Loading...
HomeMy WebLinkAbout20181287.tiffCOLORADO Department of Public Health & Environment Dedicated to protecting and improving the health and environment of the people of Colorado Weld County - Clerk to the Board 1150 0 St PO Box 758 Greeley, CO 80632 April 18, 2018 Dear Sir or Madam: RECEIVED APR 232018 WELD COUNTY COMMISSIONERS On April 19, 2018, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc. - Gillham 18 Sec HZ. A copy of this public notice and the public comment packet are enclosed. Thank you for assisting the Division by posting a copy of this public comment packet in your office. Public copies of these documents are required by Colorado Air Quality Control Commission regulations. The packet must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please send any comment regarding this public notice to the address below. Colorado Dept. of Public Health &t Environment APCD-SS-B1 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 Attention: Clara Gonzales Regards, Clara Gonzales Public Notice Coordinator Stationary Sources Program Air Pollution Control Division Enclosure 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe John W. Hickenlooper, Governor I Larry Wolk, MD, MSPH, Executiye Director and Chief Medial Officer t?ubl,ic, Re tali cc: PL(rx TP), tvr),PWCERIc t Ic(l o4 -3a -I8 by -2.3-18 2018-1287 Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: PDC Energy, Inc. - Gillham 18 Sec HZ - Weld County Notice Period Begins: April 19, 2018 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Gillham 18 Sec HZ Well Production Facility SESE of Section 18, Township 5N, Range 64W Weld County The proposed project or activity is as follows: The operator is requesting permit coverage for twenty (20) 538 barrel fixed roof condensate storage vessels at a new synthetic minor well production facility located in the ozone non -attainment area. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area) • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 18WE0042 have been filed with the Weld County Clerk's office. A copy of the draft permit and the Division's analysis are available on the Division's website at https://www.colorado.gov/pacific/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Any such comment must be submitted in writing to the following addressee: Harrison Slaughter Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 cdphe.commentsapcd@state.co.us Colorado Air Permitting Project Project Details Review Engineer: Package #: Received Date: Review Start Date: Section 01- Facility Information Company Name: PDG;Ener'g County AIRS ID: 123: Plant AIRS ID: 9F80 Facility Name: Gillfiam 18 Physical Address/Location: SESE quadrant o Type of Facility: What industry segment? Is this facility located in a NAAQS non -attainment area? If yes, for what pollutant? ❑Carbon Monoxide (CO) Harrison S laught er'. 373484 : '; 1/4/2018 Section 02 - Emissions Units In Permit Application weld Quadrant Section Township Range 1 Section 18, Township 5N, Range 64W, in Weld County, Colorado Well pad_- ri & Processing, Ye: Particulate Matter (PM) Ej3zone (NOx & VOC) AIRs Point # Emissions Source Type Equipment Name Emissions Control? Permit # Issuance # Self Cert Required? Action Engineering Remarks 001 «, *' � prr 'Tank TK 18W E0042 1 " des � Permit initial lssaancer x , Section 03 - Description of Project POC Energy, Inc. submitted an application requestingtraditional permit coverage for condensate storage vessels at a new exploration and productionfacility l'ocated" in the ozone non-attalnrrrent area. The condensate tank included in this application iiAPEN required because uncontrolled VOC emissions are > 1 itpy (Colorado Regulation 3 part;A Sectlonll .B.3.a. source also requires a permit because uncontrolled actual VOC,erriissioris f. m •the facility are greaterthan 2 tpy (Colorado Regulation 3, PartiB Sectiorx1(.D.2_a.). Pia r nttnrill be required for this source because the source is requesting synthetic ro)ectare greatertha.n.;25 tpy. Section 04 - Public Comment Requirements N Is Public Comment Required? F. - If yes, why? f,WIL st . Section 05 - Ambient Air Impact Analysis Requirements Was a quantitative modeling analysis required? If yes, for what pollutants? If yes, attach a copy of Technical Services Unit