Loading...
HomeMy WebLinkAbout20183807.tiff coPHE COLORADO c ,' Department of Public Health Et Environment Dedicated to protecting and improving the health and environment of the people of Colorado Weld County - Clerk to the Board 1150 0 St RECEIVED PO Box 758 Greeley, CO 80632 NOV 2 6 2018 November 19, 2018 WELD COUNTY COMMISSIONERS Dear Sir or Madam: On November 29, 2018, the Air Pollution Control Division will begin a 30-day public notice period for Extraction Oil Et Gas, Inc. - Leonard Production Facility. A copy of this public notice and the public comment packet are enclosed. Thank you for assisting the Division by posting a copy of this public comment packet in your office. Public copies of these documents are required by Colorado Air Quality Control Commission regulations. The packet must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please send any comment regarding this public notice to the address below. Colorado Dept. of Public Health Et Environment APCD-SS-B1 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 Attention: Clara Gonzales Regards, 24,44, Clara Gonzales Public Notice Coordinator Statio4lary Sources Program Air Pollution Control Division Enclosure 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe � -a John W. Hickenlooper, Governor I Larry Wolk,MD,MSPH,Executive Director and Chief Medical Officer 1,7,;\,1\41,:,. /J"/..4,t. „,-,,.1,,,,,,L CC1PLC),HL(sr), V\eW 'PW(3M/ERIctip() t2/3/I?) IV21/I% 2018-3807 cDPHE Air Pollution Control Division CO Notice of a Proposed Project or Activity Warranting Public TM 4' Comment Comment Website Title: Extraction Oil Et Gas, Inc. Leonard Production Facility - Weld County Notice Period Begins: November 29, 2018 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Extraction Oil Et Gas, Inc. Facility: Leonard Production Facility Well Production Facility NWSW of Section 21, Township 2N, Range 67W Weld County The proposed project or activity is as follows: The operator is requesting permit coverage for eight (8) 400 barrel fixed roof condensate storage vessels,natural gas venting from one (1) heater treater, one (1) gas buster and eight (8) three-phase high-low pressure separators, two (2) 400 barrel fixed roof produced water storage vessels, and condensate loadout. These emissions sources are located at a new oil and gas well production facility located in the ozone non-attainment area. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section IIl.C.1.a (25 tpy in a non-attainment area and/or 50 tpy in an attainment area) • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 18WE0215, 18WE0216, 18WE0217, 18WE0218 Et 18WE1092 have been filed with the Weld County Clerk's office. A copy of the draft permit and the Division's analysis are available on the Division's website at https://www.colorado.gov/pacific/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Any such comment must be submitted in writing to the following addressee: Harrison Slaughter Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 cdphe.commentsapcd@state.co.us COLORADO 1 Ia Colorado Air Permitting Project PRELIMINARY ANALYSIS-PROJECT SUMMARY Project Details Review Engineer: Harrison Slaughter diliE Package#: 375852' 33� Received Date: 3/2/2018x- .:'"'+'�ad• �3si3313�fi • Review Start Date: 10/5/241;,il """""l"itil— " ..`+ ,3111 • Section 01-Facility Information Company Name: Extractor C it&Gas,inc. Quadrant Section Township Range County AIRS.ID:.• • 123 -: {its Plant AIRS ID:. Ilk: ty i 3i 131 333111111] - Facili Name: eJyrcl,�l�r4�,uctior FacdiCr' 'i; �� 3h,i�i�.u�t .,. .,'�,'�'�� ,3;i;,,,,,;,,,,,,,�3 _ ��. .,,...i, Physical • Address/Location:. ' NWSW quadrant of Section 21,Township 2N,Range 67W . County: - 1Weld County' Type of Facility:. Explork 'r "�" -'" - - ' What industry segment7Lif&Naura -,.,:$1,,,,„. sirrp " Is this facility located in a NAAQS non attainment area? L ,.. If yes,for what pollutant? ❑ Carbon Monoxide(CO) Q Particulate Matter(PM) E] Ozone(NOx&VOC) Section 02-Emissions Units In Permit Application Emissions Self Cert Engineering AIRS Point# Emissions Source Type Equipment Name Permit# Issuance if Action Control? Required? Remarks •Aii3u , 3 3133 I 13333]y 3 3J 333 3 J3 ` r Permitt- x.17 3 33 s 11 4: 3 ,001 CondeRsateTank 11 `j*'t s1l.3i1 g.,.,.'^ Yes 1SWE02�. 3i3d3 1'313 13 r ,Yes l s . rI1 6 pp 3 ''' e •.va ;�,�. .31�,liI31 e 3 t' `� r��, .,,oo �:tP i'. . 1: Section 03-Description of Project Extraction Oi(&,Gas Inc.(Extractionjsubmitted d app(icaton requesting permit coverage for condensate storagevessetsata new'syntheticmiirorvyet p pdtlohoofac€iffy atatet(3Il 3fi�)3te3•ossone>n3o(nI attaifinent ate3"r 3 -- - .." �" i31i3313331311Ur3i3 j '3 liri�� r' .. .. .., y�`il i Sp iF''e it i .3 ,3� d l excuse uncontrolled requested isslons are greater than J.tpy(Colorado F QCCReg.3lFatlalr 3,Par It !tlan'il!!`a',Additionally the ,11 ti.,33333 p £ :.: 33 31 1 3 3 raiiil lit 3�3 (s il! is(Ie(Trtttrgq �e3 suseuncontrolled VOC emigsion [(AR7 uired otttces ptthe facility are great l a tjay rado'AQCC.Regulation S Part eetidn 11 D 2 a ..31 311113)1 '" :::-;„:.:',:i:1111111 �7 0 f, 1„ 3 3 3 3( ' : �33 31� u� 3�, 1.3. � � 3 33,� .. 3 333131i1�31 . '3111 3113 �) •i..11111 11k, }31 / ./ �i"9/71 Y k 3 ............................... 3i 7 j� f 7 T f3���1�3339j�� � .�: ,,,, 3�,�� µ,;e33333,. � j,,,,i3S ".x."� 31���,✓ss Sys � �l 19 3 ..: .::� ::�; Pukiltc tomclfiealt ts.L1 t oY xhe source because new synthhlt�i rttot llrrig's,°are being estsblisilett in°ordef ti V id:othe€€eqt hremeitts Additionally the change VCIC ₹ it fth ec i .3 313 3u7 errussir7i�s as arestiltaf the pralec�are greater than 25 tpy � � 393 u,r� y ONE ig, ___..l',' --4 Et'''''',''' '' a,,,.o,"..:h«'I ,...�.-,m.� 3 3 lj3.fir,. ', Section 04-Public Comment Requirements Is Public Comment Required? YA' ^.' >•1 Za If yes,why? YqueSSyrithetic Minor Permit .,3 ,,,,,,,;5, ';. Section 05-Ambient Air Impact Analysis Requirement Was a quantitative modeling analysis required? If yes,for what pollutants? :::j. - =i If yes,attach a copy of Technical Services Unit modeling results summary. Section 06-Facility-Wide Stationary Source Classification Is this stationary source a true minor? -l" -,` " ..'' Is this stationary source a synthetic minor? ;k If yes,indicate programs and which pollutants: SO2 NOx CO VOC PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration(PSD) _ Title V Operating Permits(OP) __ J 7 Li ❑J Non-Attainment New Source Review(NANSR) Is this stationary source a major source? ffi";.;�s3;��1�q _- 1 ' ' - If yes,explain what programs and which-pollutants hers 5O2 NOx CO VOC PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration(PSD)Title V Operating Permits(OP) — _� a j 1 — LI Non-Attainment New Source Review(NANSR) . • Condensate Storage Tank(s)Emissions Inventory 002 Condensate Tank 'Facility AIRS ID , 12 '..iwls.-A6Q twin(s County - Plant Point • Session 02-Equipment Description Details Detailed Emissions Unit Egbe(&�4BU bars€fixed ra ensatestprage Jesselsco9aected Description: ,,," yle ltgWitmaMPalef. ; Emission Control DeviceEnefosedeomtxatrand Description :" Requested Overall VOC&HAP Control .' Efficiency 96: a .........:i Section 03-Processing Rate Information for Emissions Estimates Primary Emissions-Storage Tank(s) ActualCondensateThroughput= 1„2'21,442;Barrels(661)per year Actual Condensate Throughput While Emissions Controls Operating= 7:Ty64, Barrels(bbl)per Year Requested Permit Limit Throughput= 1,966,930'.:Barrels(bbl)per year Requested Monthly Throughput= 124512 Barrels(bbl)per month - - Potential to Emit(PTE)Condensate Throughput= 0,4e9,990;Barrels(bbl)per year Secondary Emissions-Combustion Device(s) Heat content of waste gas= maht,40,414 Btu/scf - Volume of waste gas emitted p r BBL of ij liquids produced= 0.3223135'scf/bbl Actual heat content of waste gas routed to combustion device= 998 MMBTU per year Requestedheatcontentof waste gas routed to combustion device= 1,198 MMBTU per year Potential to Emit(PTE)heat content of waste gas routed to combustion device= 1,198 MMBTU per year • Section 04-Emissions Factors&Methodologies Will this storage tank emit flash 'missions? yes M, ProMax Throughput: Y 9 i 36ebbl/year Flash Emission ProMax Flash WEB Emission Pollutant Rate(lb/hr) Gas Weight% Rate(lb/year) VOC ;:6.001271598;" .:, ₹4795:12.. Benzene 35';2.040028-Obi%„' 0902312158 403.9453573 Toluene 23it40672Ec06,,;L 0.OB189@889 i„ 330.2605887 Ethylbenzene "'312668&-OS;3`,8885E6EOS%i;. 15.5240558 Xylene I. 75772E407,;,IIit 0,0066OTr96,9i1 104.1074057 n-Hex ;2.656536 OS}i.,,,,i11:02,030439 t,3 3652.20903 224 IMP iiili'13.0072&&3224; /,if002365d 4 41.31802165 • Emission Factors Condensate Tank Uncontrolled Controlled Pollutant (Ib/bbl) (lb/bbl) Emission Factor Source (Condensate (Condensate Throughput) Throughput) 9� VOC 1.4966E-OS 7.484E-03 $f5. � / Benzene 3.4610E-04 1.730E-05' /, Toluene 2.8296E-04 1.415E-05 $Eta' (tfrta�' T�. Ethylbenzene 1.3301E-OS 6,650E-07 6 'Spekithe4.F$gafgd45 agi#F Xylene 8:9148&-65 4.460E-06 514e5paelBcff(i(YchafL+#84914� - - 224 TMP 3.5401E-05 - 1.770k-06 F`.{tr, P +Y y Control Device Uncontrolled Uncontrolled Pollutant (Ib/MMBtu) (lb/bbl) Emission Factor source (waste heat (Condensate combusted) Throughput) PM10 my"'ad#° - 0.0000 -R mgg ,y Y^#PWt11;@ ,F PM2.5 `" dW75 y; 0.0000 ' ( .pq lye:. NOx i::vvl ll:6i daa ..1 0.0001 Y ,_qa .k CO ... O6IOGf'I' :f 0.0003 y Section 05-Emissions Inventory Potential to Emit Actual Emissions Requested Permit Limits Requested Monthly Limits Criteria Pollutants Uncontrolled Uncontrolled Controlled Uncontrolled Controlled Controlled (tons/year) (tons/year) (tons/year) (tons/year) (tons/year) (lbs/month) VOC 109.72 9144 4.57 109.72 5.49 932 PM10 0.00 0.00 0.00 0.00 0.00 1 - PM2.5 0.00 0.00 0.00 0.00 0.00 1 NOx 0.04 0.03 0.03 0.04 0.04 7 CO 0.19 0.15 0.15 0.19 0.19 32 Potential to Emit Actual Emissions Requested Permit Limits HazardousAirPollutants Uncontrolled Uncontrolled Controlled Uncontrolled Controlled (Ibs/year) (Ibs/year) (lbs/year) (lbs/year) (Ibs/year) Benzene 507.30 422.82 - 2L14 507.39 25.37 Toluene 414.83 345.70 17.28 414.83 20.74 Ethylbenzene 19.50 16.25 0.81 19.50 0.97 Xylene 130.77 108.97 5.45 130.77 6.54 n-Hexane 45&7.48 3822.90 191.14 4587.48 229.37 224 IMP 51.90 43.25 2,16 51-90 2.59 - - Section 06-Regulatory Summary Analysis Regulation 3,Parts A,B 500000 requires a permit Regulation 7,Section XII.C,D,E,F Storage tank issubject to Regulation 7,Section XII.C-F Regulation 7,Section XII.G,C Storage Tank Is not subject to Regulation 7,Section 011.6 Regulation 7,Section XVII.B,C.1,CO. Storage tank Is subject to Regulation 7,Section XVII,8,Cl, &C.3 Regulation 7,Section XVll.C.2 Storage tank is subject to Regulation 7,Section XVll.C.2 _ Regulation 6,Part A,NSPS Subpart Kb Storage Tank Is not subject to NSPS Kb Regulation 6,Part A,NSPS Subpart 0000 Storage Tank is not subject to NSPS 0000 NSPS 0000a - Storage Tank is not subject to NSPS 0000a Regulation B,Part E,MACTSubpart HH Storage Tank is not subject to MACr HH (See regulatory applicability worksheet for detailed analysis) 2 of 5 K:\PA\2018\18WE0215.CPS.slsm • • Condensate Storage Tank(s)Emissions Inventory Secdon 07-Initial and Periodic Sampling and Tasting Requirements - - Does the company use the state default em ssions factors to estimate emissions? Ifyes,are the uncontrolled actual nr requested emissions estimated to be greater than or equal to 80 tons VOC peryear7 N/A-site specific emission fasters were developed 10rthiz hcllRy. Ifyes„the permit will'containso"InitalCompliance"testing requiremenetd develop asitespecific'missions,Rector bated on guidelines-In PS Memo 05-01. - - Does the company useasite speci'io emissionsf ctor to estimate emissions? �., g - - If yes and if there are flashd missions,are the emissions faces based p surized liquid sample drawn at the if yes beingpermtted7 This sample should be ld d-epre tad h h generally means sdespecrficand - - - collected within one year of the appicanan received date However,if the facility has not been modified(eg.,no Yh 4a,ht on-line)then ewwells brought it ma be e ppropdate tp use an older site-specific sample. �"" V Ifne,the permltwlll contain an"Initialy Compliance"besting to develop.a site specific emissions factor based on guidelines fn P5 Mdm005-01. - - Does the ocmpany request'control device efficiency greeterthen 95%for a flare or comhust'on device? 1 - Ifyes,the permitwli contain and Initial compllencetestcondition to demonstrate the destruction efFciency ofthe combustor de b ed on inlet and outlet concentrafion sampling - Section 08-TechnicalA lys Nate "c n hef pmvnfed,fhe:tdf atlhgwa .vc kv:3F fi'. �i eons d7N`{Af'PN coheres-w25-g1o45y{njc ,-d3N[Apeftlanfi .D5-153-45049(,(050o atd3N{APtxlanhe tts-3z33 eem M5c5AP€1+itii. y y(ldgcoara 6tfiAPErhimbc 504?p1Lvi3" n£d:7NtAPt NVmnajrrQSb St-45042((v iJ Leon ardie(APerurm8pek: ti3-4sa4kt and toiii,3 f€ 4pff" 9Ck( f€$F' $afar h ( diSEpEodpc&orsdateinNaYe81�e a TA 5 d th PrpMa%$t I''�� ��1 iilrt #3etdt'tlf tj4 41 € fit' ,-- tit 3 ��ayetln-tigo,r r y(6n-51nce wrfiFiF3avenpf 104.4 pjesed r fmcturedpr 00.0 �333�" 1(I re s ge_. . ..'-„." tit 'r' F 4f 3 3 m ss soW9,w 1', rt I�1nnt"snta fral s-,:.-gi�kt ye a is*. 33 t#en�'.t` -. a ,:,,,,r.,r aog to'r t ID:WC Irattdp 1 1. Y ii"r t li i ssss sf I / ) a 7 iii - , I.k' P' .f1ri1 i3 ss*,,' qE �' °13 h 33313 - � :. ':..,*'''''..•';'16,14114A--,-, �4.5Sf).3 '` .£ Er�tesxesp'e Ifl mum on€aeCmswefed:,„i„o eml„ • g P M'iii`Eap Vfffi 4`03d l.'x:""Zii4w'a#o0 'ki,'iedtoetfm02a'!! A 34-U.d. Imat ,‘.irking d bee.- g o y h15}l.Uttiilez o,'ergs.5pt($fj)7gy flth yh¢im 5newthe p•b t 4th6HEP pa•O•*• f e uf7•fizelC''tf'i L4['1$at e: m 1 h Th EAT Fs g'suns W f$RVp 1 as(ifd f IIgod a Re,,,,,m n I gi I dole.The pep tedwrfh g I RV-':•'•:-4,-,:--4:'::1-00r 1_94.-. serv005 esfims- when yard ilia td p f Rm Innis ovvp5ob�foepetsefhRIn s("� t1�beforthe notedrhat the Pro Max s2 cc lotion predmtsan 0VPo11_?40pst ror€he stabled ll) dT,t,,ff r p`ois.hers�p.VVP St as Re bas s for the CPATanks gttfletf `£h"�I4 A J ,,, 3 h HAT n at th 1 0 'A - - 'nest u g d bre fepfated by ultiplymgthe Y(3C£nlfS ipr1Y3 b2frolryffl fpAT its a 05 y'he f 4AP - t liS/h)t th VeT o '00'(16/nrl nth P hgax�,t°ktiO Pr Maxm ulatlo Toro toeple benxer 3 x' g ndbteath g 'red t • d ell 174705.02 lb VOC/ye )(2tf4WxO0lbImrccnelhrU(00,the tt48lbveyG.Ir zenafyear Ui fgths missIooc 3tr3HSimugbputbastsufth ulalonil4660306b1/ye ) tt h • egq(se)f)p3'.Ot�5 be an (Ib/Mel)ynrn.K2mple pee dl €6((r&SSIy 3 3 3 �'Jr(1466t730bbi/yea y i QOp579 3 )ii/bb)PEpireilf 50 i w ui/lg ¢geight h','''''''."I''''' d t y f arc,the h �3s6C amPmThePr Magslmplatfonho Chic f253 A1f1bntIcga llim4t 3 € g)ssions(I We4er theeMFcJiidf�6ty ry(1�btpgydeuribed bove are',Spwfpe Teeth simply 8th I5nt% j}4 r6 pmM X v€a₹re tonCgit d'55NO4541 F' nd bre )1 (P 4 eflosi 1 aE 10ME,SJ0 T 1 M Awl u P IH i i ) �� cc �tv.p �taSh9 ab Re ab b use o3l<ng aad L7Nl lspanstypieaily have h�hr�mneenkratl'gns € �ejdY€fC a cope a hash gas�wz 3]f3 f33 1� ,�F` 33 3�� 13( �3" : 3J 8313 j3jg f1.3 I gI o L 3 x 3 3 %P,is( d` 1.$(3 33 3 1 6 F3 3 33 33t/j ' € a Thtl3 31 II If HH j3 1311 f as ode Edj n1d emg55tb11 bnsu5 CaiLnl te?p D:i l heemeend npta ow r8tp of er 3 pled y t 4P onhingee des Ylthmgh&metbn ibiCt{i'( ¢5 ig[Conhk#IG thPW§S".g�4 - • _ adding d b>• tyti gernlssl peltwa de me?ka eptabkhl7,I„'t i �0 ga iat dvntt7VO:D'kingagdbrPrP''"g'')t i.4ypyfa5O,7l''"'N rT}"iaK"tfie�g`a9 tedw thllo it mtssinns Add b lip tIe alculul d NOk d€O ems I rely Il(lelaxresotr apsetlngtln sbalds so thpadddla [w-brKwgapupa ii4Pngvraacgaam uidnothkelyoau thq NO;Eag5022 missiodstax dAPFN p rtl 8th holds, fi a` 3 pya'j)]]Iry')3,11:`i =:A-`3 `Ir� o .. 3 - a� 3�?�11"'F,4 2. dl t€ 3�Ij 11 _ binisiliNisbissHq 5,The• operat as previded-wfh draftpecoltagrAPENtedhN>zt rev?wpa rte pr hIGcommnt'tbe poratnrxevretyaAd thdocam ntsayl eKptayser}tr� 3333333 3r 3 3 ..�.....::........,u I,.,i:a33.�.i'',.. '. ��.,�,.,,.., ''bflllii_ltd,«.� ,,u ...�rvi Section O9-Inventory 5CC Coding and Emissions Fasters - Uncontrolled - _ Emissions AIRS PointM Process if SCCC d Pollutant "'ten Caniml% 001 • 05 PM30 0.00 0 b/1,000 gallons condensate throughputns PM2.5 0.00 0 6/1, gallocondensatethro ughput NOx 1.32E-03- 0 b/1000,OW gallons condensate throughput VOC 3.564 95 b/1,000 gallons condensate throughput CO 6.03E-03 0 b/3,000 gallons condensate throughput Benxene 8,24E-03 95 b/1,000 gallons condensate throughput - Tciuene 6:7401-03 95 b/1,000'gallonscendensete throughput • Ethylhereene 3.1701-04 95 6/1,000 gallons condensate throughput _ - Siene 2.12E-03 95 b/1,000 gallons condensate throughput - - n-Hexane 7.45E-02 95 b/1,000"'onecondensate throughput 2247MP 8.43E-04. 95 b/3,000 gallons condensate throughput 3 of - - K:\PA\2018\18WE0215.CPI.xlsm • Condensate Tank Regulatory Analysis Worksheet . Colorado Regulation 3 Parts A and 0-APEN and Permit Requirements • 15,,,,,e k in the.Non-Attainment Area I ATTAINMENT 1. Are uncontrolled actual emissions from any criteria pollutants horn this individual source greater than 2 TPY(Regulation 3,Part A,Section 110.1.51? 2. Is the construction date(service date)prior to 12/30/2002 and not modified after 12/31/2002(See PS Memo 05-01 Definitions 1.12 and1.14 and Section 2 for additional guidance on grandfather appliabkity)? 3. Are total(actin uncontrolled VOC emissions realer than 5 TPY,NOx realer than 10 TPY or CO emissions reefer than 10 TPY Regulation 3,Pan 0,Section 11.0.3? • You h.uvein:Rruted shut source it in the Noe-Assessment Al.NON-ATTAINMENT - ' 1. Are uncontrolled emissions from any criteria pollutants from this individual source greater than l TPY(Pegula[lon3,Part A,Session ll.O.l.aI? Yes" 11 Source Requires an APEN.Go to the next question 2. Is the construction date(service date)prior to 12/30/2002 and not modified after 12/31/2001(See P5 Memo 05-01 Definitions 1.12and1.14 and Section 2 for additional g Idence on grandfather applicability? 3145`, ,Go tonext question 3. Are total facility uncontrolled VoC emissions greater than 2TPY.NOx greater than 5 TPY or CO emissions greater than 10 TPY(Regulation 3,Part a,Section 11.0.21? (r`Sq"......i":Source Requires a permit 'Source requims a permit - Colorado Regulation 7.Section XILC-F 1. Is this storage tank located In thee-hr axone control area or any ozone non-attainment area or attainment/maintenance area? Yes Continue-You have Indicated the site attainmentstatus on the protect summary sheet. - 2. Is this storage tank located at an all and gas exploration and productionoperatlonz,natural gas compressor station or natural gas drip station? Continue-You have Indicated the facility type on the project summary sheet 3. Isthls storage tank located upstream of a natural gas processing plant? - - :tiss1e1,12411 Source Is subject Storage tank k sub act to Regulation 7.Session X0.1, Section 011.01—General Requirements for Air Pollution Control Equipment—Prevention of leakage •. Section XII.G2—Emission Estimation Procedures ' Section%110—Emissions Control Requirements _ • Section Xli.E—Monitoring Section Xll.F—Recordkeeping and Reporting • Colorado eaeoinaine 7,Section 011.0 . 1. Is this storage tank located In the 0-hr ozone control area or any ozone non-attainment area or attalnment/maintenance areal Continue-You have determined facility attainment status on the Project Summary sheet ' • 2. Is this storage tank located et a natural gas processing plant? No Storage Tank is not subject to Regulation 7,Section 010.0-000 have indicated fadlity type on project summary sheet 3. Does this storage tank eohilit"Flesh"(ac.storngnonstabilized liquids)emissions and have uncontrolled actual emissions greater than or equal to 2 tons per year VOL? Ad'.. IBkoroge Tank Is not subject on Regulation 7,Sacfirm XII.G Section X11.13.2-Emissions Control Requirements - Section 011.01—General Requirements for Air Pollution Control Equipment—Prevention of Leakage Section%11.02—Emission Estimation Procedures .- Colorado Regulation 7,Section XVII 1. Is this tank located et a transmission/storage facility? No Continue-You have indicated the source ntegery on the Project Summary sheet 2. Is this condensate storage tank`located at an oil and gas exploration and production operation,well production fac0ityz,natural gas compressor station°or natural gas processing plant? Yes Go to the next question-You have Indicated facility type on project summary sheet. 3. Is this condensate storage tank a fixed roof storage tank? x �/Go to the next question 4. Are uncontrolled actualemissionsof this storage tank equal to or greater than 6 tons per year VOCI �i cSourceis subject to parts of Regulation 7,Sections XVII.B&0.Go to the next question I Storage tank is soled to Re0vla[on7,Section 000,0,ChAC,3 • Section 01/11,5—General Provisions for Air Pollution Control Equipment and Prevention of Emissions Section)(011.0.1-Emissions Control and Monitoring Provisions Session XVII.0.3-Recordkeeping Requirements 5. Does the co de sere storag0 tank contain cob"stabilized"1'olds? Source Is subject to at previsions of Regulation 7,Section XVII,Subsections INC Storage tonk is subject to Regul z:on 7,Srto un X711.^02. Section%VII.02-Capture and Monitoring for Storage Tanks fined with Air Pollution Control Equipment 90 CFR.Pan 60,Subpart Kb,Standards of Performance for Volatile Organic Usuitl Storage Vessels • L is the individual storage vessel opacity greater than or equal to 75 cubic meters(m51(-472000)? LNO ai`lSorage Tank Is not subject NIPS Kb-The storage vessel capacity is below the applicable threshold. 2. Does the storage vessel meet the following exemption in 6o.111b(d)(9)? [JAs;.sc 3 a.Does the vessel has a design capacity less than or equal to 1,509879 m]-10,000 BBL]used for petroleum or condensate stored,processed,or treated prior to custody transfers as defined in 60.1110? - 3. Was this condensate storage tank constructedrep:Instructed,or modified(see definIdons 40 CFR,602)after July 23,19847 NA"0// 4. Does the tank meet the definition of"storage vessel"a In 60.11167 AiA.', 5. Does the stomp vessel store a"volatile organic liquid(VOLlesas defined In 60.1110? x' 6. Does the storage vessel meet any one of the following additional exemptions, NAM, a.Is the storage vessel a pressure vessel designed to operate in excess 00204.9 kPa("00,7 psi)and without emissions to the atmosphere(6D 110b(d)(1))?;or IRAs+ b.The design capacity is greater than or equal to 151 m I`950 BBL]and stores a liquid with a maximum true vapor pressure°less than 3.5 kPa(60.11.06(1111?;or A C.The design capacity Is greater than or equal to 75111°1"472 BBL)but less than 151 m5(-950 BBL]and stores a liquid with a maximum true vapor pressure°less than 15.0 kPa)60.110b(b))? , n w IStnnge Tank is not subject WASPS 5.b Subpart A,General Provisions §60.1110-Emissions Control Standards for VOC 060.1130-Testing and Procedures 060.1150-Reporting and Recordkeeping Requirements. ' 060.1160-Monitoring of Operations 40 CFR,Part 60.Subcort 0000 Standards of Performance for Crude Oil and Natural Gar Production.Transmission and Distrlbudmt - 1. Is this condensate storage vessel located at a facility In the onshoreeil and natural gas'produOion segment,natural gas processing segment or natural gas transmission and storage segment of the Industry? _ Continue-you have Indicated the source category on the Projert Summary sheet. 2. Was this condensate storage vessel constru0ed,reconstruted,or modified(see definitions 40 CFR,60.2)between August 23,2031 and September 18,7115? MOM Storage Tank is not subject NSP50000-This tankwas constructed outside of the applicability dates. 3. Are potential VOL emissions from the indiwdual storage vessel greater than or equal to 6 tens per year? 4. Does this condensate storage vessel meet the definition of"storage vessel's per 005430? 5. Is the stone vessel subject to and controlled in accordance with requirements for storage vessels in 40 CFR Part 60 Subpart Kb or 40 CFR Part 63 Subpart HH? 'Storagel:nix Is not sub]egl to ASPS DOJO Subpart A,General Provisions per 460.5425 Table 3 §60.0305-Emissions Control Standards for VOL 560.5413-TestIng and Procedures 060.5395(gl-Notification,Reporting and Recordkeeping Requirements • 360.5426(c)-Cover and Closed Vent System Monitoring Requirements • 360.5417-Control Device Monitoring Requirements - ]Note:If a storage vessel Is previouslydetennlned to be subject to SOPS 0000 due to emissions above 6 tons per year 100 on the applicability determination date,It should remain subject to NIP50000 per 60.5365(e)(2)even If - _ potential VOL emissions drop below 6 tons per year] - • - 40 CFR.Part 60,Subpart 0000a.Standards of Performance for Crude OR and Natural Gas Facilities for which Construction,Modification,or Reconstruction Commenced After September 18.2015 1. Was this condensate storage vessel constructed,reconstructed,or modified bee definitions 40 CFR,602)after September 12,2015? 03 ••':•:"G t the neon question 2. Does this condensate storage vessel meet the definition of"storage vessel"'per 605430'? G[th nwnt questlen 3. Is this condensate storage vessel located ate facility In the crude oil and natural gas production segment,natural g processing segment aldatufalgag tnhl15MI5tibn god storage segment of the Industry? Y .Go to the next question 4. Are potential VOC emissions'from the Individual storage vessel greater than or equal t06 tons per year? - Gb Storage Tank is not subject SOPS D000a. 5. Is the storage vessel subject to and controlled in accordance with requirements for storage vessels in 40 CFR Part 6nSubpert 61 or 40 CFR Part 63 Subpart OH? 2,(.17741 'Storage Tank is not subject no SISPS O000a 40 CFR,Part 63,Subaart MAR HH Oil and Gas Production Facilities 1. Is the storage tank located at an oil and natural gas production facility that meets eitheroF the following criteria: 'Yee (Continue-You have indicated the source category on the Project Summary sheet. a.A facility that processes,upgrades or stores hydraorbon liquids')63.760)a))00;OR h A fadlity that processes,upgrades or stores natural gas prior to the point at which natural gas enters the natural gas transmission and storage source category or is delivered to aka'end users l63.760(a)(3))? 2 Is the tank located at a facility that is major'for HAPs? UMW Storage Tank isnotsuhleen MALT HH-There're no MAC?HH requirements for tanks at area sources 3 Does the tank meet the definition...rage vessel?°in 63.761? 4 l{ , 4. Does the tank meet the definition of storage vessel with the potential for flash emissions'per 63.761? 5. Is the tank subject to control requirements under40 CFR Part 60,Subpart Kb or Subpart 0000? • ISterage Rank is net eubloa ru An.ACC FIN Subpart A,General provisions per 463.764(a)Table 2 863.766-Emissions Control Standards 663.773-Monitoring 303.774-flemrdkeeping 663.770 Reporting RAR Review • RACT review Is required If Regulation 7 does not apply AND If the tank Is In the non-attainment area.If the tank meets both criteria,then review RACr requirements. Disclaimer • This document assistsopenstors with determining epplisability of certain requirements of the Clean Air Pot,its imp?ementlngreguladons,and Air Quality Control Comnredan regulations,TICS dccgment Is net a rule or regulatlon,and the analysis If contains may net app(y to a pargcular situation based upon the InoYWduel felts end tdmllni0tane6S This document does not change orsu0s7Wte for any law,regulation, ' or any other legally binding requirement and is not legally enforceable.in the event clang conflict between the language of Ihls document and 0e language of the Clean AlrAct„Its implementing regulations, and Air Qualify Control Commission egulatlans,the language of the statute orreguladon will control.The use of non-mandatory language such as"recommend,-may,-should,"and"can,'Isintended to describe APCDlnferpretaoons and recommendations.Mandatory temdnology such as"must*and"mock-seam intended to describe controlling requirements under the terms of Ma Clean AirAct and Air • Quality Control Commission regulations,but this document does not establish legally binding requirements in and outsell 7't rrl it :' t �. , nut Co of Division • ' D •art nt• * blic H-th&Environment ir CONSTRUCTION PERMIT Permit number: 18WE0215 Issuance: I Date issued: Issued to: Extraction Oil &t Gas, Inc. Facility Name: Leonard Production Facility Plant AIRS ID: 123/A002 Physical Location: NWSW SEC 21 T2N R67W County: Weld County General Description: Well Production Facility Equipment or activity subject to this permit: Facility AIRS Emissions Control Equipment Point Equipment Description Description ID Eight (8) 400 barrel fixed roof Enclosed Combustion TK-1 - TK-8 001 condensate storage vessels connected Device(s) via liquid manifold. This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to the specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF-CERTIFY FOR FINAL AUTHORIZATION 1. YOU MUST notify the Air Pollution Control Division (the Division) no later than fifteen days of the latter of commencement of operation or issuance of this permit, y submitting a Notice of Startup form to the Division for the equipment covered by this permit. The Notice of Startup form may be downloaded online at www.colorado.gov/pacific/cdphe/other-air-permitting-notices. Failure to notify the Division of startup of the permitted source is a violation of Air Quality Control Commission (AQCC) Regulation Number 3, Part B, Section III.G.1. and can result in the revocation of,the permit. 2. Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self- CDPHE 1COLORADO CO 1 Air Pollution Control Division (tizzrar t.f vurrc Kez yr 8 E.>xrrnn*nea Page 1 of 9 certi c •u• ance 9 th • diti•s. Failure to demonstrate compliance within 180 days a r It i cati f th- permit. A self certification form and guidance on how o If -rtif co pli ` ce as wired by this permit may be obtained online at • .c• • •• pw, �. •3•he/.. •ermit-self-certification. (Regulation Number 3, Part B, Section III.G.2.) 3. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) 4. The operator shall complete all initial compliance testing and sampling as required in this permit and submit the results to the Division as part of the self-certification process. (Regulation Number 3, Part B, Section III.E.) 5. The operator shall retain the permit final authorization letter issued by the Division, after completion of self-certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 6. