MEMORANDUM
TO: Kim Ogle, Planning Services DATE:April 17, 2018
FROM: Hayley Ealzano, Public Works
SUBJECT: USR18-0007 Updates
CONDITIONS OF APPROVAL
Remove Condition of Approval 1.E.32 and 1.E.33
DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN)
Any oil and gas pipeline crossing an arterial road shall be bored a minimum of twenty (20) feet below
arterial roads, fifteen (15) feet below collector and paved local roads, and ten (10) feet below gravel
local roads. This depth shall be measured below the lowest roadside ditch flowline elevation, for the full
width of the future right of way. (Department of Public Works)
2. Any damage occurring to the right of way, caused by the pipeline, will be the responsibility of the
operator. (Department of Public Works)
3. With the exception of perpendicular crossings, oil and gas pipelines are not to be located within Weld
County right of way. (Department of Public Works.)