modeling results summary. Section 06 - Facility -Wide Stationary Source Classification Is this stationary source a true minor? Is this stationary source a synthetic minor? If yes, indicate programs and which pollutants: Prevention of Significant Deterioration (PSD) Title V Operating Permits (OP) Non -Attainment New Source Review (NANSR) Is this stationary source a major source? If yes, explain what programs and which pollutants here: Prevention of Significant Deterioration (PSD) Title V Operating Permits (OP) Non -Attainment New Source Review (NANSR) SO2 NOx CO VOC O O O O ❑ ❑ ❑ El ❑ ❑� PM2.5 PM10 TSP HAPs ❑ ❑ ❑ ❑ ❑ ❑' SO2 NOx CO VOC PM2.5 PM10 TSP HAPs ❑ ❑ ❑ ❑ O O ' ❑ ❑ ❑ ❑ O 0 ❑ ❑ ❑ O Condensate Storage Tank{s) Emissions Inventory _ Section 01 -Administrative Information Facility AIRS ID: i3 gq.: C ry Plant P int Section 02 -Equipment Description Details Detailed Emksions Unit omcriptlon: Emission Control Device Description: Requested Overall VOC & HAP Control Efficiency%: Section 03- Processing Rate Information for Emissions Estimates Primary Emissions -Storage Tank(s) Actual Condensate Throughput= Requested PermR Limit Throughput- Potential to Emit (PIT) Condensate Th roughp Secondary Emissions -Combustion Device(s) Heat content of waste gas- Volume of waste gas emitted per BBL of liquids')' produced = Actual heat content of waste gas routed to combustion device= Requested heat content of waste gas routed to combustion device= asela'mrmeckedu(algaidd'teas) Barrels )bbl) per year Barrels )bbl) per year Barren )bbl) per year Btu/scf scf/bbl Potential to Emit (PTE) heat content of waste gas routed to combustion deice = Section 04 -Emissions Factors & Methodologies Will this storage tank emit flash emissions? /d Pollutant Uncontrolled (lb/hr) Source VOC Benzene 19007''. P rotai Toluene .637749''.: P ro Ethylbenzene ProM Xylenes 0-. 5107.._.; Pi n -Hexane rq 2,2,4 -IMP 002099634 "... Actual Condensate Throughput While Emissions Controls Operating = 37,005., MMBTU per year 57,005 MMBTU per year 68,407 MMBTU per year Emission Factors Condensate Tank Pollutant Uncontrolled Controlled (Ib/bbl) (Ib/bbl) (Condensate Throughput) (Condensate Throughput) Emission Factor Source VOC 2,3491 1.175E-01 2.501E-04 3.378E-04 1.239E-05 1.524E-04 2.182E-03 1.113E-05 Benzene Toluene 5.003E-03 6.755E-03 2.477E-04 3.048E-03 4.364E-02 2.226E-04 Ethylbenzene Xylene n-Hexa 224 TMP Pollutant Control Devi. Emission Factor source Uncontrolled Uncontrolled )Ib/MMBtu) (Ib/bbi) (waste heat combusted) (Condensate Throughput) PM10 PM2.5 NO0 co 0.0000 0.0000 9.520E-03 1.901.2 Section 05 -Emissions Inventory Criteria Pollutants Potental to Emit Uncontrolled )tons/year) Actual Emissions Uncontrolled Controlled (tons/year) (tons/year) Requested Permit Limits Uncontrolled Controlled (tans/year) (tons/years VOC PM10 PM2.5 NOx CO 1164.72 970.60 48.53 970.60 48.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.72 3.93 3.93 3.93 3.93 9.42 7.85 7.35 7.85 7.85 Hazardous Air Rollutants Potential to Dort Uncontrolled )Ibs/year) Actual missions Uncontrolled Controlled (lbs/year) )Ibs/neon Requested Perron Limits Uncontrolled Controlled (Ibs/year) )Ibs/year) Benzene Toluene Ethylbenzene Xylene n -Hexane 224IMP 4960.62 4133.85 206.69 4133.85 206.69 669&76 5582.30 279.12 5582.30 279.12 245.63 204.69 10.23 204.69 10.23 3022.21 2518.51 125.93 2518.51 125.93 43278.32 36065.27 1003.26 36065.27 1803.26 220.71 183.93 9.20 183.93 9.20 Section 06 -Re eulatsry Summary Ana Regulation 3, Parrs A, Regulation 7, Section XII.C, D, 0, F Regulation 7, Section XII.G, C Regulation 7, Section XVII.B, C.1, C.3 Regulation 7, Section XVII.C.2 Regulation 6, Part A, NSPS Subpart Kb Regulation 6, Part A, N5P5 Subpart 0000 NSPS 0000a Regulation 8, Part E, MACr Subpart HH (See regulatory applicability worksheet for Source requires a permit Storage tank is subject to Regulation 7, Section XILC-F Storage Tank is not subect to Regulation 7, Section 311.0 Storage tank is subject to Regulation 7, Section )(VII, 0, 0.1 & 0.3 Storage tank is subject to Regulation 7, Section XVII.C.2 Storage Tank Is not subject to NSPS Kb Storage Tank is not subject to NSPS 0000 Storage Tank is not subject to 55750000a Storage Tank is not subject to MALT HH detailed analysis) 2 of K:\PA\2018\18WE0042.CP1.xlsm Condensate