney to perform such enforcement duties in
lieu of the County Attorney
4 Any arresting law enforcement officer shall follow the penalty assessment procedure
provided in Section 16-2-201, C R S , for any violation of this Article
C Equitable Relief in Civil Action In the case of any violation of this Article, the County Attorney,
in addition to the other remedies provided by law, ordinance or resolution, may institute an
injunction, mandamus, abatement or other appropriate,action or proceeding to prevent, enjoin,
abate or remove such violation
D Civil Penalties In addition to any of the penalties set forth above, any person, firm or
corporation violating any such regulation, provision or amendment thereof or any provision of
this Article, may be subject to the imposition, by order of the County Court, of a civil penalty
PAGE 7
2018-4154
ORD2018-10
in an amount of not less than two hundred fifty dollars ($250 00), nor more than five hundred
dollars ($500 00) It is within the discretion of the County Attorney to determine whether to
pursue the civil penalties set forth in this Article, the remedies set forth above, or both Each
day after the issuance of the order of the County Court during which such unlawful activity
continues shall be deemed a separate violation and shall, in accordance with the subsequent
provisions of this Section, be the subject of a continuing penalty in an amount not to exceed
fifty dollars ($50 00) for each such day In no event shall civil penalties, imposed pursuant to
this Subsection, constitute a lien against real property
BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is,
directed to arrange for Municode to supplement the Weld County Code with the amendments
contained herein, to coincide with chapters, articles, divisions, sections, and subsections as they
currently exist within said Code, and to resolve any inconsistencies regarding capitalization,
grammar, and numbering or placement of chapters, articles, divisions, sections, and subsections
in said Code
BE IT FURTHER ORDAINED by the Board, if any section, subsection, paragraph,
sentence, clause, or phrase of this Ordinance is for any reason held or decided to be
unconstitutional, such decision shall not affect the validity of the remaining portions hereof The
Board of County Commissioners hereby declares that it would have enacted this Ordinance in
each and every section, subsection, paragraph, sentence, clause, and phrase thereof irrespective
of the fact that any one or more sections, subsections, paragraphs, sentences, clauses, or
phrases might be declared to be unconstitutional or invalid
The above and foregoing Ordinance Number 2018-10 was, on motion duly made and
seconded, adopted by the following vote on the 21st day of January, A D , 2019
PAGE 8
2018-4154
ORD2018-10
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST
Steve Moreno, Chair
Weld County Clerk to the Board
Barbara Kirkmeyer, Pro-Tem
BY
Deputy Clerk to the Board
Sean P Conway
APPROVED AS TO FORM
Julie A Cozad
County Attorney
Mike Freeman
Date of signature
First Reading November 26, 2018
Publication December 5, 2018, in the Greeley Tribune
Second Reading December 19, 2018
Publication December 26, 2018, in the Greeley Tribune
Final Reading January 21, 2019
Publication January 28, 2019, in the Greeley Tribune
Effective February 1, 2019
PAGE 9
2018-4154
ORD2018-10
AI D APPENDIX 8-P-RIGHT-OF-WAY USE APPLICATION
PAGE 10
2018-4154
ORD2018-10
Weld County Department of Public Works
1111 H Street, PO Box 758
'1
Greeley, CO 80632
Phone : 970- 304- 6496
Send applications to : ROWPermits@weldgov.com
RIGHT- OF - WAY USE APPLICATION
Permit Use type : Utility Oil and Gas Private Remediation Annual
Line Abandonment or Retire
Applicant ( Permittee) : Agent :
Business name : Business name :
Contact name : Contact name :
Address : PO Box : Contact phone : ( office )
City : State : Zip : ( cell )
Phone : E - mail :
E - mail :
Primary Contractor : Secondary Contractor :
Business name : Business name :
Contact name : Contact name :
Address : PO Box : Contact phone : ( office )
City : State : Zip : ( cell )
Contact Phone : ( office ) E - mail :
( cell )
E - mail :
Traffic Control Contractor : Reclamation Contractor :
Business name : Business name :
Contact name : Contact name :
Contact Phone : ( office ) Contact Phone : ( office )
( cell ) ( cell )
E - mail : E - mail :
Inspector :
Business name :
Contact name :
Contact Phone : ( office )
( cell )
E - mail :
Page 1 of 12
Project name
Location CR between CR and CR
Road Classification Local Collector Arterial
ROW Type Maintainer Non-Maintained
Project Classification Residential Commercial Municipal
Parcel number Parcel number(opposite side for crossings)
Legal(Section/Township/Range) - N- W
Service Address Subdivision
