Loading...
HomeMy WebLinkAbout20181427.tiffRESOLUTION RE: EXTENSION OF TIME FOR SUBMITTAL OF FINAL PLAN FOR CHANGE OF ZONE, PZ -1071, FOR ADLER ESTATES PUD - MEAD CROSSINGS, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, by Resolution #2005-2855, dated October 19, 2005, the Board approved the application of Melody Homes, Inc., dba DR Horton - The Melody Series, 11031 Sheridan Boulevard, Suite A, Westminster, Colorado 80020, requesting a Change of Zone, PZ #1071, from the A (Agricultural) Zone District to a PUD (Planned Unit Development) Zone District for 833 single family residential lots, along with an elementary school site, 70.08 acres of open space, and continued oil and gas production, for a parcel of land located on the following described real estate, to -wit: Part of the SW1/4 and part of the SE1/4 of Section 33, and part of the SW1/4 of Section 34, all in Township 3 North, Range 68 West of the 6th P.M., Weld County, Colorado WHEREAS, by Resolution #2008-2630, dated September 29, 2008, the Board granted a twelve-month extension of time for filing the PUD Final Plan for Adler Estates PUD until October 19, 2009; and by Resolution #2009-2807, dated October 26, 2009, the Board granted a second twelve-month extension of time for filing the PUD Final Plan until October 19, 2010; and by Resolution #2010-2341, dated October 4, 2010, the Board granted a third twelve-month extension of time for filing the PUD Final Plan until October 19, 2011; and by Resolution #2011- 3144, dated December 12, 2011, the Board granted a fourth twelve-month extension of time for filing the PUD Final Plan until December 12, 2012; and by Resolution #2014-3780, dated December 8, 2014, the Board granted a fifth twelve-month extension of time for filing the PUD Final Plan until December 8, 2015, and by Resolution #2015-3985, dated December 21, 2015, the Board granted a sixth twelve-month extension of time for filing the PUD Final Plan until December 8, 2016, and by Resolution #2017-0735, dated March 13, 2017, the Board granted a seventh twelve-month extension of time for filing the PUD Final Plan until December 8, 2017, and WHEREAS, pursuant to Section 27-8-50 of the Weld County Code, the current owner of the property, Mead Crossings, LLC, do Fred Kelley, 1200 17th Street, Suite 850, Denver, Colorado 80202, submitted a letter dated March 1, 2018, requesting the Board consider an additional one-year (1 year) extension of time for filing the PUD Final Plan for the Adler Estates PUD, and cc: PLC Ko/mm , PPL, CO -CS ./ FH) 06—ra - r8 2018-1427 PL1792 RE: EXTENSION OF TIME FOR SUBMITTAL OF FINAL PLAN (ADLER ESTATES PUD, PZ #1071) - MEAD CROSSINGS, LLC PAGE 2 WHEREAS, on April 18, 2018, the Board deemed it advisable to continue the matter to May 2, 2018, to allow Mead Crossings, LLC, c/o Fred Kelley to be present and to have a full Board. WHEREAS, on May 2, 2018, the Board of County Commissioners heard all of the testimony and statements of those present, studied the request of the applicant and the recommendations of staff from the County Attorney's Office and the Weld County Department of Planning Services, and all of the exhibits and evidence presented in this matter and, having been fully informed, deemed it advisable to grant a three (3) month extension, until August 6, 2018, to allow Mead Crossings, LLC, adequate time to provide letters from the Longs Peak Water District stating water service is feasible and available, and from the Developer that they can obtain financing for the water project. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the time for filing the Final Plan for Change of Zone, PZ #1071, for the Adler Estates PUD, for Mead Crossings, LLC, be, and hereby is, extended for the period of three (3) months, until August 6, 2018, to allow Mead Crossings, LLC, adequate time to provide letters from the Longs Peak Water District stating water service is feasible and available, and from the Developer that they can obtain financing for the water project. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 2nd day of May, A.D., 2018. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: dole%) adto;ok Weld County Clerk to the Board ounty • ttorney Date of signature: OS -4(-18 EXCUSED Ste Moreno, Chair ulie A. Cozad Mike Freeman 2018-1427 PL1792 1 PAGE OF DOCUMENT INCLUDED IN PAPER FILE. REMAINDER RETAINED ELECTRONICALLY IN TYLER. MEMORANDUM TO: Board of County Commissioners DATE: April 10, 2018 FROM: Kim Ogle, Planning ServiceO SUBJECT: RequestforExtension forsubmittal of Final PlatApplication Adler Estates PUD, (PZ-1071), Mead Crossings, LLC PZ-1071, Change of Zone for Adler Estates PUD was approved by the Board of County Commissioners on October 19, 2005. Fred Kelly, Manager, Mead Crossings, LLC, the current owner of the property is requesting a one-year extension for the submittal of the Final Plat application for Adler Estates, PUD citing that development will be unavoidably delayed. Section 27-8-50 of the Weld County Code states: "If a PUD final plan application is not submitted within three (3) years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submittal of the PUD final plan. The Board of County Commissioners may extend the date for the submittal of the PUD final plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board of County Commissioners determines that conditions or statements made supporting the original approval of the PUD Zone District have changed or that the landowner cannot implement the PUD final plan, the Board may, at a public meeting, revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original zone district." (Weld County Code Ordinance 2002-9; Weld County Code Ordinance 2003-10) Case History: October 19, 2005 Change of Zone Approved for a PUD for 833 Single Family Residential Lots, along with an Elementary school site, 70.08 acres of open space and continued oil and gas production - Melody Homes, Inc. dba DR Horton [Adler Estates PUD] April 6, 2006 Special Warranty Deed between Floyd and Marian D. Adler and Mead Crossings, LLC for three tracts of land described as Part of the SW4 and Part of the SE4 of Section 33, and part of the SW4 of Section 34, all in Township 3 North, Range 68 West of the 6th P.M., Weld County, Colorado September 29, 2008 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the currentmarket conditions. October 26, 2009 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current less - than -favorable economic and market conditions. SERVICE. TEAMWORK, fNTEGRITY, QUALITY 2018-1427 October 4, 2010 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17i Street Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions. December 12, 2011 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17A Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions. December 17, 2014 Fred R. Kelly, Jr., Partner,.Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 requested athree (3) year extension forthe submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions do not make it possible for lots to be sold at present and therefore development will be unavoidably delayed. The Board of County Commissioners granted a one (1) year extension until December 8, 2015 with quarterly updates provided to the Department of Planning services and various benchmarks achieved. March 31, 2015 First Quarterly update letter - written record of progress to date Priority 1. Assemble team to advise on the technical project issues Priority 2. Commence work on project financing Priority 3. Engage services of an investment banker Had discussions with developers and builders in the vicinity of Mead to determine viability