Storage Tank(s) Emissions Inventory Section 07 -Initial and Periodic Sampling and Testing Requirements Does the company usethe state default emissions factors to estimate emisions? -' Woes, are the uncontrolled actual or requested emissions estimated to be greater than or equal to 80 tons VOC per year? lives, the permit will contain an "Initial Compliance" testing requirementb develop a site specific emissions factor based -on guidelines In P5 Memo 05-01. Does the company use a site specific emissions factor to estimate emissions? If yes and if there are flash emissions, are the emissions factors based on apressurized liquid sample drawn at the facility being permitted? This sample should be considered representative which generally means site -specific and collected within one year of the application received date. However, ifthdaciltty has not been modified (e.g., no.. new wells brought on-line), then it may be appropriate to we an older site -specific sample. If no, the permit will contain an "Initial Compliance" testing requirement to develop a see speck emissions factor based on guidelines in PS Memo 05-01. s N/A -Operator developed site specific emissions factors to estimate emirs ons Does the company request a control device efficiency greater than 95%tor a flare or combustion device? if yes, the permit will contain and initial compliance test condition to demonstrate the destruction efficiency of the combustion device based on inlet and outlet concentration sampling Section 08 - Technical Analysis Notes _ ' 1. Typically, thesecondary_cambunron emissions are lculated using bk.siarte gas flow and heatcontent predc.d by the model used to esta [e P oMax simulation thetotalwastegas flow rate was predict edtabe-9.1§48533 MMscf/de; Mash and W&egos) AddtHonaiv anaveraq= beat Cant gas stream (2565399tafsct]aedtf,etW&O stream (2602.27 B/scf)a e£hefolloiv, equations: aatespeif onros' nsfactors oeltdonthe e[ fmined wing the heat mmem'o€iheflash- Average Heat Content ffp56s 840WM0.0439322MMsa/day)/10{ 600 Mi"1scf/dav3l*112602.27Btu-/scf)#0.0107f/day1/(00546633 MMscf/dayll=2572.63 at u/sr o, -,.....d-''-'7,!" nC this Informationrtileyeariyieatinput ofthegswould be'Gdlcula wd as -608000s: Heat Input' iMM&to/y9 (O0546633MMscf/dayI'(a65 day/Yeafj°I2572.6MBtu/Flirt 1515319.38--- Mhtfltu/yeah b gthk alue,Hte6Ox and COem Idbecafevfatedao 3.54tpyaod 702ipyr p ely l'HTF'''''''"u- p dthef loilf '.gq £ rto caI ciat th aohulbest pt H tl a ilMMD /ye} [d II 2VOC It /y I112000lb/f I/IMW(Ib/Ib''' I)I 1a 19•4flb- all''11/il WI== l LH cn t t(8t f ctlj)k}NiMlk fS4d00009Y j The p ratox xp ersed h lortolecular ghr voc .6 - II at content dmthe quaff weredevalopedby a,,,,,,,,,,,,,,,00 f g ulllple fl s h ga analyse nPrrMax.Tkeopensfen'SarihernnpressedthaM{e ₹oey re conseroU.ve enough to b� ed as reprexcntat vie values"The oatues'wed irtihe equation are as follow'))toofecuiar weighs: 381b/Ib I f'1Yp€p2%b8%,(irplerst,A,enf' 20lnylcjtrf_T/strg thes..:0..._, t,„ cc polar eakulafedaheaclon Iof 57,005.47 MMRmjyr-_5iacett+is value's no econservat vie than the aluecalculated aboveusrrg ptosmibcd'lnetdad5,'it d(ffe usddfo paM9ti&tgyurposes. - - 2. The see specific sampleused0zestablahem'ssbnsfattarsfonths was obtained withna yeah Sn•Or appbeaflecu Thessamplewasobtanedfromtiie&llham18y.202 well on 12/19/2011. el, well is one of th n0e we it. dlrllodatthsfacilky. Asa esud, the pe<mrtwdino4Jequ' Iial test ng olderty obtainasite zpecdc simple 3..The permi[w 111 tcontanm • Ualerperodieopa,,itytpstingfortheflarebefausethe.0&M plan approvedF rihissourcerequ rev weekly hieemissions observatonsof the tare= 4. :The rprovdadthe€eil gInformatienregardingthe000 baiLOcamroltanic listed onthe fa Itydgram 'T! essel on the/p rhtydagromtobeled 00681 CO Control Tank is !fie knockout tank jar ft ftluhtyvs icadoutjlare 00 amfremYlLCk tdedaot re rstrovted this tank, on¢:hen 0000 /lam d ed [o connollt eloadout oet rr Any emrssron noted wrtb�Rfin�took' so ccanrted jar4r0efmdau;amiss[ons-ltls tot M.M.00opBnthPAf '..... ndensvtp to enfeefh)s ienk. lnkhetin!xely cyantlquid comlen5vteaccolswitFin !fir 1pnk, eltberfrom themnil4hsing aj:-- aporsorrle/1ood,oyojtfa egk-trumkvop0 0 due tagverJdiiing the-iquidrmmedr 1AytmnsferredfromHre&nackuuI tunkna thft weetes[omge tarztk Tfils informatonlnd cares angi potential remissions a.;soCated wth this vessel are approprfatelyaGounted for- She application. •- _ - S.Tieoperator was provided wihadraf: permit to review prior to issuonce..The operator vied the dr submitting a Notce of Startup bee ved.' This reque s agreed 01488ecauperato se the or submitted operator expressed they had no othercomments on the draft - Section 09- Inventory SCC Catlin and Emissions Factors AIRS Paint 0 001 Process a S;C�:yC��.