Does Project disturbance exceed 1 Acre Yes No
Provide if applicable
Grading Permit# CDPHE Permit#
Planning Case# Other Permits
Impacted surface(check all that apply)
_Asphalt Concrete Gravel Treated Gravel Outside of Roadway Unmaintained Native
Other
Type of Use(check all that apply)
_Communications Electric Potable Water Non-Potable Water Sanitary Sewer Natural Gas-Utility
Natural Gas Pipeline Crude Oil Pipeline Produced Water Pipeline Fresh Water Transfer Irrigation Storm Water
Other
Provide detailed description of Project
Page 2 of 12
Construction Details(check or complete all that apply)
Line type
Appurtenance Cable Casing/Sleeve Conduit Fiber optic Pipeline Powerline
Composition of Line
Asbestos Concrete(AC) Aluminum Carbon Steel Conductor Copper PVC_Steel_Flex Steel
Ductile Iron Polyethylene(PE) HDPE Lay flat CMP RCP Other
Line Size
Inside diameter Outside Diameter
Appurtenance type
_Cabinet Manhole Meter Hand hole Valve Utility pole Pedestal Monitor well
Other
Appurtenance Dimensions Length Width Height
Classification of Work
Temporary New Service Maintenance Occupation Relocation Disconnect Surveying
Overhead Underground Potholing Culvert install Tree Trimming Road improvements
Road maintenance Traffic control Retire or Abandon line Other
Construction Methods
Directional Bore Open cut Excavation Trenching Plow or Cable puller Core Drilling Paving
Gravel placement Topsoil replacement Debris removal Snow removal Reseeding
Open cut/excavation/trench details
Length Width
Restoration Methods
Asphalt(HMA) Flowable fill Compaction testing Non-shrink Grout Structural fill Road base
Surface Gravel Fugitive dust product Native material Reseeding Mulching Erosion Control
Future location markers
Requested Start date Projected Completion date
Weekend hours requested Yes No
Permittee Signature Printed name Date
Page 3 of 12
Right of Way Permit Fee Schedule
Administrative fees
1) Application and Review-Standard $150 00
2) Application and Review-Annual $300 00
3) Permit revision $75 00
4) Permit extension $150 00
5) Inspection outside normal hours •
5 $75 00/Hr(minimum 2 hours)
Construction fees
1) Bore Crossing w/both pits outside ROW
a) Line outside diameter<12" $50 00+$0 30/LF
b) Line outside diameter 12"to 20" $75 00+$0 30/LF
c) Line outside diameter>20" $100 00+$0 30/LF
2) Bore Crossing w/one(1)or both pits within ROW
a) Line outside diameter<12" $75 00+$0 30/LF
b) Line outside diameter 12"to 20" $100 00+$0 30/LF
c) Line outside diameter>20" $125 00+$0 30/LF
3) Bore parallel in ROW outside of Roadway
a) Line outside diameter<12" $25 00+$0 30/LF
b) Line outside diameter 12"to 20" $50 00+$0 30/LF
c) Line outside diameter>20" $75 00+$0 30/LF
4) Open cut Asphalt or Chipseal<5 years old $5 00/SF Minimum$100 00
5) Open cut Asphalt or Chipseal>5 years old $2 50/SF Minimum$75 00
6) Open cut Treated Gravel Surface $2 50/SF Minimum$50 00
7) Open cut Gravel Surface $1 00/SF Minimum$50 00
8) Parallel installation Outside roadway
a) Trench width up to 12" $0 30/LF
b) Trench width 12"to 20" $0 60/LF
c) Trench width>20" $0 90/LF
9) Pothole/Test hole 8"or less
a) Asphalt or Chipseal $50 00/each
b) Treated Gravel Surface $50 00/each
c) Gravel Surface $25 00/each
d) Outside roadway $10 00/each
10) Above ground occupation within ROW $0 25/LF Minimum$50 00
11) Appurtenances
a) <3 SF $50 00/each
b) >3 SF $175 00/each
12) Penalties
a) Failure to obtain a Permit Total of all fees X days delinquent
b) Safety Violation $250 00
13) Abandonment/Retirement of Line in ROW
a) =<12" $75 00+$0 50 LF
b) >12" $150 00+$0 50 LF
Page 4 of 12
RIGHT- OF -WAY USE PERMIT
The intent of the Right-of-Way Use Permit is to regulate and permit the use of Weld County's public right-of-way by private
companies, municipalities and/or special districts constructing and burying lines either crossing or running parallel within Weld
County right-of-way. Crossings are allowed for all lines. Parallel installations are allowed for lines of "public utilities" that are
defined in CRS 40-1- 103 and are "domestic or foreign electric light power, gas, or pipeline companies" holding current Certificates
of Public Convenience and Necessity issued by the Colorado Public Utilities Commission ; for water lines of municipalities, water
districts, and water and sewer districts; for transmission lines or pipelines used solely for agricultural purposes; and-for fresh water
above-ground transfer pipelines; and for lines in non-maintained right-of-way if approved by Weld County based upon locational
factors; such as, surrounding population density, to aogra Thy, or providing access to a recorded exemption lot, and with Permittee's
Agreement to move the line at its sole expense if Weld County or an annexing municipality intends to improve the right-of-way.