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4.) Annual Limits: Facility AIRS Tons per Year Emission Equipment ID Point PM2.5 NO. VOC CO Type TK-1 - TK-8 001 --- --- 5.5 --- Point Note: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility-wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility-wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility-wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits, for both criteria and hazardous air pollutants, shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate actual emissions each month and keep a compliance record on site or at a local field office with site responsibility for Division review. 7. The emission points in the table below shall be operated and maintained with the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) ca 'COLORADO Air Pollution Control Division epsry t ye a cat itLv nc,rmefe Page 2 of 9 I •c ' . .. i• t '` Control Device Pollutants of Controlled TK-1 - TK-8 001 Enclosed Combustion Device(s) VOC and HAP PROCESS LIMITATIONS AND RECORDS 8. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, Section II.A.4.) Process Limits Facility AIRS Equipment Point- Process Parameter Annual Limit ID TK-1 - TK-8 001 Condensate 1,466,030 barrels Throughput The owner or operator shall monitor monthly process rates based on the calendar month. Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. STATE AND FEDERAL REGULATORY REQUIREMENTS 9. The permit number and ten digit AIRS ID number assigned by the Division (e.g. 123/4567/001) shall be.marked on the subject equipment for ease of identification. (Regulation Number 3, Part B, Section III.E.) (State only enforceable) 10. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) 11. This source is subject to Regulation Number 7, Section XII. The operator shall comply with all applicable requirements of Section XII and, specifically, shall: • Comply with the recordkeeping, monitoring, reporting and emission control requirements for condensate storage tanks; and • Ensure that the combustion device controlling emissions from this storage tank be enclosed, have no visible emissions, and be designed so that an observer can, by means of visual observation from the outside of the enclosed combustion device, or by other means approved by the Division, determine whether it is operating properly. (Regulation Number 7, Section XII.C.) (State only enforceable) 12. The combustion device covered by this permit is subject to Regulation Number 7, Section XVII.B.2. General Provisions (State only enforceable). If a flare or other combustion device is used to control emissions of volatile organic compounds to comply with Section XVII, it shall be enclosed; have no visible emissions during normal cE 'COLORADO co o Pollution Control Division :t ,Re_xr,# vtr rnmerx Page 3 of 9 oper. Qicy deft and ;-gula on Number 7, XVII.A.17, and be designed so that an o' e an, •-, ans ``' 'sual •servation from the outside of the enclosed flare or • sti i d vic- or •y oth: convenient means approved by the Division, m - i ratin• operly. This flare must be equipped with an operational auto-igniter according to the following schedule: • All combustion devices installed on or after May 1, 2014, must be equipped with an operational auto-igniter upon installation of the combustion device; • All combustion devices installed before May 1, 2014, must be equipped with an operational auto-igniter by or before May 1, 2016, or after the next combustion device planned shutdown, whichever comes first. 13. The storage tank covered by this permit is subject to the emission control requirements in Regulation Number 7, Section XVII.C.1. The owner or operator shall install and operate air pollution control equipment that achieves an average hydrocarbon control efficiency of 95%. If a combustion device is used, it must have a design destruction efficiency of at least 98% for hydrocarbons except where the combustion device has been authorized by permit prior to May 1, 2014. The source shall follow the inspection requirements of Regulation Number 7, Section XVII.C.1.d. and maintain records of the inspections for a period of two years, made available to the Division upon request. This control requirement must be met within 90 days of the date that the storage tank commences operation. 14. The storage tanks covered by this permit are subject to the venting and Storage Tank Emission Management System ("STEM") requirements of Regulation Number 7, Section XVII.C.2. OPERATING a MAINTENANCE REQUIREMENTS 15. Upon startup of this point, the owner or operator shall follow the most recent operating and maintenance (OEM) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to the OEtM plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements 16. This source is not required to conduct initial testing, unless otherwise directed by the Division or other state or federal requirement. Periodic Testing Requirements 17. This source is not required to conduct periodic testing, unless otherwise directed by the Division or other state or federal requirement. ADDITIONAL REQUIREMENTS 18. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, Section II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: D" 1COLORADO Co xx ,Air Pollution Control l71V1S&= � meit rxt wig Page 4 of 9 I F rtes ttin• s tha 100 tons per year, a change in actual emissions o - (5) F .e'er a or m= e, above the level reported on the last APEN; or • ,.,N-ors r• you VOC) and nitrogen oxides sources (NOx) in ozone nonattainment areas emitting less than 100 tons of VOC or NO. per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non-criteria reportable pollutant: If the emissions increase by 50%or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • .Whenever there is a change in the owner or operator of any facility, process, or activity; or • Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. 19. The requirements of Colorado Regulation Number 3, Part D shall apply at such time that any stationary source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation that was established after August 7, 1980, on the capacity of the source or modification to otherwise emit a pollutant such as a restriction on hours of operation (Reference: Regulation Number 3, Part D, Section V.A.7.B). GENERAL TERMS AND CONDITIONS 20. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 21. If this permit specifically states that final authorization has been granted, then the _ remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self-certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self-Certify for Final Authorization section of this permit. 22. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or 40kCA E ICOLORADO CO Air Pollution Control Division 1'kp�rt tar Pubkr kean,&E-,r 6 r I me nt Page 5 of 9 o er or nts. ; is v •. only for the equipment and o operations or activity P sped c y entif n th p rmit 23 Unlr su ci all sta d . erwise the general and specific conditions contained in pe h - -e ined he APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 24. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self-certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 25. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 26. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: Harrison Slaughter Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Extraction Oil Ft Gas, Inc. Permit for condensate storage vessels at a new synthetic minor oil and gas well production facility. cs j OLORADO c4 Air Pollution Control Division ,ic1JRY:'Y*it iYuut F€u3'*.'e E".Tli(JLVT.ILIC Page 6 of 9 Notes • Pe ; it 10 -r at {tim- • : his p mit issuance: 1) T per t l• ; is r qui -d ti p.' fee.or the processing time for this permit. An invoice fo the fe l b iss d er the -rmit is issued. The permit holder shall pay the i - wi 3$ +: o' of t voice. Failure to pay the invoice will result in revocation of this permit. (Regulation Number 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-regs 4) The following emissions of non-criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Uncontrolled Controlled Point Pollutant CAS # Emissions Emissions (lb/yr) (lb/yr) Benzene 71432 508 26 Toluene 108883 415 21 Ethylbenzene 100414 20 1 001 Xylenes 1330207 131 7 n-Hexane 110543 4,588 230 2,2,4- 540841 52 3 Trimethylpentane Note: All non-criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 001: Uncontrolled Controlled CAS # Pollutant Emission Factors Emission Factors Source lb/bbl lb/bbl VOC 1.497x10-1 7.48x10-3 71432 Benzene 3.46x10"4 1.73x10"5 ProMax and EPA 108883 Toluene 2.83x10-4 1.42x10-5 Tanks 4.09d cc", !COLORADO co I= ti Air Pollution Contra D vlsaon tp� .w ry En4,0nr k ee Page 7 of 9 Unc trolled Controlled CAS °` Poll a, � miss n Factors Emission Factors Source /bbl lb/bbl a : ,.-. 3 . ,•x10"3 1.57x10-4 Note: The controlled emissions factors for this point are based, on the enclosed combustion device control efficiency of 95%. The site specific emission factors in the table above are based on ProMax and EPA Tanks 4.09d. The ProMax simulation is based on site specific pressurized oil sample obtained from the outlet of the low pressure separator for the Leonard 10N well on 02/14/18. The sample temperature and pressure are 118°F and 44 psig respectively. The EPA Tanks simulation is based on gasoline with RVP 12. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five- year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This permit fulfills the requirement to hold a valid permit reflecting the storage tank and associated control device per the Colorado Oil and Gas Conservation Commission rule 805b(2)(A) when applicable. 8) This facility is classified as follows: Applicable Status Requirement Operating Permit Synthetic Minor Source of: VOC, n-Hexane and Total HAPs NANSR Synthetic Minor Source of: VOC PSD True Minor MALT HH Major Source Requirements: Not Applicable Area Source Requirements: Not Applicable 9) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1-End Subpart A - Subpart KKKK NSPS Part Appendix A - Appendix I Appendixes Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories cAE )9COLORADO co r Air Pollution Control Division 4 map t of fstz e ll s Emrrnrrr Page 8 of 9 63 5'• ` •ubp A - Subpart Z 3 0 6 . rt z' 1iubp AA - Subpart DDD ,£A '' .1 Aix• Sub• ) _, EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ- Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ - Subpart MMMMM MACT 63.8980-End Subpart NNNNN - Subpart XXXXXX • • CDA' !COLORADO a4.— " ` I Air PollutionControl Division M Depotmcrt�r�c HeAlth&tnvimnrnere Page 9 of 9 Colorado Air Permitting Project PRELIMINARY ANALYSIS-PROJECT SUMMARY Project Details Review Engineer: takisgrkSlaygjrter:..: • Package 6: 882 : Received Date: Review Start Date: 4E35/2018 .,,,, r Section 01-Facility Information Company Name: ExtractionJf� rle � Quadrant Section Township Range` County AIRS ID: �J :e' 13>1 3• Plant AIRS ID: dl Facility Name: ''Lot€a€z3t+mduction Facili • .:q,,v / j3 }l;y4 : Physical Address/Location: NWSW quadrant of Section 21,Township 2N,Range 67W County: (Weld County Type of Facility: Id tio�$cl�,r€aifutktaWelt�ac4 - - : ttl What industry segment?t,3&ilatureiGesProdu on.MPoc s4 ;; Is this facility located in a NAAQS non-attainment area? •^`';;,';`;'.' If yes,for what pollutant? ❑ Carbon Monoxide(CO) Particulate Matter(PM) Ozone(NOX&VOC) Section 02-Emissions Units In Permit Application Emissions Self Cert Engineering AIRs Point# Emissions Source Type Equipment Name Permit# Issuance# Action. Control? Required? Remarks �1 3313 33 11133 .-.. �,+\�•5 \�'\ `.. d 1 t1t I paratar V nfang YRT Separator Vent ng Yes x8WEt3'16. 1 ,,3 ,z�,11'11111131 3, x,.,,31 Section 03-Description of Project a 1 h '' ,}}bYti 3 3 3 .... r-:, . ic°Cractcr rL4rI t G 3131 ti ill et �st}rn)4 irks,�,ie 0666ik coverage#or,natural gas�€enting frorn.Anal{ilipap€#ci7 51,,D,,wili d 4€r v-Y,gas isaster at an ail and'gas z 3 3 3�1 3 3 � -,.a r'" d33} ., pp3, 33r 33 3 .. 1v€gll3pradifCtidl'f`fa ;41313d333.,e4WAhgozone non t .e i Etea .t i� 933I 1„33 • 14, F� 33 111 0, ,,,r - .. 3 3 1 rfy' ,{' 3 3 3,� ;:,, y, 3f '€i so s I APEN requ€red because uncontrolled requested VOC emissions aregreaterthan l.tpy[ColoradoRegals„i•. A Seot€on1155 a).Furtfier,the"source in permit•req t€r'd'1 X333�1} becaY.31 otY¢Ilea.jgquesiedVOC emissions rromall-APENrequire&sources atthisfacifs₹y are greetetthan2SprlatonPart6seetinnR.D2a} � � 3 3� zt3`ku 33 it Fu g.g�`RtrbIf,04p0:61.5# odirertforthis source because the change€n vocemissiensare greaterthan 25tpy and newsy t#€ 1 3lf a limits aca 6emg established m ordartoaddYo ; g�>��1"ementls.. .. • )3133331f3313131 3 3 3 311 3 ryr . .. .i313i331333jlllr€;,k a3 a33 }}1311 Y3r1 i v v vf13;333 1 3 rr „y.` 3 al.a 3 �� 4v' • .:1113j133 3 3331 v3 3 3 °?l 31 3 1Ilhiii33..• :; "a3,;,,,,;,,,,,,».�„«»„,,,33 1 ✓3 ........� ,3 r, ca�xrHfairfiu'tit .i,) 3i13UI131 i3i11 3313 33 3r •3 • - : : r3,a is 33 Ir ]]J1Ji ys'% .............aA a.,,.':..,r,......t';,a ul lla. _ _W........ •- 11�...»..x,.aw3€.>i., '","-'- --- .. Section 04-Public Comment Requirements Is Public Comment Required? If yes,why? ReryuestingSyrsthetic i€€pr.Permit Section 05-Ambient Air Impact Analysis Requirement Was a quantitative modeling analysis required? If yes,for what pollutants? If yes,attach a copy of Technical Services Unit modeling results summary. Section 06-Facility-Wide Stationary Source Classification Is this stationary souris a true minor? n �ao'z>s Is this stationary source a synthetic minor? T ,Yes _ If yes,indicate programs and which pollutants: 502 NOx CO VOC PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration(P5D) _ Title V Operating Permits(OP) ✓ Non-Attainment New Source Review(NAN5R) ✓ Is this stationary source a major source? .::1,%S5l` If yes,explain what programs and which pollutants hers 502 NOx C0_,VOC 11PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration(PSD) n _ Li V Operating Permits(OP) id Non-Attainment New Source Review(NAN5R) • • • Separator Venting Emissions Inventory Section Yl-Gdminiztrative lnformaaon -'Facility Alb Allis I. 133 kZ.... 08-001.. HI0222.szuir R62' 1.i Cnunty� � � �PI Pint ��S. sem0n 1rz-Egmpment De5aTiption oe4i15 O (1} P0z retawe riE bdsfxv' 3 "tt F4FX oe4nea Emissions u2 toa51rptr06: �,,,,,,„ ......t„ 3�3h 311�13i3�3yii3L«,,,�,., ,. €I� ,,,,,,„. ,,,,,,,,:. .110.11.111 at14ialI d1 uesdr'45aaaetu&Wd414# 3"d don4.*aw 3 73 . Em ss on Control OeVice DezcnPtnn. ,,,, . }. : ✓,; ..,0111 ii t , Requested Oderall'VOC&HAP Control Efficiency h. 2 000 Process Parameter ! Gasmeter Yet;,;- Be 1*903-Promssi962013 Ird*44241 for6miszi012 Estimates Pdmary Emissions-SeWnior Actual Throughput S4 6.s.Per Year Requested Penn it Um tThughput 68 1.;342_:MMscf per year PotentlaI to EmltlPTEl Throughput= 6.3 MMscf per year • Process Control(Mayen.) Equipped with a VRU - IS VBUprocessequ pment `{4,.'-.,s ///„gUncontrolledand calNolkdemisskns usedmes4bihh requested perm tllm�6arebased 0nly0n wM1m[he VflU is bypasredli.e wastegaswlumethatu routed to[he Flare) Secondary Emissions Device(s)for Air Pollution Control Sepamr0r Gas Heating Valuer 335 •2881 Btu/scf Volume afwazte fps emitted per 38hof /��Z Ipu'ds tM1rOughput / 11`00 scf/hbl Section M-EmissioM Factors&MeModolWles - I R �hha,+ 83331 1 33 D / 333333 SY'U\ 1 P 1301 1111 / c /ii/ , 3I i Oil I P''Y�flf43t1A1aa0 2 kg41 e0g9�'ps; .+44a1'`«Y9tt5e asa0orovrms 416 .0 9$211/2 a Deraalream,,, ma 66E nd3* Se,'�yg1k.�PubO,na7prytaa8 vo 81159 3h?,5f0p01y3*. 8 47rgfp't0:#0aMig 111th /13 s dcas-aeaang.r,:wc Mwgr)�fihmtfykb4f I,y�uao ',./6"4301253 RYp d �F s�yr:sYr�5pJ 0 fn Oil,% sp1 3�3 'rg 'ptl 'r`e a mdn4thavaimp7m th t4ox/₹gr3");21aaNp t(Ngwk sg9rfloastabl 59 rto-a mp:� tan r fiat colic=nghcsk P9s,� (mod t0u1a41�km 1m 1te3aat 40.614edI mr.mm3n NTna40.4 anteW,ow 0edtza9skn3xp � /t6 tw (0i ear a msaaf tm '06 :401954a4; V .,..31 i�',4a ..a�a�m, AN 0031020428 Equation 2ispb¢me801300lon Ez=Oe row"1x/C a=a.row eox/C Ivapor Volumetric Rewrote I ••131141131 MMscf/day MW `520900:Ib/Ib-cool IMW REV, ''.50.488Z116/Ib-mol Ib/hr Weight% Hyar2gensul940 ?;;13:4 HVdroge03110d* 20; "01.411.44 002 :005'. CO2 mob,.., 001699.310 0.04 y. .::.3 3333.3:/''64 112xz methane ,...,, >009 methane 2.11•I1w110016.,D0° ethane ;,„c ..385: ethane t,iR p�li fr 1,1/2. ::30.46: 7020550 "'S/so sobu4ne 313 12.53- 150001502 ''9.32: n butane f3Y ,54.50 -- n butane -21.8N z0pemm,e 3311N'.....;;.4058 500215= ;7,85/ W64ne 11:11/10/1/10 =31181,21 - 6-0=443* . 91020005 a 31//1///.;;iR9 _ *yd0pmtane 047' n-H5xme. 310,( .t. ;33:2:43: - mHaa6e :'181. — 07215059200 1O.M 426 - M100exane ., 0.39 0352,5exanez 1.. F 03r6;nn- Other 5222920 3.22 05p4nes .31/2/1/v1₹32'.. nepame5 111/2100/,=le>,,01 mmhymycmh*xane ₹1111131G.aa.. mem01cx15h2058* fir ' ,a.2.224.82 ',.-',-P., ,11111110.08'., 224TMP 1 ••.J' .:w &82=02 0111111111523 a 318/22'. Toluene 1;;(311 10.30 Toluene 111A. ,. E[hylbenzene 33,,;1..:000 EMVibonzenz x11:8 Oi, XVknes 111114001 CB+Heavies .;83b,9j CBa Heavies ;-='1�;;';?p Total 12009 Total 99:61 VOC 121.41 VOCWt;E 90.37090 10115120 Factors Separator Venting Emission Facors Separator Venting Uncontrolled Controller, Uncontrolled Controlled Pollutant (ib/MMscf) (fir/R414.000100100 Facbr50urro (01/MMscf) (Ih/MMss6 Emission Facbr5aw¢ Pallg4nt (Gas (Gas ThroughWt) (Gas Thmughputl (Gas Throughpyt) Thmughputl VOC 12 76573 607 .7:0180%10 ,°00.9, TOO 1215]9143 .45 r 1,01.4030A0 Bemene 244 12 1010 2051 -41';''''''''''':,,' Q/,� eemene 2444474 122224 EMlzlfte'd 10991 enzene 323I0 - 0.1615 3 ¢xx.�� 2 Ethy�leneene 13.2288 01614 ,201r=7,406,04_17.03. 0.8518 0,40 1-X80095 2829.1800 321-0590 / f 5_ rvHexane 00323653 121.6103 0-/� n 2241-NIP 04516 0.0926 „ r-m2»tfix 224 ENIP 0.6072 0.0404 V„ ` j ,F . Primacy...oil5oke Primary Coonntnevice V 658820 rmolkd Umm�tmlletl._ trolled Pollutant 115/84.1.011 Ib/MMscf Emission FaMr5ource Polluant (lb/MMBtu) Ih/MMsA Emission Faator5oula (Wart (Waste Heat 102 Combusted) (Gas 35 ughPut) Combusted) Throughput) PM10 0.801..44148 1. ' j { gip'= PM10 1Fhd Mikiii7S' �,. .y " .�3¢JAt 2".//�� ��'_'� PM2.5 IIO0F5 21.163 '211'81t.. A /// upP'�GG .'r PN¢.5 .0074 2 1 ' 4 M5UjYM25( `0 5' SOz WOG 1.621 ON - SOx 0.1111.5 1.6 NOx 010001l1 193.13] (llOs04afFfales{Fitix{1114 NOx flfI6411 193.13] y9� In3s0.1{14T£kzeC' CO ,30Uln.b$i% 880.478 7XesjCO} CO 433011.. .. 880.28 F,.^. 1HazcEjG515. Milton.-Emissions Inventor, Potential to Emit 2002211,4151ons Requested Permit06610 Potential00 Emit Actual Emissions Pequertea Pemrit Umits CriteriaP 2(20286 Uncontrolled Uncontrolled Controlled Uncontrolled Controlled Criteria 0011utenn Uncontrolled Uncontrolled Controlled Uncontrolled Controlled (tone//earl 11025/ye5r) (3060/year) (tons/02501 (tons/yea,) Ron,/yearn 1tens/year) 1300./1050) (tons/yearn (tons/yea,) PM10 0.07 0.05 0.05 0.07 0.07 P 0.0 0.07' OAS 0.115 0.0] 0.20 PP412.55 045 0.0] 0.07 - PM25 O,W .0.07 0.07 SO0 0.01 400 0.00 0.01 0.01 508 0.01 0.00 020 .01 0.01 NOP 0.60 0.48 0.48 .598] 0.598] NM DM 0.48 0.48 0 VOC 3]6.36 303.58 15.18 1 6 18.8182 VON 316.90 15.20 3]6.00 188498 CO 2.73 2.20 2.20 32.73 2,73 00 273 32.20 2.20 223 273 Potential to Emit ACM110010bns Requested Permit Umits 000200lb Emi[ 001622Em341015 Requested Permit Umits Xaz 0/02*Air Pollutants. Uncontrolled Uncontrolled Controlled Uncon5olled strolled HanNouz Air P011253K controlled Uncontrolled C 03,01150 Uncontrolled Controlled Iles/year) 11151,earl 1110/ye0,1 nibs/year) 1110/o,rl U lks/year) 1./75.0 1120/y0ar1 1115/015,) Ilbz/yearl Bemene 1513.43 1220.75 1404 1513.43 75.67 Ber¢erle 1515.6 1222.5 61.1 1005.57 75.78 Toluene702.94 56].00 28.35 702.90 35 15 704.0 567.8 20.2 703.99 35.20 115310enzene 2023 16.16 0.81 20.03 1.00 E0 310amene 20.0 11.1 3.2 20,02 1.00 10)22= 105.59 15.17 4.26 20559 5.28 171525 105.9 85.4 4.3 105.93 5.30 n-Hexane 15060.92 1214823 607.42 15060.82 753.05 0-52x06= 15023.7 121643 608.2 15080.67 73403 224TMP 5.28 426 0.21 5.28 0.26 224TMP 5.0 40 0.2 100 0.25 Se000n 06-Begulatory 5ummary Nmksis rPegulab"0n 3,ParmA,8 Source requires a permit flegulation],Section XVII.3,G SOurce is subjeRto ftegu4Uon2,SeNan%VII.0.2,G 8*0*1521n],9 21019 1512 9.2.8 Ther7nm2ldevim751101ss0Wmmcis rotsuhletttoeeguk4on],5ealonXO11.8.?e (See regulatory applicability w011025etfor detailed analysis) • 2 of 4 2:\PA\2018\ISWE0216.CP1.Ismm • • • Separator Venting Emissions Inventory Section 07-..eland PedOdkSamclinDard Testme Requirements Usl g0asT.eughputm Monitor Compliance Does[he company uses.specific emission factors based on a r.sample.mama.emoslonsi The sample should represent the gm outlet of the equipment covered under Meals ID,and should have been collected within one year of the application revived dale However,If Me facility has not been modified(e.D no new wells brought on-line),then it may beappropr.{ate to use an older ate-specific sample. lino,the permit.'contain an"Initial Testing Requirement"to collect a sitesped...malefrom the equipment being peanfned and conduct an emesion factor analyse m demons..that the emission factors are kssthan unequal.the emissions factors established with Misapplication. Are facility..permitted emissions of VO0 greater than or equal.50 tonsperyear2 Dyes,the permit.?.dint -An"Initial Toiling Requirement"to collects site-specific E.Domple from the equipment tieing permitted and conduct.emision factoranalyzi to demonstrate Matthe emission factors are less than or equal to the emissions factors established with Mk appllo&On. 9edodieTesting Requirement"to collects ate-specific gas sample from the equipment being permitted and condom an emission factor analysis to demonstrate Mat the emission factors are less than ore,'to the emissions factors mtablished with Mrs application on an...basis. WIlI the operator have a meter installed and operational upon startup of this tees? Yes If tt,the permitwill contain a condition that requires the operator tookulate gas throughput using the liquid throughput until the meter is installed and opeefio,el(not to exceed 180 days):The condition will use the"Volume of was.gas emitted per Belot liquids throughput"Is t/bb9 value In section 03. Does the company requests controldevke efficiency greater than 98%for a fare or combustion device? rata, ��'T If yes,the permit win cons.and initalmmpliance.st condition to demorutra.the destruction ef&knryofMee...Bondevke based on idet and outlet concentration sampling You have Indicated above that the an $' j l Tf o 1^4 1 � tl ire r.� ,,V i"i/ ,.r�'.t; iOr2l ileJ(rp i rIj i7.t J l M4 /iJ.f lr�/rte .. ' JI lean r.r 'rqpj Tp hdS I bsl N - _ 1 TreditionTay,.eadraiont from Wtort are care.utadu tit d I#et Eiii a' from the Eee Emharon Mame.,marraminentA Publication:.siumo Chapter 30 Dimloceem.Equ4 (20,4-21(ExO 714W Mx/C),This I let methodobgyl5 includedmihe0ghtn0echon04 or the'unayss and re intendedtobuused for compare bvepurpo0es The operator calculated e ssoncusngaProhlazsanulahan base?on s to spec flcgasanalyshobtined from theoutlet of thevasor recovery ewer,.ga brew dod2/14f18 TH sips yes used the mal.aaltu.flarnthe gas ly specify a eat stream,Me Prolate simulation.The ProArlax firtruhdauh eterm the lb/h .P eacticampon.in Me gas so ambased on standartfvolenxehriolowrotaof tt002duMulldaocmersseingmeiensfgm eachnakulaloomethodofegy are avadeblen Sn0on 05-above,The ernistketsrexu!dng from Me disphcementequatiorhercept ethylbenzerie end 2a4TMfl # are seedy more conservative Pao Movraldesohlned horn Me looMaz simulibon...eve,Me do fferencefn thevaloos is small'.enough to be...red neg.....a resulpltwazae.rmfned Mevalues estmate0 using the ProMax...ion were acceptable for Permie'ngpuryoses. - S Baud on tht applleadek a Rwrmeier...startea at ass thethe enMetycethe VRCardgasbusrer gas vented00etdboth VRTs and Me ga,buster.Thsauw meter is looted downstream ofMesssydedvtoy umts(VRU)atosfaeteY that are seed to compreae2otso tesbuster gas and:0.n.t ee:dee.pipear.ThIs.Rw meters thus used measure toll VDT andgasbusterpps Mat eroded to theenclosed mmbusdondmecesfntd00nng?!at€downb'me.eased.Me flow meter location,Me..m a..need-.vase VRU dawndme moor..anem.on wain Pawl..data[ottoman..mny...with Mc permit limitt the flow measured Wine lbw meteewill be sufficientfoedaavrutcatingcompllanrewM Mepermrt thrum. • 3,The application indicates Mt flow metetsare Metaika and operational at Uses faubty 4,Neither inidai norperhsdlemefod0opedtytestswere included Mete prerndbemmsethe opera tor,required to dowephlr weibfeemesmnt checks per the Operzhnga... a ana plan the eventvisible emissionsareobsewed,the operators required:.tither shorin the cpppmartttnmedfately and.conduct repairs or conduct fomalmethod 22 opacity M.In the evens vieSle emissions ore observe,Mrbugh the method;, required.anmedi elyconduct mp,rsor shutin the equipment repairs cannot 000000uttd lmmedtately.Sine M a nideibvbdtiagoino eompDa edemnxtado0lo tie-hmemethd0,?1,10 tIhzixomuanardanonstme ere,.a.ym Me perms.agrilliomav the weekly yield,enflame npekaand Rbbiphagnt q em r irk emiationa areebserved$a tnsfjvan o ,rag zaeP rtr oe gs not fee....rFe:Derm r. 5,The heateententusedtoleufate Noe and 00 emissions was...from the Prof/taxsme its.. I.The operator orgl allychssfied,-..coal dance as a thermal oxideer.Typfca9vsirennal oxidizers am requtred.mamtanammrwm combustion chamber...meaterem order Do demonstrate Ms antrMdevimfi-meeting the requested combos.. efficiency(usually gear Man95%finpractia ehis minimum combustion Wmbee£emperature?soften verified thrmgis nddeletd pedodk hid testing However,the operatormthotedthat the destructione3tdetm achievedbythis enclosed cembustlondevices not,RipnootafMe combattion chamber temperature.Instead,.doerzmr Indicated thesn'aingof gases eddeyedhy the Design as weltaztlic'eaten.dmeof the gas Ntheeombo?Gonchasehei:soitira the highe02000.Coq efficiency requestedtsifl E249.ItsimoR10tdtther noted Math's combustiondevic.differs from other thermal exidaersinthaltdoes not require smile-moo 0lfiteltu brsi Me ware Further,theheatmnttm-ofinevaporrecovery tower waste. Drastreorn(3,Ba0t0/scUsvgMD-oaD2hi}Set manthe heat totves mstypkely controlled by Merm.F..Doers Ito sand dehydrator ntri Mat supplemental to manta.theoombm5oadmmtro tempera v.n . n - ersb esu en tore in aides to maintain compielocumboatioa result it was determined tlasamnmum combustion chamber temperatutewouM natbea permit kPCO and Mai.he aomrol derce should be refereed.as an EOUtathx Man a thermal oaf-Meer hasadw the aforemaatmeed4ftf..ores J.The decaneucdmpaa ntftl 0.0tokilaxaraviationaspec,hetlusng Memolecular weight and API gravty of tiro Claecomporieritm the p s reed limed ample-.7d toealuh .storage vessel mass.tote esul0og from emlertsa s[ eennssansr MsProMmarradad ndgselym'rmrtlm ra Its using traditional cultsf aeonetethotit, was determined the 0000tssed ea span(',the decarws eam wereaeptable 8 The operatodindlutado singe EltOgotllzed to control ermshonsfromboththe VRr/bas buster and low prers tesepao.rz during Vat,downimo S.The appratorcanfrtmed the emh'entpassmeoftht mocha waste[M 111 arm.Meese see rhe ProMuzreport;Wed iotheeppllht nfor reference. 10.The operator wasprovufedwrtha2oflpermlt and APED redline Y.v.66c comment.the operator roewest thedaRyermrt and provided tw000mmonssThe comments and responses provukdamamed...Comma.Requesting. rernave l for both panmss LP ondtraT ma streams..metered'and VWetereme 6adong knot necessary.demon a ompiiance p/Respome.Thu informed'onperkinmgio'MU dawnhmed condi..7 is'r included for clarification rather Mao requiting VDU runtime trackfng001&am.efsackongwere requited,anseol50tdonddmn would he included in the perm. Moo stria Masud,have included Me ad.mentabdutvd005wntfrne to rodeo.to Me inspector Mat Mislaobry keeraffahred e ManfasaMMordat on routedtomcomburjon'foal.Ilasuted taed on is,"WM rumrwheniheemais re lacondperarus(IWommsnthod mforrnoton Oas3 .. tee permit,OMOViotrictfit omt.toladbtretseey of II lgoateafrom MesePequsanareshoall mete2ifr'from quipmest hc cordon asall,h fromliustiort device Brough and accounted torae"wiliremampad.