HomeMy WebLinkAbout20181756.tiffMEMORANDUM
TO: Kim Ogle, Planning Services DATE:April 18, 2018
FROM: Hayley Balzano, Public Works
SUBJECT: USR18-0027 DCP O'Connor to Crossroads
The Weld County Department of Public Works has reviewed this Use by Special Review Pipeline proposal.
Staff comments made during this phase of the application process may not be all-inclusive, as other issues
may arise during the remaining application process.
COMMENTS
GENERAL PROJECT INFORMATION/LOCATION
Project description: A Site Specific Development Plan and Use by Special Review Permit for a greater than
12 -inch high pressure natural gas pipeline approximately four (4) miles long in the A (Agricultural) Zone
District
General Location of Pipeline: between County Road 44 and County Road 52, east of County Road 49
ACCESS
The application material indicates that no temporary or permanent access points are planned outside of the
pipeline ROW. Any unintended construction/temporary access points shall be required to obtain a Weld
County Access Permit. Public Works will review any application(s) and provide a recommendation for
access locations based on County code and safety criteria in accordance with the Weld County Engineering
and Construction Criteria. Questions concerning access requirements can be directed to Public Works
access permit division.
For new accesses and/or change of use of an existing access, the fee and photos are required (photo
looking left and right along roadway from the access point and looking in to and out of the access point).
These photos are used to evaluate the safety of the access location. Access permit instructions and
application can be found at https://www.weldgov.com/departments/publIc works/permits/. Chapter 6,
Sections 6.3, 6.4 and 6.5 of the Weld County Engineering and Construction Criteria offer access design
guidance, which can be accessed at: https://www weldgov com/departments/public works/engineering/.
ROADS AND RIGHTS -OF -WAY
County Road 50 is a paved road and is designated on the Weld County Functional Classification Map (Code
Ordinance 2017-01) as a(n) collector road, which requires 80 feet of right-of-way. The applicant shall
delineate on the site map or plat the future and existing right-of-way and the physical location of the road.
If the right-of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld
County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future
right-of-way line. Be aware that physical roadways may not be centered in the right-of-way. This road is
maintained by Weld County.
County Road 48 is a gravel road and is designated on the Weld County Functional Classification Map (Code
Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way. The applicant shall delineate
on the site map or plat the future and existing right-of-way and the physical location of the road. If the right-
of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County
Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-
way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained
by Weld County.
County Road 46 is a gravel road and is designated on the Weld County Functional Classification Map (Code
Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way. The applicant shall delineate
on the site map or plat the future and existing right-of-way and the physical location of the road. If the right-
of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County
Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-
way line. Be aware that physical roadways may riot be centered in the right-of-way. This road is maintained
by Weld County.
Per Chapter 12, Article 4, Section 12-4-30.B, a Weld County Right -of -Way Use Permit is required for any
project that will be occupying, constructing or excavating facilities within, and/or encroaching upon, any
County rights -of -way or easement. Pipelines crossing a county road shall obtain a Right -of -Way Permit and
possibly a Special Transport Permit. Pipelines crossing county roads shall be bored, unless otherwise
approved by Public Works. Right -of -Way Use Permit instructions and application can be found at
https://www.weldgov comldepartmentslpublicworks/permits/.
Any oil and gas pipeline crossing an arterial road shall be bored a minimum of twenty (20) feet below arterial
roads, fifteen (15) feet below collector and paved local roads, and ten (10) feet below gravel local roads.
This depth shall be measured below the lowest roadside ditch flowline elevation, for the full width of the
future right of way.
Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate
existing utilities within the County right-of-way.
TRAFFIC
The application material indicated that once construction of the pipeline is complete, there may be
occasional traffic for inspection and maintenance of the pipeline.
TRACKING CONTROL POLICY
The pipeline accesses may be required to have temporary tracking control.
ROAD MAINTENANCE AGREEMENT
Public Works is requiring a Road Maintenance Agreement for one or all the following reasons:
• Off -Site Public Improvements
• Road Maintenance Agreement
• Construction Maintenance Agreement
• Access Improvements Agreement
An Improvements Agreement is required for sites with required offsite improvements per Chapter 12, Article
5, Section 12-5-60. Collateral is required to ensure the improvements are completed, and maintained.
Improvements/Road Maintenance Agreement: An example agreement is available at:
https://www.weldclov com/UserFiles/Servers/Server 6/File/Departments/Publie/020Works/DevelopmentR
eviewlsprusr.pdf. It will detail the approved haul route(s), outline when offsite improvements will be
triggered, and include a maintenance agreement for the haul routes. Possible mitigations included in the
road maintenance agreement may include but are not limited to: dust control and damage repairs.
DRAINAGE REQUIREMENTS
Pipelines are excepted from the requirements of a drainage report and detention pond design under 23-
12-30.F.1.a.5 for pipelines or transmission lines.
GRADING PERMIT
If more than 1 acre is to be disturbed for construction of non -pipeline items such as structures, parking lots,
laydown yards etc..., a Weld County grading permit will be required prior to the start of construction. Grading
Permit applications are accepted after the planning process is complete (plan recorded). An Early Release
Request Form may be entertained only after the applicant, Public Works and Planning Department have
reviewed the referral and surrounding property owner comments. The Early Release Request may or may
not be granted depending on referral comments and surrounding property owner concerns. Contact an
Engineering representative from the Public Works for more information.