�Code 01' ���,im T nudydo0Cgomment. The operatorrequested Ia have 'Permit Con0,0nl'.cegaading prihe ston getank on o4/16/2018andprovided atop., of the submittal. The - Pollutant PM10 PM2.5 600 VOC CO Benzene Toluene Ethylbenzene %Olen n -Hexane 224TMP Uncontrolled Emissions Factor 0.00 0.00 0.227 55.93 0.453 0.1191 0.1600 0.0059 0.0726 1.0391 0.0053 Control% Uni% O b/1,000 gallons condensate throughput O b/1,000 gallons condensate throughput O b/1,000 gallons condensatethroughput 95 b/1,000 gallons condensate throughput O b/1,000 gallons condensate throughput 95 b/1,000 gallons condensatethroughput 95 5/1,000 gallons condensateth roughput 95 5/1,000 gallons condensateth roughput 95 b/1,000 gallons condensateth roughput 95 b/1,000 gallons condensate throughput 95 b/1,000 gallons condensatethroughput 3 of 5 K:\PA\2018\18 W E0042.CPLalsm Condensate Te nit Regulatory Analysis Worksheet Colorado Regulation 3 Parts A and B - APEN and Permit Requirements IVnu have indicated that 000:00 to in the Non. Attainment Atria ATTAINMENT . Are uncontrolled actual emissions from any criteria pollutants from this individual source greater than TPY (Regulation 3, Party, Section 11.0.1.017 2. Is the construction date (service date) prior to 12/30/2002 and not modified after 12/31/2002 (See PS Memo 05-01 Definitions 1.12 and1.14 and Section 2 for additional guidance on grandfather applicability)? 3. Are total facility uncontrolled VOC emissions greater than 5TPV, NOx greater than 10 WY or CO emissions greater than SOTPY (Regulation 3, Part 0, Section 0.0.3)7 'You-:nve indicated that source in in tho Inn Attaimnnnt Area NON -ATTAINMENT 1. Are uncontrolled emissions from any criteria pollutants from this Individual source greater than 1 'MY (Regulation 3 Part A, Section II D 1 a)? a. is the construction date(serylce date) prior to 12/30/2002 and not modified after 12/31/2002 (See PS Memo 05-01 Definitions 1.12 and1.14 and Section 2 for additional guidance on grandfather applicability)? 3. Are total facility uncontrolled VOC emissions greater than 2 TPY, NOx greater than 5 TPY or CO emissions greater than 5 TPY (Regulation 3, Part 0, Section 11.0.3)7 'Source requires a own* Colorado Regulation 7. Section tit e -c 1: Is this storage tank located in the 8 -hr ozone control area or any ozone non -attainment area or attainment/maintenance area? 2. Is this storage tank located at an oil and gas exploration and production operation'. natural gas compressor station or natural gas drip station? 3. Is this storage tank located upstream of a natural gas processing plant? 'Storage tank Is subject to Regulation 7. Section Y.I .C -f Section XII.C.1 —General Requirements for Air Pollution Control Equipment —Prevention of Leakage Section XII.C2—Emission Estimation Procedures Section SOLD —Emissions Control Requirements Section RILE —Monitoring Section X110— Recordkeeping and Reporting Colorado Regulation 7, Section X31.5 1. Is this rtorage tank located in the &hr ozone control area or any ozone non -attainment area or attainment/maintenance area? a. Is this storage tank located at a natural gas processing plant? 3. Does this storage tank exhibit "Flash.. (e.g. storing non -stabilized liquids) emissions and have uncontrolled actual emissions greater than or equal to 2 tons per year VOC? 'Storage Tank Is not subject to Regulation 7. Seenno 2026 Section XII.G.3 - Emissions Control Requirements Section XII.C.1 —General Requirements for Air Pollution Control Equipment —Prevention of Leakage Section XII.C.2—Emission Estimation Procedures Colorado Regulation 7. Section aye 1. Is this tank located at a transmission/storage facility? 2. Is this condensate storage tank' located at an oil and gas exploration and production operation, well production facility', natural gas compressor station' or natural gas processing plant? 