(mioncoons Comment tooth ka.mpOarypieafequiapeoplvod....from,tslityaded Wocermitiem lof"Gence toBust emebster.,remain.the through antler Damp f .do. .mm. .0m(miss-coons.Da%yo Since modifyhe gm oericon aiemove issofa nation.andiherasvmviewed he ndutletl n eepeersed*imitheyefern o the me si epetorexpre ntey ho ceMteotseser Med edmweeot oveafromMd rwNry,e modiyM MuOPT. move Mrsnmma mTheapeatbrrcviewetlthert and a r. a me ptmer On Done m you re ha spomo tgsessMMatxhey agreetlwtthmeaa�ment Tneopeomrexpmssetlaiey6adrm SutMttaonwertis onthedrafspesmksMYnatihpy agreed with Mere nesmatlem Me OPEN. Section 09-...on/StC CodIe and Emissions Factors Unconl gilled Emissions AIRS Point# Ptacos. SCCCode Paeudni Factor Control% Uadd 002 Ol .1000140 Flares P.0 710 a DIMM5C5 PM2,5.5 0.15 o h/MM522 50x DUI h/MM5CF HCx 193.14 0 6/6/IMSM VOC 121407.65 95 6/MM3CF CO B80.48 0 i/MMSCF Benzene 24410 95 6/MMSCF Toluene 113.38 95 6/MM5CF Ethylbenzene 3.23 95 b/MMSCF gylene 11.03 95 3/MM500 n-Hexane 2429.18 95 h/MM50 224 TMP ¢85 95 6/MMSCF 3 of4 K\PA\2018\18WED216.0,dsm Separator Venting Regulatory Analysis Worksheet Colorado Rego atlup 3 Parts A and B-AFRO and m Permit aeeuireents +$ource Is in the Non-Attainment Area • - - ATTAINMENT • 1. Are uncontrolled actual emissions from any cnteda pollutants from this Individual source greater than 2 TPY(Regulation 3,Part A,Section'LD.La)7 2. Are total facility uncontrolled VOC emissions greater than 5 TPY,N0x greater than 10 TPY or CO emissions greater than 10 TPY(Regulation 3,Part S,Section 11.0.3)7 You have indicated that source in in the Non-Attainment Area NON-ATTAINMENT 1. Are uncontrolled emissions from any criteria pollutants from this individual source greater than 1 TPY(Regulation 3,Part A,Section 11.0,3.3)7 YmEa Source Requires an APES.Go to the next question 2. Are total facility uncontrolled VOC emissions from the greater than 2 TPY,NOx greater than 5 TPY or CO emissions greater than 5 TPY(Regulation 3,Part B,Section 11.0.2)7 Y&;, i,%'.Source Requires a permit • ISource requires a pemtit Colorado Reaulatlen 7,Section XVII 1. Was the well newly constructed,hydraulically fractured,orrecompieted on or after August 1,2014? real:,.1l Source Is subject,go to next question ISouree is subject to P,eeulation 7,Section XVi1.0.2,G Section%VII.e.2—General Provisions for Air Pollution Control Equipment and Prevention of Emissions Section XVII.G-Emissions Control t - • Alternative Emissions Control(Optional Section) a. Is this separator controlled by a back-up or alternate combustion device(I.e.,not the primary control device)that is not enclosed? °.s1 The control device for this separator is not subject to Regulation 7,Section XVII.B.2.e [The eeet,cl device for eh's separator is not subject to Regulation 7,Section XVli.B.2.e sectlee XW.a.2.e—Alternative emissions control equipment - - Disclaimer This document assists operators with determining applicability of certain requirements of the Clean Air Act,is implementing regulations,and AV'Quality Control Commission regulations.This document is not • a rude or regulation,and the analysis a contains may not apply to a particular situation based upon the individual facts and circumstances.This document does not change or subsfdcte for any law, regulation,or any other legally binding requirement and is not legally enforceable.In the event of any conflict between the language of this document and the language of the Clean Air Act„its implementing regulations,end Air Quality Control Commission regulations,the language of the statute or regulation wdl control The use of non-mandatory language such as'recommend,"may,"'should,"and tan,"is Intended to descrlbe.APCD interpretations and recommendations.Mandatory terminology such as°must"and°required"are intended to describe controlling requirements under the terms of the Clean Air Act and Air Ovally Control Commission regulations,but this document does not establish legally binding requirements in and of itself 1.1 ,, Air *n Contra Nat tr Depa. ff.. ent o Healt - Environ on t aK CONSTRUCTION PERMIT Permit number: 1 8WE021 6 Issuance: 1 Date issued: Issued to: Extraction Oil Et Gas, Inc. Facility Name: Leonard Production Facility Plant AIRS ID: 123/A002 Physical Location: NWSW SEC 21 T2N R67W County: Weld County General Description: Well Production Facility Equipment or activity subject to this permit: Facility AIRS Emissions Control Equipment Point Equipment Description Description ID Low pressure gas is routed to and VRT Low pressure natural gas venting from controlled by an Separator 002 one (1) vapor recovery tower (VRT) and enclosed combustion Venting one (1) gas buster. device (ECD) during vapor recovery unit (VRU) downtime. This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to this specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF-CERTIFY FOR FINAL AUTHORIZATION 1. YOU MUST notify the Air Pollution Control Division (the Division) no later than fifteen days of the latter of commencement of operation or issuance of this permit, submitting a Notice of Startup form to the Division for the equipment covered by this permit. The Notice of Startup form may be downloaded online at www.colorado.gov/pacific/cdphe/other-air-permitting-notices. Failure to notify the Division of startup of the permitted source is a violation of Air Quality Control core ! COLORADO co 'AzPoitntionControlDrosion t*DAJIMent OT PUN 6 er,,waime,t Page 1 of 9 mmission 1CC) • = Number Pa Sectio and can r It in the ocation o e p: it 2. thin o ndred d eig days 0) of th- tter o )mmencement s ,peration ce of thi -r- ' , CO ��.• .."nth th_ • � .ined in th � shalt be demonstrated to the Division. It is the owner or operator's responsibility to self- certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. A self certification form and guidance on how to self-certify compliance as required by this permit may be obtained online at www.colorado.gov/pacific/cdphe/air-permit-self-certification. (Regulation Number 3, Part B, Section III.G.2.) 3. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) 4. The operator shall complete all initial compliance testing and sampling as required in this permit and submit the results to the Division as part of the self-certification process. (Regulation Number 3, Part B, Section III.E.) 5. The operator shall retain the permit final authorization letter issued by the Division, after completion of self-certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. • EMISSION LIMITATIONS AND RECORDS 6. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4.) Annual Limits: Facility AIRS Tons per Year Emission Equipment ID Point PM2.5 NO, VOC CO Type VRT Separator 002 --- --- 18.9 2.8 Point Venting Note: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility-wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility-wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility-wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits, for both criteria and hazardous air pollutants, shall be determined on a rolling twelve (12) month total. By the end of each month a new ICOLO2ADO co . Air Pollution Control i3ivision Oepr, 3a Pubi Het. & >,mP;t Page 2 of 9 elve mont .tal 'd based o, -vious twR ii F ths' data. e permit ldll cula ac� :fficemission �_ _ th and -p ion omplianc � -cord on or at a al fie th site � sponsib for Di review. 7 - - sion poi he . .- • shal •.e .  : d mainta '. h the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) Facility AIRS Pollutants Equipment Point Control Device Controlled ID VRT Emissions from the VRT and gas buster Separator 002 are routed to an enclosed combustion VOC and HAP Venting device (ECD) during vapor recovery (VRU) downtime. PROCESS LIMITATIONS AND RECORDS 8. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, Section II.A.4.) Process Limits Facility AIRS Process Parameter Annual Limit Equipment ID Point VRT Separator 002 Natural Gas Venting 6.2 MMSCF Venting The owner or operator shall monitor monthly process rates based on the calendar month. Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. 9. The owner or operator shall continuously monitor and record the volumetric flow rate of natural gas vented from the vapor recovery tower (VRT) and gas buster and routed to the enclosed combustion device using a continuous operational flow meter. The owner or operator shall use monthly throughput records to demonstrate compliance with the process limits contained in this permit and to calculate emissions as described in this permit. STATE AND FEDERAL REGULATORY REQUIREMENTS 10. The permit number and ten digit AIRS ID number assigned by the Division (e.g. 123/4567/001) shall be marked on the subject equipment for ease of identification. (Regulation Number 3, Part B, Section III.E.) (State only enforceable) 11. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) CAPE 'COLORADO CO Air Pollution Control Division impart;unt:d pu V-,€cz.rnfs E^a7onrfrere Page 3 of 9 Elk 12 y e combus de ed by this pe t is subj • egulation mber 7, tion XVII 2 er. • ovisions y enfor • e.r If a flar or other bustion ice i sed t •ntrol Fissions •� olatile •aniccompound • comply . XV ;§:,all -d• h. v -missions •° ormal operations, as defined under Regulation Number 7, XVII.A.17; and be designed so that' an observer can, by means of visual observation from the outside of the enclosed flare or combustion device, or by other convenient means approved by the Division, determine whether it is operating properly. This flare must be equipped with an operational auto-igniter according to the following schedule: • All combustion devices installed on or after May 1, 2014, must be equipped with an operational auto-igniter upon installation of the combustion device; • All combustion devices installed before May 1, 2014, must be equipped with an operational auto-igniter by or before May 1, 2016, or after the next combustion device planned shutdown, whichever comes first. 13. The separator covered by this permit is subject to Regulation 7, Section XVII.G. (State Only). On or after August 1, 2014, gas coming off a separator, produced during normal operation from any newly constructed, hydraulically fractured, or recompleted oil and gas well, must either be routed to a gas gathering line or controlled from the date of first production by air pollution control equipment that achieves an average hydrocarbon controls efficiency of 95%. If a combustion device is used, it must have a design destruction efficiency of at least 98% for hydrocarbons. OPERATING £t MAINTENANCE REQUIREMENTS 14. Upon startup of this point, the owner or operator shall follow the most recent operating and maintenance (OftM) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to the OEtM plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements 15. This source is not required to conduct initial testing, unless otherwise directed by the Division or other state or federal requirement. Periodic Testing Requirements 16. This source is not required to conduct periodic testing, unless otherwise directed by the Division or other state or federal requirement. ADDITIONAL REQUIREMENTS 17. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, Section II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or 4 GDA HE ! COLORADO Pallutmrt Control Division „ I a: r'trk t t'4th feet bL;vrror,mesiL Page 4 of 9 A Forvr ile • n" ,mpounds �- _�� � itrogen i.e. ources (NI in ozone • nonarea inme e itting =ss tha .0 ton f VOC or NO), i year, a ge in � a: .,.,..::ctu �.., F L,of on • . $:; or more o ,.- cent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non-criteria reportable pollutant: If the emissions increase by 50%or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or • Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. 18. The requirements of Colorado Regulation Number 3, Part D shall apply at such time that any stationary source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation that was established after August 7, 1980, on the capacity of the source or modification to otherwise emit a pollutant such as a restriction on hours of operation (Regulation Number 3, Part D, Section V.A.7.B). GENERAL TERMS AND CONDITIONS 19. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 20. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self-certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self-Certify for Final Authorization section of this permit. 21. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or 4, c E ICOLORADO CO r Air Pollution Control Division Depart wEC Hen I E-Y1r4f1r,WI Page 5 of 9 aerators a is 4 only for .quipmen operations activity -cifically i = tifi •n •ermit 22 less s• call "y ed o ise, e gener nd sp a conditions c ; ained in it have .- -ter -• r e AP • • •- 'ry to assu'" • •' lance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 23. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self-certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request,a hearing before the AQCC for review of the Division's action. 24. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 25. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: Harrison Slaughter Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Extraction Oil a Gas, Inc. Permit for natural gas venting from one (1) vapor recovery tower and one (1) gas buster at a synthetic minor oil and gas well production facility. CDn COLORADO Co .vo,. AirPollonon Control Dxvision c.euS v e a Ru6i u3 n v L:�m r nx i Page 6 of 9 • Notes t -permit Hot „E at t •• this perm ce• 1) Th- rmit hold s re• ed � ay fees f e p -ssing ti for his permit invoice for se fe- I be i ed a the mil is is d Th ermit holders pay the , , y��,,.n „`30 da .�.. .o eipvoice. �� k.�. �� he invoic- ult in revocation of this permit. (Regulation Number 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-regs 4) The following emissions of non-criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. Facility AIRS Uncontrolled Controlled Equipment Point Pollutant CAS # Emissions Emissions ID (lb/yr) (lb/yr) Benzene 71432 1,514 76 Toluene 108883 703 36 VRT Ethylbenzene 100414 20 1 Separator 002 Xylenes 1330207 106 6 Venting n-Hexane 110543 15,061 753 2,2,4- 540841 6 1 Trimethylpentane Note: All non-criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 002: Uncontrolled Controlled CAS # Pollutant Emission Emission Source Factors Factors (lb/MMSCF) (lb/MMSCF) CO 880.48 880.48 AP-42 Chapter 13.5 DP COLORADO CO j Air Pollution Control Division w t th.ver r nx -dVee„ I: 6.,.n,rt Page 7 of 9 11111 ' Y 1 Uncontr. 'ed Contr • Emis ,,- $ v = Emis n ollut S Fa rs Faca ce VOC 121,407.66 6,070.38 ProMax 71432 Benzene 244.1 12.21 ProMax 108883 Toluene 113.38 5.67 ProMax 110543 n-Hexane 2,429.18 121.46 ProMax Note: The controlled emissions factors for this point are based on the enclosed combustor control efficiency of 95%. The emission factors listed above are based on a ProMax simulation that utilizes a site specific vapor recovery tower and gas buster gas sample obtained on 02/14/2018. The sample temperature and pressure are 66°F and 5.3 psig respectively. The AP-42 Chapter 13.5 CO emission factor (0.31 lb/MMBtu) was converted to units of lb/MMscf using a heat content of 2840.25 Btu/scf. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five- year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This facility is classified as follows: Applicable Status Requirement Operating Permit Synthetic Minor Source of: VOC, n-Hexane and Total HAPs NANSR Synthetic Minor Source of: VOC PSD True Minor 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1-End Subpart A - Subpart KKKK NSPS Part 60, Appendix A - Appendix I Appendixes Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA - Subpart DDD MACT 63.1200-63.1439 Subpart EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ- Subpart YYYY x, �, iCOLORADO co ' 3 Air Polution control Dar ion {s X .ep r r..., i 3,a;s&Es Imrrxe t Page 8 of 9 T 63 0 63 Subpart bpart 3 T 63. n4I'•0 E �! Subpar e ''1 bpart XX CDPHE COLORADO Mr Potitttion Control Division "` e .rr,p rzt,o .iE5k He€Hh'&eVirur:rren Page 9 of 9 Colorado Air Permitting Project PRELIMINARY ANALYSIS-PROJECT SUMMARY Project Details Review Engineer: ig}arrLsor Slyxfghter • ' Package#: 3'75882-, Received Date: 3/2/2016 Review Start Date: 10/11/2018 Section 01-Facility Information Company Name: Extraction Oil&Gas,Inc. Quadrant Section Township Range County AIRS ID: 123 'NWSW 21 • 2N 67 Plant AIRS ID: A002 Facility Name: Leonard ProductionFacility "r' Physical - Address/Location: .NWSW quadrant of Section21,Township 2N,Range 67W County: lWeld County • Type of Facility: Exploration&,PCOduetion WaIJ�p�p What industry segment?Oil&Natuta(Gas P adu t an#J?r 4 - _ Is this facility located in a NAAQS non-attainment area? it� a If yes,for what pollutant? ❑ Carbon Monoxide(CO) fl Particulate Matter(PM) El Ozone(NOx&VOC) Section 02-Emissions Units In Permit Application Emissions Self Cert Engineering AIRS Point# Emissions Source Type Equipment Name Permit# Issuance# Action Control? Required? Remarks 4 i �� Permit Initial 003 5eparatorVenting LP Separator Venting 18WE0217= I vas Issuance. Section 03-Description of Project Extraction Oil&Gas,Inc.(Extraction(submitted an application requesting permit coverage for natural gas venting from eight(8)three-phase,high-low pressure(19LP)separators at a new" synthetic minor well,-production facility located in the ozone non-attainment area. • This source is APEN required because uncontrolled requested VOC emissionsa re greater than 1 tpy(Colorado AQCC Regulation 3,Part A,Section;1 6.3,a.).Additionally,the source is permit required;because uncontrolled VOC emissions from all APEN required sources at the facility are greater than 2 tpy(Colorado AQCC Regulation 3,Part 6,Section II.A_2.a.). Public comment is required for this source because new synthetic minor limits are being established in order to avoid other requirements.Additionally,the change in VOC emissions as a result of the project are greater than 25 tpy. - - - Section 04-Public Comment Requirements Is Public Comment Required? Yes If yes,why? Requesting Syrtt 1 nor Permit, Section 05-Ambient Air Impact Analysis Requirement Was a quantitative modeling analysis required? No If yes,for what pollutants? If yes,attach a copy of Technical Services Unit modeling results summary. Section 06-Facility-Wide Stationary Source Classification Is this stationary source a true minor? No ' Is this stationary source a synthetic minor? vas If yes,indicate programs and which pollutants: SO2 NOx CO VOC PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration(PSD) .❑ _ Title V Operating Permits(OP) _ J�1 J Non-Attainment New Source Review(NANSR) ✓ Is this stationary source a major source? If yes,explain what programs and which pollutants here SO2 NOx CO VOC PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration(PSD) — EJ - ❑ CI V Operating Permits(OP) Non-Attainment New Source Review(NANSR) - - - Separator Venting Emissions Inventory Section 03-Admintstadve Information - 'Facilily:nil,M: ,M,,; 5.3'-a- ,,,,,P.s.'6 E.idLi$ [. _:..:y County PI Point Section 02-Equipment Description Details - - - 3 Nh333a,-,-a7 H j 33 3'PT'fi1' 3 3I�3 / dl 4 ���.� &'.a Gpn)hdmia7 m „A.,..xaayrles.setF. k .. Sv�,L( OetaOed Emissions UmfOaonptran. y1, --.a •Fa�...F.F4 2,.n, 3. , - _ o..as Y�a?ca..S._-�-r - - igsfi�,+Ae4` a hk13Aoi' yo4xnrraeyi agq;'4i,, ! 11 3l .o _ Emaslon.Control D Description: /,. 33 ,,.219 , �.,,„,„,„.0,,,a iii Requested Overall VOC&HAP Control Efficiency% liA3Sl y VallfitiUmked Process Parameter .,,_,,.,.:-.,,,, ,,,,,,,,, - Gasmeter .. ..ax ... S Xgtlan 03-Processing WminIormatlan for Emission Fstlmstes - Primary Emission Separator Actual2roughput " *,MMseiperyear Requested Permit UmtTbroughput w".2Si1';MMscf per year Potential to Emit(PTE)Throughput= 211 MMscf per year Process formal(3eryding) Equipped 11th a VPU: I SVRUprosssequipmen1 : "Uncontrdkd anti controlkdemissbns used Ioeztabikh reques[M permit limitsare bash nnh On when Me VRUkbypasud(i.e.waste gazvolume Wa[is r0utedm Me fUre) Semndary Emhslom-Combustion DeWce(5)for Air pollution cllsa - for Gas Heating Value:. -'1861'1214433 Volume ofwarte 39s emined per 00l-of � liquids throughput // 3;yi// scflbbi Section 04-04-Emission factors&MetMdologles D emiptl 3 11311 j 31 '3jj3111 3 3 3j33 / T' 3T313t11D.-" ,.,,,,,,,-.6p';"'.1296u theooH t b/ 3 Past P'' t.W'4:4j201,63iha,94IPI19mgq 9dWtsm z0 dM�,,,g0,rnwlY Ph 1 .i d�d�Euwg M fi a hlpia d2psnielh/h W. l3, s m 1 0 ago rag r6oNalriE Ttr6 x91494 a,o8n rabrG1Tlkydntsmnith b P Grp par9tori1y9 ,�egrd paded7d' ernM tiaesvm+t4'( 1551 1 One f Ie1 j519Yd al 0a Wes rte th s mu!rb tlat paeptpdnbildmvm dle162828 bM220041 5i17mbel wt9,,,'*O maro' 1ta�°a1SEWt4latb& W 7a 10e31bF 37 kofallgrs c 2713, MI anal.,brmmPamtive WrTmez did .022;co)Ort5 51'4 rLiffreresuhsMUt tw lalyslinnet6341:25ecib D942.3sr £ - S 3 SS q ,..',.-T-._e,-.Ti.»c a_• "P'�,sxu „nn ,.. .a::i..., , , ,,;i_ ,...... „1,i„n ,�e,,...... r-.2 3;,..;,,,, -,,,.,.:,.. T1`L>.,.,x:3,.1,,, .. Displacemem Equation Olspkcemem Equation DE=Q"MIN'Xx/D Ex=Q'MW'(WC 'a1pWor Volume[rk Flownte ,,,,,,202 b)lb cm/day IMW __ IF-;C :,.•35:isozilb/Ib-tool lb/hr Weight% Nydrogen5u17de "v'6-,»:,: 000: Hydrogen 04104. :.."9At1 - 102 :'12232. CD2 .0:4095 63 'ioas N2 ,":S,ii337ans methane ...,.,,,14,6s .9.,,.a .'r r133131s84 eNanrensOsSOSSSOs13,92 eMa60 '38:S8 490315 ,)-3133l5,,;4'24,22 ird,mm�e YidN///41/R33/.-=-464 is0bumpe 021 ',butane 33p(,a,am /744..06 1424 '!3',69. .pen.. 4'03,1 ///////l///J//'402 72404 n -. 3„514/11//o,,,,,00 741 P=nene .'D,2s nHexanetaa 'I'i271 - ,S..':3;;. 0,41 cydahwne 1400/37005 3 3138 Other hounesOW 01.21,,.,.,. 7142. 'Pt."e: heptaners ,cos methykyxbM1esane0.37meNykycbheaane ,.//0/4FF 32.63MP 224-4MP ;33,6(9066 Benzene 0.15: Benzene /111r129 Toluene 0.14 Toluene !.•3.333o.1s' E2ylbenzene O.W, Ehyhenaene 3i Xylem :365: Xyenes 05..aDe 12.97.6 - CBa Head 1 Total 92.81 Total .95 VOC VOC 57.28 VOCWt% 61.6435_ Emission Factors Separator VentingZ:Q' Uwsmolkd Controlled Poll.. (91/6.66-1) �1 i) WM..) Em,ssmn Facmr50mce porrt 116.16a i�.u l (Mural. Emlssloe FadorSounx (Ws (6...06hWt) (Gas.06001 N (Gas...PO Thmu6hPut) VOC 529290443 38063362 W�� ` Benzene 149.3560 7.4628 Ethylbenzene 79519a 0.3976 y IIISIIEI r®" Xvkne 0.6184 2.5303 ,, �.1® `®"" ®_ 5,. 32426 a ]3.90610 653095 qy r "®' r'®". .. '.. 224TMP 0.9061 0.0403 YG////,,:: __. ,,�,'Zry%, R'1�� Primary Control 0evice .s1j7 Uncontrolled Unc,n1died PokrInnt )b/MM6tu) 111MMsA Emission Facor5omce Pofutam MI.Mil Emission Factor Source (Waste Heat (Waste Hest (Gas Combinted) (1.10.60166) Combusted) Throughput) PM10 00078, 16359 W Wf4. ^n. �3 .75 '.Mann. 1Py._ PM65 93,63360076)./ 16359 1 ..Eal 0,0079 [ /A 50x Di00A63j333 1165 .y' ®' .,.0.01106 Nox 0.Ii.c?.,3,.y 134692 ej N1, , ®' i0.O6B6 ®•' ..� -;)0.0-0i:64)--'1) Co - .,,,,333330.310033331333 614.053 - _ .. .0.0{r/. � 03104( .. .x......e.... aus At SeNon 05-Emission Irnerntory Potential to Emit Ac733110nslons Requested Permit Umih Po.,UM Emit Actual Emissions Requested Permit limits Criteria7081mmm Uncantrolled Uncontr70,0 Controlled Uncontrolled Controlled Criteria Pollutants Uncontrolled Ummntrolkd Controlled Uncontrolled Controlled (0010,000 (tons/Sear) Ions/year) (o3s/043,) Dons/year) (Ions/yea) (Ions/ye0) (tans/year) (tons/years (Ions/year) PM30 0.16 0,13 0.13 0,16 016 PM10 0.16 0.13 0.16 0.16 PM25 636 0.13 6B - 0.16 6. PfR5 616 0.16 003 0.01 0.01 601 0.01 0,01 503 0.01 0.01 0.01 0.01 0.01 NOx 142 L. 115 14261 14210 NOx 1.42 1.15 .115 L42 L. VOC 48131 2458 60435 362172 VOC 603.P 48474 2634 603;77 .30.1896 CO 66.405 5,22 5.22 6,40 6,40 CO 6.48 5.22 5,22 6,48 648 P.1ential7 Emit 43tval5085 53 Requested Permit Umin PotenffiIto Emit 115511missio, Requested Permit limits Wz,073,Mr Polk13573 Uncontrolled Uncontrolled Controlled Uncontrolled Controlled Hanmgus Air Pollutantr Uncontrolled Uncontrolled Controlled Uncontrolled "Controlled (Ws/year) 115ywar) 61n/yead (Ibs/year) (1bywar) /Ws/yea) 053/23331 Obs/yesrl lls/yeerl (In/3earl Benzene3.1.41 2540,55 127.03 315141 157.P Benzene 3155,8 25461 127.2 5155.81 157.79 Toluere 301£24 243117 12156 30..74 150,79 Toluene 3020,6 3435.1 8 3026. 3510 EtM1ylbenzene 67.87 135.39 6.27 167:87 8.39 EMylbemene 168.5 135.8 6:8 0383. 9168.05 86102 4365 1068.05 53.40 7ylene 1069.6 53.48 n-Hexane 2]58.61 22218.29 1110.91 27560.61 1378.03 n4lexane 27597.2 22247.8 1112.4 2759720 s379,e8 714 TAP 17.01 1673 0.69 17.01 0.85 224TMP 12.6 142 0.7 17-05 6. Section 06.negulaforySumman/Analysis Regulation 3,Parts q,0 Source requires a permit Regulation 7,Section XVII.8,6 Source Hzubfect to Regulation 7,sectl4n 269.6.2,6 .. Pegu2tlon 7,Section XVII.W2.0 newt..device fort I,separator h not zuhjca10 Regulation 7,Xmon 26116.1e (See regulatory applicability wminheet fordn.Bed analysis) 2064 kVA12018\10WEOSO7,a3adem • • • Separator Venting Emissions Inventory • *odou Dl-Inttal and Periodic 5a m W ng avd Teztlng Requirement. • - - .king Gas Threughputtm Monitor Compibre Does the company use side specific emission factors based an a gaz sample to estimate-emissions, ono 0 s, This sample should represent the,n outlet of the equipmentcoveted unclert0a AIRS 1O,and should leave been collected within one year of the application recessed date,However,if the Wilt,has not been modified(e.&.no newwells brought andlnel,then km.he appropriate to use an alders te-specific sample: If no,the permit wgl main an alniuoiTesting Requirement.to cogecta sho-apeclik gaas.sample from the equipment bssngpermgted and conduct an emkskn factor analysis to demonstratethatthe emission factors are less than or equal.the emissions fe m e established with this application. Are facllhy-wide permitted emissions of V2 greater than or equal to 90 tons per year] If yes,the permit will contain: -An'Inmal Testing Requirement.to collect stte-speciffc gas sample from the equipment being*meted and conduct an emission facmranalysis to demonstrate that the ' emmnn teeters are less Mae or equal to the emissions factors established with this application. Pododk Testing Requirenerde to collect site-specific gas sample from the equipment being permitted and conductor emission factor analysis to demonstrate Mat the emission factors are less.se or equal to the emissions factors established with this application an an annual basis. Will the operator have a meter installed and operational upon startup of this paint? Yes •it*,the Me permit will condina condition that requires the operator...date gas throughput using Me liquid througrput until the meter O}omit.and apendonal(not to exceed 120 d0Ys).Thkmnditian will use the"Volume of waste gas emitted per MotliquidstroughpuC(scf/bbp vaioeiosection 01 Does to mm }device efficiency than a flare or combo.*device} Ryes,heepermntra rygreamr Ryes,on permit will contahmand initial compliance tertcondition to demonstrate the destruction efficiency of the combustion devise baud on Inlet and outlet concentatian sampling You have Inclimthd above thath ed process parameter.natural tas vented.The following „ ill G �' /,.. '°'; / �i. !.x„ .✓ R/. Sec5on the 7ntnlcalpnalysis Notes_- 1,Ttadtpnally,emsspnstrgmse0at esseated+argue drsplacemetequaton from the ERA Ers mzylmpravernent Program Puhlanon.Volume,Chapter'10 Dzplacemant Equaten 10043}(Es=s'MW v Xe/LiTfrrsalmlaton ' methodology ls included to to right Cotbon U4 oftheanaysrs antis Intended to be-used krcdnparatvepurposes The operator.cakuated einissiods usingaP emulation based on a site spears gas arialyssobtaned tram theautletoithe lwz pros separatason 02f14/t&The dpehter used the mofYa es bon Meg analysts.speed gas ePloMaxsimuUhon wassthenused determine the:./ es of each componentln the gas....hazed on ure h 'o stardardvolrnetrc flowr.*0.024MMscffday,the resofting emissions thorn ach,ukulaton messetiology am available us5ntron 05 above The missions resultingfront the d pa test equation, CeptVOe,ateslghtly more toners**than the values obtznedfrom Me Russel.x simulation.However,Me difference in lhevaNess-small enough tobemas es.negdgble...result,ithnsdassmmeel the valves ezmm.us gble Prof...imol ton were assessable-for permutes.purposes. 2.Eased on t9edppllcation.a flow messmssalustalledatthiefapLLty.frteasnretheessrety of the thwurwsscreseparator gaprossedsstheenciceettimisibustiondevice.11.ftow meter z lotated downstream of Me vapor recovery uortz 1VPLlt Us tact. ss Nat am used tots peowprezaute ssparator gas and route iota the with PpaCon.}fdsllowm¢ter isthmusadmmeaur¢mot6.wpn¢ssure zepar mt:gas a scouted mtlne I.zed mmburtiondoocelECO(durvrgVAUdowntme;Bamdan Ne flow meter.ecabon.M:e opt ..wll notrued to track VAOdoyrdtme records In cdmuncmnwith Pow:meter data to demontra compile me with the pemnermits The how measured by Mc Pow meter wet ho o1cost for demonstrating compliance with the pnm tl nits. 3.The appta0oeo0tcates Me flow=Monate installed and oiler...Tatth-shol ty. 4 Neto,btttal:norperodt meMod22opecity testswereincha#din the pmnFthemusctheoperatorizrequred to do weektytiottnembs msohe35zpsr the ossratnee od maintenance pkn.MMM¢event Vffibleenussiertaare oL...i d, operator is required toettfer strut in the µ utely a.mass.repairs or conduct a formal method 22 opacity test In the estosswsibleemzslons...served ved. ugn.heme[hod 22,Me operator is tea tared immetltelycanduct repars*Mut m Me: *dementf repass tbe<endue.immediately,5tc blurs a more ropusiamgmng compliance dmonstradon.than a one, method 22,thsinttalmmpGnce dernmstration is not n.essary in the Retort A o Ily,theweo4vesible ems*n u checks and bs0q qurements..tl emissions ateebsemed is aayfgcl,t n-going comp. d tmtlot periodic method 22 arocA Costing is required In the perm. 5.the heat content..tosaf<Nate.Ness and COemsziois was obtained from the ProMaxzmile*. 6,the operatorerr®nally classifiedxlaemrvaW*sine as a thermal*deer.Typtpaily Mermai oxidizemre required to mantamammtmmn combostrohctambe ten Petathssio order to demonstriie.the mntmldewms-=Vine the request.combustion amcerry(use.dygtea ten duut5%l.mmacdm.Ths m*Mmanniomhus0onciumhertemoemturels H verfiedthroughnta..pe od..1tesfint.Powther,the newramrndatedthetthedezotsctonetflderrryaehieved bythsendosed combustion deny is mote function oft*minims.*chamber tempetature,.Mstea3 the operator indicated Me.mixing of gases achievedbythedeogn*well a Me residence*leaf the gasin3Mmenbus0On ebandsrzevsbio Me higher deztruenon efficiency,rq es dfarNS ECU.Irshb id*further noted Mat thU Pombustiondevice differs from otter-thermal°mamas.Na0ttdoton Muite suppffimeutalf lip corn bust Om waste gss.thrthetthe heat contesspetheI p separator waste BM/sc.issgptfXanatyhigher than the hetcorfentohwaste gas men's ttpiolly.nholedfiythekmaloidMers(t'.e.*doe Pelt dehydrate,zrtivents,that'requiresuPplementaitholthmo0tam t19cbmhastlon chamber temperature in to omplete combustion,Asp resttlt.itwas determined thata minimum combustionthambertemgerafttme,wouti not*a permit land Poi ihs EC.and that t[contrPi*toss Anted ibe referredWasan ECU rather thane • thermal oxkliterhased an time afooem eo*ued differences ]the*cane*component in MC Prot..simufation vrazsoecrfied.ingthemaleculat wnght and API gsntyof the ClOrcomponentinthepressurs.am id sample used to...date mwetsate storage vesselemssoasr. ce the emrssioderesuiting Mom epro1axsm9iattandltselymltorMelee ingna halation mefi ds,r tmintd Mel/Mususedtpspetifytlfedepnesastxam were acceptable. B.The operator intica ted a 65...-510-*utilized to controt emissions tom both the 4RF/gas booth ndiewprersureseparotaridur ng 0003owntime. • 9.The operamrmnh[med me ambient pr..*of the madlwassetto 12.12esta,Please zee Ne liffiftffilifflifrep0rryteludedin Neapplftationtotteletanaa 10.The operator was ptavMedvnt:adn%permtardAGElfredne b reviewquwrtepublicoommentllto operator reviewedthe-dattpermtar0yamutledarc earth**lass comment and responseprovldedarcefedfw.lil:COmment0 0s9m rth ssill* irne remove 4AH£ttltolon gthmm(ls ng010tw tlma Soci ntmr[s.l t tbmft'asst werere oaex..contlmn000ld be Mended inthip,,ott indicating arng'ominc.(ri I havense:T.Mtstatements-tth0 downtwe Mindia to the included msstotMatt.