of the existing land plan in today's market. Attended two public meetings held with at the Town of Mead, on February 4 and March 16, 2015 to discuss plans and topics of mutual interest. July 10, 2015 Second Quarterly update letter - written record of progress to date Priority 1. Assemble team to advise on the technical project issues, discussions with Ken Puncerelli and Josh Rowland, Land Architects Priority 2. Commence work on project financing, discussions with the law firm of Fairfield and Wood Priority 3. Engage services of an investment banker, selection of D.A. Davidson Had further discussions with developers and builders in the vicinity of Mead to determine viability of the existing land plan in today's market. Met with Ms. Dawn Adams, Town of Mead Development Directorwho has provided assistance on the towns development plans. With assistance of Fairfield and Wood, had preliminary discussions with the oil and gas producer and the development of a surface use agreement. SERVICE, TEAMWORK, INTEGRITY, QUALITY October 10, 2015 Third Quarterly update letter - written record of progress to date From preliminary discussion had in the 2nd Quarter, received a new proposal outlining a new configuration for the surface use agreement. Goal is to have signed document by end of 2015 after review by Fairfield and Wood. In the last three months considerable time was devoted to update development costs, review of special district service plans and the means to provide financing for the expensive infrastructure. Some additional time may be required to determine a suitable financial vehicle. December 8, 2015 March 6, 2017 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 is requesting a three (3) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions do not make it possible for lots to be sold at present and therefore development will be unavoidably delayed. The Board took action on his request and granted him a one year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) until December 8, 2016 with quarterly updates provided to the Department of Planning Services. April 2, 2016 First Quarter update letter - written record of progress to date With assistance of Fairfield and Wood, have had ongoing discussions with the oil and gas producer and the development of a surface use agreement. Continuing to monitor Ballot Questions# 75 and #78 July 2, 2016 Second First Quarter update letter - written record of progress to date Ongoing discussion with oil and gas producer and the development of a surface use agreement. Evaluating number of housing units within development to address some of the infrastructure costs. October 12, 2016 Third Quarter update letter - written record of progress to date Discussions with the Town of Mead, Longs Peak Water and area developers for participation in a water line extension. The Town of Mead is running point pulling parties together to address this issue. Anadarko the oil and gas producer has changed their long term area plans and therefore the tentative SUA will be required to be reworked. February 28, 2017 First Quarter update letter - written record of progress to date Meeting of January 16, 2017 with the interim manager of the Town of Mead. Discussion on the status of potable water for area residential development and fire suppression. The Town indicated they had secured funding to bring a 6 -inch line to the intersection of Hwy 66 and County Road 7. Good news, as there is a potential for tie in at this point and bring water south into the Adler Estates PUD development. Details of an agreement between the Town and Adler Estates remain to be worked out. Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 in a letter dated October 12, 2016 is requesting a one (1) year extension for the submittal of the Final Plan application, Adler Estates SERVICE, TEAMWORK, INTEGRITY, QUALITY PUD (PZ-1071) stating that the improvement in the Mead market conditions are now favorable for development. The Board took action on his request and granted him a one year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) until December 8, 2017 with quarterly updates provided to the Department of Planning Services. April 10, 2018 Fred R. Kelly, Jr. Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 in a facsimile letter dated March 1, 2018 and received March 6, 2018 is requesting a one (1) year extension for the submittal of the Final Plan application, Adler Estates Planning staff did not receive quarterly updates on the status of the application during the 2017 calendar year. This is the eighth (8) request for an extension of time for the submittal of a PUD Final Plan application from Mr. Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17r Street, Suite 850, Denver, Colorado 80202 SERVICE, TEAMWORK, INTEGRITY, QUALITY motion carried unanimously. Commissioner Conway moved to re-classify CR 29, north of CR 392 from arterial to collector. Upon a roll call vote, the motion failed with Commissioners Kirkmeyer, Freeman, and Cozad being opposed. Commissioner Kirkmeyer moved to approve Code Ordinance #2017-01 on First Reading as amended. The motion, which was seconded by Commissioner Conway, carried unanimously. PLANNING: 1) CONSIDER RELEASE OF COLLATERAL FOR NGL WATER SOLUTIONS DJ, LLC, AND ACCEPT REPLACEMENT WARRANTY COLLATERAL FROM CENTENNIAL WATER PIPELINES, LLC: Ms. Lundquist requested the release of the NGL collateral in the amount of $2,400.00 and acceptance of replacement collateral, in the amount of $2,400.00, from Centennial Water Pipelines. The motion, which was made by Commissioner Kirkmeyer, and seconded by Commissioner Moreno, carried unanimously. 2) CONSIDER REQUEST CONCERNING EXTENSION OF TIME FOR SUBMITTAL OF FINAL PLAN FOR CHANGE OF ZONE, PZ-1071, FOR ADLER ESTATES PUD - MEAD CROSSINGS, LLC: Kim Ogle, Department of Planning Services, stated the Final Plan application was not submitted within the three-year time frame. Mr. Ogle stated that the Board has provided additional time for the applicant to submit the Final Plan application with a one (1) year extension to end December 8, 2016, while requiring quarterly updates, which have been submitted regarding the development. The applicant has requested an addidtional one (1) year extension due to a plan to bring water in through the Town of Mead. Mr. Ogle stated this is the seventh (7) request for extension of time. Fred Kelly, with Mead Crossings, LLC, stated a major issue has been getting water to the properties, which originally was to be built by a company that failed to do so. Mr. Kelly explained that the Town of Mead has plans to build a water line extension, which will allow for an extension from Mead to serve this property. He noted that January was when the discussion with Mead began and the construction will start within the next year. Mr. Ogle stated staff recommends a one-year extension, with the requirement of quarterly updates to continue. Upon a roll call vote, the motion to approve said extension, with conditions that quarterly reports continue, passed four to one, with Commissioner Kirkmeyer being opposed. 