3. Is this condensate storage tank a fixed roof storage tank? 4. Are uncontrolled actual emissions' of this storage tank equal to or greater than 6 tons per year VOC? 'Storage tank subjcsttotsecola3on7,Seen nKVd,O,Y.E&0.0 Section XVII.B-General Provisions for Air Pollution Control Equipment and Prevention of Emissions Section %VII.C.1 - Emissions Control and Monitoring Provisions 5ectlon 1411.0.3- Recordkeeping Requirements 5. Dces the condensate storage tank contain only 'stabilized" liquids? �Stnr'ay+ funk is.snbjor.t I.o Rnguiatinnt 7. Section 000 +: ;. Section XVII.C.2 - Capture and Monitoring for Storage Tanks fitted wily Air Pollution Control Equipment 40 CFR, Part 60, Subpart Kb. Standards of Performance for Volatile Organic Liquid Storage Vessels 1. Is the individual storage vessel capacity greater than or equal to 7S cubic meters (m) [-472 BBlsl? 2. Does the storage vessel meet the following exemption In 60.111b(d)(4)? a. Does the vessel has a design rapacity less than or equal to 1,589.874 m' In1o,000 BBL] used for petroleum or ondensate stored,processed, or treated prior to custody transfer' as deFlned in 60.0001? 3. Was this condensate storage tank constructed, reconstructed, or modified (see definitions 40 CFR, 60.2) after July 23, 1984? 4. Does the tank meet the definition of "storage vessel"' in 60.1111? 5. Does the storage vessel store a "volatile organic liquid (VOL)"' as defined in 6o.111b? 6. Does the storage vessel meet any one of the following additionalexemptlons: a. Is the storage vessel a pressure vessel designed to operate in excess of 204.9 kPa 1"29.7 psi] and without emissions to the atmosphere 160.110b(d)(2))7; or b. The design capacity is greater than or equal to 151 ms [^950 BBL] and storesa liquid with a maximum true vapor pressures less than 3.5 kPa (fio.110b(b))?; or c. The design capacity Is greater than or equal to 7! M' 1-472 BBL) but less than 151 m' [-950 BBL] and storesa Ilquld with a maximum true vapor pressures less than 15.0 kpal60.110b(b)l7 I010 -06e Tank is not subject to N005 010 Subpart A, General Provisions 460.112b - Emissions Control Standards for VOC 460.1135 - Testing and Procedures 460.1155 - Reporting and Recordkeeping Requirements §60.1150 -Monitoring of Operations 40 CFR, Part 60 Subpart 0000, Standards of performance for Crude Oil and Natural Gas Production, Transmission and Distribution 1. Is this condensate storage vessel located at a facility in the onshore oil and natural gas production segment, natural gas processing segment or natural gas transmission and storage segment of the industry? 2. Was this condensate storage vessel constructed,reconstructed, or modified (see definitions 40 CFR, 60.2) between August 23, 2011 and September., 2015? 3. Are potential VOL emissions' from the Individual storage vessel greater than or equal to 6 tons per Year? 4. Does this condensate storage vessel meet the definition of "storage vessel"' per 60.5430? S. Is the storage vessel subject to and controlled in accordance with requirements for storage vessels in 40 CFR Part 60 Sub art Kb or 40 CFR Part 63 Sub art HH? I3toragu Tank is not auniect 10 6586 0000 Subpart A, General Provisions per 460.5425 Table 3 460.5395 - Emissions Control Standards for VOC 460.5413 - Testing and Procedures 460.5395(g) - Notification, Reporting and Recordkeeping Requirements 4605416(c) - Cover and Closed Vent System Monitoring Requirements 4605417 . Control Device Monitoring Requirements [Note: if a storage vessel is previously determined to be subject to NSPS 0000 due to emissions above 6 tons per year 000 on the applicability determination date, it should remain subject to NSPS 0000 per 00.5365(0)(21 even If potential VOC emissions drop below 6 tons per year] ti ettt YRS [" 'I Yas YC r. Yes No Fin Yu! wovve Source Requires an APES. Go to the nest question Go to next question Source Requires a permit Continue- You have indicated the site attainment status on the project summary sheet. Continue- You have indicated the facility type on the project summary sheet. Source is subject ontinue - You have determined facility attainment status on the Project Summary sheet. to2ge Tank is not subject to Regulation 7, Section 011.0 -You have Indicated facility type on project summary sheet. Continue - You have indicated the source category on the Project Summary sheet. Go to the next question - You have Indicated facility type on project summary sheet Go to the next question Source is subject to parts of Regulation 7, Sections XVII.B&C. Go to the next question Source Is subject to all provisions of Regulation 7, Sections B & C Go to the next question Storage Tank Is not subject SOPS Kb. Continue -You have indicated the source category on the Project Summary sheet. Storage Tank Is not subject NSPS 0000 -This tank was constructed prior to or after the applicability date. 40 CFR, part., subpart 0000a. Standards of Performance for Crude Oil and Natural Gas Facilities for valid) Construction. Modification. or Reconstruction Commenced After September it. 2015 1. Was this condensate storage vessel constructed,reconstructed, or modified (see definitions 40 CFR, 60.2) after September 05, 2015? 2. Does this condensate storage vessel roast the definition of"storage vessel' per 60.5930a? 3. Is this condensate storage vessel located at a facility In the crude oil and natural gas production segment, natural gas processing segment or natural gas transmission and storage segment of the industry? 9. Are potential VOC emissions' from the individual storage vessel greater than or equal to 6 tons per year? 5. Is the storage vessel subject to and controlled in accordance with requirements for storage vessels in 40 CFR Part 60 Subpart Kb or 90 CFR Part 63 Subpart HH? 'Storage Tank is not subPut to tubIS 0000 - 40 CFR, Part 63, Subpart MAR 140, Oil and Gas Production Facilities 1. Is the storage tank located at an oil and natural gas production facility that meets either of the following criteria: a. A facility that processes, upgrades or stores hydrocarbon liquids' 163.7601x1(2)/; OR b. A facility that processes, upgrades or stores natural gas prior to the point at which natural gas enters the natural gas transmission and storage source category or Is delivered to a final end user' (63.76015)(3)1? 2. Is the tank located at a facility that Is major' for RAPS? 3. Does the tank meet the definition of "storage vessely° in 63.761? 4. Does the tank meet the definition of storage vessel with the potential forfash emssions"' per 63.761? 5. Is the tank subject to control requ rements under 90 CFR Part 60, Sub art Kb or Sub art 00007 'Storage Tank is rrot'su Subpart A, General provisions per 463.764 (a) Table 463.766 - Emissions Control Standards §63.773 -Monitoring §63.774 - Recordkeeping 463.775 -Reporting 4as Go to the next question Go to the next question Go to the next question Storage Tank is not subject NSPS 0000a. boo 'Continue- You have Indicated the source category on the Project Summary sheet. 4 k' PIA PACT Review RICO review is required if Regulation 7 does not apply AND if the tank is in the non -attainment area. If the tank meets both criteria, then review RACY requirements. Dlselelmer This document assists operators with determining applicability of certain requirements of the Clean Air Act, its implementing regulations, and Air Quality Control Commission regulations. This document is not a rule or regulation, and the analysls it contains may net apply to a pettloUlOt slt0atlott based Upon the lndlvldual Meta end olrculnstenCes. This dAturnent does not change or substitute for any law, regulation, or any other legally binding requirement and is not legally enforceable. In the event of any conflict between the language of this document and the language of the Clean Alf AM„ Its Implementing regulations, and Air Quality Control Commission regulations, the language oh the statute or regulation will control. The use of non -mandatory language such es 'recommend," "may," "should," and "can,' is intended to describe APCD interpretations a and recommendations. Mandatory terminology such as Inver and "required" are intended to describe controlling requirements under the terms of the Clean Air Act and Air Quality Control Commission regulations, but this document does not establish legally binding requirements in and of itself. [orage Tank is not subject MAR HH -There are no MACE HH requirements for tanks at area sources CONSTRUCTION PERMIT Permit number: Date issued: Issued to: 18WE0042 Facility Name: Plant AIRS ID: Physical Location: County: General Description: Issuance: PDC Energy, Inc. Gillham 18 Sec HZ 123/9F8B SESE SEC 18 T5N R64W Weld County Well Production Facility Equipment or activity subject to this permit: 1 Facility Equipment ID AIRS Point Equipment Description Emissions Control Description TK-1 001 Twenty (20) 538 barrel fixed roof condensate storage vessels connected via liquid manifold. Enclosed Combustors This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to the specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION 1. Within one hundred and eighty days (180) of the latter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self -certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. A self certification form and guidance on how to self -certify compliance as required by this permit may be obtained online at www.colorado.gov/pacific/cdphe/air-permit-self- certification. (Regulation Number 3, Part B, Section III.G.2.) 2. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months after either, the date of issuance of this construction permit or the date on which such construction or activity was scheduled to commence as set forth in the permit application associated with this permit; (ii) discontinues construction for a period of eighteen months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III.F.4.) COLORADO Air Pollution Control Envision Y9u6I Nee 1. eMir.Or r 11.r,C Page 1 of 7 3. sting and sampling as required in this permit the self -certification process. (Regulation 4. er nal au ation letter issued by the Division, after completion of self -certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 5. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4.) Annual Limits: Facility Equipment ID AIRS Point Tons per Year Emission Type PM2.5 NO, VOC CO TK-1 001 --- 4.0 48.6 7.9 Point Note: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Facility -wide emissions of each individual hazardous air pollutant shall not exceed 8.0 tons per year. Facility -wide emissions of total hazardous air pollutants shall not exceed 20.0 tons per year. The facility -wide emissions limitation for hazardous air pollutants shall apply to all permitted emission units at this facility. Compliance with the annual limits, for both criteria and hazardous air pollutants, shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate actual emissions each month and keep a compliance record on site or at a local field office with site responsibility for Division review. 6. The emission points in the table below shall be operated and maintained with the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) Facility Equipment ID AIRS Point Control Device Pollutants Controlled TK-1 001 Enclosed Combustors VOC and HAP PROCESS LIMITATIONS AND RECORDS 7. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rates shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, Section II.A.4.) Process Limits Facility Equipment ID AIRS Point Process Parameter Annual Limit TK-1 001 Condensate throughput 826,349 barrels The owner or operator shall monitor monthly process rates based on the calendar month. COLORADO Air Pollution Control Division Page 2 of 7 e determined on a rolling twelve (12) month th total is calculated based on the previous culate throughput each month and keep a *th site responsibility, for Division review. STATE AND FEDERAL REGULATORY REQUIREMENTS 8. The permit number and ten digit AIRS ID number assigned by the Division (e.g. 123/4567/001) shall be marked on the subject equipment for ease of identification. (Regulation Number 3, Part B, Section III.E.) (State only enforceable) 9. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) 10. This source is subject to Regulation Number 7, Section XII. The operator shall comply with all applicable requirements of Section XII and, specifically, shall: • Comply with the recordkeeping, monitoring, reporting and emission control requirements for condensate storage tanks; and • Ensure that the combustion device controlling emissions from this storage tank be enclosed, have no visible emissions, and be designed so that an observer can, by means of visual observation from the outside of the enclosed combustion device, or by other means approved by the Division, determine whether it is operating properly. (Regulation