Public right-of-way subject to regulation by the Right-of-Way Use Permit includes Weld County's maintained and non-maintained
gravel and paved roads, and all public drainage easements. A Right-of-Way Use Permit grants the Permittee and its Contractors
permission to occupy designated County right-of-way. The Permit authorizes excavation, surveying, and/or construction of facilities
within the County right-of-way and provides for their subsequent restoration upon completion of the Project . The Permit is issued
solely for the Permittee's and its Contractor's construction of the Project . Permittee is prohibited from changing the use of the
Project in any way without first obtaining a new permit .
SUBMITTAL REQUIREMENTS
1 . Complete application . Permittee must submit a complete Right-of-Way Use Application and include required submittals for
review and consideration of its Project . If the Project is approved , a Right-of-Way Use Permit will be issued to the Permittee .
It is the Permittee' s responsibility to inform its Contractor of all Permit requirements, Provisions, and attached Special
Provisions .
2 . Drawing, plan set, and map . A drawing, plan set and map are required to be submitted with the Application . Detailed plan ( s ),
sketch , and/or map ( s ) showing the work location and roadway, edge of roadway, County ROW lines, at least one crossroad ,
and a legend . It is preferred , that drawings be 11x17 or capable of being printed out in 11 x 17 . All underground installations
must include a cross section typical showing depth of line being installed per County requirements based on the lowest point
of the County ROW and show the County ROW width . Drawings at intersections must be in plan and profile, and shall be at
a scale of 1 : 100 or as determined by the Department of Public Works .
3 . Traffic Control Plan . A Traffic Control Plan (TCP ) or Method of Handling Traffic ( MHT) must be submitted and approved prior
to Permittee' s commencement of work . Permittee shall provide all necessary traffic control in accordance with the Manual
on Uniform Traffic Control Devices ( MUTCD ) in drawing form ; narratives will not be accepted .
( a ) Flaggers shall be required at any locations where there is encroachment into a travelling lane .
( b ) Full road closure requests must be prepared by and signed by a Traffic Control Supervisor (TCS ) .
( c ) Full road closures exceeding three ( 3 ) days shall require approval of the Board of County Commissioners .
4. Insurance . Permittee and/or its Contractor shall secure and maintain insurance policies and/or provide proof of adequate
self-insurance that will protect itself, its sub - contractors, members of the public who use the right-of-way associated with the
Project, and Weld County, Colorado, from claims for bodily injury, death , or property damage which may arise from the
construction of the Project, or caused by the facilities which are constructed as permitted herein . The Board of County
Commissioners of Weld County, Colorado, its officers, and employees must be named as an "Additional Named Insureds"
in all liability insurance policies secured by the Permittee and/or its Contractor . The following insurance policies and amounts
are required . Certificates of insurance evidencing such policies shall be delivered to the Weld County Department of Public
Works :
( a ) Statutory Worker' s Compensation .
( b ) Contractor' s public liability and property damage in the following sums :
Bodily Injury : Property Damage :
Each person $ 1, 000, 000 Each accident $ 1, 000, 000
Each accident $ 1, 000, 000 Aggregate $ 2 , 000, 000
Page 5 of 12
( c ) Automobile public liability and property damage in the following sums :
Bodily Injury : Property Damage :
Each person $ 1, 000, 000 Each accident $ 1, 000, 000
Each accident $ 1, 000, 000
5 . Bonding and Surety. If determined necessary by Weld County' s Department of Public Works, Permittee shall provide a surety
bond or other security for the total amount required to restore the right-of-way under which the Project is to be installed or
constructed , based upon current Weld County Department of Public Works contract prices for the performance of such work .
Said collateral shall remain in effect for a period of two ( 2 ) years after inspection of completed construction by Weld County
Department of Public Works . Whether or not covered by a bond, Permittee shall reimburse Weld County for all expenses
incurred by it as the result of, or related to, the failure by Permittee or its Contractor to perform all installation , construction ,
maintenance or other work pursuant to this Permit in a workmanlike manner .
6. Geotechnical Submittals. The Weld County Department of Public Works reserves the right to request from Permittee
geotechnical submittals if deemed necessary .
The grant of this Permit is conditioned upon Permittee's and its Contractor' s compliance with the General Provisions,
Construction Provisions, Pipeline Provisions ( if applicable), and General Matters set forth below. By accepting this Permit,
Permittee and its Contractor agree to comply with the terms and conditions set forth herein .
GENERAL PROVISIONS
1 . Permit Required .