A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact:
Colorado Department of Public Health and Environment, Water Quality Control Division, 303-692-3575.
CONDITIONS OF APPROVAL
A. A Road Maintenance Agreement is required during the construction of the pipeline. Road maintenance
may include dust control, tracking control, damage repair attributable to construction of the pipeline and
located within 1/2 mile of any construction access point for the project. (Department of Public Works)
B. The plan shall be amended to delineate the following:
1. County Road 50 is a paved road and is designated on the Weld County Functional Classification
Map as a collector road which requires 80 feet of right-of-way at full buildout. The applicant shall
delineate on the site plan the future and existing right-of-way. All setbacks shall be measured from
the edge of future right-of-way. This road is maintained by Weld County. (Department of Public
Works)
2. County Road 48 is a gravel road and is designated on the Weld County Functional Classification
Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall
delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge
of right-of-way. This road is maintained by Weld County. (Department of Public Works)
3. County Road 46 is a gravel road and is designated on the Weld County Functional Classification
Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall
delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge
of right-of-way. This road is maintained by Weld County. (Department of Public Works)
4. Show and label the approved access locations on the site plan (If applicable). The applicant must
obtain an access permit in the approved location(s) prior to construction. (Department of Public
Works)
Prior to Construction:
A. The approved access and tracking control shall be constructed prior to construction of the pipeline.
(Department of Public Works)
B. The applicant shall submit evidence of a right-of-way permit for any work that may be required in the
right-of-way and/or a special transport permit for any oversized or overweight vehicles that may access
the site. (Department of Public Works)
C. If more than one (1) acre is to be disturbed for construction of non -pipeline items, a Weld County grading
permit will be required. (Department of Public Works)
DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN)
1. The property owner shall control noxious weeds on the site. (Department of Public Works)
2. During construction, the access(es) on the site shall be maintained to mitigate any impacts to the public
road including damages and/or off -site tracking. (Department of Public Works)
3. During construction, there shall be no parking or staging of vehicles on public roads. On -site parking
will be utilized. (Department of Public Works)
4. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire
an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works)
5. Any oil and gas pipeline crossing a county road shall be bored a minimum of twenty (20) feet below
arterial roads, fifteen (15) feet below collector and paved local roads, and ten (10) feet below gravel
local roads. This depth shall be measured below the lowest roadside ditch flowline elevation, for the full
width of the future right of way. (Department of Public Works)
6. With exception of perpendicular crossings, oil and gas pipelines are not to be located within Weld
County right of way or future right of way. (Department of Public Works)
7. Any damage occurring to the right of way, caused by the pipeline, will be the responsibility of the
operator. (Department of Public Works)
8. The historical flow patterns and runoff amounts on site will be maintained. (Department of Public Works)
WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org
Memorandum
To: Kim Ogle
From: Lauren Light, Environmental Health Services
Date: April 19, 2018
Re: USR18-0027 DCP Operating Company, LP
Environmental Health Services has reviewed this proposal for a Site Specific
Development Plan and Use by Special Review Permit for a greater than 12 -inch high
pressure natural gas pipeline approximately four (4) miles long in the A (Agricultural)
Zone District.
Permanent water and sewer is not required as this request is a temporary construction
use. Portable toilets and bottled water can be utilized during construction of the
pipeline. As the amount of disturbed area exceeds 25 acres an Air Pollution Emission
Notice (APEN) is required.
We have no objections to the proposal; however, we do recommend that the following
requirements be incorporated into the permit as development standards:
1. During construction, all liquid and solid wastes (as defined in the Solid Wastes
Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and
removed for final disposal in a manner that protects against surface and
groundwater contamination.
2. During construction, no permanent disposal of wastes shall be permitted at this
site. This is not meant to include those wastes specifically excluded from the
definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act,
30-20-100.5, C.R.S.
3. During construction, waste materials shall be handled, stored, and disposed in a
manner that controls fugitive dust, fugitive particulate emissions, blowing debris,
and other potential nuisance conditions. The facility shall operate in accordance
with Chapter 14, Article 1 of the Weld County Code.
Health Administration
Vital Records
lot: 9/U 304 6410
Fax: 9/0-301-64 I'2
Public Health &
Clinical Services
cic: 9/0 304 6420
Fax: 9/0-3N-6416
Environmental Health
Services
Tele: 970-304-6415
Fax. 970-304-6411
Communication,
Education & Planning
Tele: 970-.304-6470
Fox: 970-304-6452
Emergency Preparedness
8 Response
Te le: 970-304-6470
Fax: 970-304-6462
Public Health
4. Fugitive dust and fugitive particulate emissions shall be controlled throughout
the duration of construction of the pipeline and until ground cover is
established. Uses on the property shall comply with the Colorado Air
Quality Commission's air quality regulations.
5. During construction, adequate toilet facilities and handwashing units shall be
provided. Portable toilets are acceptable. Portable toilets shall be serviced by a
cleaner licensed in Weld County and shall contain hand sanitizers.
6. The applicant shall submit an Air Pollution Emission Notice (A.P.E.N.) and
Emissions Permit Application and obtain a permit from the Air Pollution Control
Division, Colorado Department of Public Health and Environment, as
applicable.
7. The facility shall notify the County of any revocation and/or suspension of any
State issued permit.
8. The operation shall comply with all applicable rules and regulations of the State
and Federal agencies and the Weld County Code.