*iicatoa latestpped..In10VAVdthatS15kng01 ly account the gas that is tautrequired,an comb combustor be Mendeere not pe50tng(ass.,thnginrmahond,he etodu,it could saptear t that tlttlloyatthe gas ventereto the .P tooMatthauss facility rat.than tott the that ,red to theamuntstocgd0Nat try on oils mm bust rw niheV o,o1,coedit n.00XtMuttt rssie maho h"Itcouldappea0Mat Meenhretyatthegessment from t Besse hen duo lo,-late just ft edtt150 d at9say ea Pas.the a ondrton V,The pper4mtrevswedibe and eepreFaedmatlhepagneedwiM Neassessmen£'the operator expressed.,had no(tithe orttfiedmkpermitand thattnexagse.with the redlines made.the APE. SeMaa o9-Inventory SCC Cad(ng_and Emissions Factors Uncontrolled Emissions Paint rocess SCCCade Pogudnt Facer Control% Onlb 033 01 3-i6UUt60 Flares PM.10 14.75 0 b/MMSCF PML5 14.76 0 b/MMSCF 504 112 bfMM56 NOt 134.69 bfMM5CF VOC 57254.22- b/MMSCF CO 61104 0 b/MMSCF Benzene 149.36 95bfMM5CF Toluene 142.93 95 b/MMSCF Ethytenzetie 7.96 95 b/MMSCF Xylene 5462 95 b/MMSCF mliexane 1306.19 95 h/MMSCF 224TMP 0.131 95 b/MMSCF • • 3014 - ktPAl019\1BWE021T.CPlxism, Separator Venting Regulatory Analysis Worksheet Colorado Regulation 3 Parts A and B-APES and Permit Requirements rce la In the Yon-Attainment Area ATTAINMENT • 1. Are uncontrolled actual emissions from anycrlterla pollutants from this individual source greater than 2 TPY(Regulation 3,Part A,Section ll.D.1.a)? 9H,/f// � 2. Are total facility uncontrolled VOC emissions greater than 5TPY,NOR greater than 1OTPY or CO emissions greater than 10 TPY(Regulation 3,Part B.Section 11.0.3)? //H/�'Yj You have indicated that source js in the Non.Attainmont Area NON-ATTAINMENT 1. Are uncontrolled Missions from any criteria pollutants from the individual source greater than lTPY(Regulation 3,Part A,Section lit?I? Y§4 j,',1Source Requires an APES.Go to the next question , 2. Are total facility uncontrolled VOC emissions from the greater than 2TPY,NOx greater than 5TPY or CO emissions greater than 5 TPY(Regulation 3,Part B,Section 11.0.2)? Yee Source Requires a permit Source requires a permit Colorado Regulation 7,Section XVII 1. Was the well newly constructed,hydraulically fractured,or recompleted on or after August 1,2014? IYuA ?J5ource is subject,go to next question I5purce is sublost to Regulation 0,Section XVli.0,2,G • Section XVII.B.2—General Provisions for Air Pollution Control Equipment and Prevention of Emissions Section XVII.G-Emissions Control Ahernative Emissions Control(Optional Section). a. Is this separator controlled by a back-up or alternate combustion device(Le.,not the primary control device)that is not enclosed? .la:The control device forthls separator Is not subject to Regulation 7,Section XVI I.B.2.e (The control device for this separator is not subject.Regulation 7,Section XVIl.B,2.a Section XVll.B.2.a—Alternative emissions control equipment Disclaimer This document assists operators wdh determining applicability of certain requirements of the Clean Air Act,its implementing regulations,and Ai Quality Control Commission regulations.This document is not a rule or regulation,and the enaysis it contains may not apply to a particular situation based upon the individual facts and circumstances.This document does not change or substdide for any law, regulation,or any other legally binding requirement and is not legally enforceable.In the event of any conflict between the language of this document and the language of the Clean Air Act„ds implementing regulations,end Air Qualty Control Commission regulations,the language of the statute or regulation will control The use of non-mandatory language such as"recommend,"may,""should,"and"can,"Is intended to describe APCD Arterpretations and recommendations.Mandatory terminology such as"must"and"required"are intended to describe controllurg requirements under the terms of the Clean Ah Act and Air Quay Control Commission regulations,but this document does not establish legally binding requirements in and of deed CDPHE c . 0 A DOA Air n C©rItro ... Depa ertt o $•itc Healt Environ t CONSTRUCTION PERMIT Permit number: 1 8WE021 7 Issuance: 1 Date issued: Issued to: Extraction Oil Et Gas, Inc. Facility Name: Leonard Production Facility Plant AIRS ID: 123/A002 Physical Location: NWSW SEC 21 T2N R67W County: Weld County General Description: Well Production Facility Equipment or activity subject to this permit: Facility AIRS Emissions Control Equipment Point Equipment Description Description ID Low pressure separator gas is LP Low pressure natural gas venting from routed to and Separator 003 eight (8) three-phase, high-low pressure controlled by an Venting (HLP) separators. enclosed combustion device (ECD) during vapor recovery unit (VRU) downtime. This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to this specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF-CERTIFY FOR FINAL AUTHORIZATION 1. YOU MUST notify the Air Pollution Control Division (the Division) no later than fifteen days of the latter of commencement of operation or issuance of this permit, bar submitting a Notice of Startup form to the Division for the equipment covered by this permit. The Notice of Startup form may be downloaded online at www.colorado.gov/pacific/cdphe/other-air-permitting-notices. Failure to notify the G4E COLORADO Co Air Pollution Control Division ' tkvaerle,u PuiN S le0,t&Erwnnni.'x Page 1 of 9 ision of rtup rmitted Ai, F is a viol .8. Air Qual Control mmission ICC) gu •n Number ° Sectio G and can r - It in the ocation , he P� it. 2. • e hundr- . -igh • •) oft - _r r enceme • •`-ration � � �" ' �• �• or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self- certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. A self certification form and guidance on how to self-certify compliance as required by this permit may be obtained online at www.colorado.Qov/pacific/cdphe/air-permit-self-certification. (Regulation Number 3, Part B, Section III.G.2.) 3. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) 4. The operator shall complete all initial compliance testing and sampling as required in this permit and submit the results to the Division as part of the self-certification process. (Regulation Number 3, Part B, Section III.E.) 5. The operator shall retain the permit final authorization letter issued by the Division, after completion of self-certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 6. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4.) • Annual Limits: Facility AIRS Tons per Year Emission Equipment ID Point PM2.5 NO. VOC CO Type LP Separator 003 --- 1.5 30.3 6.5 Point Venting Note: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility-wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility-wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility-wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits, for both criteria and hazardous air pollutants, shall be determined on a rolling twelve (12) month total. By the end of each month a new 4, corHe ,COLORADO CO ,;. Air Pollution Control Division ; Hot.,”, n�,er,e Page 2 of 9 delve mont •tal d based o vious tin/4 u ths' data e permit elder shalt cola ° ac emission th and -p - omplianc -cord on or at a al fie; •ffic th site sponsib for Di ion review. ,y. �.� a„ �� '' ,� ° t?�+.�.�-'w�r,.'� ��.Via: �.o.,� 7 - „_ sion poi he .• • $ shal . ..e ,'<..i.• d mainta •.... , h the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) Facility AIRS Pollutants Equipment Point Control Device Controlled ID LP Emissions from the low pressure Separator 003 separators are routed to an enclosed VOC and HAP Venting combustion device (ECD) during vapor recovery (VRU) downtime. PROCESS LIMITATIONS AND RECORDS 8. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, Section II.A.4.) Process Limits Facility AIRS Process Parameter Annual Limit Equipment ID Point LP Separator 003 Natural Gas Venting 21.1 MMSCF Venting The owner or operator shall monitor monthly process rates based on the calendar month. Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. 9. The owner or operator shall continuously monitor and record the volumetric flow rate of natural gas vented from the low pressure separators and routed to the enclosed combustion device using a continuous operational flow meter. The owner or operator shall use monthly throughput records to demonstrate compliance with the process limits contained in this permit and to calculate emissions as described in this permit. STATE AND FEDERAL REGULATORY REQUIREMENTS 10. The permit number and ten digit AIRS ID number assigned by the Division (e.g. 123/4567/001) shall be marked on the subject equipment for ease of identification. (Regulation Number 3, Part B, Section III.E.) (State only enforceable) 11. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) 12. The combustion device covered by this permit is subject to Regulation Number 7, Section XVII.B.2. General Provisions (State only enforceable). If a flare or other 4, COLORADO Co A,r Pollution Control Division d_ ;.mar",# t er≥mre2,,,-W Page 3 of 9 bustion •, ice i -• , entrol em .ion Ya :f volatile • compound • comply h Sectio VII, s be enclo no visi e ssions dur normal -rations, w defin 3 and 'e ulati Numb , XVII 7, and be desig • so that g -.ax s can, s o �� ... � t-rvati•R Y •• •.... 'de of the -• -• flare or combustion device, or by other convenient means approved by the Division, determine whether it is operating properly. This flare must be equipped with an operational auto-igniter according to the following schedule: • All combustion devices installed on or after May 1, 2014, must be equipped with an operational auto-igniter upon installation of the combustion device; • All combustion devices installed before May 1, 2014, must be equipped with an operational auto-igniter by or before May 1, 2016, or after the next combustion device planned shutdown, whichever comes first. 13. The separator covered by this permit is subject to Regulation 7, Section XVII.G. (State Only). On or after August 1, 2014, gas coming off a separator, produced during normal operation from any newly constructed, hydraulically fractured, or recompleted oil and gas well, must either be routed to a gas gathering line or controlled from the date of first production by air pollution control equipment that achieves an average hydrocarbon control efficiency of 95%. If a combustion device is used, it must have a design destruction efficiency of at least 98% for hydrocarbons. OPERATING Et MAINTENANCE REQUIREMENTS 14. Upon startup of this point, the owner or operator shall follow the most recent operating and maintenance (OEtM) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to the ()Eon plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements 15. This source is not required to conduct initial testing, unless otherwise directed by the Division or other state or federal requirement. Periodic Testing Requirements 16. This source is not required to conduct periodic testing, unless otherwise directed by the Division or other state or federal requirement. ADDITIONAL REQUIREMENTS 17. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, Section II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or DA COLORADO Co ParPo₹tutiort Control Drinsion e.t>ttttttytJ. gat tt,wor t Page 4 of 9 For vet ile • 1• pounds ( a nitrogen • ,ources (N4 in ozone nonat nme at-- emitting =_., � 100 ton Vi or NO. � year, a cha in an z,ry.l ac emissi• of one ton pe -ar or more or fi percent, ever A= er, N • -vet r , •� past APEN; e.. For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non-criteria reportable pollutant: If the emissions increase by 50%or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or • Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. 18. The requirements of Colorado Regulation Number 3, Part D shall apply at such time that any stationary source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation that was established after August 7, 1980, on the capacity of the source or modification to otherwise emit a pollutant such as a restriction on hours of operation (Regulation Number 3, Part D, Section V.A.7.B). GENERAL TERMS AND CONDITIONS 19. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 20. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self-certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self-Certify for Final Authorization section of this permit. 21. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or * CDPN£ :COLORADO co Mr Pollution Control Division w i DeixanmentcaPub( L"tiMnptee;t Page 5 of 9 -rators a 1 ts. d only for quipmen '• perations activity ifically i= tifi •n permit. 22 less s• catty i ed o ise, �se gener nd sp , is conditions c ained in • it have ,•a .- • ter -• :; ,:.e AP •. .d,. ry to assu • '`*Hance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 23. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self-certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 24. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 25. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: Harrison Slaughter Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Extraction Oil Ft Gas, Inc. Permit for natural gas venting from eight (8) three-phase, HLP separators at a synthetic minor oil and gas well production facility. G LsPtFE 'COLORADO co I Air.Pollution Control Envision ,,,s eYxXi Pubt_WedY=', Arz,meTe Page 6 of 9 Notes t; �'ermit Hot at t PIIli, this permice: 1) Th- -rmit hold s re•3 ed ay fees f "'' e p -ssing ti for his permit n invoice for se fe- � I be i` ed a the • mit is is = d Th: ermit holder s pay the Y_� , _ _, in 30 da,,.:,-• eip ..•,,,;, - .,,w. oice. °. • • D. , he invoic- ult in revocation of this permit. (Regulation Number 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-regs 4) The following emissions of non-criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. Facility AIRS Uncontrolled Controlled Equipment Point Pollutant CAS # Emissions Emissions ID (lb/yr) (lb/yr) Benzene 71432 3,152 158 Toluene 108883 3,016 151 LP Ethylbenzene 100414 168 9 Separator 003 Xylenes 1330207 1,068 54 Venting n-Hexane 110543 27,561 1,378 2,2,4- 540841 17 1 Trimethylpentane Note: All non-criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 003: Uncontrolled Controlled CAS # Pollutant Emission Emission Source Factors Factors (lb/MMSCF) (lb/MMSCF) NOx 134.69 134.69 AP-42 Chapter 13.5 �DPHE COLORADO co Air Poflution Control Diva= Devemem PwcHet,0 Urnrvnr,terAL Page 7 of 9 ,h. Uncontr. ed Contr • ollut Emis,,. Emis n S• ce Fa t�rs Fact CO 614.04 614.04 AP-42 Chapter 13.5 VOC 57,284.72 2,864.24 ProMax 71432 Benzene 149.36 7.47 ProMax 108883 Toluene 142.93 7.15 ProMax 1330207 Xylenes 50.62 2.53 ProMax 110543 j n-Hexane 1,306.19 65.31 ProMax Note: The controlled emissions factors for this point are based on the enclosed combustor control efficiency of 95%. The emission factors listed above are based on a ProMax simulation that utilizes a site specific low pressure separator gas sample obtained on 02/14/2018. The sample temperature and pressure are 75°F and 44 psig respectively. The AP-42 Chapter 13.5 NOx and CO emission factors (0.068 lb/MMBtu and 0.31 lb/MMBtu respectively) were converted to units of lb/MMscf using a heat content of 1,980.77 Btu/scf. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five- year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This facility is classified as follows: Applicable Status Requirement Operating Permit Synthetic Minor Source of: VOC, n-Hexane and Total HAPs NANSR Synthetic Minor Source of: VOC PSD True Minor 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1-End Subpart A - Subpart KKKK NSPS Part 60, Appendix A - Appendix I Appendixes Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA - Subpart DDD CVPNE ', COLORADO CO Air Pollution Control D vi,o t u - -)epsrmcic t iAb Neves" €-.—Armen Page 8 of 9 T 63. '≤� 0-63 • ,4.-r/ Subpart -jpart PPP T 630-63 75 ��" Subpar :ji• ' •art :°•580 . ZZ MACT 63.8980-End Subpart NNNNN - Subpart XXXXXX • • ri �y 4 CDPHE ' +.OLORADO O ' ` Air Pollution Control Division ^a.•or s tPubric Newt U Envimmerterl Page 9 of 9 Colorado Air Permitting Project PRELIMINARY ANALYSIS-PROJECT SUMMARY Project Details Review Engineer: NafflsoiiSlaughter Package R: 375882'.. ' Received Date: 3/2/2015 Review Start Date: 14/4/201$ Section 01-Facility Information Company Name: Extracti0h Oll&Gas„Ihe - Quadrant Section Township Range County AIRS ID: 123, r iJiEWSW.:.. 21 Plant AIRS ID: p0[iZ Facility Name: oftardProduction`Facility - Physical Address/Location: NWSW quadrant of Section 21,Township 2N,Range 67W County: (Weld County Type of Facility: aF t[on&Pmductton It What industry segment? ra[G�s Psactaaf B Pry Is this facility located in a NAAQS non attainment area? 5 If yes,for what pollutant? ❑ Carbon Monoxide(CO) Partculate Matter(PM) E Ozone(NOx&VOC) Section 02-Emissions Units In Permit Application Emissions Self Cert Engineering AIRS Point# Emissions Source Type Equipment Name Permit# Issuance it Action Control? Required? Remarks 104 +(dliucet� atetTank PWr1 S PW 2 Yes 10WI t1 18 1 Yes issuaneW Section 03-Description of Project Extractiq'n Oal&Gasza tc '(dract€on)submitted an application requesting p qr tcnvorage fAr produced water storage vessels a₹an.cdl:arti!gas a well p odu€1 on faeih l: located in theocone non attainmenturea_ " Thrssource ADENrequiredbecauseuncontrolledrequestedVOCemissionssregredterthan1tpy(Col dtagegtilation3,PartA,Seetiosll63.a) Furtherthesource permit 5 quired because uncontrolled requested VOC emissions from a€)APEN required sources attlmtfattyare greater than 2tpy:(Colorado Regulation 3,Part.g section !i D.ga. Public comment is required for this source becausethe change in VOC e4.i..;;:!.tn!i are greater than 25 tpy and new synthetiic minor limits are being established in order to avoid other requirements Section 04-Public Comment Requirements Is Public Comment Required? Yes If yes,why? dquesfi ng synthetic3lnrzrtt$ V4,,, Section 05-Ambient Air Impact Analysis Requirement: Was a quantitative modeling analysis required? _ i If yes,for what pollutants? If yes,attach a copy of Technical Services Unit modeling results summary. Section 06-Facility-Wide Stationary Source Classification Is this stationary source a true minor? Is this stationary source a synthetic minor? Xis If yes,indicate programs and which pollutants: 102 NOx CD VOC PM2.5 PM10 TSP HAPs Prevention Operating of acing Permits Significant Deterioration(PSD) E _ © ❑ Title V Operating Permits(OP) Non-Attainment New Source Review(NANSR) J Is this stationary source a major source? 7 If yes,explain what programs and which pollutants here 502 NOx CO VOC PM2.5 PM10 TSP HAPs Prevention Operating of rating t Deterioration(PSD) _ s ❑ i ❑ ❑ Title V Operating Permits(OP) tL.,..lf Non-Attainment New Source Review(NANSR) • Produced Water Storage Tank(s)Emissions Inventory 005 Produced Water Tank (Facility Allis ID: ,,,�, �etfi32, ,o E02 f>ill,°,:,,,,,'!VE,,': County Plant Point Section 02-Equipment Description Details Detailed Emissions Unit Aurt:l9IIN�, hd• i � rd'ira� ' x ,) Description: ;" "f' vs»a,,'A.... .rragalioAa,•,aa maKk Emission Control Device ` _'-.`, A b 4 ,� y € -y.,"'�I133yi» I'' I'e, Description' ( rRu a6usfimF;04 3¢�''_.�M Requested Overall VOC&HAP Control Efficiency 9.6( Section 03-Processing Rate Information for Emissions Estimates Primary Emissions-Storage Tank(s) _u • (bbl) '" r Actual Produced WaterThrou 6:41746 ActualProduced Water Throughput= 65'7`i�Barrels bbl ghput While Emissions Controls Operating= Requested Permit UmitThroughputc 789;477 Barrels(bbl)per year Requested MonthlyThmughput= 67051 Barrels(bbl)per month I Potential to Emit(PTE)Produced Water • Throughput= II ii.,�r�.*))Barrels(bbl)per year Secondary Emissions-Combustion Davic(*) Heat content of waste gas= 2-051'Btu/scf Volume of waste gas emitted per BBL of liquids mamtmwn produced= ::,,,,v:,;;;:aN Bscf/bbl Actual heat content of waste gas routed to combustion device= 1,337 MMBTU per year Requested heat content of waste gas routed to combustion device= 1,604 MMBTU per year Potential to Emit(PTE)heat content of waste gas routed to combustion device= 1,604 MMBTU per year Section 04-Emissions Factors&Methodologies Ex=Q"MW'Xx/C Ex=emissions of pollutant x Q=Volumetric flow rate/volume of gas processed MW=Molecular weight of gas=SG of gas MW of air Xs=mass fraction of x in gas C=molar volume of ideal gas(379 scf/Ib-cool)at 60F and 1 atm IMW r,; 3 37:6739;Ib/Ib-coal GWR /3'333:4:scf/bbl W i htP t Hydrogen Sulfide ".311311. I,3$ f CO2 '''3i 3311330 -B.2b,! N2 "1333111�1tils.•„11,99' methane •I 155 .27.15-. ethane `•S"0 :.bird$ propane 11113�2as isobutane rI 1 }"y133(2:59: n-butane Isopentane 3h..bfi1:b n-pentane ;dtii:5,92. cyclopentene 0.33'. , n-Hexane a% 0.43''. cyclohexane Ir 0:71 Other hexanes (1? 164''. ...... heptanes XI,. 017. methylcyclohexane 0:141 224-TMP 0.00 Benzene _0:25 Toluene 0.10 Ethylbenzene I 0.00' Xylenes '.0.02 Co 0:081 C9 Total 100.00 VOCWt% 19.90 Will this storage tank emit flash emissions? Emission Factors Produced Water Tank Uncontrolled Controlled (l6/bbl) (l6/bbl) Emission Factor Source Pollutant (Produced (Produced Water Water Throughput) Throughput) VOC 4.61498E-02 2.307E-03 » �_ Benzene 2.84089E-04 1.420E-05 �-- Toluene 1.16018E-04 5.801E-0fi Eth benzene 4.16417E-06 2.082E-07i�1� Xyiene 2.08209E-05 1.041E-06 J /,(�// n-Hexane 1.65537E-03 8.277E-05 Si (d^ utdta(eYf4u`tx ) , 224 IMP 3.47014E-07 1.735E-08 Control Device Uncontrolled Uncontrolled Pollutant (Ih/MMBeu) (16/661) Emission Factor Source (Produced (waste heat Water combusted) Throughput) PM10 00075 - 0.0000 .1"*4"r AP6'6E#j0dE2 • PM25 `xt' 010075 - 0.0000 3f *01tve2wP1W2.3( NO 006803 iris. 0.0001 �, SP.14; F1drg5 CO e ,p 31061::. ( 0.0006 =�19;- _- 13.,Fr'.4usk7are,"s,Cfl 2 of 4 K:\PA\2018\18WE0218.CP1.xlsm Produced Water Storage Tank(s)Emissions Inventory Section OS-Emisslons Inventory - - - Potential to.Emit Actual Emissions Requested Permit Umgs Requested Monthly Limits Criteria Pollutants Uncontrolled Uncontrolled Controlled Uncontrolled Controlled Controlled (tons/year) (tore/veer). (mns/vearl tone/veer) Roos/veer) (Ibs/month) VOC 18:217 15.181 0:]59 18.217 0.911 155 - PM10 0.006 0,005 0:005 0.006 -0.006 1 PM2.5 0.006 0.005 0.005 0.006 0.006 1 Non 0.055 0.045 0.045 0.0545 0.0545 9 CO 0.249 0.207 0.207 4249 0.249 42 Potential to Emit Attual'Emissione Requested Permit Umgs Hazardous Air Pollutants Uncontrolled Uncontrolled. Controlled Uncontrolled Controlled (Ibs/year) (Ibs/year) (Ihs/year)' -(Ibs/year) (Ihs/year) Benzene 224:28 186.90 9.35 224.28 11.21 Toluene 91.59 76.33 3.82. 91.59 4.55 Ethylbemane 3,29. 2.74 0.14 3.29 0.lfi %ylene 16.44 13.70 0:68 16.44 0.82 n-Hexane 1306.67 1089.06 54.45 1306.8] 65.34 224 TMP_ 0,27 0.23 0.01 0.27 0.01 Section 06-Regulatory Summary Analysis Regulation 3,Parts A,B Source requiresa permit Regulation 7,Section XVII.B,Cl,. C.3 Storage tank is subject to Regulation 7,Section 0011,e,C.l&C.3 Regulation 7,Section XVII.02 Storage tank is subject to Regulation 7,Section XVII.C.2 Regulation 6,Part A,NIPS Subpart 0000 Storage Tank is oatsub)ectta NIPS.0000 NIPS Subpart 00005 Itorege Tanklec tsublayt to NSPS 00002 (See regulatory applicability worksheet for detelled analysis) Section 07-Initial and Periodic Sampling and Testing Requirements - Does thecompany us aeee specific emimillatailiatit issions factor to estimate emissions? `, If.yes and lf'there are flash emissions; the emisslonsfactors based ono pressurized liquid water sampiedraxn et ;i!A the facility being permitted-and analya are Flash liberation analysis7This sample should he considered `�' representative.which:generallymeans site-specific and collected withietoe yeaffigliN r of the application received date. - However,If the facility has not been modified(e.g.,no new.weils brought on-line),then it may be appropriate to use`y n olderslte-specific sample. If no,the permit will contain an"Initial Compliance"testing requirement to develop a site specific emissions factor.See P5 Memo 14-03,Question 5.9 and 5.12 for add(tional guidance on testing. Does the company.requesta control device of ciency greater than 95%fora flare orcombustion device? "' If yes,the permit will contain and initial compliance test condition to demonstrate the destruction efficiency of the combustion device based on inlet and outlet concentration sampling Saeti 08 T h i l A Iysis N t yt3t j 3 - "" ''N,r-t �t"mT '5717 f'"" ;vl '"' - i 1 Sisaspedifiq emasro s4aatcrsdevetopedfcYtht gifrm r b sad anaHa3h lgret tlartadaiy� don I ,747wr stalla gsatngiealata#nedon[12}Td#1##Blel 5{ar.5-t.faa 4.1••' menm Thoresuh3af2he unolyslsprcw dada p Aeti li$ 01(a hgas agasto-waterpaklogfiy,.a4; Na ei•5 la wel fI of 34,37141 pee.')'he(la h)lb rafierc onlie hepai ate plc rCa' rgefartN cedhdt filz2.''�pj ant{72^R j£4 333333 3} W, ,fr i-1'"" £ i 33 331 31 £ Y'13 f331 tp 31r 3Rls �' 33:.A� e r Eg! 'u'_ m I 1 11nl s 3 3081 slxss 'r-i v :I .J 33 1 1 A ��' / t£ iY a S3s#tpuid i}e tad rfrrflashhbere}lo anatgs(sg1 esSt4dl the pshpop}Iigf Pfe07₹ssi §JrAm ttpeatorage:yesseLe..H yeritwa daYer#dtpe �tiggand bpeathtngporiinq-bia ss(rsd(i Y- o- J. 3 r,:n 3 °ice* f i sp 3, P j he A S1pst'mated this hskM forthetoiJawfigmasax Iiffiygloyi"grp�d3,pSeatYiti ti sgeci4{pemtsst pstI {Fiepnaduoedt>"4w s elJ dtte litioytdetrrfom ttononrneth rat: _l tlh o kingazrdb tl(pglossesand(li�'T(iawarkmgfhr�rg tb(P6`l0ssearwot�d-iikefybetouaatalfroee ppAd&d'Wate tpiage+3eese)n}6�31 3.''x S; C it,'0 ti 33 i _ r 3 a Ir'3 ,yt, x :x a, k 3 333'- 3'3 r-, s Rio 2,Y iexapeittheardyllAPw th m3 mno bove reporttng₹Tce hoYds�s e..i2541S/l`ear#As,a300td 17S1Flrpo t fop.. �� I0,0,nIedAd:ui Phe perm t 3 ib - - az;3-,f - 3 .T.ivi 734 3 hA4orgc - mi t - 3_ 3p113 pa� PyeRf swa a. r, 3r The ap4faforwas'"::.1 d:::': aRp:""'"' ndAPE4l:rer4�rietffreylevi pri rtapubtrmi'm revtewe4 thzttgckgerfrn ,,,,,,,,,,i:d. ragAmpoyq mentand t n P 3 3 3 h 13 33 3 praWd'q rg;lsfo(Ww f(Camtnettt fodil,eld are 3 a&apse rm'YntiaaY�estpy uncap#all¢d ndt' s'a rr���exHnpl(rott-. --'requlreRfertis,N4gpf*rf t�.uflEd dlilanro, i7�iE18M$,tp.m #(1(itbs It')tfep4(pfl 1 s besptl6)1(°''..*'' 'f�e�4� e0i'`ff bit (ffSe0 Based onthe requestedthreughPut the ucvuetrolledemfsslonsfl`ffiU• irfeagOeBoten%lailyg3rtafnrthan 5tpg @s� {'tp`ProdUg0# tf`re3Ubt4or'gPth�f(rf11ot3� Ird1(legts'af 0 gblarmn7Sctipnxv)l In orderro have this condtclCnCRy({iy diiif' efltoregU00O shroughput a E6 '4hq�0 kk4S f '''''f3 'lr.s#80bk4ss ill G�'Ygyf`I .. gp Sln4db cOydltlu',3*Nderernarl In Shy p lOx.TheapaeutgrroslRwRdt $o,-.44 8ntt6ifffi Bse{I2fAf I eg-4ftrWNttf':t&948tl8n tpt]4 T t 64tAVRY4Y 40 ltefSdr0d T'' [fYllntp onihO drale pdea)tandEdelthey en_e dwgtahe+erdhtas MAd/f4YY� g� -- ,x3333 . _ 3133 X33 77 Uncontrolled Section 09-Inventory SCC Coding and Emissions Factors - Emissions AIRS PelntIi ProcessU SCC Coda Pollutant Factor Control% Units 004 01 404003-15 Eked Roof Tank Produced Water,working+breatliing+Flashing losses PM30 ' 3.60E-04 0 b/1,0O0 gallons liquid throughput PM2S 3,60E-04 0 6/1,000 gallons liquid throughput - NOx 3.29E-03 0 6/1,000 gallons liquid throughput VOC 1.10E+00 95 b/1,000 gallons liquid throughput CO 130E-02 0 6/3,000 gallant liquid throughput • Benzene 6.76E-03 95 b/1,000 gallons liquid throughput Toluene 2,76E-03 95 b/1,000 gallons liquid throughput Ethylbenzene 9.91E-06 95 b/1,000 gallons liquid throughput %ylene • 4.96E-04 95 b/1,000 gallons liquid throughput n-Hexane 3.94E-02 95 b/1,000 gallons liquid throughput 224 TMP 826E-06 95 6/1,WOgellens liquid throughput 3 of 4 K:\PA\2018\18WE0218.CPixlsm • Produced Water Storage Tank Regulatory Analysts Worksheet Cl..,.nataahe5N2n gb sr hna.myht a.eppllubl.far umin reale et water management end I.I•abn Malalv.If the bulks you no revk,olueera at one of these hcilitk.,ple.se review NSPS Kb. cale..aaw lei cea. I2212,lwUen,.t.2,e2 'eulum.rn 1.Wrewcontrolled actual=Mons Wm any criteria polmanaofrom tlmlelvuol source outer then 2TPYlpeautstlon 3.Par.2.1.1l.0,salt C/i/l • 1.Is tee oper.2.w...Ine Ins than ttprndea.els the tank tmxd at a mnuoe.wl facility for pmmangoa+Wass wastewater,(paubtbna,Pan 0.12.1.2,11 3.Amts u erh.nloaVorCOerkslon gruter.nuerw lae¢ut.tboa,Pan 3,52.01.'1.D...2 I2'ou 2.2ve ba.mtadt.at.ovee u.ntb.s_....raalao-em.:ve xaxanuxMwr v,/m uncontrolled emmom from.nycrawl,pollutant.from the inavlau.source greater then 3 my laaulatmn3,van',Setonl.0.1.a12 ,Yes ,14:source Require.on/WEN.Go to then..gasmen ' 1.Is the opeatorcamaessthanln made dl etas the tank no ma nonmmmercel fealty far proce2sInoll and gaswestewateri(nag nnl Pan e,Sea.1.0,1.M1 No "3e Gowned suetan 3.Are total fclnv uncontrolled VOCern.ore greater than 2mY,xoaAreeterthan 3 TM'prro•mnlnis greater then 102P/1pauletbn a,Pert e,s•gonhG.11i • ya......,,.source. permit calando Regulation 2.54otIon 1.11 dila tank Wledm/atan•ehc0tyi .o- .r,*oSummary ehee. 1.lame prmuetwate.ao tank'lwtedatanoa and aesa ao.andpmaactlanapeeo.,weu produabnfeAuy'.netualgas mmp.ntarateaaaarmbalgasp�,,K deal es Congnue-You Mylndknemofarvitoge.onA Prgmsunm.ryohm. he prodweiwaterstmgetankefxerocfxoregeunk,p 2222-7,7,k2OAK Go to the nog puvtmn e.Am IWrs Ions per year max Y i in.,,,.,,.Some%stdlm to parts a eatlatiw,T,3awnslM.e&CGo to them.wagon h22,W omtlu Air rpoletian Control enu'M 2rra Prevention of Emhslue Sectlen.a.c1-Emellord Control and nionitorte.gPrtrghlons S.Does the produced water steraxetanl,contain oAv"staNlbe'Ibuvlsi if no,filonewiw.ddltmul peoNaem.er21, 22 source uwbim led pmbloe,Aseeuhtloni,see,.Kw,Subscalw col seal.x1/11.[.1 Capture and Moninnva lor3tonge'rank.We..Mr pollution Control UW2..1 • 40 CFR,Pen GO,suborn 0000,Sunder.of Padvm.u•tar 4uas02•e Natural a.e eredunlen,irenmlutan end Dtnnbuven • is thisatellocatedIt.lac M In themhereo and Future ors pmdwanaegment,nauu gas pioms.e segmea or nature gas tammss on and storage segment of he lnduaxyi s out havendreted the source oteeary on the Proles summarysheet 2.Was produced water conaruvea reconstructed,ormodfle(sendelntbna 40 all,coal between August a3,1011en p ba 10,10122 Nm 15toegeTenk3nw.ublee2Ps 0000-ibis tank was mnnmcted ome de d roe ap,2 uhnryaate 3.Are patentIal vocemealons from Iravkluel storage',easel greaterthan or equal toe tan per • 4.gout of stoagemsel.per 60,24302 2 t.2Rl!'2;:' ' � su2rae subpart',General Pmwbm per 00.AoA0C ggos3ss-.batonsControl send4rds lowc bg0s412-Teela and Pr ams faos3aslA-xa d Ilcadkcphgeaeuseeds ;20.6061.1-Cover and closed mmnwngpwwreme ts Paea41i-Control Ow.MonitorngRequirements • Nowt omly. subject to Inn 0000 due to•mle.lan shave abra per yea..ant.epplicabalty determlunen elan,It deraa rem.whl•ette NseS Ono°per gas303(e1f11 o wn,.peuntlelVoc•mwion.drop laws tan peryeerl naosWp.rt0c000 water rge vessel mmanstreae•ormodIlllgetl Iseedef•n CFR,so.B.R,uember IS,30121 rdaan.o-ua enmmm.mann.rs.Pumb.ne,acaE y o tame next punton 2.goesthiod produced mid m<dtmaa th a produced va.elaetea ate fealty "stomp Mungn Padua on'ern n..lg.