( a ) Commencement of construction prior to receiving an approved Permit will result in applicable penalties ( see emergency
repair section for exclusions listed as item number 12 ) .
( b ) Contractor must have a copy of this Permit on site during construction of the Project .
( c) This Permit expires requires completion of construction within three ( 3 ) months from date issued unless otherwise
stated . The Permittee may apply for an extension if work is not completed before the permit expiresexpiration of three
' 3 ' months . All applicable fees must be paid before extension will be issued .
2. Inspection . Inspection of work performed in Weld County right-of-way is required . The Weld County Department of Public
Works must be notified 48 hours prior to commencing all work within Weld County right-of-way . Final inspections are
required . Weld County shall have the right to order Permittee or its Contractor to stop work anytime Weld County believes
that a violation of this Permit has occurred or if there is a danger to the safety of the public if the work continues .
3 . Additional Permits. Permittee shall be responsible for obtaining all other state, federal, or local permits which may be
required of Permittee and/or its Contractor to install and/or maintain its Project . Permittee shall provide evidence of such
other permits upon request by the Weld County Department of Public Works .
4. Determination of Placement . Weld County reserves the right to determine the specific placement of the Project within its
right-of-way .
5 . Suspension of Work. Weld County' s Department of Public Works shall have the authority to suspend work, wholly or in part,
because of the failure of Permittee to properly execute the work in accordance with this Permit . Notwithstanding the
issuance of this Permit, Weld County reserves the right to make or to require Permittee to make any changes, additions,
repairs or required relocation of any facilities within the dedicated right-of-way at any time .
6 . Setback Requirements. By accepting this Permit, Permittee hereby waives its right to require industry setback requirements
which it might otherwise require from other utilities which may be placed in Weld County' s right-of-way and relinquishes its
authority over the placement of all other electric, power, gas, communications or other conduits, pipelines, appurtenances,
or irrigation structures which Weld County may allow to be placed in its Right-of-way . Weld County must approve location
prior to construction .
Page 6 of 12
7 . Compliance with Utility Notification Requirements. Permittee and/or its Contractor shall comply with all applicable
requirements of C . R . S . § § 9- 1 . 5 - 101, et seq . , and be responsible for locating all existing utilities and registering all new lines
with 811 . Contact the Utility Notification Center of Colorado at 811 or 1 -800-922 - 1987 at least two days in advance of digging .
Markers and flags are valid for 30 days . Permittee must remove all utility locates such as flags and marker pins from the right -
of-way once the construction is complete . Any subsurface utility engineering notification sent to the Colorado Notification
Association shall also be sent to the Weld County Department of Public Works .
8 . No Damage to Other Projects. No culverts, irrigation structures, drain lines, utility lines, or any other Projects or facilities
within the right -of-way are to be cut or damaged . In the event Permittee or its Contractor damages an existing facility,
Permittee shall first notify the owner and either immediately repair and replace the damaged facility or pay the owner to
repair and replace the same in accordance with the desires of the owner .
9. Emergencies. Permittee shall report all emergency repairs to Weld County Public Works immediately upon being advised
that an emergency exists . During such repairs, Permittee shall utilize proper traffic control measures . Permittee shall apply
for a Right-of-Way Use Permit and make the required repairs as soon as practicable after the Weld County Department of
Public Works is notified of the emergency situation and the need for such repairs . In no event shall such repairs be completed
later than 24 hours after receiving such notification , unless adverse weather conditions prohibit the repair process .
10 . Changes Made to the Right-of-way - Permittee's Financial Responsibility. In the event changes are made by Weld County
to the right-of-way or appurtenances within the right-of-way that would necessitate removal or relocation of the Project,
Permittee shall do so promptly at its own expense upon the request of Weld County .
11 . Permittee Responsible for All Project Related Expenses. The construction , operation , maintenance and repair of the Project
constructed by Permittee, and all other improvements described in this Permit, shall be at its own expense and without the
aid or use of Weld County funds .
12 . Permittee Solely Responsible . Permittee or its successors and assigns, remains solely responsible for all matters pertaining
to the Project and all costs associated with or pertaining to the Project . These responsibilities include, but are not limited to,
the following : repair and maintenance of the physical components of the Project ; removal of the physical components of the
Project upon retirement of the use or following the request of Weld County to remove the Project ; cooperation with Weld
County and other Permittees whose projects are placed in Weld County' s right -of-way .
13 . Successors and Assigns of Permittee . It is mutually understood and agreed that this Permit and all the terms and conditions
hereof shall extend to and be binding upon the Permittee and its successors, and assigns
CONSTRUCTION PROVISIONS
1 . Road Crossings. All underground installations crossing maintained or non - maintained Weld County roadways and right of
ways shall be by directional bore unless otherwise approved by Weld County Public Works .