3) CONSIDER RECORDED EXEMPTION, RECX16-0203 - ROBERT AND SALLY DALTON: Michael Hall, Department of Planning Services, stated the applicants are proposing a two -lot recorded exemption on Lot B, which is 20.2 acres in size. He stated staff recommends denial due to the lot being less than the required thirty-five (35) acres. Robert Dalton, applicant, stated annexation into Frederick is not an option due to the property being within the Frederick -Boulder Creek Planning Area Intergovernmental Agreement (IGA) between Boulder County and the Town of Frederick. IUr. Dalton stated research shows the Commissioners have previously allowed exemptions with less than thirty-five (35) acres on a lot. He pointed out the easement and access that is granted to Lot B has no restrictions and agreements are in place for road maintenance, which is maintained by the owners of Lot A, and is already in use by himself for farm equipment. Commissioner Kirkmeyer stated that the new Lot B must have a separate access and utility easement use agreement. Mr. Hall addressed Commissioner Kirkmeyer stating that this does meet the intent of the surrounding neighborhood. Commissioner Kirkmeyer moved to grant Recorded Exemption RECX16-0203, with the conditions of approved as presented. Seconded by Commissioner Conway, the motion carried unanimously. Chair Cozad stated it is important to meet with the Town of Frederick, to attempt to get out of the IGA with Boulder County, which restricts development in unincorporated Weld County. R HSOI _ LIMNS AND ORDINANCES: The resolutions were presented and signed as listed on the Consent Agenda. Code Ordinance #2017-01 was approved on First Reading, as amended. Minutes, March 13, 2017 Page 5 2017-0717 BC0016 Y;, ; INBOUND NOTIFICATION : FAX RECEIVED SUCCESSFULLY ** TIME RECEIVED March 6, 2018 at 1:02:15 PM MST REMOTE CSID DURATION PAGES STATUS 35 1 Received Mar 06 2018 02:04PM HP Fax page 1 Mar 1, 2018 Sent via fax: 970.304.6498 Mr. Kim Ogle Senior Planner Weld County Planning Department 1555 N. 17th Avenue Greeley, CO 80631 Dear Mr. Ogle: I am writing to request a one-year extension of time from the due date for finalizing the plat on the Adler Farm near Mead. Development will be unavoidably delayed. Thank you in advance for your consideration of my request. I eagerly await your written response. Sincerely, Fred R. Kelly, Jr. Partner Mead Crossings 1200 17th Street, Suite 850 Denver, CO 80202 (303) 572-6990 From: Amber Kauffman [mailto:akauffman@LTWD.org] Sent: Thursday, March 8, 2018 10:17 AM To: Kim Ogle <kogle@weldgov.com> Subject: Phone Call Kim, Thank you for the call and voicemail. The developer located north of WCR 26 and South of SH 66 west of 1-25 and east of WCR 5 1/2 is correct, we do have an IGA with the Town of Mead to serve where they annex. We are working with the Town and Longs Peak Water District to determine if a planning boundary is appropriate and where that boundary would be. We are currently anticipating generally half way between WCR 3 and WCR 5 however that is not set in stone at this time. We have talked to a developer about the same area you mentioned. I believe they understand that we have no waterlines in that area and a system upgrade would be required. We do currently have a 24 -inch stub underneath l- 25 approximately 1/3 mile south of SH 66 (behind the U -Haul business. We are working with Developers that annex into Mead to exclude from Longs Peak Water District and be included in LTWD. I hope that helps! Feel free to call/email with other questions. I would also like to talk to you at some point about water dedication and development and how the County would like development to move forward in this regard. Sincerely, Amber Amber Kauffman, P.E., District Engineer Little Thompson Water District 835 E. State Highway 56, Berthoud, CO 80513 PH: 970-532-2096 I FX: 970-532-3734 akauffman@ltwd.org I www.ltwd.org Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast Ltd, an innovator in Software as a Service (SaaS) for business. Providing a safer and more useful place for your human generated data. Specializing in; Security, archiving and compliance. To find out more Click Here 1 / ICJ 1 f% /\ ' Cu R 40 1']/" 1 rc ESt 1 ` --.• 'Sw'<'`, ♦., W Cu Rd 44 .. I fit / -•• •\ •. - • •. _d\ •�- RCo Rd Co Rd .4Q /• � an/ .1 ., _ .. • L444 tie I i ( RI I cnRa� _-, - - ... - Marron. _ ___.._-.._-. Ii ,g .