•P.n.a.aaeem•nt or22,,4 em van,meaonardnongeeegmmtdtMlnamtryi y „cc to the next quexton m this rdWlda storage vmadgnater than m equal tog tans per reaafv Storage s not whim xsss00om. s.... �ub2etoand controlled e.vnbenuwlthreyulrementaloraarnta vases In 40 4p Pan sex Subpart 2b a4G CE/Part 63 wbp.n NN2 •NV2.•,2,.I'. a 1s3o.aeo T:r.srotauhlaa to x;n„a 02 PACT Rewleew P AU review 13,...,1 H pudanoni aa..ut apply Axo Hate tank,.In tile twaewlmum v...Hew tank moan bthaxuds,then.low MCI r•aWumnn OlsclaTmer his document eases fa opera fore Mb determining eppacadlitydoarleln requkemenla of lAe Clean At Act its Inrokne0Wg rwddAnp,end Ak Wally 00000IConwlaalOO reµAlbns.This documenl is note rule erreaulellon,end the analysis a contains mays.,apply to a parlkularsesalbn based aeon the IndNlduel feels and cererrsiences.This docamanl does ool crane or subalilufe for any law,regulation,orany otherlegely dintlin regarafrenl endla no(legely an/ncaede,In be avant olep0 ronillcl oaluaen(M1ebnOOedC dm6 documanl entlltr Ian0ue0e dlM1e Glean Air Act.Ifs Implamenling regulation,end Air Wanly Cannel Commission regulations.Ills language d ba el.Nte w/.92,3lbn aillconlyd.The 22a ofror-mandalorylen0uraasuch es • 'recommend:hney,"should,'end'can,'Is Wended to describe APCC tilerembnons and recommendation.Mendelory lerminobkyeueb CO 1000/•end hequbao"ere In,ended to describe • controlling requvam.nle under Me forme of the Clean Aired and AN Qualify Coned Commission raeda000a,bul lhls document does sal establish legally bindng requearrenle In end of itself. • Colorado Air Permitting Project PRELIMINARY ANALYSIS-PROJECT SUMMARY Project Details Review Engineer: Harrrsori S)a 3'Nt 333 xizEl 3l 33 131 Rai 313,air)) ,r io�: Package#: 87S882- 33 � Received Date: 3/2j20]� 1111 3 ill05,p'31 3P Al ll11113j� G3 l.3 f rSf- Review Start Date: 10/,4 - , Section 01-Facility Information Company Name: • €xtraotto 3I f r 3 " quadrant Secti•on Township Range County AIRS ID: 3r �� NW 11 11 Plant AIRS'ID: • 77 , 3 I 1 3 Facility Name: 13 4 uctimrt acility ��%3 3 33 ' �113n....�.;e„ ..,,n„ llf.far.fi �.,s :: „„ ���Ir33111I.a. Physical - Address/Location: NWSW quadrant of Section 21,Township 2N,Range-67W County: 'Weld County Type of Facility: f - What industry segment2 I Ga5`PBu<te %tea. Is this facility located in a NAAQS non-attainment area? Z. 'Yas • If yes,far what pollutant? Carbon Monoxide(CO) Particulate Matter(PM) Ozone(NOx&VOC) Section 02-Emissions Units In Permit Application Emissions Self Cert Engineering AIRS Point# Emissions Source Type Equipment Name Permit# Issuance# - Action Control? Required? Remarks Y s j&y� �. 3l33 13 13 - 1i 3i 1331ii133 p.$33 33 a, Permit Initial 33 itef a. 3111 Ill i 31 l 3 I 1 0p4..... ,..3 .�,. ,..r"aduced 11141 Ta ., h131 PW E 8z PW 2 YeS, 3.8WE!}18 7 Gssuance Section 03-Description of Project ' Extraction Oil.. C s,:nc(Extraction)sabmitt�d an-applicat on requesting permit coveragefor produced water s oragevessels at an ail an€Jgas weiSproriuct[orrfaei)Ityl- ocated in the ozone non-attainment area. I„ X10 p �f d�� 104 This source is APEN required because uncontrolled Cequest2d\fCF�e t1351tirt 11 3Rp g edtgrthan 7 tpY(Colorado Regulatkb 1" 1411Y` 'VIVO'V �5tttYtC ta5O 3 3 3 31333aH, £ t l 3 • 33 s SeCt'r ommemegon permit required because unc aht aus::requested VOC emiss[ons frill' oo rot lap,,tg esat thts facitity are gra tar`so • • Ip Ammo l fi.D.2.a,)� • i 3133yl'1til',r , £ � � 4 ,I x�3 „31..:3 llAjl �1 €I 3 333 Public comment Is required-for this source because the change in VOC'eriissions are greater than 25 tpy and new synthetic minor limits are being established in orderta avoid other requirements. Section 04-Public Comment Requirements Is Public Comment Required? YeSyyi/4 If yes,why? ,kequ4iiiiiitithetinMinot P&r0i. .„. -. . . Section 05-Ambient Air Impact Analysis Requirement Was a quantitative modeling analysis required? Ala If yes,for what pollutants? i. i3p ,' ,( If yes,attach a copy of Technical Services Unit modeling results summary. Section 06-Facility-Wide Stationary Source Classification Is this stationary source a true minor? Pity ksz Is this stationary source a synthetic minor? ilxsi.4 If yes,indicate programs and which pollutants: 502 NOx CO VOC PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration(P5D) _ _ Title V Operating Permits(OP) _ Uii Non-Attainment New Source Review(NANSR) Is this stationary source a major source? PA If yes,explain what programs and which pollutants here 502 NOn CO VOCCCCU ' PM2..55 PM10 TSP HAPs Prevention Operating of acing t Deterioration(PSD) — e k t ❑ ❑ Title V Operating Permits(OP) Q • Non-Attainment New Source Review(NANSR) J Produced Water Storage Tank(s)Emissions Inventory 005 Produced Water Tank (Facility AlRs 10: d SIC'RY3e.....:; ..,iVtl02 �9 .....'✓..;..,;sa s�z a Plant Point Section 02-Equipment Description Details Detailed Emissions Unit 1Y73 t7t .�} I 3aj �3"j33133 93�p ( rre€fized, fgr o diw tersto'.gavesse >mapl =a s x:• Descrlption: ft Emission ControI D Hit ,� lEI,VRE 1+Lp:.- - d 9la"''33 Description mh' r, s�;_ �r'9'';,a ±, <,,.„,< x m m''H'i.sliNi Requested Overall VOC&HAP Control rrE / - Efficiency%: I I11111 ,? Section 03-Processing Rate Information for Emissions Estimates Primary Emissions-Storage lank(s) Actual Produced WaterThroughput= :;,€.5 Barrels(bbl(per year Actual Produced Water Throughput While Emissions Controls Operating= ,9hi Requested Permit UrnitThroughput= ,789:V'7.,%Barrels(bbl)per year Requested Monthly Throughput= 67051 Barrels(bbl)per month Potential to Emit(PTE)Produced Water Throughput= .__7&9,k7.3BarreIs(bbl)per year Secondary Emissions-Combustion Device(s) Heat content of waste gas • �f45B,.;Btu/scf Volume of waste gas emitted per BBL of liquids produced= �T ,,14j scf/661 Actual heat content of waste gas routed to combustion device= 1,337 MMBTU per year Requested heat content of waste gas routed to combustion device= 1,604 MMBTU per year Potential to Emit(PTE)heat content of waste gas routed to combustion device= 1,604 MMBTU per year Section 04-Emissions Factors&Methodologies - Ex=O'MW.Xx/C Ex=emissions of pollutant x q=Volumetric flow rate/volume of gas processed MW=Molecular weight of gas=SG of gas.MW of air Xx=mass fraction of x in gas C=molar volume of ideal gas(379 scr/Ib-cool)at 6OF and 1 atm IMW e 't33 139 Ib/Ib-mol GWR scf/bbl Weight Percent(%) Hydrogen Sulfide I g8s ilf^ CO2 N2 /f{ 4,1$§,4''. a methane ethane iliewheamtega. propane n ii,'5011p47'ii)Reft7. isobutane n-butane fl y,ilia':.ai:&'241.e Isopentane >,?3'e„ga.a,:.;,,..,,i.61. n-pentane M nia'PIM1:5;92 cyclopentane •n 3 :.tl.#9' n-Hexane ga2MIDNauti. cyclohexane v1 }p,„j1110; _ Other hexanes t 1,4rsa 1 heptanes :s::.....:.....:.......:...0:1T,': methylcyciohex 0114) _ 224-TMP q)/di1 000'• Benzene MEW 0.25 Toluene a a- 0_10 Ethylbenxene '�7 11 0,00 Xylenes ca 008. C9 C10 9.a4 Total 100.03 VOCWt% 39.90 Will this storage tank emit flash emissions? Emission Factors Produced Water Tank Uncontrolled Controlled (lb/bbl) (lb/bbl) Emission Factor Source Pollutant (Produced (Produced Water Water Throughput) Throughput) VOC 4.61498E-02 2.307E-03 fi4" Benzene 2.84089E-04 1.420E-OS ,, '� ~ Toluene 1.16018E-04 5.801E-0fi Ste B,._✓/'Att f Ethyihenzene 4.16417E-06 2.082E-07 Xylene 2.08209E-05 1.041E-06 '5ftuPg n-Hexane 1.65537E-03 8.277E-05 5'S�'W • 224 TMP 3,47014E-07 1.735E-08 3 ,,, Control Device Uncontrolled Uncontrolled Pollutant (Ib/MMBtu) (Ib/hbQ Emission Factor Source (Produced (waste heat Water combusted) Throughput) PM10 00075 0.0000 -fa 21'TcYiege- PM2.5 0007S :' 0.0000 OA*_ NO 00680, 0.0001 r #u1a � CO .01310,Da n3, 0.0006 ek',13•°,', li4`c r RlA�A','., 2 of 4 K:\PA\2018\18WE0218.CP1.xlsm Produced Water Storage Tank(s)Emissions Inventory Section 05-Emissions Inventorµ Potential to Emit Actual Emissions Requested Permit Limits Requested Monthly Omits CHteda Pollutants Uncontrolled Uncontrolled, Controlled Uncontrolled Controlled Controlled (tans/year) (tone/year) (tons/year) (tans/year) (tans/year) (6s/month) VOC 18.21] 15.183 0.759 10.21] 0.911 155 PM10 0.006 0.005 0.005 0.006 0.006 1 PM2.5 0.006 0.005 0.005 0.006 0.006 1 NOx 0.055 0.045 0.045 0.0545 0.0545 9 CO 0.249 0,207 0.20] 0.249 0.249 42 Potential to Emit Actual Emissions Requested Permit Limits Hazardous Air Pollutants Uncontrolled Uncontrolled Controlled Uncontrolled Controlled (Ibs/year) (Ibs/Year) (Ibs/year) (Ibs/year) (Ibs/y®r) Benzene 224.28 186.40 9.35 224.28 11.?i Toluene 91.59 76.33 3.82 91.59 4.58 , Ethylbseasne 3,29 2,74 0,14 3.29 0.16 Kylene 16.44 13,70 16.44 0.12 e-Hexane 1306.87 0005.00 50:1°.°4015 1306.8] 05.34 224 TMP 0.27 0.23 0.27 0.01 Section 06-[Mau(atory Summery Analysis Regulation 3,Parts A,B Source requires a permit Regulation 7,Section XVI1.0,C.1,C.3 Stor"'reek's' ge tank is subject no Regulafi0n 7,section X1/11,8,C.1&C.3 Regulation 7,5ectton XVlI.C.2 Storage tank is subject to Regulatio07,Section 0011.1,2 Regulation 6,Part A,NSPS Subpart 0000 Storage Tookis not sebiect to N$P50000 NIPS Subpart 00001 Storage Tank is not suhjactto NSPS OOOO0 (See regulatory appllseblllty wesksheet for detailed analysis) Section 07-initial and Periodic Sampling and Testing Requirements Does the company useasrte spec f'c emissions factor to estimate emissions? Y If yes and'fthere are flash emissions,arethe emissions factors based one pressurzed„,::::::::::::::::,:::, • mple draw t '�'— thefacildy being perm tted and analyzed usingflash liberation analysis?This sample should be considered representative which generally means site-specific and collected within one year of the application received date. How r,if thefacilRy has not been modified(e.g.,no new wells brought on-line),then it may be appropriate to use n older site-specific sample. If no,the permit will contain an"Initial Compliance"testing requirement to develop a ske speciflcemissians Rector.See PS memo 14-03,Questions 5.9 and 5.12 far additional guidance on testing. Does the company requoctecontrol device efficiency greater than 95%loreflar mbustlon device? If yes,the permit will contain and Initial compliance test condition to demonstrate thectestruction efficiency of the combustion device based on inlet and outlet noncentrationsompling Section 08 Technical A 10 Not 1� ajliate�i#ssons,Cacar dove[ppgdrurihis sourceaia basedon fiaSh li6glatlain ix5fysiscgnduct don asst peef cps ssa zed wet:Esam,(wievneda�dnfi2114F1B fro thgiganard'SDAEweli ( Thg Tdq 6t,Fiear�'rSi ra d drip ci tion of theflash gas,a6 v-watertatio oYl4�affh rtd fI hga sill I Ight Y31313916f1CS-n— 'nil tion ao'alyeta waseuaIuated ae 0001 ptrenpstE')"fa' ' 4ti[4t jla P12,2(is d72°F ---:,-'; 3 3 3Ipi(;i(ial ,_,lb il,4l "i'"-�"` 1 3 -Ii 'pa f 1 .j mlitnll i 7 tip 1 x i is 1� ta, .tta ifst aS �y �f'dglf ! .7 .:Ua jH 3 - L� 3n I hln 1 1111&1'r a i Il I .,1 310 l 1 It A' d o Wotarlk,,r ehers#f91\6'3,S,,� I}'est m t th 47 h p rt bR f ns I xh for gd SseF il,,,, tbragt3l17,m rtEilalli .iatl ft mF4,li h pM:tst p rrl{mn,,n n5 0"({ofiyl n edt0 he estilxlat d qt d.isstadte fartA )j w g r nras(1)D en grt da desmlop g f sp d1 mfrs oo:irg -,,r'fd orndbcedwtaterxes6elsdoesnatpro9 do ln€omat an do meta ddf r/fi a esumatmgwarklpg and bxeathingr ss d 1)Th del gp d b th g Ie se vsld llke(ybe miyimal from prodac dw E t rage Ys I If t� Il f : `,i' 2 A Henn lsptxg dal)ItAPwith emisslpria oboS ,eportmg th h₹ds(I.n.>2SI lblyaar ip itli, 1 1 lu6 fotpp1ya,,e,,'Porwhshanznussion••hbntormilbe Ii)uded,tn the.pen ob ,1 1 /1,01,11131 3 ex '1 1 a I 11111 i 4)nre jl i l l;s l l 11311'fr Seed: aperatorwasprpvl Gd3�„'draftpe!mlt 11.1F14 dllnety re vievip l rt p bh ritmment Tneaperat g is ,d fhperm tandtirQirtd d, �demrrl pt#,,,.ednEment apd�Po e prpvided areasfalla .(I)C"inrq t t1paduced Vyarera to lermssinnsary Atpy uncvp₹rollod dthes reel exgr!'P T° gQucfiehtsl.(tEY t�tli $ 7ve(Aa'FidndidatrS3 -eno.is04E021 11101505pans'Thepermit is wr6t 'aseda(falit,reiquzs#edtNFoughy Conti aAPEN-Basedonthe requestedthrouglfip$titt� m{}If�f'Y ps(OR.'I}ki h�S-peeai^k cdtla1E greater a)li6 1gj s re3Wt 1ho'pi'odu 4314 rtatcf55aresmib(v'1 hviii yt{C(a nd STEMraqur tsafeg Iatmn71605i 0xVII 7R ofdevffri1:0't)lmo'p�dlU`Ct..,ade,C18d,(1 ,,!Hvid7'≥ ''vii uig9C'4).Rr 1 'l) rkf}Tngrogfatds tngR r[trolle VDCetnfss€nn5 IesSthan6 toy.Uhies6 at chayge made 1, ndlt19R15wlp q,rm*n Chap mit.Tkcuper'horreyieeoedobe a pdnse pYmu(ded'jndae%Pt a9elL'0El6fj "�, 5$r@ndielithdit 900055Metrt;Th p ratan e%n as dthey had not4ether comments 1L'th SlrafS panl1lmt ltk Lth yogi ed thine redl(n ntad toth APEN a iii »� 3s it E ,.�>.�t'i.,,L(111 1l a'affi(ir :.. ; • Section 09-Inventory SCC Coding and Emissions Factors Uncontrolled Emissions AIRS Point ft Process 8 SCC Code Pollutant Factor Control% Units 004 01 4-04-003-15 Fixed Roof Tank Produced Water,working+brealfiing+flashing losses PM-- 3.60E-04 0 g�/1,000 gallons liquid throughput PM2.5 3.60E-04 0 6/1,000 gallons liquid throughput NOx 3.29E-03 0 6/1,000 gallons liquid throughput VOC 1.10E+00 95 6/1,000 gallons liquid throughput CO 1.50E-02 0 6/1,000 gallons liquid throughput Benzene 6.76E-03 95 6/1,000 gallons liquid throughput Toluene 2.76E03 95 6/1,000 gallons liquid throughput Ethylbenzene 961E-OS 05 6/1,000 gallons liquid throughput Xylene 4.96E-04 95 6/S,DUD gallons liquid throughput , n-Hexane 3.94E-02 95 6/3,000 gallons liquid throughput 224 TMP 8.26E-0fi 95 6/1,000 gallons liquid throughput 3 of 4 K:\PA\2018\18WE0218.CPlxism • • Produced WaterstaragaTank liegulataryAnalyslsWorksheet vtam.not.th.t tun Xk myht bamlgnt pp bla for eeromtanks at wank managamentand Injection ftIXlea.lftha tanks you me nyl.wmg are at one orthe,e femme.,plane rsWew rugs Kb. wanaa.1x„m,...ethe u.m/Mainree,a,oe •omr.m.m .1.Are uncontrolled...I 2.Tb theopoaat so.cleimti Ins 1,+.n nude dl and Is tlretankWtd uannol s non-w.p.m.,hanv for processing al.ndpewurwuourcogreatarthan21TY(Regulation',Part �iteri oguhrbns,perte,=mlon.o..Ml 3.Are[alai f'dny un sre unmdro emissions greater the v ew greaterthanao tpvueo enbuem preererthan sotpv Plenuleuu,3,pan O.sertIon n l 1. rolled emissions fro any pXana polidants from tnthisIndividual source enaterthan2 T n A,Py Illepvlation 3,ra Sealonll.o,srli .6o the nutquesdon 2.I m Is the oeratordelming less then%ndodl antlls Netank!mated et a mncommerclalfadluV for pr n.',oil end geswedvweteA(3. Part 0,setlIon II.O.1.M1 Sa ntlonApP m 3.An total lat l o lad. VOC ernIsslom x greater than x TN,oagmxterthans my or CO emiaslons greeter khan 10 Tr!Olepulatwn 3 pane senbna.ox)T urtapwuim-sapelmn • egulation st trammii ou haw inmeskd the source c.a.,on the Project summery aFed. Colorado ntion isnk.4.7,Sa•tnnem4elcNnan e 2.is this produced wua von..ten0lxeted tie net,and ea,e.plorettonad production operation,well production feMtyh,natualpa.mmprasaorauimsomtunign prcensmedeeti ou have lndleetm na hefty lax an the Pram summary sheet. s edroof eteageuNT a.Anuncontrolled eaualam•mnskdthis usage tankwaelw mereaterthan b tans per year VOC7 ...,,..•source is sat,edl p..ofRegulation x.setlomxMl.egeao tothend gum,. Inc — f Pdluii n ant.Equipment and Prevention n of Emissi • soak. Control and Modmnnerrawawn • «crakes..Wremaw S.Doesnbprd vale.ddagetank Adak,only...IV4ee•liquids}Xro,tl.fallewln.aaadla,alpra+dance apply. oo.r.•.J�anrra 4,...ra n.I wm4aradpegulawnT,,Irenxui sub....at, • 'Sid sannngvli.0 atiµu Capture and.to rarStoragee Tan,fitted ih.Pdlnlm Control ewament 1,3C.,Partan,swmrtac0o,3tanandaaf Pedormerrda for m.,cil•d4n,ad anPreauden,Trant mmnad o4tdbrelon ' 2.Isthis proanro+watnnange...,d!mud at a latlbnintheommrewiawl natunlva prdnnfonsegmesn,nauragaapnrnnneamentar knad,weg,eanmtanaidn., - ins the Pmeaswnmar/shm. 2.Was Nis produced nadm,atrwsd,mrnteund,nrmoNbd ireeddxliioa aonx,w.ilbatweeniAugust 23,3031 edsepmbuxg,xossi �.' •s ag .,,,,,ne,0*.mvs00003n4 lank was mmuundonade dNeapplkbly e. 3. from the Idiwdual stage vend greater than m equal to a tons per year? K. Does 61.produced terstw.peae„dmn,ro=awnnion ordongewaar Ira 6nsa3oT +�S:.•:'2='. ISto -,uwe:ec tmeseo. .r.,a inx Heed p.16gsax¢Tame3 yea.se3-emwign,word stareardx for VOL 480.3e13-rmnu And vr«muraa 530.53351¢$.daXiudm,Reporting and Remrelkaglne 3equlrements y¢o.31161,1•CavareMtlnd Vn1 synem Mennnlne pwurremenu 4.0.30,.Comm 4aaln Mo.:ringRwnlrenrrca Irvo er Ilsaaryswual le preWomtyd.nrmlmda be.ubJanto xsn0000eut.ammieu.bow¢lam pervsarvocon W.ppllubllnydatermwuondd.,itelnwa remalneub)ento lisps 0000 p..60.53331agx1 even patent's,VOC emlenons drop bolowa tens paryaarl g bndsrda.f Padarmanee far uudeo erW a l 1. u.4 produced ma o.pe vassal mnnrunetl.nmmtiund ormodndln=delntons 10 60.2)akar September 18.2D25? on mmm.wtlgx.rs.m.m.1e,2oti lg2¢i Wen so toFanad question 2. produced w.terstoragavend mad the defines of°storage von'pct ,.br eon.thane.quest. 3.o ro Y this paduced ea Map located at Iadlity Inth=md=dl.na natunl gas production segment,netunl en Prowling eeament ornannleasknnsmiaaim.nadongesymemdtMlntlmtryp >• ntinned ouestbn 4.Ans opal VOC.1111ansh(rum the led Aualnaageveaselpregtcthonoregual to s tomp.rv.a M4 • Ste nn penkds 4nublect 45Psooeoa. K.I.the Menge vassal sublw to and mmmpd aa aondancewith nyuirrnems loum w as= adsln ac CHI Part 60 subpart kb graO up Par-163.6Par-163.6Par-163.6,1.H.dgrta afi ISko.gyeix:N a matsukbnee tears:o-�x MCfnWsw4neulua X Rapuiatien2 doge,t cooly ANOX the tankt ln.anen..alnmamarc.,If tM tank m..bathemsna.than ndsw Mnraqulnmarm. Disclaimer This doeumenl esakls operalws with ddb Tng appkelaily of certain requiem..oflhe Clean AV Ad,Xs Impbmwnflap re4ublionx endg,Waliy Con.COMmissiOnrepulafiOnS.This tlocumanl Is 2M a ivfe rryulatian,end(ha analysisgmnfains may not apply toe palkularsdualbnbased upon'he hdIkluel/acts and circumstances.Thisdocwmd ekes not changes subsulule,for any law repukWn manydnakpgalyddkg requirement end k red bgely enbmebk.In IM even,many con., lie language of dmumanladthe!e.t.aau. Chen Ae AC4.ifs lnPlamnlbg/opts I, and/vWaMyM 4MCamr42244 regubpuns,N2 knguege d Um sblule art.gub.M.424 cun4M The use na4-Mardelay language such es Yean,meds may."shwM'erl'can;I kgeded todesaibe APCO intafp'elelkos end recnrrvrendagons.Mandatory lamine.y such s'nust and4equvedma inlmdcdla describe mneo rg requiamenls urderga lwms&Me Clean Air cl and AY Quality Cmbe Comm.,onrepu6Wna,4241412 documenitloes not eskb4Xh1.6 yhiMinp.q.k.renisS and°Ilself. GDP IV C i L • - . ( * illi 0 Ai � nut Co ol Division D .art nt a • bItc He th Environment wif CONSTRUCTION PERMIT Permit number: 1 8WE021 8 Issuance: 1 Date issued: Issued to: Extraction Oil Et Gas, Inc. Facility Name: Leonard Production Facility Plant AIRS ID: 123/A002 Physical Location: NWSW SEC 21 T2N R67W County: Weld County General Description: Well Production Facility Equipment or activity subject to this permit: Facility AIRS Emissions Control Equipment Point Equipment Description Description ID PW-1 Et Two (2) 400 barrel fixed roof produced Enclosed Combustion PW-2 004 water storage vessels connected via Device(s) liquid manifold. This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to the specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF-CERTIFY FOR FINAL AUTHORIZATION 1. YOU MUST notify the Air Pollution Control Division (the Division) no later than fifteen days of the latter of commencement of operation or issuance of this permit, submitting a Notice of Startup form to the Division for the equipment covered by this permit. The Notice of Startup form may be downloaded online at www.colorado.gov/pacific/cdphe/other-air-permitting-notices. Failure to notify the Division of startup of the permitted source is a violation of Air Quality Control Commission (AQCC) Regulation Number 3, Part B, Section III.G.1. and can result in the revocation of the permit. 2. Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self- *, CDPHE COLORADO co 7 1 Air Pollution Control Division - ., .;-x t a i Na•n v Enyimmer,t Page 1 of 9 certi c y mu anceF, th; • diti• s. Failure to demonstrate compliance within 180 days a r It i cati f th- •ermit. A self certification form and guidance on how • if -rti co pli. ;ce as r-;•wired by this permit may be obtained online at • .c•, . ,• p• •he/.' •ermit-self-certification. (Regulation Number 3, Part B, Section III.G.2.) 3. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) 4. The operator shall complete all initial compliance testing and sampling as required in this permit and submit the results to the Division as part of the self-certification process. (Regulation Number 3, Part B, Section III.E.) 5. The operator shall retain the permit final authorization letter issued by the Division, after completion of self-certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 6. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4.) Annual Limits: Facility AIRS Tons per Year Emission Equipment ID Point PM2.5 NO. VOC CO Type PW-1 Et PW-2 004 --- --- 1.0 --- Point Note: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility-wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility-wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility-wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits, for both criteria and hazardous air pollutants, shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate actual emissions each month and keep a compliance record on site or at a local field office with site responsibility for Division review. 7. The emission points in the table below shall be operated and maintained with the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) T CD AE COLORADO CO ' Air Pollution Control Division L-rvtror met Page 2 of 9 .-C a 0 t Control Device Pollutants F 'liolil Controlled I W 004 Enclosed Combustion Device(s) VOC and HAP 2 PROCESS LIMITATIONS AND RECORDS 8. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, Section II.A.4.) ) Process Limits Facility AIRS Equipment Point Process Parameter Annual Limit ID PW-1 £t PW- 004 Produced Water 789,473 barrels 2 Throughput The owner or operator shall monitor monthly process rates based on the calendar month. Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. STATE AND FEDERAL REGULATORY REQUIREMENTS 9. The permit number and ten digit AIRS ID number assigned by the Division (e.g. 123/4567/001) shall be marked on the subject equipment for ease of identification. (Regulation Number 3, Part B, Section III.E.) (State only enforceable) 10. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) 11. The combustion device covered by this permit is subject to Regulation Number 7, Section XVII.B.2. General Provisions (State only enforceable). If a flare or other combustion device is used to control emissions of volatile organic compounds to comply with Section XVII, it shall be enclosed; have no visible emissions during normal operations, as defined under Regulation Number 7, XVII.A.17; and be designed so that an observer can, by means of visual observation from the outside of the enclosed flare or combustion device, or by other convenient means approved by the Division, determine whether it is operating properly. This flare must be equipped with an operational auto-igniter according to the following schedule: • All combustion devices installed on or after May 1, 2014, must be equipped with an operational auto-igniter upon installation of the combustion device; • All combustion devices installed before May 1, 2014, must be equipped with an operational auto-igniter by or before May 1, 2016, or after the next combustion device planned shutdown, whichever comes first. ,, Gam£ COLORADO CO r 1 Air Pollution Control Division I ,,!p4r.,Tier,t,DtYubrcr.u.nCCrL>rovse;c Page 3 of 9 12. The sr. nk c•,, '°-ed b �°s per it= is subject to the emission control requirements in R: ul�i�. Nu . 7, c on II.C.1. The owner or operator shall install and oper e r flu .`•n s ntri.. equip nt that achieves an average hydrocarbon control - e _a if • stion ice is used, it must have a design destruction efficiency of at least 98% for hydrocarbons except where the combustion device has been authorized by permit prior to May 1, 2014. The source shall follow the inspection requirements of Regulation Number 7, Section XVII.C.1.d. and maintain records of the inspections for a period of two years, made available to the Division upon request. This control requirement must be met within 90 days of the date that the storage tank commences operation. 13. The storage tanks covered by this permit are subject to the venting and Storage Tank Emission Management System ("STEM") requirements of Regulation Number 7, Section XVII.C.2. OPERATING Et MAINTENANCE REQUIREMENTS 14. Upon startup of this point, the owner or operator shall follow the most recent operating and maintenance (0&tM) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to the 0&tM plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements 15. This source is not required to conduct initial testing, unless otherwise directed by the Division or other state or federal requirement. Periodic Testing Requirements 16. This source is not required to conduct periodic testing, unless otherwise directed by the Division or other state or federal requirement. ADDITIONAL REQUIREMENTS 17. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, Section II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or For volatile organic compounds (VOC) and nitrogen oxides sources (NOX) in ozone nonattainment areas emitting less than 100 tons of VOC or NOX per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or * ct+rt+ COLORADO 0 ' Are Pollution Control Division sys-urt ofPubl Y &E.—Any r ,:t Page 4 of 9 F t y no eri r='•orta le pollutant: I he i-. ions cr se by 51 or five (5) tons per year, whichever is less, above e •o • • he la 'EN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or • Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. 18. The requirements of Colorado Regulation Number 3, Part D shall apply at such time that any stationary source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation that was established after August 7, 1980, on the capacity of the source or modification to otherwise emit a pollutant such as a restriction on hours of operation (Reference: Regulation Number 3, Part D, Section V.A.7.B). GENERAL TERMS AND CONDITIONS 19. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 20. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self-certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self-Certify for Final Authorization section of this permit. 21. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 22. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 23. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self-certification and final authorization by COAHE ' COLORADO s Air Pollution Control Division 3e0&rt;x.qt t xbt Hea"h b E;;vamn-tent Page 5 of 9 FyE. the A ' P PLC. •1 Di (AP zIP) on grounds set forth in the Colorado Air Quality Contl nd r tion o the F r Quality Control Commission (AQCC), including failu - tr m -t . "y e .+res term o ondition of the permit. If the Division denies a it, • •d 0 im+ `- -r +on a it are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 24. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 25. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: Harrison Slaughter Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Extraction Oil >:t Gas, Inc. Permit for produced water storage vessels at a new synthetic minor oil and gas well production facility. CDPHE COLORADO Co Air Pollution Control Division sue n r .,fs E-- r,,er;r Page 6 of 9 Notes • Pe " it ill) -r at tim- ' his p :; mit issuance: 1) T per t ,l•" : is r qui -d t, p. fee•: or the processing time for this permit. An invoice fo the fe • l b iss d . er the -rmit is issued. The permit holder shall pay the i • "- wi ` 3f •: : o' • of t voice. Failure to pay the invoice will result in revocation of this permit. (Regulation Number 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-regs 4) The following emissions of non-criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Uncontrolled Controlled Point Pollutant CAS # Emissions Emissions (lb/yr) (lb/yr) Benzene 71432 225 12 Toluene 108883 92 5 Ethylbenzene 100414 4 1 004 Xylenes 1330207 17 1 n-Hexane 110543 1,307 66 2,2,4- 540841 1 0.1 Trimethylpentane Note: All non-criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 004: Uncontrolled Controlled CAS # Pollutant Emission Factors Emission Factors Source lb/bbl lb/bbl VOC 4.61 x10-2 2.31x1O-3 110543 n-Hexane 1.655x10-3 8.28x10"5 Gas Analysis cf:AH COLORADO O 7 Air Pollution Control Division ')eparrie,t o Pubir c Erworp,ert Page 7 of 9 dote e • •fled ions c •rs fo his point are based on the enclosed combustion device c• effic• c .F,. of 9 he sit specific emissions factors in the table above are based o a :sh Q"•er.; on a(ysis c ducted on a site specific pressurized water sample o• ain, o '`02/1 18 F om the ':•aonard 10N well. The results of the analysis provided -ci. • f t - •as, a •. o water ratio of 1.4 scf/bbl and a flash gas molecular weight of 31.3139 lb/lb-mot. The emission factors were determined using the results of the flash liberation analysis in conjunction with the EPA Emission Inventory Improvement Program Publication: Volume II, Chapter 10 - Displacement Equation (10.4-3).The flash liberation analysis was evaluated at atmospheric storage tank conditions of 12.2 psia and 72°F. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five- year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This permit fulfills the requirement to hold a valid permit reflecting the storage tank and associated control device per the Colorado Oil and Gas Conservation Commission rule 805b(2)(A) when applicable. 8) This facility is classified as follows: Applicable Status Requirement Operating Permit Synthetic Minor Source of: VOC, n-Hexane and Total HAPs NANSR Synthetic Minor Source of: VOC PSD True Minor MACT HH Major Source Requirements: Not Applicable Area Source Requirements: Not Applicable 9) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1-End Subpart A - Subpart KKKK NSPS Part 60, Appendix A - Appendix I Appendixes Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA - Subpart DDD MACT 63.1200-63.1439 Subpart EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ- Subpart YYYY CDPHE COLORADO CO I Air Pollution Control Division i ;:4 P bt - a-r,V,;C Page 8 of 9 .. .. :. ..,,,., ...:........ . .:...:: ACT 80-6,, 30 `•ubp . ZZZZ - Subpart MMMMM , iCT3 -80- ubp NNNNN - Subpart XXXXXX • cnat+s COLORADO co - r Air Pollution Control Division- . zurr,- i v �Heafth& ; ,n me:r' Page 9 of 9 Colorado Air Permitting Project , PRELIMINARY ANALYSIS-PROJECT SUMMARY Project Details -Review Engineer: HarrisanSlaughter- Package If: 375882 " 'O111j'111111111x` Received Date: 5/2/,2015 Review Start Date: Section 01-Facility Information CompanyName: =€xt€actiori:Q}l&.Sax inc. • Quadrant Section Township Range • County AIRS ID: 1�xm!�n r -NWSW Plant AIRS ID: 11£167 3 N fa�r3 r r' rr Facility Name: 11 qn Fae3lil�•_ j i .: - Physical. Address/Location: NWSW quadrant of Section 21,Township 2N,Range 67W - County: Weld County - • Type of Facility: Exploration&Praductioh-Weliiad- W - - - What industry.segment? t qft ftfffetibir&,:Frocest)issg'. Is this facility located in a NAAQS non-attainment area? Yes - If yes,for what pollutant? O Carbon Mono de(CO) O Particulate Matter(PM) E Ozone(NOx&VOC) Section 02-Emissions Units In.Permit Application Emissions Self Cert Engineering AIRs Point It Emissions Source Type Equipment Name Control? Permit# Issuance*t Required? Action Remarks i�ISrSKi ' /iii....y.arkx Pemsit inhia 005 taqurd3 adidg IL} 15 v177)3fl[v ,6% E. 1'i tRii0:l9 1 Yes fssuas€ce . .R, I)II3II� E, - .. F - s-' .z..�.�, .�.,�,-,33,3, l G ,. - - ,,, ,,. ,._, � - • Section 03-Description of Project Extra3Gtion Oil'`•RtOitifnc(ExtractiorFsubmittedart app)€estton requesting pet I nr*m- fide 1"Gnct`eGtilt₹joadout eta'new synthetic minorvrel€productionrfaci€itylocated anthe ozone non attainmebta ea ./� r'1. flt �.v r3,�..✓ 3 3.3a3 r .. xY III I3jj ₹. 3. '.. n 34o r1 APEN.required because uncontrolled requested VOC emisstonsere graet"ertha ?ztpy(Colored3QCC Regul nsatio PartA 3 Section II 535)Additional€y the source is permit 1* 1 redtiCre.beaau{s e utconttolied VQC emissions from nil APEN required sour heceketIt FaoiC¢ af`e gse, r rf;3 i2*Mtorado AQCG e a t[on 3k Fart# 5edian 331111 y� :N ,3, . � � f" 1 31 �1113 33 11 1 I11311T��'� Pub)3ecammentt's-requlresf�o tilssoutce ec use new syntheticminorlimitsarelaeingestaf3)ishedlrrordertoavoidotherregouamen-Add3tf[�f+a€y933'th Chang if l -tee' resin oftheprofect te:rteteft a 2S 33 /1 13 _ -- 'b 3 �. 1 O Aj3i333�3�313131 %, /'i /: - - _ X337 ,� 1 3 s 31I1i �,axcek:.w:wa�vwr✓✓ Section 04-Public Comment Requirements Is Public Comment Required? ...Xes-..,. If yes,why? f{�r�)ies Ltitttvpo PermrY• " Section 05-Ambient Air Impact Analysis Requirement: Was a quantitative modeling analysis required? -""s:"%N stOt\ If yes,for what pollutants? If yes,attach a copy of Technical Services Unit modeling results summary. Section 06-Facility-Wide Stationary Source Classification Is this stationary source a true minor? ,,te €-eI Is this stationary source a synthetic minor? _ If yes,.indicate programs and which.pollutants: SO2 NOx CO VOC PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration(PSD) _ Title V Operating Permits(OP) _ -- © El - Non-Attainment New Source Review(NANSR) -✓ Is this stationary source a major source? "" - - If yes,explain what programs and which pollutants herc SO2 NOx CO VOC PM2.5 PM10 TSP HAPs • Prevention of Significant Deterioration(PSD) - ❑ ❑ - Title V Operating Permits(OP) • Non-Attainment New Source Review(NANSR) • • • • Hydrocarbon Loadout Emissions Inventory . 005 Liquid Loading • 123...� z .1. ..�''.,U' : i`�' 'Ct Facility Al Rs ID, ..>..... County • Plant Point - - Section 02-Equipment Description Details tit • Detailed Emissions Unit � )v�'(r' '� -- "" �_ j 3€)3�� Loadontafcortdensatefrom &��,Y�rIkKCo vi.4rhgwhmergedfilF .. / jJ Description: � 3 ✓... �,�.,A3 ,,,m.C°:,: :: , �f._:3133. .3 ... / Emission Control Device 3 3 j Enc€osed C inbustor(s} ;. 13 d. 133 / -_ 3 3a33 33 J3 Descnption: o.3uISPil ', ,,: 4 /,'/f,,,,,:..., X3.,.',,.1113.1 Is this loadout controlled? Collection Efficiency: 3 13'`()iii II s,.,13r3' Control Efficiency: 3 ' ;;;,3333. Requested Overall VOC&HAP Control Efficiency%: 3 95.00 Section 03-Processing Rate Information for Emissions Estimates Primary Emissions-Hydrocarbon Loadout Actual Volume Loaded= •�,,_,.,}%1;2 1yB Barrels(bbl)peryear Actual Volume Loaded While Emissions Controls Operating= ef", 6921 Barrels(bbl)per year Requested Permit Limit Thrau h ut= ;�3"',;"1%;zS;+l 'A3t'Barrels 661 que y p (bbl) mon I qu g p ( )per year Re sited Mental Throughput 124512 Barrels bhl th Potential to Emit(PTE)Volume Loaded= ?f'i' ;46tj;"(? Barrels(bbl)per year Secondary Emissions-Combustion Device(s) Heat content of waste gas= �#„5,73q Btu/scF Volume of waste gas emitted per year= 472,508.80 scf/year Actual heat content of waste gas routed to combustion device= 998 MMBTU per year Requested heat content of waste gas routed to combustion device= 1,198 MMBTU per year Potential to Emit(PTE)heat content of waste gas routed to combustion device= 1,198 MMBTU per year Section 04-Emissions Factors&Methodologies • Does the company use the st t d f It s factors toestimate missions? �,; D th hyd b liquid ding operation utilize ubm rg d f ll? The state default emissions factors may be used to estimate emissions. Does co/Pan /i /o iodine .. /� //% ter. //,O,4,,T ;4 !//-may / s ':,,,,,,,,,,..,•,,,,.„.. s, }z :tbjkp %..:�///O' ✓ / /!/r%// /.!6!"/ ✓i�'�/ r B�' /...64,-;---- '*� � /n'":�Y//I %//l- ' /��: ,/ N1:/ "u a✓7lJ �i'` ,ra.�M?!'i/ ///% ' Uf ate' ii ,... �fi �' ?a! aEi><u.��m�wr:�wrysi , `�vi Jti '// �i8M..& / / ' l6 N 4.<,. lr / ��� iii �c ?d �G rkkb :. x W ii X,,.., � �'�lagt �l . 1:4 I, _ lay //o. %r , r ,'' / ra a / ffl�' " ! " r ' am r ' te` � f ; �r I *VIIAJJIIIPAWAP11 PItW/iI gil. / L, ? Emission Factors Hydrocarbon Loadout Uncontrolled Controlled Pollutant (Ib/bbl) (16/661) Emission Factor Source (Volume (Volume Loaded) Loaded) VOC Z.36E-01 1.18E-02 ,'', /,'"Benzene 4.10E-04 2.05E-05 "tttzfat9"£:�,., ck�,3- -, 0.00E+00 0.00E+00 Toluene Ethylbnsenne 0.00E+00 Xylene 0.00E+0o 0.00E+00 6. n-Hexane 3.60E-03 1.80E-04 224 TMP 0,00E+00 0.00E+00 , ,,,,',./ ,,,..);,I,,,, , Control Device Uncontrolled Uncontrolled Pollutant (Ib/MMBTU) (lb/bbl) Emission Factor Source (Volume (waste heat combusted) Loaded) PM30 .33..33. 0 00E+00 /rjr y � /% PM2.5 '' L�'"' 33 1 3 333 3 0.00E+00j/ /" SOX i�' 33 .133 0.00E+00 �' /.. NOx �ru.0ud�8f1 € 1,1 L3'1? 5.56E-05 .�% ./j0r(t}jir a?c..Li!1drps[#1€3 ..,A CO F�.`,3((S.3f 3i((,nO 31OU3}tt#3a3 all i( 2.53E-04 f,.�, _,r' ,,,,FEtrs€ttstrtaGrlar;`.(u y�„ 2 of 4 K:\PA\2018\18WE1092.CP1.xlsm Hydrocarbon Loadout Emissions Inventory • Section 05-Emissions Inventory Potential to Emit Actual Emissions Requested Permit Limits Requested Monthly Limits Criteria Pollutants Uncontrolled Uncontrolled Controlled Uncontrolled Controlled Controlled (tons/year) (tons/year) (tons/year) (tons/year) (tons/year) Ohs/month) PM10 0.00 0.00 0.00 0.00 0.00 0 PM2.5 0,00 0.00 0.00 0.00 0.00 0 sox 0.00 0.00 0.00 0.00 0.00 0 00x 0.04 0.03 0.03 0.04 0,04 7 VOC 172.99 144.16 7.21 172.99 8.65 1469 CO 0.19 0.15 0.15. 0.19 0.19 32 Potential to Emit Actual Emissions Requested Permit Limits Hazardous Air Pollutants Uncontrolled Uncontrolled Controlled Uncontrolled Controlled (Ihs/year) (Ibs/year) (lbs/year) (Ibs/year) (lbs/year) Benzene 601.07 500.60 25,04 601.07 30.05 Toluene 0.00 0.00 0.00 0.00 0.00 Ethylhenzene 0.00 0.00 0.00 0.00 0.00 Xylene 0.00 0.00 0.00 0.00 0.00 n-Hexane 5277,71 4398.09 219.90 5277.71 263.89 224 TMP 0.00 0.00 0.00 0.00 0.00 Section 06-Regulatory Summary Analysis Regulation 3,Parts A,B Source requires a permit RACT-Regulation 3,Part B,Section 111.0.2.a The loadout must operate with submerged fill and loadout emissions must be routed to flare to satisfy RACT. (See regulatory applicability worksheet for detailed analysis) Section 07-Initial and Periodic Sampling and Testing Requirements IMIIIIPPr Does the company request a control device efficiency greater than 95%for a flare or combustion device? " e If yes,the permit will contain and initial compliance test condition to demonstrate the destruction efficiency of the combustion device based on inlet and outlet concentration sampling Section 08-Technical Analysis Notes 1,Typically,thew€l An o€w tea rotted during hyd c rhun llaadouteyeratroo s alc lated using thefollewi.ngequation:Vnlume(scf/year] {Uncontrolled 001(tan/yeosr))iz[250O(bjkonj/(Molecul rWeight ip (Ib/Ib-mol) (379sof/Ibrnpl)Wheo he state defau(tsmieviunfactoyk.for oodet I dour ra usedto estint topic ma ryewoolensthe cpuf vaiue.fas mu) ularwe€ghtts65te/lbmul.Usiingfihiv!infartn tlons,;[he �olomeo€waste asemitgedwou€dfid.°P4D,AiOR9F.tFi r3/year.TWs volumeafwa5tegas'along wlthahibat contentofi4S5�t4/s E;aryd AP42Ghzpx 13S em;s rory€actorsi₹ar M1iOx rrtl L43jO0681bfMMBtf!' g I rid O93 lb/MMBtu rn pecto,ly)re5uits�in NOx n%CO ego Irons af015.tpy and Th71 spy respe=too(p t Wiltthis application,the-operator hasetoestimatelI pandCl.emissionsassociatedwiththeluadout operaston using theGO₹h[{13223tl5 sct/bblt acid waste gas heat iveter�(2 Safi 73 Pdt2W'4Eitainedfrom the flashgo u,,r'=am.for thecondensate stora eTen elsio h P Max,imul ion.5nee'the lnadoote esatia0 anlpino lees stahiized lvid fheuse of the GOFE iated with tha ondan'3ate{un gas stream fss g G likely o nructve.Addltinnagy•the heatconteot stoics hePtvld I0ulat3 0Ismoree nservatn0e,han The default valor used ptthe'calculaton.The use:of tual data:asso₹efedwth this,,p,t Tatherth na e d f It,dim t method ispreferable.asklih ly resell o„-ac u t r prese t ti f aAaulemissions5 Additions Ry the use of the roadensate tackparamecer3 hke(ynn ulesiina an ocooti'v est t hen consldaringaat al opgrPn.Asa resu{t;t[te operatot'ss talcufatfa+t nfcombuscton emisslonsfonSNLe loadouCoperatlan vas deeniedatceptable far permlSCing purposes. 2 Ae drog,to the epnrator,the waste gas assoaated,ouhth to dvut pe atroois aptured usinga vapor collectwnsystem;hat nonects.₹S trucko no,1, dspa etoth sm g tank d p{-e dvaporsfcom nit too ksaro thus robt;0'1., to and cnotrc€led•clang witty the stgra etaolv4pers She ovrmttvuillaontain a omtditfoo thatt quit 1515 systemr be000Yaktona)Stall thn8i dtuoFl8 loadbut operations. g 3 Tke4peratttpwas pp and d wctha draft permit and APEIlik''.al 3�oibn ypiontuH3ty)l3 gmgtenc.The aperatorreviewed6 the cum nts od xp e dtheyhad./0panyaia}ds""'r`1 r t nr .�v 3 L '1 3333 of ' , Lt !3y3n331b7 1Ox31�. Section 09-Inventory SCC Coding and Emissions Factors Uncontrolled Emissions AIRS Point# Process it SCC Code Pollutant Factor Control% Units 005 01 4-06-001-32 Crude Oil:Submerged Loading Normal Service(S=0.6) PMIO 0.00 0 lb/1,000 gallons transferred PM2.5 0,00 0 lb/1,000 gallons transferred sox 0.00 0 lb/1,000 gallons transferred NOx 0.00 0 lb/1,000 gallons transferred VOC 5.619 95 lb/1,000 gallons transferred CO 0.01 0 lb/1,000 gallons transferred Benzene 9.76E-03 95 lb/1,000 gallons transferred Toluene 0,00E+00 95 lb/1,000 gallons transferred Ethylhenzene 0.00E+00 95 lb/1,000 gallons transferred • Xylene 0.00E+00 95 lb/1,000 gallons transferred n-Hexane 8.57E-02 95 lb/1,000 gallons transferred 224 TMP 0,00E+00 95 lb/1,000 gallons transferred • • 3 of 4 K:\PA\2018\18WE1092.CP1.xlsm Hydrocarbon toedout Regulatory Analysis Worksheet • o m*n.Hremants ae I color,..inonnuan tnwa ATTAINMENT 1.Ara uncontrolled&Mal ernIsslons from a.rim, lndlvlduals.urre greasrthan 2TP1'lesgukbon 3,Part4,sectlon ll.0.t.aly //. to exd.ratlon and proacaon Imle.e r�� Mh wep pall Megulation 3,Part b,semn011 01.07 Ili. 3. Is the lowloutoperaclon loading less Man to.0coxallons(234 BMA ofauaeoll per day on an annual average basisi • a.5. Is Ile IS Ileloadout p loading loadngkss than 1B,30ebblss per torn of condensate vie submergalnllprpcedurei 6.Are Mal lc unumballed V0C emissions greeter men s Tpr,kox greater.an10TPYoreo emissions greater th0tfnipY'Regulation s,Pert B,secnonll.n.ili • I MI.fat.n A.t, t...a ter Man tTPY lreguabon3,Partt,saetlon gtaii A'd! t. sloes lmman/n an product-Ion Item o.uelLadlyenoegrea enquestlon 2.le the loacloutlocatetl atan pad letion 3,dradod loading lass tan 10,000 gala 0l tteefltrl,crrua',crude per daycnnn annualo average bersi N • ' 4. Is Me icatlout operation loading less Oar 506bb per year oftncdorrate vlaspinh Rlian Nn.,.,+ co to naorcasIon ' • b. ea to Red Question s.Are fetal uncontrolled WCnemssons rromuegekbr than 21,Y,Noe greater Men5TPY or comss,.areamr man loin/ 3.Part B.sectlon ll.o.xli S,,....,,,The inioutrepurn pate,u tec ry on ' lacuna:coca.,�Vot canna i.RK'r Are uncontro the loadoutoperatlon granter Wan 2.0..(liegulatIon5ecdenl o2ali Y4..'q.T a iouloannustoperate MI submerged li ana loadoutornadoas mustbe round=contratosethry norcaroolleC,a Rau anainb racadred and provide decussya Senba 0. �'r�pioee ..e.s.wa..0 stye tta g a.,xi<ta h u a..uH an.. tc ?lam tc:s...hfy glsclalmer • This Onall Cant asslsls aperal.ro ooi deferminln0 applirab011y acedain requirementsol the Clean An lls lmpbmanpngrepulallens,and Air qua00yConl0lCbmmission regulations.This document b not a rubor regu100n,andlha analysis if canWlns may not apply In aparlkular natation based upon the individual facts and c0cumslances Thrsdocumenl does not charge orsubsyluta bran law,repd l or any ether legally bbm'inCrequlmmenland bno!spoil)/enforceable.In the ovanl of any contlzl belveen the language of Ibis document and the language oi Me Clean AlrAol„its Implemenldrnlln4regulslbn;and airquelin0cAPCl Commis,.rivubgongneknguapa ollhe silnyl Orregublbn antimnlrol The use olnonarw�tlatery language sucn as"iacomn;erq,emay" "should,"end"can,"is intended to describe APCDlnlerprefeWns and recnmmendatkns Mandatory Innmincebgy such as'musf"and"require'ere intended to describe conlMling lequiremenls antler Iha terms of the Clean Air Act and Alr qualay Control Comnlsspn regulaliens;but Ihb document does,.establish legaly binding requirements In andc:nine. • m.>E � COI `E ,. . ►' �'otluti _• trol ion Dep. ent Public .alt r '. vironment nom..., CONSTRUCTION PERMIT Permit number: 18WE1092 Issuance: 1 Date issued: Issued to: Extraction Oil Et Gas, Inc. Facility Name: Leonard Production Facility Plant AIRS ID: 123/A002 Physical Location: NWSW SEC 21 T2N R67W County: Weld County General Description: Well Production Facility Equipment or activity subject to this permit: Facility AIRS Emissions Control Equipment Point Equipment Description Description ID Loadout of condensate from storage Enclosed Combustion LOAD-1 005 vessels to tank trucks using submerged fill Device(s) This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to the specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF-CERTIFY FOR FINAL AUTHORIZATION 1. YOU MUST notify the Air Pollution Control Division (the Division) no later than fifteen days of the latter of commencement of operation or issuance of this permit, y submitting a Notice of Startup form to the Division for the equipment covered by this permit. The Notice of Startup form may be downloaded online at www.colorado.gov/pacific/cdphe/other-air-permitting-notices. Failure to notify the Division of startup of the permitted source is a violation of Air Quality Control Commission (AQCC) Regulation Number 3, Part B, Section III.G.1. and can result in the revocation of the permit. 2. Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self- certify compliance with the conditions. Failure to demonstrate compliance within 180 4 cDrHE !COLORADO #:,.; Air Pollution Control Division 3 tee,: t ifhih Etel& $E_,barn;e Page 1 of 9 A days may result in revoca an of r . m A se ,,:. icati ,..,,f.rm any`guidance on how to self-certify compl znc re• re. t s per t m be obtai -d online at www.colorado.Rov/paci is c•phe/air-permit-se -certi ication. •egulation umber 3, Part B, Section III.G.2.) 3. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) 4. The operator shall retain the permit final authorization letter issued by the Division, after completion of self-certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 5. Emissions of air pollutants shall not exceed the following limitations. (Reference: Regulation Number 3, Part B, Section II.A.4) Annual Limits: Facility AIRS Tons per Year Emission Equipment ID Point PM2.5 NOX VOC CO Type LOAD-1 005 --- --- 8.7 --- Point Note: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility-wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility-wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility-wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits for both criteria and hazardous air pollutants shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate actual emissions each month and keep a compliance record on site or at a local field office with site responsibility for Division review. 6. The emission points in the table below shall be operated and maintained with the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) coir COLORADO Air Pollution Control Division an-r t st tb:.: e,.>s e{`r Ivor tt et t Page 2 of 9 A Facility AIRS 4 � � Equipment Co of -.-vi ollutant ontrolled ID Point r.. LOAD-1 005 Enclosed Combustion Device(s) VOC and HAP PROCESS LIMITATIONS AND RECORDS 7. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rate shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, Section II.A.4) Process/Consumption Limits Facility AIRS Equipment Point Process Parameter Annual Limit ID LOAD-1 005 Condensate Loaded 1,466,030 barrels The owner or operator shall monitor monthly process rates based on the calendar month. Compliance with the annual throughput limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous twelve months' data. The permit holder shall calculate' throughput each month and keep a compliance record on site or at a local field office with site responsibility, for Division review. STATE AND FEDERAL REGULATORY REQUIREMENTS 8. No owner or operator of a smokeless flare or other flare for the combustion of waste gases shall allow or cause emissions into the atmosphere of any air pollutant which is in excess of 30% opacity for a period or periods aggregating more than six minutes in any sixty consecutive minutes. (Regulation Number 1, Section II.A.5.) 9. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) 10. This source is located in an ozone non-attainment or attainment-maintenance area and is subject to the Reasonably Available Control Technology (RACT) requirements of Regulation Number 3, Part B, Section III.D.2.a. Condensate loading to truck tanks shall be conducted by submerged fill and emissions shall be controlled by a flare. (Regulation 3, Part B, Section III.D.2) 11. All hydrocarbon liquid loading operations, regardless of size, shall be designed, operated and maintained so as to minimize leakage of volatile organic compounds to the atmosphere to the maximum extent practicable. (Regulation Number 3, Part B, Section III.E.) E.) 12. The owner or operator shall follow loading procedures that minimize the leakage of VOCs to the atmosphere including, but not limited to (Regulation Number 3, Part B, Section TILE.): CD. }COLORADO COi Air Pollution Control Division ( ,,rp rinirt r .btiz her x 3 E wIro tment Page 3 of 9 0 a. The owner or ope tor sh l i •e - onsi • ng e ip ent t ensure that hoses, couplings, d . es m tai ed to 1 rev t drippin leaking, or other liquid or vapor oss during oa•ng and un oading. The inspections shall occur at least monthly. Each inspection shall be documented in a log available to the Division on request. b. All compartment hatches at the facility (including thief hatches) shall be closed and latched at all times when loading operations are not active, except for periods of maintenance, gauging, or safety of personnel and equipment. Inspections of all compartment hatches at the facility (including thief hatches) shall occur at least monthly. Each inspection shall be documented in a log available to the Division on request. c. Inspect thief hatch seals annually for integrity and replace as necessary. Thief hatch covers shall be weighted and properly seated. d. Inspect pressure relief devices (PRD) annually for proper operation and replace as necessary. PRDs shall be set to release at a pressure that will ensure flashing, working and breathing losses are not vented through the PRD under normal operating conditions. e. Document annual inspections of thief hatch seals and PRD with an indication of status, a description of any problems found, and their resolution. 13. For this controlled loading operation, the owner or operator shall follow loading procedures that minimize the leakage of VOCs to the atmosphere including, but not limited to (Regulation Number 3, Part B, Section III.E.): a. Install and operate the vapor collection and return equipment to collect vapors during loading of tank compartments of outbound transport trucks and route the vapors to the control device listed in the Emission Limitations and Records section of this permit. b. Include devices to prevent the release of vapor from vapor recovery hoses not in use. c. Use operating procedures to ensure that hydrocarbon liquid cannot be transferred unless the vapor collection equipment is in use. d. Operate all recovery and disposal equipment at a back-pressure less than the pressure relief valve setting of transport vehicles. OPERATING a MAINTENANCE REQUIREMENTS 14. Upon startup of this point, the owner or operator shall follow the most recent operating and maintenance (O&M) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to your O&tM plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING cA 'COLOR ADO ..Air Pollution Control I3ivistrsu 4 rr.e"e c4}`,eit.+r:,W terYn 3 E^rrrcrmtert Page 4 of 9 Initial Testing Requireme : 15. This source is not requir . du(•„ _-__is •, . . . . rwise .ted by the Division or other state or federal requirement. Periodic Testing Requirements 16. This source is not required to conduct periodic testing, unless otherwise directed by the Division or other state or federal requirement. ADDITIONAL REQUIREMENTS 17. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, Section II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or For volatile organic compounds (VOC) and nitrogen oxides sources (NOr) in ozone nonattainment areas emitting less than 100 tons of VOC or NO. per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted. For any non-criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or • Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. 18. The requirements of Colorado Regulation Number 3, Part D shall apply at such time that any stationary source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation that was established after August 7,. 1980, on the capacity of the source or modification to otherwise emit a pollutant such as a restriction on hours of operation (Regulation Number 3, Part D, Section V.A.7.B). GENERAL TERMS AND CONDITIONS CDPHE 1COLORADO CO ` ..Air'Pdilution CorntrolDivision *.),1,,,,t,ntt tiv PutA i 6tee t Envftnnter.t - Page 5 of 9 19. This permit and any attar 111 us •e -tarn o ad :v.'table r inspection upon request. The permit` P reis ed a w ow ;;r b he APCD •rovided in AQCC Regulation Number , 'art B, Section II.:. upon a request or trans er o ownership and the submittal of a revised APEN and the required fee. 20. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self-certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self-Certify for Final Authorization section of this permit. 21. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 22. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 23. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self-certification and final authorization by the Air Pollution Control.Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 24. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 25. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: 4 enAAE !COLOR COLORADO CO AV Pollution Corttrot Division f l..e 1.,Px0c ,r.L-,v.,r, +t Page 6 of 9 E a Harrison Slaughter Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Extraction Oil >_t Gas, Inc. Permit for condensate loadout at a new synthetic minor oil and gas well production facility. CAE ;COLORADO a r Air Pollution Control Division f ":;epartmentc,f Psalc ise overt Page 7 of 9 v ..<.$ A Notes to Permit Holder at the ti w. of thi •er it uanc 1) The permit holder is require _ .. ees he - :' sin. his pe --v An invoice for these fees will be issued after the permit is issued. The permit holder shall pay the invoice within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit. (Regulation Number 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-regs 4) The following emissions of non-criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Uncontrolled Controlled Point Pollutant CAS # Emissions Emissions (lb/yr) (lb/yr) Benzene 71432 601 30 005 n-Hexane 110543 5,278 264 Note: All non-criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 005: Uncontrolled Controlled Pollutant CAS # Emission Emission Source Factors Factors lb/bbl lb/bbl VOC 2.36x10-1 1.18x10.2 CDPHE PS Benzene 71432 4.1x10-4 2.05x1O5 Memo 14- n-Hexane 110543 3.6x10-3 1.8x10-4 02 Note: Controlled emission factors are based on the enclosed combustion device efficiency of 95% and a collection efficiency of 100%. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five- ____. C"HE ;COLORADO CO l Air Pollution Control promo o -e J k c He.en a E-:A mn,,s,t Page 8 of 9 year term expires. Please ref: to th- os re t an r I. - invc e o detQ ine the APEN expiration date for eac m „' s • nt .•ci. ed wi thi permit. Fe any questions regarding a specific expiration 'ate ca t e Division at $3)-692- e. 7) This facility is classified as follows: Applicable Status Requirement Operating Permit Synthetic Minor Source of: VOC, n-Hexane and Total HAPs NANSR Synthetic Minor Source of: VOC PSD True Minor Source 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1-End Subpart A - Subpart KKKK NSPS Part 60, Appendix A- Appendix I Appendixes Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA- Subpart DDD MACT 63.1200-63.1439 Subpart EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ- Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ - Subpart MMMMM MACT 63.8980-End Subpart NNNNN - Subpart XXXXXX p COP :COLORADO Co w' An.Pollution forYrnl17zvasarsn ,)ept rtne t al Al i,,,,',"S Efmrvnrwnt Page 9 of 9 22 % CDPHE' A Condensate Storage Tank(s) APEN Form APCD-205 CO 4''' Air Pollutant Emission Notice (APEN) and Application for Construction Permit All sections of this APEN and application must be completed for both new and existing facilities, including APEN updates.An application with missing information may be determined incomplete and may be returned or result in longer application processing times. You maybe charged an additional APEN fee if the APEN is filled out incorrectly or is missing information and requires re-submittal. • This APEN is to be used for tanks that store condensate associated with oil and gas industry operations. If your emission source does not fall into this category, there may be a more specific APEN available for your source(e.g. crude oil storage tanks, produced water storage tanks, hydrocarbon liquid loading, etc.). In addition, the General APEN (Form APCD-200)is available if the specialty APEN options will not satisfy your reporting needs.A list of all available APEN forms and associated addendum forms can be found on the Air Pollution Control Division (APCD) website at: www.colorado.aov/pacific/cdphe/air-permits. This emission notice is valid for five(5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made(significant emissions increase, increase production, new equipment, change in fuel type, etc.). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Permit Number: 16 WC 02 I AIRS ID Number: 123 /f'0o2 / DO 1 [Leave blank unless APCD has already assigned a permit if and AIRS I0] Section 1 - Administrative Information Company Name': Extraction Oil & Gas, Inc. Site Name: Leonard Production Facility Site Location Site Location: NWSW Sec 21 T2N R67W County: Weld NAICS or SIC Code: 211111 Mailing Address: (include Zip code) 370 17th Street, Suite 5300 Denver, Colorado Permit Contact: Kathy Steerman Phone Number: (720) 974-7765 E-Mail Address2: KSteerman@ExtractionOG.com 1 Use the full,legal company name registered with the Colorado Secretary of State.This is the company name that will appear on all documents issued by the APCD.Any changes will require additional paperwork. 2 Permits,exemption letters,and any processing invoices will be issued by APCD via e-mail to the address provided. 375876 � COLORADO Form APCD-205 Condensate Storage Tank(s)APEN- Revision 07/2017 1 ! L*1�' Yv° Permit Number: 1c.??, OZl c- AIRS ID Number: / AV,/ [Leave blank unless APCO has already assigned a perrnil/t and AIRS D] Section 2 - Requested Action ✓❑ NEW permit OR newly-reported emission source ❑✓ Request coverage under traditional construction permit ❑ Request coverage under a General Permit ❑ GP01 El GP08 If General Permit coverage is requested, the General Permit registration fee of$25O must be submitted along with the APEN filing fee. -OR- ❑ MODIFICATION to existing permit (check each box below that applies) ❑ Change in equipment ❑ Change company name ❑ Change permit limit ❑ Transfer of ownership3 ❑ Other(describe below) -OR- ❑ APEN submittal for update only(Note blank APENs will not be accepted) -ADDITIONAL PERMIT ACTIONS- ▪ APEN submittal for permit exempt/grandfathered source ❑ Limit Hazardous Air Pollutants (HAPs)with a federally-enforceable limit on Potential To Emit(PTE) Additional Info Et Notes: 3 For transfer of ownership,a completed Transfer of Ownership Certification Form(Form APCD-104)must be submitted. Section 3 - General Information General description of equipment and purpose: Eight (8) - 400 bbl Condensate Storage Vessels For existing sources, operation began on: For new or reconstructed sources, the projected start-up date is: 12/2/2017 Normal Hours of Source Operation: 24 hours/day 7 days/week 52 weeks/year Storage tank(s)located at: ❑✓ Exploration a Production(EEEP)site ❑ Midstream or Downstream(non EFtP)site Will this equipment be operated in any NAAQS nonattainment area? 0 Yes ❑ No Are Flash Emissions anticipated from these storage tanks? • El Yes ❑ No Is the actual annual average hydrocarbon liquid throughput≥500 bbl/day? 0 Yes ❑ No If"yes", identify the stock tank gas-to-oil ratio: o.t 0‘ m3/liter Are these storage tanks subject to Colorado Oil and Gas Conservation Commission (COGCC) 2 Yes ❑ No 805 series rules? If so, submit Form APCD-105. Are you requesting≥6 ton/yr VOC emissions(per storage tank), or are uncontrolled actual 0 Yes El No emissions≥6 ton/yr(per storage tank)? 'lck\;wt r o.