2 . Parallel Installations. Parallel installations within the untraveled portion of Weld County right-of-way may be performed by
bore, trenching, plowing, drilling or excavation .
3 . Bridge Structures.
( a ) No lines shall be attached or otherwise placed along or upon any Bridge structure or wing walls .
( b ) No continuous line shall be installed crossing under a bridge structure .
( c ) Underground projects installed parallel to a bridge structure must maintain a minimum clearance of five feet ( 5 ' ) from
all wing walls and pilings .
4. Minimum Cover for County right of way installations. All depth requirements are minimums and are subject to approval or
modification by the Department of Public Works based on engineering and safety standards and existing utilities in the right -
of-way . In no event shall any facilities be installed in Weld County right -of-way at depth less than four feet (4' ) from top of
Page 7 of 12
line measured from the lowest point of the right-of-way
(a) Dry utilities shall be installed at a minimum depth of four feet (4')from top of line measured from the lowest point of
the right-of-way(flowline)
(b) Wet utilities shall be installed at a minimum depth of six feet(6')from top of line measured from the lowest point of the
right-of-way(flowline)
(c) All types of oil and gas lines shall be installed at a minimum depth of ten feet(10')from top of line measured from the
lowest point of the right-of-way(flowline) Concrete surfaces shall be crossed at a minimum depth of fifteen feet(15')
from top of line measured from the lowest point of the right-of-way(flowline)
(d) All line types crossing Non-maintained right-of-way shall be at a minimum depth of four feet (4') from top of line
measured from the lowest point of the right-of-way(flowline)
(e) Culverts must have a minimum of twelve inches(12")of cover
5 Daily Construction Requirements At the end of each day during the installation and construction of the Project, Permittee
shall observe the following requirements
(a) Working hours allowed under this Permit are from Sunrise to 1/2 hour prior to Sunset
(b) All materials shall be removed a minimum of ten feet(10')from outside edge of the road shoulder
(c) All excavations upon the traveled portions of the right-of-way shall be back-filled in accordance with the compaction
requirements set forth below unless otherwise approved by Weld County
(d) All traffic signs must be in place per the approved Traffic Control Plan or removed or covered if not applicable to nightly
activities
6 Equipment Movement and Equipment Crossings
(a) Movement of cleated or track equipment is restricted to the immediate work area Equipment shall be transported to a
proper unloading area No cleated or track equipment may work on or move over any road way surface without mats
(b) Equipment crossings, in line with the Project,shall be built up level with the road surface with a practicable anti-tracking
material to prevent damage to the road surfaces and shoulder areas Crushed concrete is prohibited for use as a surface
material A minimum of a twelve-inch (12")culvert shall be placed in ditch areas under tracking pad to maintain proper
drainage Existing ditch and upstream and downstream culverts must be observed in determining appropriate drainage
culvert size
7 Site Markers Permittee shall mark the site of the construction of the Project, whether permanent or temporary, with
markers acceptable to Weld County Department of Public Works Markers shall be placed as far from edge of road as to not
interfere with normal road maintenance
8 Future Line Location The installation of non-ferrous lines in the right-of-way shall require a suitable means to facilitate
future line location such as, but not limited to, metallic warning tape installed above the line and registration with 811
9 Concrete Surfaces There is a strict no cut policy on all concrete surfaces,which includes potholing Any damage or cutting
of concrete surfaces will result in the Permittee being responsible for the cost of a full replacement of concrete panel(s) by a
Contractor approved by Weld County Bore grout may be required for concrete surfaces
10 Asphalt Surfaces Asphalt surfaces are not to be cut unless approved by the Weld County Department of Public Works If
an asphalt surface cut is granted, the cut shall be repaired with a flowable fill cement (refer to Section 11 Compaction
Requirements, below)and hot bituminous pavement and/or concrete placed at a thickness of existing plus one(+1)
11 Compaction Requirements
(a) All compaction of backfills and road surfaces shall be compacted in accordance with the most current versions of the
Colorado Department of Transportation (CDOT) Standard Specifications for Road and Bridge Construction and Field
Materials Manual
(b) All backfills located within an existing asphalt surface or under the asphalt not currently in place but will be as part of a
new road construction, must be compacted using flow-fill cement in the upper three feet(3')of backfill
(c) If any wet or non-compactable materials are produced from excavations, they shall be completely removed from the
right-of-way and replaced with compactable materials the right-of-way shall then be returned to the original grades and
cross sections Weld County Department of Public Works shall have the authority to determine what materials shall be
Page 8 of 12
discarded and what materials shall be acceptable as replacement
(d) On gravel roads where excavation materials are stacked on the road surface, road base of 3A-inch surface gravel as
specified in Chapter 7 of the Weld County Engineering and Construction Criteria specifications for surface gravel shall be
