Loading...
HomeMy WebLinkAbout20181323.tiffINVENTORY OF ITEMS FOR CONSIDERATION Applicant DISCOVERY DJ SERVICES, LLC Case Number USR1 S-0007 Submitted or Prepared Prior to At Hearing Hearing 1 ' Public Works Memorandum dated April 17, 2018 2 3 4 5 i I hereby certify that the items identified herein were submitted to the Department of Planning Services at or prior to the sched ted Planning Commissioners hearing. �e! Kim r gI+ Planner I MEMORANDUM TO: Kim Ogle, Planning Services DATE:April 17, 2018 FROM: Hayley Ealzano, Public Works SUBJECT: USR18-0007 Updates CONDITIONS OF APPROVAL Remove Condition of Approval 1.E.32 and 1.E.33 DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) Any oil and gas pipeline crossing an arterial road shall be bored a minimum of twenty (20) feet below arterial roads, fifteen (15) feet below collector and paved local roads, and ten (10) feet below gravel local roads. This depth shall be measured below the lowest roadside ditch flowline elevation, for the full width of the future right of way. (Department of Public Works) 2. Any damage occurring to the right of way, caused by the pipeline, will be the responsibility of the operator. (Department of Public Works) 3. With the exception of perpendicular crossings, oil and gas pipelines are not to be located within Weld County right of way. (Department of Public Works.) EXHIBIT Hello