Loading...
HomeMy WebLinkAbout20181761.tiffHEARING CERTIFICATION DOCKET NO. 2018-56 RE: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT, USR18-0027, FOR A GREATER THAN 12 -INCH HIGH PRESSURE NATURAL GAS PIPELINE APPROXIMATELY FOUR (4) MILES LONG IN THE A (AGRICULTURAL) ZONE DISTRICT — DCP OPERATING COMPANY, LP A public hearing was conducted on June 13, 2018, at 10:00 a.m., with the following present: Commissioner Steve Moreno, Chair Commissioner Barbara Kirkmeyer, Pro-Tem - EXCUSED Commissioner Sean P. Conway - EXCUSED Commissioner Julie A. Cozad Commissioner Mike Freeman Also present: Clerk to the Board, Esther Gesick Assistant County Attorney, Bob Choate Planning Services Department representative, Kim Ogle Public Works Engineer representative, Hayley Balzano Health Department representative, Lauren Light The following business was transacted: I hereby certify that pursuant to a notice dated April 24, 2018, and duly published April 27, 2018, in the Greeley Tribune, a public hearing was conducted to consider the request of DCP Operating Company, LP, for a Site Specific Development Plan and Use by Special Review Permit, USR18-0027, for greater than 12 -inch high pressure natural gas pipeline approximately four (4) miles long in the A (Agricultural) Zone District. Bob Choate, Assistant County Attorney, made this a matter of record. la Chair Moreno advised the applicant and the public that Commissioners Kirkmeyer and Conway are excused, and approval will require a unanimous vote from the present Commissioners. The applicant agreed to proceed. IE Kim Ogle, Department of Planning Services, presented a brief summary of the applicant's proposal to construct, own, and operate, an approximate 3.8 mile, 20 -inch diameter, discharge pipeline referred to as the Crossroads Discharge Project. He reviewed the rights -of -way easements during and after construction, burial depths, and ancillary equipment. He stated the pipeline route is located within the three (3) mile referral area of the Town of Kersey; however, the Town did not return a referral response, and the referral response from the Colorado Division of Wildlife cited no concerns, and no referral response was received from History Colorado. He reviewed the requirement for an Emergency Action Safety Plan and stated the entire length of the pipeline is designed and constructed as required by the Colorado Department of Transportation, Hazardous Materials Safety Administration. He stated staff sent out eleven (11) referrals and received two (2) with comments that have been considered in the staff recommendation. Mr. Ogle reported no letters or phone calls have been received from surrounding property owners and he MPLIMMIKO> >Pwu-C,ENct-t-1, e,1rrs> os/ot la 2018-1761 PL2555 HEARING CERTIFICATION - DCP OPERATING COMPANY, LP (USR18-0027) PAGE 2 displayed the site map displaying the pipeline route and entered the unanimous favorable recommendation of the Planning Commission into the record as written. Hayley Balzano, Public Works Engineer representative, provided a brief overview of the transportation plans and requirements and described the location in relation to relevant County roads. She stated per the application materials, there are no temporary or permanent access points planned outside of the pipeline right-of-way and any access points will require a Weld County Access Permit. She reviewed the classifications of the impacted local roads, boring depths at roadway crossings, and clarified that after construction is complete, the applicant proposes occasional traffic related to pipeline inspections or maintenance. Ms. Balzano stated accesses may require temporary tracking control during construction and a temporary Improvements Agreement will be required during construction. She explained pipelines are exempt from drainage requirements and a Weld County Grading Permit will be required if disturbing more than an acre. In response to Commissioner Cozad, Ms. Balzano stated Development Standard (DS) #4 needs to be modified to match the prior application (see USR18-0026). Lauren Light, Department of Public Health and Environment, reviewed the water and sewer provisions stating portable toilets can be used along the construction route, an Air Emissions Permit will be required if disturbing more than 25 acres, and Development Standards (DS) #13-20 address Environmental Health items. Kent Naughton represented the applicant and requested the same revisions as the prior pipeline (see USR18-0026). No public testimony was offered concerning this matter. r In response to Chair Moreno, Mr. Naughton requested the same edit to DS #8 as the previous pipeline. He also requested clarification on DS #4. Commissioner Cozad agreed DS #4 needs to be changed for consistency. Commissioner Freeman agreed. Mr. Choate clarified DS #8 to read: "Any oil and gas pipeline crossing a County road shall be bored in accordance with the Right -of -Way Permit from the Department of Public Works." In response to Chair Moreno, Mr. Naughton indicated, on behalf of DCP Operating Company, LP, that he has reviewed, and agrees to abide by, the Conditions of Approval and Development Standards, as amended. Commissioner Cozad moved to approve the request of DCP Operating Company, LP, for a Site Specific Development Plan and Use by Special Review Permit, USR18-0027, for greater than 12 -inch high pressure natural gas pipeline approximately four (4) miles long in the A (Agricultural) Zone District, based on the recommendations of Planning staff and the Planning Commission, with the Conditions of Approval and Development Standards as amended and entered into the record. The motion was seconded by Commissioner Freeman, and it carried unanimously. There being no further discussion, the hearing was completed at 11:02 a.m. 2018-1761 PL2555 HEARING CERTIFICATION - DCP OPERATING COMPANY, LP (USR18-0027) PAGE 3 This Certification was approved on the 18th day of June, 2018. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: ditif44) jello•ec, Weld County Clerk to the Board BY: Deputy Clerk to the Boar ED AS TO my Attorney Date of signature: D1 -2? -/2 Steve Moreno, Chair EXCUSED Barbara Kirkmeyer, Pro -Tern EXCUSED Sean P. onway ie A. Cozad Mike Freeman 2018-1761 PL2555 ATTENDANCE LIST DATE: Cp/ IS/ OO18 ii /4/6^ r i 1411)W//�' 'l4c� i ��avy rkQ...) . 2-O - ,..lL. C►�a�,,,&8e v6.15,rn.�.c a.,,H2.- De.,e..n_s 1- P e -d. 37O I 7 ' 4{- L zsoo D,vrvcr Co I0zC)'Z n ,-r J� ,.._ 17'5: �- Sc?ce,hr - •r rr1 lth; _co .Cv, X767 wcg,46 1 ■ ■ Hello