spread over the entire road surface at a minimum depth of six inches (6") upon completion of the work Shoulders on
paved roads or barrow ditches where excavation is done shall require a minimum of four inches (4") of 3A-inch Class 6
road base material These amounts are minimums and do not supersede any requirements within the Permit
(e) On gravel roads where excavation is done within the roadway, backfilling lifts greater than eight inches (8"), but not
exceeding twelve inches(12"),shall be permitted providing that Permittee has suitable equipment to properly compact
the depth of lift placed Weld County Public Works shall determine if Permtetee's equipment and the depth of backfill lift
is appropriate Ninety-five percent (95%) of a standard proctor shall be required at any trench depth or in replacement
of any materials within the traveled portion of the right-of-way Eighty-five percent(85%)of a standard proctor shall be
required at any trench depth or in replacement of any materials off the traveled portions of the right-of-way Installations
running parallel within a gravel roadway will require a final placement of a minimum of six inches(6") of surface gravel
after all of the Project has been placed and compaction test results are in compliance
(f) Potholes in gravel surfaces shall be filled completely with road base and compacted Potholes in asphalt or shall be
filled with a cement/grout to existing thickness plus 1(+1)or filled with a compactable base material and the final
placement a HMA or concrete material of existing thickness plus one(+1)
12 Reseeding Permittee shall reseed,with a seed mix approved by Weld County Department of Public Works,all areas within
the right-of-way in which vegetation was removed or disturbed during the installation of its Project
13 Points of Access Permittee shall install manholes and other points of access to underground lines within the boundaries of
the right-of-way outside the normal wheel path of the roadway so that they do not obstruct maintenance operations within
the right-of-way Permittee shall,at its sole expense,adjust access points,when requested to do so by Weld County
14 Survey Monuments Permittee or its Contractor shall preserve or replace all survey monuments or benchmarks at each work
site If such monuments or bench marks are destroyed, Permittee shall hire a registered land surveyor to replace destroyed
monuments or bench marks If Permittee chooses to preserve such monuments or benchmarks,it shall also hire a registered
land surveyor to complete such preservation
15 Permittee's Obligations Regarding Surveys
(a) All surveying performed within the boundaries of the right-of-way shall be conducted with proper safety equipment and
advanced warning signs, ,
(b) Surveying permit holders can be issued an annual permit
(c) Any excavation within the boundaries of the right-of-way will be backfilled with the same material or better than what
was excavated
(d) Weld County Department of Public Works offers free monument boxes and lids to Permittee to establish, upgrade or
perpetuate the location of an aliquot corner of any section on a paved road Permittee shall furnish the location of the
section corners being preserved to the Department of Public Works when obtaining monument boxes
16 Permittee's Obligations Regarding the Completion of Proiect
(a) Permittee shall place surface gravel,as specified in Chapter 7 of the Weld County Engineering and Construction Criteria,
on all surfaces where any damage has occurred to the road surface from equipment, trenching, or storage of material
Weld County shall determine the damaged areas, remedial work required, and timing of said work
(b) -Permittee shall complete road restoration including, but not limited to, clean-up (including utility markers), repair of
damaged facilities,trench compaction, and replacement of gravel shall be kept within one(1) mile of new excavation
(c) All disturbed portions of the right-of-way or damaged road surfaces are to be returned to their original condition prior
to demobilizing if the right-of-way is not returned to original conditions, Weld County may perform or contract such
remedial work and Permittee shall pay for all work or forfeit its surety bond in order to pay for all work done
(d) Permittee shall own, maintain, operate and repair any line installed or constructed herein in accordance with the
regulations,conditions and terms of this permit No lines installed within County rights-of-way may be abandoned by the
owner at any time Although the lines may be retired, they may not be abandoned and all responsibility for such lines
remains with the owner The County does not recognize, nor accept, any lines designated by any other source as
abandoned, and the County will continue to expect such lines to be maintained or removed by the Permittee
Page 9 of 12
17 Line Retirement Retirement of lines in Weld County right-of-way are still required to be located as part of 811 If Weld
County approves a line to be retired, the retirement of an existing line in the right-of-way shall be subject to conditions as
determined by the Weld County Department of Public Works based on the age,condition,material type,and size Permittee
shall cut, cap,and fill Project(s)that are not required to be removed
18 Line Abandonment If Permittee desires to abandon a line from being located as part of 811 notification, Permittee shall
completely remove the line from Weld County right-of-way, unless otherwise approved by Weld County
19 Drainage Interference Permittee shall not obstruct the natural free and clear passage of water along the roadside ditch flow
lines or other waterways If surface drainage is to be affected, Permittee is responsible for the proper disposition of the
runoff
PIPELINE PROVISIONS