*;catioK.. H�5 \ I„.1, Ayr ,t;aaaD0 Form APCD-205 Condensate Storage tank(s)APEN Revision 07/2017 2 Permit Number:. 14,Lt.D.O?.-1 AIRS ID Number: 1Z7D I ADZ/ 00 [Leave blank unless APCD has al eaey assigned a permit it and AIRS 1)] as Section 4 -.Storage Tank(s) Information Actual Annual Amount Requested Annual Permit Limit4 (bbllyear) • (bbl/year) Condensate Throughput: 1,221,692 1,466,030 From what year is the actual annual amount? Projected Average API gravity of sales oil: 50.62 degrees RVP of sales oil: 11.84 Tank design: ❑✓ Fixed roof ❑ Internal floating roof ❑ External floating roof Storage if of Liquid Manifold Storage Total Volume of Installation Date of Most Date of First! Tank ID Vessels in Storage Tank Storage Tank Recent Storage Vessel in Production (bbl) Storage Tank(month/year) (month/year) TK-1-TK-8 8 3200 11/2017 11/2017 Wells Serviced by this Storage Tank or Tank Battery5(EEP''Sites Only) API Number Name of Well Newly Reported Well See Form APCD-212 ❑ 0 - - 0 4 Requested values will become permit limitations. Requested limit(s)should consider future growth. 5 The EEtP Storage Tank APEN Addendum(Form APCD-212)should be completed and attached when additional space is needed to report all wells that are serviced by the equipment reported on this APEN form. Section 5 - Stack Information Geographical Coordinates (LatitudelLongitude or UTM) 40.12198/-104.90267 Operator;;Stack Discharge Height Above Temp. Flow Rate Velocity ID No. Ground Level (feet) (°F) (ACFM) (ft/sec) ECD -15 TBD TBD TBD • Indicate the direction of the stack outlet: (check one) Upward ❑Downward ❑Upward with obstructing raincap ❑Horizontal ❑Other(describe): Indicate the stack opening and size: (check one) ❑Circular Interior stack diameter(inches): 48 o Square/rectangle Interior stack width(inches): Interior stack depth (inches): ❑Other(describe): COLORA60 Form APCD-2015 Condensate Storage Tank(s)APEN i evisior 07/2017 3 I H.���,,;r��.„: ,tl Permit Number: 1%(.0601-k 11.75 ID Number: / od [Leave blank unless APCO has atready assigned a permit/1 and AIRS D] ,4 Section 6 - Control Device Information ❑ Check this box if no emission control equipment or practices are used to reduce emissions, and skip to the next section. Pollutants Controlled: Vapor Size: Make/Model: ❑ Recovery Unit(VRU): Requested Control Efficiency: % VRU Downtime or Bypassed (emissions vented): Pollutants Controlled: VOC/HAPs Rating: TBD MMBtu/hr p Type: Two (2) ECDs Make/Model: I ES . 48 ❑ Combustion Requested Control Efficiency: 95 % Device: �'J a{6 Manufacturer Guaranteed Control Efficiency: >98 % ZS J � Minimum Temperature: TBD Waste Gas Heat Content: 2,523 Btu/scf S�,rnrl Constant Pilot Light: ❑ Yes ❑ No Pilot Burner Rating: TBD MMBtu/hr kAkyz Description of the closed loop system: ❑ Closed Loop System Pollutants Controlled: O Other: Description: Control Efficiency Requested: Section 7-Gas/Liquids Separation Technology Information (E£tP Sites Only) What is the pressure of the final separator vessel prior to discharge to the storage tank(s)? 5 psig Describe the separation process between the well and the storage tanks: HLP Separator, Gas Buster, VRT, Condensate Storage Tanks COLORADO Form APCD-205- Condensate Storage lank(s)APEN Revision 07/201 4 ` ur nn'n: Permit Number: 1`&WCOZ\S AIRS ID Number: `Z ,��7 ( ()DI , 3F [Leave blank unless APCJ has already assigned a permit and AIRS 1)] • Section 8 - Emissions Inventory Information Attach all emissions calculations and emission factor documentation to this APEN form6. If multiple emission control method's were identified in Section 6, the following table can be used to state the overall (or combined)control efficiency(%reduction): Overall Requested•Control Pollutant Description of Cantrol Methods) Efficiency,'. (%•reduction in• emissions) VOC _..... . . .. ECD 95% NOx CO HAPs ECD 95% • Other: • From what year is the following reported actual annual emissions data? Projected Criteria Pollutant Emissions Inventory • Emission Factor6 = Actual Annual Emissions ; Requested Annual Permit Emission t(s)a Pollutant Source •Uncontrolled Controlled Uncontrolled (AP-42, Controlled Uncontrolled! Emissions Emissions7' Emissions' Emissions Bases Units Mfg.etc);; (fops!year); (Tonslyeor.) (Tons year) (Cons year) VOC 1.41q� Xio i lb/bbl °� � K c11. `I•S3- lf7j �Z S•`i`I NOx 0.068 Ib/MMBtu AP-42 0,0S 084 0.03 D.061 e7e5 0.04 CO 0.31 Ib/MMBtu AP-42 DA'S 0.1-7 0,1S' 0.1°l .5721 0.1', Non-Criteria Reportable Pollutant Emissions Inventory Chemical Emission factor6 Actual Annual Emissions Chemical Name Abstract Source Uncontrolled Controlled Service CAS uncontrolled ( ) Units (AP-42 Emissions Emissions Number Basis' Mfg. etc Pounds/ ear g ) ( y ) (Pounds/year) :. Benzene 71432 _ 3 •tuyiE lb/bbl Z°7` , 4.33 42L.8 -22' Li.1 � `l �P� �arrg Toluene , 108883 Z.cd3)(i6,"9 lb/bbl �`pa� t� 35.5 yi 48 11,3 Ethylbenzene 100414 Xylene 1330207 n-Hexane 110543 3,i lb/bbl PYowro+� 3X�o3 E`i f1 i �S -2,79e'9'38u.9 -1-26 Ill. 2,2,4- 540841 Trimethylpentane f Rcdl(+�C.S uyAvarrA ckkuJI.Q±IOW5 �75 4 Requested values will become permit limitations. Requested limit(s)should c nsider future growth. 1\I} 1� 6 Attach condensate liquid laboratory analysis,stack test results,and associated emissions calculations if you are requesting site specific emissions factors according to the guidance in PS Memo 14-03. Annual emissions fees will be based on actual controlled emissions reported. If source has not yet started operating,leave blank. COLOR x00 Form APCD-205-Condensate Storage lank(s)APEN - Revision 07/2017 5 I Alr Permit Number: ' AIRS ID Number: � / ACOZ / O0( ,. ! has e opermit. ID] [Leave oa.3k unless;a'£:f) :sir.�c���assigned a�._ rrr��.. and MRS Section 9 - Applicant Certification I hereby certify that all information contained herein and information submitted with this application is complete, true and correct. If this is a registration for coverage under General Permit GP01 or GP08, I further certify that this source is and will be operated in full compliance with each condition of the applicable General Permit. �GfGr _��Ch�rr �ivt-- 03/02/2018 Signature of Legally Authorized Person (not a vendor or consultant) Date Kathy Steerman Air Quality Coordinator Name(print) Title Check the appropriate box to request a copy of the: ❑ Draft permit prior to issuance ❑ Draft permit prior to public notice (Checking any of these boxes may result in an increased fee and/or processing time) This emission notice is valid for five(5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made(significant emissions increase, increase production, new equipment, change in fuel type, etc.). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Send this form along with$152.90 and the General Permit For more information or assistance call: registration fee of$250, if applicable, to: Colorado Department of Public Health and Small Business Assistance Program Environment (303)692-3175 or(303)692-3148 Air Pollution Control Division APCD-55-B1 4300 Cherry Creek Drive South Or visit the APCD website at: Denver, CO 80246-1530 Make check payable to: https://www.colorado.gov/cdphe/apcd Colorado Department of Public Health and Environment Telephone: (303)692-3150 AyCOLORADO Form APCD 205Tank(s)Storage APEN - Revision n 07/2017 6 i H .lrs ne E&P Storage Tank Air Pollutant Emissions Notice(APEN)Addendum Form' Company Name: Extraction Oil&Gas,Inc. Source Name: Leonard Production Facility Emissions Source AIRS ID2: N/A/ 123-4-002-00 Wells Services by this Storage Tank or Tank Battery (E&P Sites Only) API Number Name of Well Newly Reported Well 05-123-45045 Leonard 2N 05-123-45049 Leonard 3N 05-123-45046 Leonard 4N 05-123-45048 Leonard 5C 05-123-45047 Leonard 6N 05-123-45052 Leonard 7N 05-123-45044 Leonard 9C 05-123-45050 Leonard l0N - - ❑ - ❑ - - ❑ - - ❑ •� Footnotes: I Attach this addendum to associated APEN form when needed to report additional wells. 2 If this is a newly report source that has not been assigned an AIRS ID by the APCD, enter N/A Form APCD-212 5.AP FormAPCD-212-EP-StorageTank-APEN-Addendum 20180219. ft A �1 , ,, ,� CDPHE PH I Natural Gas Venting APEN - Form.APCD-21 Air Pollutant Emission Notice (APEN) andCO Vi Application for Construction Permit All sections of this APEN and application must be completed for both new and existing facilities, including APEN updates. An application with missing information may be determined incomplete and may be returned or result in longer application processing times. You may be charged an additional APEN fee if the APEN is filled out incorrectly or is missing information and requires re-submittal. This APEN is to be used for Natural Gas Venting only. Natural Gas Venting includes emissions from gas/liquid separators, well head casing, pneumatic pumps, blowdown events, among other events. If your emission unit does not fall into this category, there may be a more specific APEN for your source. In addition, the General APEN (Form APCD-200)is available if the specialty APEN options will not satisfy your reporting needs. A list of all available APEN forms can be found on the Air Pollution Control Division (APCD)website at: www.colorado.gov/cdphe/apcd. This emission notice is valid for five (5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Permit Number: AIRS ID Number: )23, /c3 / 0OZ [Leave Wank uhleTs APC:D has al.rea£"k assigned a permit#and AIRS ID] Company equipment Identification: VRT Separator Venting [Provide Fad ity Equipment ID to identify how this equipment is referenced w t.h'in your organ'Z.ationi Section 1 - Administrative Information . Company Name': Extraction Oil &Gas, Inc. Site Name: Leonard Production Facility Site Location Site Location: NWSW Sec 21 T2N R67W County: Weld • NAICS or SIC Code: 211111 Mailing Address: (include Zip code) 370 17th Street, Suite 5300 Denver, Colorado Permit Contact: Kathy Steerman Phone Number: (720) 974-7765 E-Mail Address': KSteerman@ExtractionOG.com 'Please use the full,legal company name registered with the Colorado Secretary of State.This is the company name that will appear on all documents issued by the APCD.Any changes will require additional paperwork. 2 Permits,exemption letters,and any processing invoices will be issued by APCD via e-mail to the address provided. Q COLORADO Form APED 211 Natural Gas Venting€l'l s' Rev 03/2017 315O8 1 A • •13 Permit Number: `Q p-ur, AIRS ID Number: � / Acp2 00Z [Leave hunk unless APCD has already assigned ape e t II and AIRS ID] ,� Section 2- Requested Action ✓❑ NEW permit OR newly-reported emission source -OR- ❑ MODIFICATION to existing permit (check each box below that applies) ❑ Change fuel or equipment ❑ Change company name ❑ Add point to existing permit ❑ Change permit limit ❑ Transfer of ownership3 ❑ Other(describe below) -OR- ❑ APEN submittal for update only(Please note blank APENs will not be accepted) -ADDITIONAL PERMIT ACTIONS- ❑ Limit Hazardous Air Pollutants (HAPs)with a federally-enforceable limit on Potential To Emit(PTE) Additional Info Ft Notes: 3 For transfer of ownership,a completed Transfer of Ownership Certification Form (Form APCD-104)must be submitted. Section 3 - General Information General description of equipment and purpose: Vapor Recovery Tower("VRT") Separator Venting Emissions For existing sources, operation began on: For new or reconstructed sources, the projected start-up date is: 12 / 2 / 2017 ❑ Check this box if operating hours are 8,760 hours per year; if fewer, fill out the fields below: Normal Hours of Source Operation: hours/day days/week weeks/year Will this equipment be operated in any NAAQS nonattainment ❑ Yes ❑ No area Is this equipment located at a stationary source that is ❑ Yes ❑✓ No considered a Major Source of(HAP) Emissions 406, rCOLORADO Form APCD-211 -Natural Gas Venting APEN Rev 03/2017 2 i tsl ":, " ` .k= ,n Permit Number: `cb(A)6OZlk) AIRS ID Number: 1Z i 404 co 2, [Leave blank unless APCD has already assigned a permit It and AIRS ID] E' ,p4 Section 4 - Process Equipment Information 2 Gas/Liquid Separator ❑ Well Head Casing ❑ Pneumatic Pump Make: Model: Serial#: Capacity: Gal/min • ❑ Compressor Rod Packing Make: Model: #of Pistons: Leak Rate: Scf/hr/pist ❑ Blowdown Events #of Events/year: Volume per event: MMscf/event ❑ Other Description: If you are requesting uncontrolled VOC emissions greater than 100 tpy for a Gas/Liquid Separator you must use Natural Gas Venting as a process parameter. Are requested uncontrolled VOC emissions greater than 100 tpy? 0 Yes 0 No Maximum Vent Vent Gas Natural Gas Venting Rate: 704.98 SCF/hr Heating Value: 2 ,o BTU/SCF Process Parameters4: Requested: 6.2 MMSCF/year Actual: 5.00 MMSCF/year -OR- Liquid Throughput 4 Requested: • Bbl/yr Actual: Bbl/yr Process Parameters4: 4 Requested values will become permit limitations. Requested limit(s)should consider future process growth Molecular Weight: ,gm2't(i►7,,,1o` -5079%82-- VOC (mole%) 82.239 cl VOC(Weight%) 90.3708 Benzene (mole%) 0.1186 Benzene(Weight%) 0.1817 Toluene(mole%) 0,0467 Toluene(Weight%) 0.0844 • Process Properties: Ethylbenzene (mole%) 0.0012 Ethylbenzene(Weight%) 0.0024 ' Xylene (mole%) 0.0061 Xylene(Weight%) 0.0127' 7� t n-Hexane(mole%) 1.0697 n-Hexane(Weight%) 1.808 `� \ 2,2,4-Trimethylpentane 0 0003 2,2,4-Trimethylpentane 0 0006 (mole%) (Weight%) ttioL I Additional Required Information: . ❑✓ Attach a representative gas analysis(including BTEX Et n-Hexane, temperature, and pressure) ❑ Attach a representative pressurized extended liquids analysis (including BTEX Et n-Hexane, temperature, and pressure) COLORADO Form APCD-211 ..Natural Gas Venting APEN- Rev 03/2017 3 t31 :: Mfl= Ce Fs Permit Number: l✓p'��b AIRS ID Number: 174.3 /AWL( Do2 ha s blank unless APCD aLready assigned a per eft ft and AIRS ID] l Section 5 - Stack Information Geographical Coordinates (Latitude/Longitude or UTM) 40.12198/-104.90267 Discharge Height q343148AiaiiiieSP ` Temp mot' FGo Rate" @ t Cl y S € ^uu Above Ground Level Q5000 —30 TBD TBD TBD Indicate the direction of the stack outlet: (check one) Upward ❑ Downward ❑ Upward with obstructing raincap ❑ Horizontal ❑ Other(describe): Indicate the stack opening and size: (check one) ❑✓ Circular Interior stack diameter(inches): TBD ❑ Other(describe): Section 6 - Control Device Information Pollutants Controlled: Size: Make/Model: ❑ VRU: Requested Control Efficiency VRU Downtime or Bypassed % Pollutants Controlled: VOC/HAPs Rating: TBD MMBtu/hr Type: C.,D Make/Model:Questor/Q5000 ❑ Combustion Requested Control Efficiency: i }lc-% Device: Manufacturer Guaranteed Control Efficiency >99 % ZENO Minimum Temperature: TBD Waste Gas Heat Content -2 8554 Btu/scf Constant Pilot Light: ❑� Yes ❑ No Pilot burner Rating TB MMBtu/hr Pollutants Controlled: ❑ Other: Description: Control Efficiency 0 Requested Voki ?( crOZta O4. NDs 1 ail%S 'COLD-RAOO Form APCD-211 -Naturel Gas Venting APE 1- Rev 03/2017 4 1 A �_ : RF A • Permit Number: ICELCCOMO AIRS ID Number: 17,' "CAi�/ l( [Leave blank unless APCD has already assigned a >e€mit#and AIRS 1D) f. Section 7- Criteria Pollutant Emissions Information Attach all emission calculations and emission factor documentation to this APEN form. Is any emission control equipment or practice used to reduce emissions? El Yes ❑ No If yes, please describe the control equipment AND state the overall control efficiency(% reduction): Qverall Requested'Controli; Pollutant Control Equipment Description Efficiency (%reduction in emissions) PM SOX NOx VOC Ec •si3•%- 9S CO HAPs E t✓D -98°/ 1 Other: From what year is the following reported actual annual emissions data? Projected Use the following table to report the criteria pollutant emissions from source: (Use the data reported in Sections 4 and 6 to calculate these emissions.) Emission y . Requested Annual Perini Uncontrolled Emission . Factor Aclual Annual Emissions Emasstoh I_trnit s Pollutant Emission Factor ' Source k' Factor'; Units (AP 4z, Uncontrolled Controlled6 Uncontrolled Controlled PM Mfg.etc) (Tons/year) (Tons/year) (Tons/year);', (Tons/year) SOX NOX O.oto% Ib/MMBtu A -H i p�{� ca`-lS 0.b_ 0•b VOC ltl,uo'•.n i1W,,,A • Promax Scrs.5$ 15.1 , 3�tp•3b 1ca.3i CO 0.31 Ib/MMBtu ��-tit 2 t 2.2 Z.1- Benzene 2y%-1,1 tl,,,.,,, X; Promax 0.61 0.01.0.03 0.7b 97920.0A Toluene ,biw,mcs Promax 0.28 0.01 0.35 a 9Q O.OL. Ethylbenzene Xylenes n-Hexane 2.'4251.\`i. ttitn€e,54 Promax 6.07 0.12 0.3 7.53 945 0.3S 2,2,4- Trimethylpentane Other: V c1„ki ?Li" Q a,t CalWl Or. Skcc tS. 5 Requested values will become permit limitations. Requested limit(s)should consider future process growth. t L 6Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating, leave blank. [kt,S O COLOR ADO Form APCD-211 -Natural Gas'�'enti g APEN I ev O I20i7 5 1 ' •;s 12 Permit Number: kcIJU E 07A AIRS ID Number: ,1,2 /Aoo7.,r00 [Leave bank unless APCD has aireact/assig e i a permit#and AIRS ID] ` Section 8 - Applicant Certification I hereby certify that all information contained herein and information submitted with this application is complete, true and correct. � tr ` ze.h.4-r -_. 03/02/2018 Signature of Legally Authorized Person (not a vendor or consultant) Date Kathy Steerman Air Quality Coordinator Name (please print) Title Check the appropriate box to request a copy of the: Draft permit prior to issuance ❑✓ Draft permit prior to public notice (Checking any of these boxes may result in an increased fee and/or processing time) • • Send this form along with $152.90 to: For more information or assistance call: Colorado Department of Public Health and Environment Small Business Assistance Program Air Pollution Control Division (303)692-3175 or(303) 692-3148 APCD-SS-B1 4300 Cherry Creek Drive South Or visit the APCD website at: Denver, CO 80246-1530 https://www.colorado.gov/cdphe/apcd Make check payable to: Colorado Department of Public Health and Environment Telephone: (303)692-3150 Form APCD-211 -Natural Gas Venting APEN Rev 03/2017 6 1 � G 444, CDPHE Natural Gas Venting APEN — Form APCD-211 \ ,K Air Pollutant Emission Notice (APEN) and C Application for Construction Permit • All sections of this APEN and application must be completed for both new and existing facilities, including APEN updates. An application with missing information may be determined incomplete and may be returned or result in longer application processing times You may be charged an additional APEN fee if the APEN is filled out incorrectly or is missing information and requires re-submittal. This APEN is to be used for Natural Gas Venting only. Natural Gas Venting includes emissions from gas/liquid separators, well head casing, pneumatic pumps, blowdown events, among other events. If your emission unit does not fall into this category, there may be a more specific APEN for your source. In addition, the General APEN (Form APCD-200)is available if the specialty APEN options will not satisfy your reporting needs. A list of all available APEN forms can be found on the Air Pollution Control Division (APCD)website at: www.colorado.gov/cdphe/apcd. This emission notice is valid for five(5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Permit Number: ( i 6 21 . .- AIRS ID Number: 123 • / ?-Q02./ 665. [Leave blank unless APCD has at ready y assigned a permit#and AIRS ID] Company equipment Identification: LP Separator Venting -n, r['' ' .. ker referenced .. 1;�;':rv€cic=Fad,i.y E..;€,��rn�.,. ID to identify how th,.:.>-€:;�rn�nr is within your or�ar��rat€os€? Section 1 -Administrative Information Company Name': Extraction Oil & Gas, Inc. Site Name: Leonard Production Facility Site Location Site Location: NWSW Sec 21 T2N R67W County: Weld NAICS or sic Code: 211111 Mailing Address: • !Include zip code) 370 17th Street, Suite 5300 Denver, Colorado Permit Contact: Kathy Steerman Phone Number: (720) 974-7765 E-Mail Address2: KSteerman@ExtractionOG.com 'Please use the full,legal company name registered with the Colorado Secretary of State.This is the company name that will appear on all documents issued by the APCD.Any changes will require additional paperwork. 2 Permits,exemption letters,and any processing invoices will be issued by APCD via e-mail to the address provided. � CGLf3RRClD Form APCD-211 - Natural Gas Venting APEN - Rev 03/2017 375879 ,t= Permit Number: C.()l)t✓O7A+ AIRS ID Number: f7� /AML I co3 [Leave h:a k unless APCD has already assigned`a permit AIRS`t0] f i • Section 2- Requested Action • NEW permit OR newly-reported emission source -OR- ❑ MODIFICATION to existing permit(check each box below that applies) ❑ Change fuel or equipment ❑ Change company name ❑ Add point to existing permit ❑ Change permit limit ❑ Transfer of ownership3 ❑ Other(describe below) • -OR- ❑ APEN submittal for update only (Please note blank APENs will not be accepted) -ADDITIONAL PERMIT ACTIONS- ❑ Limit Hazardous Air Pollutants (HAPs)with a federally-enforceable limit on Potential To Emit(PTE) Additional Info Ft Notes: 3 For transfer of ownership,a completed Transfer of Ownership Certification Form (Form APCD-104)must be submitted. Section 3 - General Information General description of equipment and purpose: Low Pressure ("LP") Separator Venting Emissions For existing sources, operation began on: For new or reconstructed sources, the projected start-up date is: 12 / 2 / 2017 O Check this box if operating hours are 8,76O hours per year; if fewer, fill out the fields below: Normal Hours of Source Operation: hours/day days/week weeks/year Will this equipment be operated in any NAAQS nonattainment E Yes ❑ No area Is this equipment located at a stationary source that is ❑ Yes ❑✓ No considered a Major Source of(HAP) Emissions 2 ,�y -.C oCOLOR""ADO Form APCD-211 ...Natural Gas Venting APEN Rev 03/2017 °�" rr:(=ruiecsnen. .FE Permit Number: (,3f✓OZ1 AIRS ID Number: /4(3Q /c_20 [Leave Dank unless APCD has already assigned a per€r€t and AIRS ID] ;kl Section 4 - Process Equipment Information Gas/Liquid Separator ❑ Well Head Casing ❑ Pneumatic Pump Make: Model: Serial#: Capacity: Gal/min ❑ Compressor Rod Packing Make: Model: #of Pistons: Leak Rate: Scf/hr/pist ❑ Blowdown Events #of Events/year: Volume per event: MMscf/event ❑ Other Description: If you are requesting uncontrolled VOC emissions greater than 100 tpy for a Gas/Liquid Separator you must use Natural Gas Venting as a process parameter. Are requested uncontrolled VOC emissions greater than 100 tpy? ✓❑ Yes ❑ No Maximum Vent 2 397 96 SCF/hr Vent Gas 98` BTU/SCF Natural Gas Venting Rate: Heating Value: Process Parameters4: Requested: 21. MMSCF/year Actual: 17.01 MMSCF/year -OR- Liquid Throughput 4 Requested: Bbl/yr Actual: Bbl/yr Process Parameters4: 4 Requested values will become permit limitations. Requested limit(s)should consider future process growth Molecular Weight: 35 Z3'k$� 11`�_•r,,���rJ 1862— VOC (mole%) 39.8285, • VOC (Weight%) Benzene (mole%) 0.Q726 Benzene (Weight%) 0.16b`1 Toluene(mole%) 0.0589 Toluene (Weight%) 0.15,31 Process Properties: Ethylbenzene(mole%) 0.0028 Ethylbenzene(Weight%) 0.0086 Xylene (mote%) 0.0181 Xylene (Weight%) 0.0545 n-Hexane (mole%) 0.5752 n-Hexane (Weight%) 2,2,4-Trimethylpentane 0.0003 2,2,4-Trimethylpentane 0.0009 (mole%) (Weight%) Additional Required Information: ❑✓ Attach a representative gas analysis (including BTEX ft n-Hexane, temperature, and pressure) CI pressure) a representative pressurized extended liquids analysis (including BTEX Et n-Hexane, temperature, and pressure) 5?-140^tS QW cvpiCk ioq , trt( t� co�QRaon 11 Form APCD-211 -Natural Gas Venting APEN Rev 03/2017 3 "} wsn„'n= Permit Number: 1c-buD of AIRS ID Number: /A03--[ GD li..cave hank unless.4PCD has already ?ssi<grec`a<e€'rnit:`and AIR ID] Section 5 - Stack Information Geographical Coordinates (Latitude/Longitude or UTM) 40.12198/-104.90267 �� a °� Discharge Height t e Qperatr + Temp Flaw Rate 1/eYOcltjt _, Above Ground Levu Stack 1D,`No Fee# fA F�4Y) (, Q5000 -30 TBD TBD TBD Indicate the direction of the stack outlet: (check one) ❑✓ Upward ❑ Downward ❑ Upward with obstructing raincap ❑ Horizontal ❑ Other(describe): Indicate the stack opening and size: (check one) ❑✓ Circular Interior stack diameter(inches): TBD ❑Other(describe): Section 6 - Control Device Information Pollutants Controlled: Size: Make/Model: ❑ VRU: Requested Control Efficiency % VRU Downtime or Bypassed % Pollutants Controlled: VOC/HAPs Rating: TBD MMBtu/hr Type: EC l7 ' Make/Model:Questor/Q5000 ❑ Combustion Requested Control Efficiency: ...081S—% Device: Manufacturer Guaranteed Control Efficiency >99 % Minimum Temperature: TBD Waste Gas Heat Content ,98 ` Btu/scf Constant Pilot Light: ❑✓ Yes ❑ No Pilot burner Rating TBD MMBtu/hr Pollutants Controlled: ❑ Other: Description: Control Efficiency Requested r.cg ckp?1:&d-1 OA. �j ,-I U fr Form APCD-211 -Natural Gas Venting APEN- Rev C3/2017 Permit Number: `$uoEOZI4 AIRS ID Number: 1?., / Aoo / S�Q3 :I eav•black unless APCD has already assigned a permit#and AIRS ID] ,l= Section 7- Criteria Pollutant Emissions Information Attach all emission calculations and emission factor documentation to this APEN form. Is any emission control equipment or practice used to reduce emissions? Yes ❑ No If yes, please describe the control equipment AND state the overall control efficiency(%reduction): Overall Requested Control Pollutant Control Equipment Description Efficiency, (%reduction in emissions) PM SOX NO. VOC � 98% cis CO HAPs (DLO 98% '1 Other: From what year is the following reported actual annual emissions data? Projected Use the following table to report the criteria pollutant emissions from source: (Use the data reported in Sections 4 and 6 to calculate these emissions.) Emission Requested Annual Permit Uncontrolled Emission Factor Actual Annual Emissions Emission Limtt(sj5 Pollutant Emission Factor Factor ! Units (AP-42 Uncontrolled Controlled6 Uncontrolled Controlled Mfg.etc) (Tons/year) (Tons/year) (Tons/year) (Tons/year) PM SOX NO), O,0"p Ib/MMBtu l,1s I.IS 1, Z 1.`2_ VOC sq,zub-.3L Ibimyvi5cc Promax y`5}•L yy,bb (,o'1. '>D•22- ' CO 0.31 Ib/MMBtu AP-47 5.2'L S.7-1- I e.4% lo.`ig Benzene �yq �� t�,q,,i � Promax 1.27 ' 6-63 cap 1.5 6.630.0$ Toluene t'-1Z.c1-S �1�„,k� Promax 1.22 • 6782 t�.4tp 1.51 9-93 O.og Ethylbenzene Xylenes �.�� ��,��,�� Promax 0.43 ' 9:etD.oz 0.53 6$1 O,o3 n-Hexane lq _ Ibimm c f Promax 11.11. 8722OISIo 13.7 eb 2,2,4- Trimethylpentane Other: 'i\cd1', v( v co1GA c&k )tati0'L sift ttS. 5 Requested values will become permit limitations. Requested limit(s)should consider future process growth. 6Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating,leave blank l' i COIQR ADO FormAPCD-211 -Natural Gas Venting APEN Rev 03/2017 5 Ay :°°D" .F= • Permit Number: OSLOC-DZl1-- AIRS ID Number: Z� / Aap / col E [Leave blank unless APCD has already assigned a permit#and AIRS iD] Section 8 - Applicant Certification I hereby certify that all information contained herein and information submitted with this application is complete, true and correct.// / 6 _ ecJz�rrc c_—• 03/02/2018 Signature of Legally Authorized Person (not a vendor or consultant) Date Kathy Steerman Air Quality Coordinator Name (please print) Title Check the appropriate box to request a copy of the: (] Draft permit prior to issuance �✓ Draft permit prior to public notice (Checking any of these boxes may result in an increased fee and/or processing time) Send this form along with $152.90 to: For more information or assistance call: Colorado Department of Public Health and Environment Small Business Assistance Program Air Pollution Control Division (303) 692-3175 or(303) 692-3148 APCD-SS-B1 4300 Cherry Creek Drive South Or visit the APCD website at: Denver, CO 80246-1530 https://www.colorado.gov/cdphe/apcd Make check payable to: Colorado Department of Public Health and Environment Telephone: (303)692-3150 COLORADO Form APCD-211 -Natural Gas Venting AI'Lld Rev 0312017 6 1 R„ � , ti nes- C A P H E Hydrocarbon Liquid Loading APEN - Form APCD-208 da Air Pollutant Emission Notice (APEN) and CO rf Application for Construction Permit All sections of this APEN and application must be completed for both new and existing facilities, including APEN updates. An application with missing information may be determined incomplete and may be returned or result in longer application processing times. You may be charged an additional APEN fee if the APEN is filled out incorrectly or is missing information and requires re-submittal. This APEN is to be used for Hydrocarbon Liquid Loading only. If your emission unit does not fall into this category, there may be a more specific APEN for your source. In addition, the General APEN (Form APCD-200)is available if the specialty APEN options will not satisfy your reporting needs. A list of all available APEN forms can be found on the Air Pollution Control Division (APCD)website at:www.cotorado.gov/cdphe/apcd. This emission notice is valid for five(5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made(significant emissions increase, increase production, new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Permit Number: IgW E I OCIZ AIRS ID Number: 1Z,3 //1-602.1 CO S [Leave blank unless APCD has already assigned a permit and AIRS ID] Company equipment Identification: LOAD-1 [Provide Facility Equipment ID to identify how this equipment's referenced within your organization] Section 1 - Administrative Information Company Name': Extraction Oil & Gas, Inc. Site Name: Leonard Production Facility Site Location Site Location: NWSW Sec 21 T2N R67W County: Weld NAICS or SIC Code: 211111 Mailing Address: (include Zip Code) 370 17th Street, Suite 5300 Denver, Colorado Permit Contact: Kathy Steerman - Phone Number: (720) 974-7765 E-Mail Address2: KSteerman@ExtractionOG.com Use the full,legal company name registered with the Colorado Secretary of State.This is the company name that will appear on all documents issued by the APCD. Any changes will require additional paperwork. 2 Permits,exemption letters,and any processing invoices will be issued by APCD via e-mail to the address provided. 