Loading...
HomeMy WebLinkAbout20180141.tiffMEMORANDUM TO: Board of Commissioners DATE: January 17, 2018 FROM: Jay McDonald, Director of Public Works SUBJECT: 3 -Ton Double Drum Vibratory Roller, Bid B1800024 The Public Works Department recommends awarding the bid to the lowest bidder that meets specs, Wagner Equipment Co, for one, 3 -Ton Double Drum Vibratory Roller at a cost of $38,313.40. The lowest bidder, Titan Machinery did not meet specs for Engine Horse Power. Maintenance and Service manuals are available online for $350.00 per computer (we would need just one). The cost for one, 3 -Ton Double Drum Vibratory Roller with one online subscription fee for Maintenance and Service manuals is $38,663.40. There is $60,000 budgeted for this purchase. If you have any questions, please call me at extension 3761, M: Eq uipmentspecs/2018eq uipmentmemos/m6 in chtrahpum p.docx aoi$-o1WW WELD COUNTY PURCHASING 1150 O Street Room #107, Greeley CO 80631 E-mail: rturfcweldQov.com E-mail: reverett(aweldgov.com E-mail: mwalers@v jdgov,corn Phone: (970) 400-4216,4222 or 4223 Fax: (970) 336-7226 DATE OF BID: JANUARY 4, 2018 REQUEST FOR: 3 TON DOUBLE DRUM VIBRATORY ROLLER - Qty. 1 DEPARTMENT: PUBLIC WORKS DEPT — Road & Bridge Mgmt Division BID NO: #81800024 PRESENT DATE: JANUARY 10, 2018 APPROVAL DATE: JANUARY 24, 2018 VENDOR YEAR/MAKE/MODEL DELIVERY TITAN MACHINERY 7250 GREENRIDGE RD. WINDSOR, CO 80550 2018 CASE DV26 WAGNER EQUIPMENT CO 2018 CATERPILLAR 7260 CROSSROADS BLVD WINDSOR CO 80550 4 RIVERS EQUIPMENT 125 JOHN DEERE DR. FORT COLLINS, CO 80524 90-120 days ARO OPTION PRICE 3yr/5000hrs $35,299.00 +$1,109.00 MAY -JUNE 18 AVAILABLE $38,313.40 UPON REQUEST 2018 DYNAPAC CC1200VI 60-90 days ARO 2yr/2500hrs +$995.00 POWER EQUIPMENT CO 2018 BOWMAG BW 120 AD -5 500 E. 62nd AVE. DENVER, CO 80212 FARIS MACHINERY 2018 VOLVO DD 30B 5770 EAST 77TH AVE. COMMERCE CITY, CO 80022 MACDONALD EQUIPMENT 2018 SAKAI SW354 7333 HIGHWAY 85 COMMERCE CITY, CO 80037 HONNEN EQUIPMENT, INC 2018 HAMM HD13I W 5055 EAST 72ND AVENUE COMMERCE CITY, CO 80022 90-120 days 6-8 wks. ARO 03/08/2018 04/01/2018 1 yr/PT/+$450 2yr/PT/+$495 N/A lyr stdrd $39,997.06 $41,161.00 $43,600.00 $54,200.00 1yr/1,000hrs $56,164.30 5/yr/3500extd +$1,748.00 OPTION: ADDITIONAL EXTENDED WARRANTY - SPECIFY LENGTH OF TIME & HOURS THE PUBLIC WORKS DEPT WILL REVIEW THE BIDS. /10 2018-0141 66075 Hello