1 Natural Gas/Crude Oil Pipelines
(a) Natural gas/crude oil pipelines are allowed road crossings only, no parallel installations
(b) Road crossings for natural gas/crude oil pipelines must be by directional bore, only
(c) Above-ground appurtenances and/or equipment are not permissible for installation within the County right-of-way and
must comply with setback requirements
2 Permanent Fresh Water(Non-Potable) Pipelines
(a) Permanent fresh water(non-potable) pipelines are allowed for road crossings, only,no parallel installations
(b) Road crossings for permanent fresh water(non-potable)pipelines must be by directional bore, only
(c) Permanent fresh water(non-potable) pipelines must extend past future right-of-way prior to daylighting
(d) Above ground appurtenances and/or equipment are not permissible for installation within the County right-of-way and
must comply with setback requirements
(e) Weld County approval is required for any change of use or retirement of a permanent fresh water(non-potable)
pipeline
3 Temporary Fresh Water Above-Ground Transfer Pipelines
(a) Fresh water above-ground transfer pipelines are allowed as a temporary use for a period of 6 months or less for both
road crossings and parallel installations See the limitations and restrictions set forth below depending upon crossing
methods
(b) Fresh water above-ground transfer pipelines may transfer fresh or recycled water,only
(c) The source of water must be disclosed on the Right-of-Way Use Application
(d) The use of unmaintained Weld County right-of-way for temporary fresh water above-ground transfer pipelines shall be
negotiated with the landowner(s)
(e) Existing driveway culverts may not be used for water transfers
(f) All pipelines or lay flat pipes occupying the right-of-way(running parallel to the roadway) must be secured up out of
the ditch flowlines and away from the road edges They may not interfere with normal road maintenance
Crossing methods for temporary fresh water above-ground transfer pipelines
1) Plate/Manifold
a Applicable for untreated gravel roadways for a transfer duration of 10 days or less
b Must be covered with Class 6 road base with a minimum of 15-foot road base tapers on each side All forms of
traffic must be able to safely cross the plate/manifold
c Traffic control signs required including a speed reduction to 15 mph for the duration of the transfer
d Permittee is required to maintain the crossing which includes 24-hour snow removal in winter
2) Culvert Sleeve
a Applicable for longer term transfers crossing untreated gravel roadways only
b Maximum culvert size is 15"outside diameter unless approved by the Weld County Department of Public Works
Page 10 of 12
c Minimum of 18"of Class 6 road base cover on culvert
d Compaction tests of road base is required after culvert is removed if flowable fill is not used for final restoration
of the roadway
3) Existing Culverts
a Requests for use of existing County culverts(any culvert crossing under a County maintained roadway or
intersection)are subject to special review Use is for a maximum of 15 days
b Existing culverts are not available for use from March through October
c Driveway/access culverts are not available for use
d If the culvert also serves for irrigation,written permission from the Irrigation or Ditch Company may be
required
e Culvert must be cleared anytime drainage is impeded due to run-off or flooding
4) HDPE or PVC Pipe
a Applicable for longer term transfers where a paved, hard surface,or treated gravel roadway must be crossed
b Pipeline ends must extend past future right-of-way before daylighting
c Weld County approval is required for any change of use or retirement of the pipeline
4 Produced Raw Water Pipelines
(a) Produced water pipelines may apply for road crossings only No temporary above-ground transfers or parallel
installations will be permitted
(b) Pipelines will only be considered for approval that are transferring to a County approved injection or recycling facility
(c) Casing is required for crossing under County roadways
(d) Casing type may be determined by the Permittee or its Contractor
(e) Casing maximum outside diameter is not to exceed 12"
(f) Casing ends must extend outside of the County right-of-way
(g) If Flex Steel Pipe is used, casing requirement will be waived
(h) Maximum size of the produced water pipeline is not to exceed 8"and not to exceed 10"OD
(i) Requests for larger diameter pipelines will require special review by the Weld County Department of Public Works
(j) Location markers shall be green in color and must list"produced water"and an emergency contact number
GENERAL MATTERS
1 Terms
(a) All references herein to "Right-of-Way" refer to a portion of land that is dedicated or granted to and accepted by Weld
County for transportation purposes, such as a paved or gravel roadway or highway whether maintained or not-
maintained by Weld County The term is used as both singular and plural
(b) All references herein to "Permittee" are to any persons and/or entities applying for and being issued this Right-of-Way
Use Permit granting permission to construct their Project within Weld County's right-of-way
(c) All references here to "Lines" means all underground and overhead cable, telephone, electric, power, wire, gas and
irrigation lines, and/or appurtenances,structures or pipelines
(d) All references herein to "Contractor"are to any persons or business entities retained by Permittee to install the Project
in Weld County right-of-way
(e) All references herein to "Permit" refer to this Right-of-Way Use Permit, including all Permit requirements, Provisions,
and attached Special Provisions
2 Weld County's Limited Interest in Right-of-Way Weld County owns a limited interest in the right-of-way and therefore,