- _ Rd i. lI • rte_ J i... i 1 i t y.. - I I i I: !- III 1 ! I t I I"........1- Rd 4jjii_4._r- .... .. j Co 1 / I / i lik---.......,, , et I I anlalelCl � i I I •l•I•.._• I ••` ._ ., / • I , o ' I \ I _ , •,` . : /�'..._• _ - US �or.eR. • 1•...\v 1 lip 1 ` • If lif - IIIA •,. I ••, _.._ _. to •-� ;, ,� ..., 'a------�' III J ,titi�6EI9� E21 4 •. .._..._ _... __ ' =� - = ��� �1.._• _�■■� .Raa Rd 2422 _ _,,_, 1 ' i i$ •••_.. ' 1 lid 1 ,` 1���� ,., ,.■ w� i '�_ plc • < - .,, �rllllllllll�� III�_■ ..i . . _.. _..._._ ; �. 3 •_ ..'- , 1.::11■-�IIIIIII���i ��� ...... - ` _1� .a�:1� , -..: . ...... - �: ` �� ■11111111111111 :• �1 III f ,. , �`--� v .. .- TIC\ ` - 1 _..._..._ •::• r••�., `.. 11 - ' Salm Maid �1 ,... 91YralnRd - 1 ' 9AAv ', W9 A 1111• ,J ` — _ . r •_. -=; �� ■.■■.�.■,�■■i.�� _ ., , - f ...: ■i■..at.�..■.■_ 4,91♦: .. _ , .. X11 �,11.��• i• �1 _..._ i fA _ 1. •Siln<yn�Blvq �r.• —� —'.lift 1�;�;■■�■�■■■■� a ,1 e _ ;rr� n �■:■:■■■■ llli9r w' . Legend• . ',III 1■1� „ 119 / \ •'. ��` �� �' - - 9w.1e. , 19 .. 1 :.. _..�rl ,wa4�: .� ... _ _ ' I \\ cya4n llJ '- ' •47v67 Roads LPWD Boundaries LPWD Water Mains LPWD Nodes ., - Pump Station � worms/ -I _ n `^`: Rail Road ---- Expanded Area - LPWD Water Mains Blowoff '' I' Reducer •='• >: ' � IIIIIII Lakes ---- Boundary ,� Fire Hydrant Tank r � Pall / •. _ Waal ,.- % •_ ..,' � r -,I '' V=• - . 60 ' _ Streams --- Gap Area PRV _'> Valve �; .. r �.aa�l,e wn..;` ' ct - Outside of District = Plant Vault P 41>• ri�l��� - — — LTWD Water Mains " � ♦ w —tllll _ 1_ ■ �l i 1 l'• --r• ' � i 'C d____: -c4 a mtim Rd j : fl �1:- /: PIER in LONGS PEAK WATER DISTRICT MD • • • • • • • • • • • • • • • • • • 0^ LONGS PEAK WATER DISTRICT PRVil1-r ELEV 5240 FT 120 PSI IN 180 PSI OU a .................. c J Cutvet Ditch rr ca/nrei Little T River • J to 17 10 efrira LONGS PEAK WATER DIS'T'RICT LP - LT INTERCONNECT VAULT 4"'ELEV=6196 FT 155 PSI IN 1 100 PSI OUT SHEET 2 I I I 1 1 Supply Ditch .f/!'"1 '-'$0 Wanrlla n t Rd Yallowite a.Rd— `4 Crystal L i. cematie0C I I I I ,I I II Terry Lake • Cn Rd l c '4 SI OUT RABBIT MTN PUMP STATION 55 PSI IN / 135 PSI OUT Rab • i ' oun . m S0K GAL TANK FIWL = 5348 FT BASE ELEV = 5330 FT 250K GAL TANK HWL a 5353 FT BASE ELEV = 5334 FT 4" DRAIN US Hwy 66 pigarhhY Diect' _ SHEET 3 1 *• Journey In • .foodlana Rd PRV #1 - 4' ELEV 5129 FT 95 PSI IN / 70 PSI OUT PRIMARY FEED 4 Spinnaker0 A- AC icy Vsrmlfion Rd PRV #2 - 4" ELEV 5103 FT 110 PSI IN 1'10 PSI OUT SECONDARY FEED 6• Anhewa Ave J o 22nd Av4. A LONGS PEAK WATER DISTRICT I In LONGS PEAK WATER DISTRICT a .................. Flemming Dr Adkinson Ave 20th Ave Calkins Ava PRV #3-4` ELEV 5127 FT 96 PSI IN ! 70 PSI OUT TERTIARY FEED f Kalil( P1 j1 Criiman Dr Bragg P1 Tony PI Henan PI 23rd Ave Nonsked Ave Paz PI M L, o, Vermillion Rd Canadian Winding Dr SHEET 5 PRV $4 . 4- ELEV 5040 FT 100 PSI IN ) BO PSI OUT TERTIARY FEED Olenarbor C& Pra LONGS PEAK WATER DISTRICT E17ThAve Tonkin PI PRV #5 - e• ELEV 5081 FT 125 PSI IN (80 PSI OUT PRIMARY FEED PRV #6 - 6' ELEV 5087 FT 130 PSI IN 180 PSI OUT SECONDARY FEED L_ • • , Co Rd 34 i f• ' e• r r �. colPRN7-2' ELEV 5054 FT PSI IN 170 PSI OU 1 S. I r P I h cc 0 U SHEET 6 PA LONGS PEAK WATER DISTRICT 1 •MM_GEMN N M 2. _ US, _Qli__ PRV 08 - 2' EMERGENCY FEED ELEV 4979 FT 110 PSI IN f 80 PSI OUT orer MIngefilithiljujj 9 K O a \1 6uN4 ,( Mulligan Reservoir e I -Ire Q _Whitetail -4- Ct I Highland Or LP - LT INTERCONNECT VAULT 4- - ELEV 4976 FT 95 PSI IN / 75 PSI OUT 1/ E 125 Frontage Rd i 4 E; Yl Muflha!p sl N Valley Dr 2 s whey or a M a MIS a Mani.. S.M. a— f In — •�!i Peak Ave Olrgarchv Ditch Sanborn Reservoir Co Rd 28 SHEET 7 LP - lM EMERGENCY INTERCONNECT VAULT _ Elmer Lin trier-LinnDr LP - LT INTERCONNECT VAULT 4" • ELEV 4976 FT 95 PSI IN/ 75 PSI OUT Foster' Resereorr F LONGS PEAK WATER DISTRICT Mr .................. Hello