HomeMy WebLinkAbout20183288.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 19 BETWEEN COUNTY ROADS 16 AND 18 FOR
APPROXIMATELY FIVE (5) DAYS, FOR CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 19, between County Roads 16 and 18,
be temporarily closed, with said closure being effective October 22, 2018, for approximately
five (5) days for a culvert replacement, and further, that standard official traffic control devices
shall be erected at said closure giving notice of the restrictions.
cc.: sec RS. ;c1/4-1-Cr),
GCS StQte, i-t.tro t
(II -7l1$
2018-3288
EG0024
TEMPORARY CLOSURE - COUNTY ROAD 19
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 15th day of October, A.D., 2018.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: dartifet)�
Weld County Clerk to the Board
ounty Attorney
Date of signature: 11 ( Co(
�E v _ / /LC,.Z�
Steve Moreno, Chair
2018-3288
EG0024
861
MEMORANDUM
TO: Clerk to the Board DATE: October 9, 2018
D U„N T FROM: Amy Joseph, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 50 between WCR 13 north and WCR 13 south is closed from 10/22/2018 thru 10/26/2018 for a
culvert replacement.
WCR 19 between WCR 16 and WCR 18 is closed from 10/22/2018 thru 10/26/2018 for a culvert
replacement.
See attached closure diagram(s).
2018-3288
aC7oo Dy
POSTED AT WCR 20 ( 311N�Ov3Htl
03S010 OtlOa
N
Mir
a
a
a
a
._4- ,. '� -fay f a � a �� �r.v� f ! � a �� -f�� �� ! � � �� ��
WCR 18
a s .......... °Se f! a s .S -Sr f! ore a -epi— a s 4.6
• r. I
:.. toI
i
I
I
•
�2
•.i tits.
API
Aii
p)_ kCAU ten
Alike
iHAF=Ic UNI
Pr) iii
WCR 16
I
I
J
1
1
WCIR 21
I
.� .a a .a ISSIOnoTf a — e —e _— — S /' — a IS— — So a — a a
ROAD CLOSED
AHEAD 1.5 MILE
POSTED AT HWY 52
i
1
I
i
I
I
1
i
la a s a.sawa a a ea ar a la a _—
S
Project # AN -59
Road closure description
WCR 19 between WCR 16 and WCR 18
closed 10/22/2018 thru 10/26/2018
for culvert replacement
Notice to Public
Road signs and barricaded during closure
Message boards to be used
Detour Route
WCR 16 between WCR 19 and WCR 21 1 mile gravel
WCR 21 between WCR 16 and WCR 18 1 mile gravel
WCR 18 between WCR 19 and WCR 21 1 mile gravel
Notes
ADT of WCR 19 is; 1948/2017
Culvert replaced is drainage: with new 18" CSPR
Mag chloride to be used for dust control
Culvert is .6 north of WCR 16 on WCR 19
Placement of signs not to scale
Date
10/9/2018
Prepared by
LEE STEPHEN
Approved by county engineer
CAMERON PARROTT
Hello