3715 SW Amy COLORADO Form APCD-208- Hydrocarbon Liquid Loading APEN - Rev 02/2017 1 I m ' .qF r,. ,j Permit Number: 1%WC Ic9Z AIRS ID Number: v s /Acoi/pO5 [Leave blank unless APCD has already assigned a permit#and AIRS ID] Section 2- Requested Action 'CAA to I i s I IT r a ttac Yltd ❑ NEW permit OR newly-reported emission source e(h((l [, Request coverage under construction permit tgl. Request coverage under General Permit GP07 If General Permit coverage is requested,the General Permit registration fee of$250 must be submitted along with the APEN Filing fee. -OR- ❑ MODIFICATION to existing permit(check each box below that applies) Cl Change fuel or equipment ❑ Change company name ❑ Change permit limit ❑ Transfer of ownership3 ❑ Other(describe below) -OR- ❑ APEN submittal for update only(Blank APENs will not be accepted) -ADDITIONAL PERMIT ACTIONS- El Limit Hazardous Air Pollutants(HAPs)with a federally-enforceable limit on Potential To Emit(PTE) Additional Info£t Notes: 3 For transfer of ownership, a completed Transfer of Ownership Certification Form (Form APCD-104)must be submitted. Section 3 - General Information General description of equipment and purpose: Condensate Truck Loading For existing sources, operation began on: For new or reconstructed sources, the projected start-up date is: 12/ 2 /2017 Will this equipment be operated in any NAAQS nonattainment area? 1] Yes ❑ No Is this equipment located at a stationary source that is considered a Major Source of(HAP) ❑ Yes ❑✓ No emissions? Does this source load gasoline into transport vehicles? ❑ Yes El No Is this source located at an oil and gas exploration and production site? CI Yes El No If yes: Does this source load less than 10,000 gallons of crude oil per day on an annual ❑ Yes ❑✓ No average? • Does this source splash fill less than 6750 BBL of condensate per year? ❑ Yes ❑✓ No Does this source submerge fill less than 16308 BBL of condensate per year? ❑ Yes ❑✓ No vy D Form APCD-2.08-Hydrocarbon Liquid Loading APEN- Rev 02/2017 2 j � (5pilh F Permit Number: \c43 UDC\CAL AIRS ID Number: /A0D2- coS [Leave blank unless APCD has a ready assigned a permit#and AIRS 1DI • to Section 4 - Process Equipment Information Product Loaded: ❑✓ Condensate ❑ Crude Oil O Other: If this APEN is being filed for vapors displaced from cargo carrier, complete the following: Requested Volume Actual Volume Loaded4: � ,466,030 Bbl/yr Loaded: 1,221 ,692 Bbl/yr 4 Requested values will become permit limitations. Requested limit(s)should consider future process growth This product is loaded from tanks at this facility into: tank trucks (eg, "rail tank cars"or"tank trucks") If site specific emission factor is used to calculate emissions, complete the following: Saturation Factor: Average temperature °F of bulk liquid loading: True Vapor Psia 60 °F Molecular weight of Lb/lb-mol Pressure displaced vapors If this APEN is being filed for vapors displaced from pressurized loading lines, complete the following: Requested Volume Bbl/yr Actual Volume Bbl/yr Loaded : Loaded: 4 Requested values will become permit limitations. Requested limit(s)should consider future process growth Product Density: Lb/ft3 Load Line Volume: ft3/truckload Vapor Recovery Line Volume ft3/truckload Form APCD-208-Hydrocarbon Liquid Loading APEN- Rev 02/2017 3 � �' �"` Permit Number: 1LLAYE:toc1L AIRS ID Number: 1l3 /A3)L/ o05 [Leave Wank untess APCD has a ready assigned a permit#and AIRS[D] Section 5 - Geographical Information . Geographical Coordinates (Latitude/Longitude or UTM) 40.12198/-104.90267 We: `i ` �l goiaropitiiit lU "' i��s S rt i t p l ke; ` �' � � $ e "i �.r - ltig ` � i Flo dt ':` "` r Velocity 4 �sma S s�,�„s a> AboV itt'li�3C' Le el ',tr'' .� 3 y- r,� ash:ds* r -era s , x irk u c S 3 4 (ft,�$eL t.� ° %Ff i 'r r -'$- - Fie " mss.3Fq �, la § sa ECD -15 TBD TBD TBD Indicate the direction of the stack outlet: (check one) ❑✓ Upward ❑ Downward ❑ Upward with obstructing raincap ❑ Horizontal ❑ Other(describe): Indicate the stack opening and size: (check one) ✓❑ Circular Interior stack diameter(inches): 48 ❑ Other(describe): Section 6 - Control Device Information ❑ Loading occurs using a vapor balance system: Requested Control Efficiency Pollutants Controlled: VOC/HAPs Rating: TBD MMBtu/hr Type: Two (2) ECDs Make/Model: IES_48 0 Combustion Requested Control Efficiency: 95 % Device: Manufacturer Guaranteed Control Efficiency >98 % Zs3S Minimum Temperature: TBD Waste Gas Heat Content _27523_ Btu/scf Constant Pilot Light: ❑✓ Yes ❑ No Pilot burner Rating TBD MMBtu/hr Pollutants Controlled: ❑ Other: Description: Control Efficiency Requested t i2 ccll:.mac j( c sa lt,J lr kj ohs• ‘4 Ds s "111‘c6 GOLD PA0O Form APCD-208-Hydrocarbon Liquid loading APEN - Rev 02/2017 4 I Av, f.:" `.Hea�S£F 11. Permit Number: \$uDI✓A Z AIRS ID Number: 123 / Z/ 00.5- "Pt ;•4 [Leave blank unless APCD has a ready assigned a permit#and AiRS ID] Section 7 - Criteria Pollutant Emissions Information Attach all emission calculations and emission factor documentation to this APEN form. Is any emission control equipment or practice used to reduce emissions? ❑✓ Yes ❑ No If yes, describe the control equipment AND state the overall control efficiency(%reduction): IgioxOverall Requested Control Pollutant Control Equipment Description Efficiency (%reduction in emissions) PM SOX NOx CO VOC ECD 95% HAPs ECD 95% Other: E Using State Emission Factors(Required for GP07) VOC Benzene n-Hexane ❑✓ Condensate 0.236 Lbs/BBL 0.00041 Lbs/BBL 0.0036 Lbs/BBL ❑ Crude 0.104 Lbs/BBL 0.00018 Lbs/BBL 0.0016 Lbs/BBL From what year is the following reported actual annual emissions data? Projected Use the following table to report the criteria pollutant emissions from source: (Use the data reported in Sections 4 and 6 to calculate these emissions.) INDESSINIMMEMERSEmission I u i v INIENI R tieestaMn 1a P Uncontrolled Emission at Annual EmissionsIll!ijogillo � Factor z _* n�tas�or]1tnttS i Pollutant Emission Factor Source : ---Factor------"Units-- {AP-42, Uncontrolled Controlled5 Uncontrolled Controlled Mfg,etc) (Tons/year) (Tons/year) (Tons/year) (Tonsyear) PM SOx NOx 0.068• Ib/MMBtu AP-42 0.05 0.040 p•a..k 0.05•p,0‘, VOC 0.236' Ib/bbl • State EF 144.16 • 7.21 • 172.99 • 8.65 • CO 0.31 • Ib/MMBtu AP-42 D.tc 94-7U.iS o. vi e21 G.lq Benzene 0.00041. lb/bbl State EF 0.25. 0.01 - 0.30 • 0.02 • Toluene Ethylbenzene Xylenes n-Hexane 0.0036 • Ib/bbl State EF 2.20 • 0.11 ' 2.64 • 0.13 2,2,4- Trimethylpentane Other: -q,cGI,t,•\tS .7 d (& CA:lc to KS 4 Requested values will become permit limitations. Requested limit(s)should consider fdture process growth. 5Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating,leave blank. tll�It-q Aviv COLORADO Form APCD-208-Hydrocarbon Liquid Loading APEN - Rev 02/2017 5 ► M F Permit Number: t`E) J( Z AIRS ID Number: i /AFL/ 005 [Leave blank unless APCD has already assigned a permit#and AIRS ID] ''p Section 8 - Applicant Certification I hereby certify that all information contained herein and information submitted with this application is complete, true and correct. If this is a registration for coverage under General Permit GP07, I further certify that this source is and will be operated in full compliance with each condition of the applicable General Permit. f`7 .r 03/02/2018 Signature of Legally Authorized Person (not a vendor or consultant) Date Kathy Steerman Air Quality Coordinator Name(print) Title Check the appropriate box to request a copy of the: ❑ Draft permit prior to issuance ❑ Draft permit prior to public notice (Checking any of these boxes may result in an increased fee and/or processing time) This emission notice is valid for five (5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type,etc).See Regulation No. 3, Part A, II.C. for revised APEN requirements. Send this form along with $152.90 and the General For more information or assistance call: Permit registration fee of$250 as applicable to: Colorado Department of Public Health and Small Business Assistance Program Environment (303) 692-3175 or(303)692-3148 Air Pollution Control Division APCD-SS-B1 Or visit the APCD website at: 4300 Cherry Creek Drive South Denver, CO 80246-1530 https://www.colorado.gov/cdphe/apcd Make check payable to: Colorado Department of Public Health and Environment Telephone: (303)692-3150 a COLORADO Form APCD-208-Hydrocarbon Liquid Loading APEN- Rev 02/2017 6 l ,Q� =` `≤ i \1Q % IN to A CDPHE Produced Water Storage Tank(s) Air APEN — Form APCD-207 CO q Air Pollutant Emission Notice (APEN)and s Application for Construction Permit All sections of this APEN and application must be completed for both new and existing facilities, including APEN updates.An application with missing information may be determined incomplete and may be returned or result in longer application processing times. You maybe charged an additional APEN fee if the APEN is filled out incorrectly or is missing information and requires re-submittal. This APEN is to be used for tanks that store produced water associated with oil and gas industry operations. If your emission source does not fall into this category, there may be a more specific APEN available for your source(e.g. crude oil storage tanks, condensate storage tanks, hydrocarbon liquid loading, etc.). In addition, the General APEN (Form APCD-200)is available if the specialty APEN options will not satisfy your reporting needs. A list of all available APEN forms and associated addendum forms can be found on the Air Pollution Control Division (APCD) website at: www.colorado.gov/pacific/cdphe/air-permits. This emission notice is valid for five (5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made(significant emissions increase, increase production, new equipment, change in fuel type, etc.). See Regulation No.3, Part A, II.C. for revised APEN requirements. Permit Number: 1 1) UE O7 -6 AIRS ID Number: 123 / /9-602! 004 [Leave blank unless APCD has already assigned a permit#and AIRS ID] Section 1 - Administrative Information Company Name': Extraction Oil & Gas, Inc. Site Name: Leonard Production Facility Site Location: Site Location NWSW Sec 21 -T2N R67W County: Weld NAICS or SIC Code: 211111 Mailing Address: (include Zip Code) 370 17th Street, Suite 5300 Denver, Colorado Permit Contact: Kathy Steerman Phone Number: (720) 974-7765 E-Mail Address2: KSteerman@ExtractionOG.com I Use the full,legal company name registered with the Colorado Secretary of State.This is the company name that will appear on all documents issued by the APCD.Any changes will require additional paperwork. 2 Permits,exemption letters,and any processing invoices will be issued by APCD via e-mail to the address provided. 375877 W. COLORADO Form APCD-207 Produced Water Storage Tan€k(s)APEN- Revision 07/2017 1 EAll =NIT= ks Permit Number: ,C1OtOU7g, AIRS ID Number: 2 / 002-/ 009 [Leave blank unless APCO has atreacy assigned a permit r'and AIRS€D] �l Section 2 - Requested Action O NEW permit OR newly-reported emission source O Request coverage under traditional construction permit ❑ Request coverage under a General Permit ❑ GP05 ❑ GP08 If General Permit coverage is requested, the General Permit registration fee of$250 must be submitted along with the APEN filing fee. -OR- ❑ MODIFICATION to existing permit(check each box below that applies) El Change in equipment ❑ Change company name O Change permit limit ❑ Transfer of ownership3 ❑ Other(describe below) -OR- ❑ APEN submittal for update only(Note blank APENs will not be accepted) • -ADDITIONAL PERMIT ACTIONS- El APEN submittal for permit exempt/grandfathered source ❑ Limit Hazardous Air Pollutants(HAPs)with a federally-enforceable limit on Potential To Emit(PTE) Additional Info Et Notes: 3 For transfer of ownership,a completed Transfer of Ownership Certification Form (Form APCD-104)must be submitted. Section 3 - General Information General description of equipment and purpose: Two (2) -400 bbl Produced Water Storage Vessels For existing sources, operation began on: For new or reconstructed sources, the projected start-up date is: 12/2/2017 Normal Hours of Source Operation: 24 hours/day 7 days/week 52 weeks/year Storage tank(s) located at: 0 Exploration a Production(EEtP)site El Midstream or Downstream (non MP)site Will this equipment be operated in any NAAQS nonattainment area? 0 Yes ❑ No Are Flash Emissions anticipated from these storage tanks? 0 Yes ❑ No Are these storage tanks located at a commercial facility that accepts oil production El Yes ❑✓ No wastewater for processing? Do these storage tanks contain less than 1%by volume crude oil on an annual average basis? 0 Yes El No Are these storage tanks subject to Colorado Oil and Gas Conservation Commission (COGCC) 2 Yes ❑ No 805 series rules? If so, submit Form APCD-105. Are you requesting a 6 ton/yr VOC emissions(per storage tank), or are uncontrolled actual 0 Yes ❑ No emissions≥6 ton/yr(per storage tank)? ,y :COLORADO 2 Form APCD 207 - Produced Water Storage Tank(s)APEN Revision 07/2017 • • Permit Number: Epz1 q, AIRS ID Number: rZki A007, C [Leave clank unless APO)has already assigned a perrnii/1 and A1RS ID] . .,E Section 4 - Storage Tank(s) Information Actual Annual Amount Requested Annual Permit Limit4 (bbl/year) (bbl/year) . Produced Water Throughput: 657,894 789,473 From what year is the actual annual amount? Projected Tank design: Fixed roof ❑ Internal floating roof ❑ External floating roof Storage #of Liquid Manifold Storage Total Volume of Installation Date of Most Date of First Tank ID Vessels in Storage Tank Storage Tank Recent Storage Vessel in Production (bbl) Storage Tank(month/year) (month/year) PV-1&Pw-2 2 800 11/2017 11/2017 • Wells Serviced by this Storage Tank or Tank Battery5 (EftP'Sites Only) API Number Name of Well Newly Reported Well See Form APCD-212 ❑ - - ❑ - - ❑ 4 Requested values will become permit limitations. Requested limit(s)should consider future growth. 5 The EFrP Storage Tank APEN Addendum(Form APCD-212)should be completed and attached when additional space is needed to report all wells that are serviced by the equipment reported on this APEN form. Section 5 - Stack Information Geographical Coordinates (Latitude/Longitude or UTM) 40.12198/-104.90267 Operator:Stack Discharge Height Above Temp. Flow Rate Velocity ID No Ground Level (feet) (°F) (ACFM) ' (ft/sec) ECD -15 TBD TBD TBD Indicate the direction of the stack outlet: (check one) ❑� Upward ❑Downward ❑Upward with obstructing raincap ❑Horizontal O Other(describe): Indicate the stack opening and size: (check one) ❑✓ Circular Interior stack diameter(inches): 48 ❑Square/rectangle Interior stack width (inches): Interior stack depth (inches): ❑Other(describe): COLORADO Form APCD-207 Produced Water Storage-lank(s)ADEN - Revision 07/2017 3 :=1-7=1: Permit Number: �O1,14L, AIRS ID Number: , / 'C�Z ( CO [Leave blank unless APC0 has already assigned a permit, and AIRS ID] .E: Section 6 - Control Device Information ❑ Check this box if no emission control equipment or practices are used to reduce emissions, and skip to the next section. Pollutants Controlled: Vapor Size: Make/Model: ❑ Recovery Unit(VRU): Requested Control Efficiency: % VRU Downtime or Bypassed (emissions vented): % Pollutants Controlled: VOC/HAPS Rating: TBD MMBtu/hr Type: Two(2)ECDs Make/Model: I ES-48 ✓❑ Combustion Requested Control Efficiency: 95 % Device: Manufacturer Guaranteed Control Efficiency: >98 Minimum Temperature: TBD Waste Gas Heat Content: 1 451 Btu/scf Constant Pilot Light: ❑✓ Yes ❑ No Pilot Burner Rating: TBD MMBtu/hr Description of the closed loop system: ❑ Closed Loop System Pollutants Controlled: O Other: Description: Control Efficiency Requested: % Section 7 -Gas/Liquids Separation Technology Information (E£tP Sites Only) What is the pressure of the final separator vessel prior to discharge to the storage tank(s)? —45 psig Describe the separation process between the well and the storage tanks: HLP Separator, Produced Water Storage Tanks , cc.ac COLORd€5O Form APCD-207 Produced Water Storage Tank(s)APBs! Revision 0712017 • Permit Number: \ J DDS AIRS ID Number: IZ�/.Aoot r cot-I _ , [Leave blank unless APCD has already assigned a permit:;:t and AIRS D] f Section 8 - Emissions Inventory Information Attach all emissions calculations and emission factor documentation to this APEN form6. If multiple emission control methods were identified in Section 6, the following table can be used to state the overall (or combined)control efficiency (%reduction): Overall Requested Control. Pollutant Description of Control Methods) Efficiency (%reduction in emissions) V0C ECD 95% NOx CO HAPs - ECD 95% Other: From what year is the following reported actual annual emissions data? Projected Criteria Pollutant-Emissions Inventory Emission Factorb Actual Annual Emissions Requested Annual Permit.Emissian Limit(s)4 Pollutant: Uncontrolled Source Uncontrolled Controlled Uncontrolled • Controlled . Basis Units (AP-42, Emissions Emissions Emissions Emissions; 1t;.cc�i Mfg. etc) (Tons/year) (Tons/year) • (Tons/year) (Tons/year).Qv( VOC 0.0461 - lb/bbl Analysis 15.15? 0.76 18.2 L 0.91 (T NOx 0.068 • lb/MMBtu AP-42 O,oS- 0.05 0,OS 0.05 • ' it }Ii CO 0.31 • lb/MMBtu AP-42 O.Lk 0.21 . O.LS 0.25 • ,• Non-Criteria Reportable Pollutant Emissions Inventory Chemical - Emission Factor6 Actual Annual Emissions Chemical Name. Abstract Source Uncontrolled Controlled Service CAS Uncontrolled � (CAS)- Units (AP-42, Emissions Emissions Number Basis Mfg. etc) (Pounds/year) (Pounds/year)! Benzene 71432 Toluene 108883 Ethylbenzene 100414 Xylene 1330207 • n-Hexane 110543 0.0017_ lb/bbl Analysis 1,088 54 . 2,2,4- 540841, Trimethylpentane 4 Requested values will become permit limitations. Requested limit(s)should consider future growth. 6 Attach produced water laboratory analysis,stack test results,and associated emissions calculations if you are requesting site specific emissions factors according to the guidance in PS Memo 14-03. 7 Annual emissions fees will be based on actual controlled emissions reported. If source has not yet started operating,leave blank. COLOR ADO Form APCD-207- Produced Water Storage Tank(s)APEN - Revision 07/2017 5 1I3 .yu°:rid • Permit Number: 1ebli)e.bu� AIRS ID Number: hACOZ /cOL( [Leave blank unless APCD has already assigned a permit#and AIRS D] a ,Fa • Section 9 - Applicant Certification I hereby certify that all information contained herein and information submitted with this application is complete, true and correct. If this is a registration for coverage under General Permit GP05 or GP08, I further certify that this source is and will be operated in full compliance with each condition of the applicable General Permit. /1/at03/02/2018 Signature of Legally Authorized Person (not a vendor or consultant) Date Kathy Steerman Air Quality Coordinator Name(print) Title Check the appropriate box to request a copy of the: ❑� Draft permit prior to issuance E✓ Draft permit prior to public notice (Checking any of these boxes may result in an increased fee and/or processing time) This emission notice is valid for five(5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type, etc.). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Send this form along with$152.90 and the General Permit For more information or assistance call: registration fee of$250, if applicable, to: Colorado Department of Public Health and Small Business Assistance Program Environment (303)692-3175 or(303)692-3148 Air Pollution Control Division APCD-SS-B 1 4300 Cherry Creek Drive South Or visit the APCD website at: Denver, CO 80246-1530 Make check payable to: htt's://www.colorado.gov/cdphe/apcd Colorado Department of Public Health and Environment Telephone: (303)692-3150 COLORADO Form APCD-207 Produced Water Storage Tank(s)APEN - Revision 07/2017 6 ( &a Ra„, E&P Storage Tank Air Pollutant Emissions Notice(APEN) Addendum Forml ks Company Name: Extraction Oil&Gas,Inc. Source Name: Leonard Production Facility Emissions Source AIRS ID2: N/A/ 12 h00 Z - 004-- Wells Services by this Storage Tank or Tank Battery (E&P Sites Only) API Number Name of Well Newly Reported Well 05-123-45045 Leonard 2N 05-123-45049 Leonard 3N 05-123-45046 Leonard 4N 05-123-45048 Leonard 5C 05-123-45047 Leonard 6N 05-123-450SL Leonard 7N 05-123-45044 Leonard 9C 05-123-45050 Leonard 10N El - - ❑ • El El El - - ❑ El - - ❑ C-, ❑ El Footnotes: 1 Attach this addendum to associated APEN form when needed to report additional wells. 2 If this is a newly report source that has not been assigned an AIRS ID by the APCD, enter N/A Form APCD-212 5.AP FormAPCD-212-EP-StorageTank-APEN-Addendum_20180219. ` ,C)",!-.' Hydrocarbon Liquid Loading APEN - Form APCD-2O8 ��ti" it` Air Pollutant Emission Notice (APEN) and Application for Construction Permit All sections of this APEN and application must be completed for both new and existing facilities, including APEN updates. An application with missing information may be determined incomplete and may be returned or result in longer application processing times. You may be charged an additional APEN fee if the APEN is filled out incorrectly or is missing information and requires re-submittal. This APEN is to be used for Hydrocarbon Liquid Loading only. If your emission unit does not fall into this category, there may be a more specific APEN for your source. In addition, the General APEN (Form APCD-200) is available if the specialty APEN options will not satisfy your reporting needs. A list of all available APEN forms can be found on the Air Pollution Control Division (APCD)website at:www.cotorado.gov/cdphe/apcd. This emission notice is valid for five(5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made(significant emissions increase, increase production, new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Permit Number: IgvuE 10612- AIRS ID Number: I2.3 /19-602J 006 [Leave blank unless APCD has already assigned a permit r'and AIRS ID] Company equipment Identification: LOAD-1 [Provide Facility Equipment.ID to identify how this equipment is referenced within your organization] Section 1 - Administrative Information Company Name': Extraction Oil & Gas, Inc. Site Name: Leonard Production Facility Site Location Site Location: NWSW Sec 21 T2N R67W County: Weld NAICS or SIC Code: 211111 Mailing Address: (Include Address: Code) 370 17th Street, Suite 5300 Denver, Colorado Permit Contact: Kathy Steerman - Phone Number: (720) 974-7765 E-Mail Address2: KSteerman@ExtractionOG.com Use the full,legal company name registered with the Colorado Secretary of State.This is the company name that will appear on all documents issued by the APCD.Any changes will require additional paperwork. 2 Permits,exemption letters,and any processing invoices will be issued by APCD via e-mail to the address provided. sSig COLORADO Form APCD-208- Hydrocarbon Liquid Loading APEN - Rev 02/2017 1 I k ' { 3;, ';:„ Permit Number: 1ci>WE`(nZ AIRS ID Number: 12S /,400Z/eO5 [Leave blank unless APCD has already assigned a permit F and A R5 ID] Section 2- Requested Action KAA l0 I 1 g I t$` p-e r a{{7(G ht ❑✓ NEW permit OR newly-reported emission source email aRequest coverage under construction permit tgl Request coverage under General Permit GP07 If General Permit coverage is requested, the General Permit registration fee of$250 must be submitted along with the APEN Filing fee. -OR- ❑ MODIFICATION to existing permit(check each box below that applies) ❑ Change fuel or equipment ❑ Change company name ❑ Change permit limit ❑ Transfer of ownership3 ❑ Other(describe below) -OR- ❑ APEN submittal for update only(Blank APENs will not be accepted) -ADDITIONAL PERMIT ACTIONS- Limit Hazardous Air Pollutants(HAPs)with a federally-enforceable limit on Potential To Emit (PTE) Additional Info£t Notes: 3 For transfer of ownership, a completed Transfer of Ownership Certification Form (Form APCD-104)must be submitted. Section 3 - General Information General description of equipment and purpose: Condensate Truck Loading For existing sources, operation began on: For new or reconstructed sources, the projected start-up date is: 12/ 2 /2017 Will this equipment be operated in any NAAQS nonattainment area? 2 Yes ❑ No Is this equipment located at a stationary source that is considered a Major Source of(HAP) ❑ Yes El No emissions? Does this source load gasoline into transport vehicles? El Yes ❑✓ No Is this source located at an oil and gas exploration and production site? El Yes ❑ No If yes: Does this source load less than 10,000 gallons of crude oil per day on an annual ❑ Yes ❑✓ No average? Does this source splash fill less than 6750 BBL of condensate per year? ❑ Yes El No Does this source submerge fill less than 16308 BBL of condensate per year? ❑ Yes ❑ No _ _ COLORADO A Form APCD-2.08 -Hydrocarbon Liquid Loading APEN Rev 02/2017 2 I P r Permit Number: \cbliDC 1MZ AIRS ID Number: Z/oo' [Leave blank unless APCD has already assigned a permit#and AIRS lDi Section 4 - Process Equipment Information Product Loaded: 0 Condensate ❑ Crude Oil ❑ Other: If this APEN is being filed for vapors displaced from cargo carrier, complete the following: Requested Volume Actual Volume Loaded4: 1 ,466,030 Bbl/yr Loaded: 1 ,221,692 Bbl/yr 4 Requested values will become permit limitations. Requested limit(s)should consider future process growth This product is loaded from tanks at this facility into: tank trucks (eg, "rail tank cars"or"tank trucks") If site specific emission factor is used to calculate emissions, complete the following: Saturation Factor: Average temperature °F of bulk liquid loading: True Vapor Psia®60 °F Molecular weight of Lb/lb-mot Pressure displaced vapors If this APEN is being filed for vapors displaced from pressurized loading tines, complete the following: Requested Volume Actual Volume Loaded5: Bbt/yr Loaded: Bbl/yr 4 Requested values will become permit limitations. Requested limit(s)should consider future process growth Product Density: Lb/ft3 Load Line Volume: ft3/truckload Vapor Recovery Line Volume ft3/truckload p s coloHA©o Form APCD-208-Hydrocarbon Liquid Loading APEN-• Rev 02/2.017 3 Q1 .ns Permit Number: lclzki)l✓10`12— AIRS ID Number: /XD'L/ 005-- [Leave blank unless APCD has atready assigned a permit#and AiRS ID] '1_ Section 5 - Geographical Information Geographical Coordinates (Latitude/Longitude or'UTM) 40.12198/-104.90267 Stack[f No � Above Groui Level f#/sect ECD -15 TBD TBD TBD Indicate the direction of the stack outlet: (check one) 0 Upward ❑ Downward ❑ Upward with obstructing raincap ❑ Horizontal ❑ Other(describe): Indicate the stack opening and size: (check one) ✓❑ Circular Interior stack diameter(inches): 48 ❑ Other(describe): Section 6 - Control Device Information D Loading occurs using a vapor balance system: Requested Control Efficiency Pollutants Controlled: VOC/HAPs Rating: TBD MMBtu/hr Type: Two (2) ECDs Make/Model: IES -48 ❑ Combustion Requested Control Efficiency: 95 % Device: Manufacturer Guaranteed Control Efficiency >98 % 7,S35- Minimum Temperature: TBD Waste Gas Heat Content _2-523__ Btu/scf Constant Pilot Light: ❑✓ Yes ❑ No Pilot burner Rating TBD MMBtu/hr Pollutants Controlled: ❑ Other: Description: Control Efficiency Requested i�.c4l�v•C- ‘7SV k-C-J C�ltr,]Gt ohs � COLOR DO Form APCD-208-Hydrocarbon Liquid Loading APEN - Rev 02/2017 4 I AT -'r �;«.F.��" lE Permit Number: \q-JuDEtZ- AIRS ID Number: \'3 / L/ .5 [Leave blank unless APCD has a ready assigned a permit.#and ARS ID] Section 7 - Criteria Pollutant Emissions Information Attach all emission calculations and emission factor documentation to this APEN form. Is any emission control equipment or practice used to reduce emissions? ❑✓ Yes ❑ No If yes, describe the control equipment AND state the overall control efficiency(%reduction): Overall Requested Control Pollutant Control Equipment Description Efficiency (%reduction;in emissions) PM SOx NOx CO VOC ECD 95% HAPs ECD 95% Other: E Using State Emission Factors(Required for GP07) VOC Benzene n-Hexane ❑✓ Condensate 0.236 Lbs/BBL 0.00041 Lbs/BBL 0.0036 Lbs/BBL ❑Crude 0.104 Lbs/BBL 0.00018 Lbs/BBL 0.0016 Lbs/BBL From what year is the following reported actual annual emissions data? Projected Use the following table to report the criteria pollutant emissions from source: (Use the data reported in Sections 4 and 6 to calculate these emissions.) Emission, a l;�qu�stenua60erm�t Uncontrolled Emission Factor Ac ual Ann ual Emissions a Enttsst t.tati s 5� . Pollutant Emission Factor ' x. ....;. o ..a.�.•, ���_, •�_.. _.moow �� �a.>-� Factor Units (AP-42, f,:Uncontrolled. Controlled Mfg.etc); (Tons/year) (Tons/year) (Tons/year) (Tons/year) PM SOx NOx 0.068• Ib/MMBtu AP-42 0.05 0.04-goo O 0.05p•o.f VOC 0.236 lb/bbl State EF 144.16 • 7.21. • 172.99 • 8.65 • CO 0.31 • Ib/MMBtu AP-42 0.tS 9 70.AS 0. VI 8.24 0.tc:\ Benzene 0.00041. lb/bbl State EF 0.25 . 0.01 - 0.30 • 0.02 • Toluene Ethylbenzene Xylenes n-Hexane 0.0036 • lb/bbl State EF 2.20 • 0.11 ' 2.64 • 0.13 • 2,2,4- Trimethylpentane - Other: .Jpckc'*c cA.1.G6 tt to KS • 4 Requested values will become permit limitations. Requested limit(s)should consider future process growth. 5Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating, leave blank. 11tf It� COLORADO Form APCD-208-Hydrocarbon Liquid Loading APEN- Rev 02/2017 5 I �� 1 � Rev E;a<I1tcFs:nF%carueani Permit Number: k%t66 AIRS ID Number: /ACOL/ tCO5 [Leave blank unless APCD has already assigned a permit#and AR ID: Section 8 - Applicant Certification I hereby certify that all information contained herein and information submitted with this application is complete, true and correct. If this is a registration for coverage under General Permit GP07, I further certify that this source is and will be operated in full compliance with each condition of the applicable General Permit. 03/02/2018 Signature of Legally Authorized Person (not a vendor or consultant) Date Kathy Steerman Air Quality Coordinator Name(print) Title Check the appropriate box to request a copy of the: ❑ Draft permit prior to issuance ❑ Draft permit prior to public notice (Checking any of these boxes may result in an increased fee and/or processing time) This emission notice is valid for five(5)years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made(significant emissions increase, increase production, new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Send this form along with $152.90 and the General For more information or assistance call: Permit registration fee of$250 as applicable to: Colorado Department of Public Health and Small Business Assistance Program Environment (303) 692-3175 or(303)692-3148 Air Pollution Control Division APCD-SS-B1 Or visit the APCD website at: 4300 Cherry Creek Drive South Denver, CO 80246-1530 https://www.colorado.gov/cdphe/apcd Make check payable to: Colorado Department of Public Health and Environment Telephone: (303) 692-3150 a COLORADO Form APCD-208-Hydrocarbon Liquid Loading APEN- Rev 02.12017 6 I g1 ==='.'='. Hello