does not, by the issuance of this Permit,warrant its ownership of the right-of-way Permittee is responsible for determining
the ownership of properties traversed by its lines,the location of all property boundary lines,and the ownership of all right-
of-way Therefore,Permittee shall obtain from the fee title owner(s)of the right-of-way or others having proprietary interests
in the right-of-way such authority or rights as Permittee may need, in addition to this Permit for Permittee's use of the right-
of-way Permittee acknowledges and agrees that the authorization granted herein by Weld County is subject to Permittee's
securing such authority or rights
3 Rights Reserved by Weld County Permittee acknowledges and agrees that the Right-of-Way which are the subject of this
Permit exist as public right-of-way for the primary benefit of the travelling public, and that the rights granted in this Permit
to the Permittee are subject to Weld County's rights and obligations to preserve and maintain the right-of-way and the
Page 11 of 12
public's right to continue to travel safely upon the right-of-way
(a) Subject to the right granted herein to Permittee,Weld County reserves the remaining use of the Right-of-Way for existing
and future construction, operation, maintenance, repair, replacement relocation and abandonment of its own use and
facilities
(b) Weld County reserves the right to revoke this Permit at any time if Permittee or its Contractor fails to comply with the
requirements of this Permit Should this Permit be terminated for non-compliance by Permittee or its Contractor, any
lines or facilities installed prior to the termination shall remain the responsibility of the Permittee and may be removed
or maintained by Permittee at the sole discretion of Weld County
(c) This Permit is non-exclusive Weld County reserves the right to allow other public and private utilities and entities to
utilize the subject right-of-way and may impose location requirements and restrictions on Permittee in anticipation of
requests by future public and private utilities and entities to occupy the right-of-way
(d) Weld County reserves the right to reconstruct,widen and/or maintain the right-of-way which are the subject Permit In
the event this work requires Permittee to incur expenses to preserve, re-locate or maintain its Project, Permittee shall
do so upon notification from Weld County at its sole cost
4 Indemnification Except for the negligence of Weld County, Permittee shall indemnify and save harmless Weld County, its,
officers, employees,agents,successors and assigns from any damage or loss sustained by them or any of them,which arises
by reason of Permittee's negligence with respect to the installation, upgrade and/or maintenance of the Project
5 Hold Harmless Permittee agrees to protect Weld County and save and hold Weld County harmless from any and all third
party claims and damages which the installation and/or maintenance of Permittee's Project and related facilities may directly
or indirectly cause Additionally, Permittee releases Weld County from any and all claims and damages to property owned
by Permittee resulting from any act, either by or on the part of Weld County or by or on the part of any third-party
6 No Assignment Permittee shall not assign any or all of its rights under this Permit without first obtaining written consent to
such assignment from Weld County, which consent shall not be unreasonably withheld However, in the event Permittee
contracts with a third-party Contractor to perform the work associated with the installation of the Project,Permittee remains
solely responsible for Contractor's compliance with the terms and conditions of this Permit
7 Entire Permit Agreement The parties hereby agree that neither has made or authorized any agreement with respect to the
subject matter of this instrument other than expressly set forth herein,and no oral representation,promise,or consideration
different from the terms herein contained shall be binding on either party hereto, or its agents or employees This Permit
embodies all agreements between the parties hereto and there are no promises,terms, conditions, or obligations referring
to the subject matter whereof other than as contained herein
8 Effect of Invalidity of Provision If any term or provision of this Permit, or the application thereof to any person or
circumstances shall,to any extent, be held invalid or unenforceable,the remainder of this Permit, or the application of such
terms or provisions, to a person or circumstances other than those as to which it is held invalid or unenforceable, shall not
be affected,and every other term and provision of this Permit shall be deemed valid and enforceable to the extent permitted
by law
9 No Waiver of Immunity No term or condition of this Permit shall be construed or interpreted as a waiver,express or implied,
of any of the immunities,rights,benefits, protections or other provisions,of the Colorado Governmental Immunity Act§§24-
10-101 et seq,as applicable now or hereafter amended
10 No Third Party Beneficiary It is expressly understood and agreed that the enforcement of the terms and conditions of this
Permit, and all rights of action relating to such enforcement, shall be strictly reserved to Weld County and nothing in this
Permit shall give or allow any claim or right of action whatsoever by any other person not included in this Permit It is
mutually understood and agreed that this Permit and all the terms and conditions hereof shall extend to and be binding upon
the Permittee and its successors, and assigns
SPECIAL PROVISIONS
This Permit may be subject to additional Special Provisions Such Special Provisions are attached hereto
Page 12 of 12
Hello