Number 7, Section XII.C.) (State only enforceable) 11. The combustion device covered by this permit is subject to Regulation Number 7, Section XVII.B.2. General Provisions (State only enforceable). If a flare or other combustion device is used to control emissions of volatile organic compounds to comply with Section XVII, it shall be enclosed; have no visible emissions during normal operations, as defined under Regulation Number 7, XVII.A.16; and be designed so that an observer can, by means of visual observation from the outside of the enclosed flare or combustion device, or by other convenient means approved by the Division, determine whether it is operating properly. This flare must be equipped with an operational auto -igniter according to the following schedule: • All combustion devices installed on or after May 1, 2014, must be equipped with an operational auto -igniter upon installation of the combustion device; • All combustion devices installed before May 1, 2014, must be equipped with an operational auto -igniter by or before May 1, 2016, or after the next combustion device planned shutdown, whichever comes first. 12. The storage tank covered by this permit is subject to the emission control requirements in Regulation Number 7, Section XVII.C.1. The owner or operator shall install and operate air pollution control equipment that achieves an average hydrocarbon control efficiency of 95%. If a combustion device is used, it must have a design destruction efficiency of at least 98% for hydrocarbons except where the combustion device has been authorized by permit prior to May 1, 2014. The source shall follow the inspection requirements of Regulation Number 7, Section XVII.C.1.d. and maintain records of the inspections for a period of two years, made available to the Division upon request. This control requirement must be met within 90 days of the date that the storage tank commences operation. 13. The storage tanks covered by this permit are subject to the venting and Storage Tank Emission Management System ("STEM") requirements of Regulation Number 7, Section XVII.C.2. OPERATING Et MAINTENANCE REQUIREMENTS 14. Upon startup of this point, the owner or operator shall follow the most recent operating and maintenance (OEtM) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to the OEtM plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COLORADO Air Ponution Control Division ep;a:, tt pktz i to ^ v rb- n cerrt Page 3 of 7 15. o � er state or ederauir. d to ee • uc ° itial tests° unless otherwise directed by the Division or �` rce :.not requiremen Periodic Testing Requirements 16. This source is not required to conduct periodic testing, unless otherwise directed by the Division or other state or federal requirement. ADDITIONAL REQUIREMENTS 17. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, Section II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or For volatile organic compounds (VOC) and nitrogen oxides sources (NOX) in ozone nonattainment areas emitting less than 100 tons of VOC or NO, per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non -criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or • Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. 18. The requirements of Colorado Regulation Number 3, Part D shall apply at such time that any stationary source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation that was established after August 7, 1980, on the capacity of the source or modification to otherwise emit a pollutant such as a restriction on hours of operation (Regulation Number 3, Part D, Section V.A.7.B). GENERAL TERMS AND CONDITIONS 19. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 20. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not COLORADO AirPoliution Control Division .macro of Yu6O., ₹.1eeeh 6 E'vu`hrsment. Page 4 of 7 opera','in of this source. Final authorization of the writi in accordance with the provisions of 25 -7 - on Numbe!3, Part B, Section III.G. Final authorization he op : tlo r activit mmences and has been verified by the APCD confo i "n a "sects i.._ conditi: the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self -Certify for Final Authorization section of this permit. 21. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 22. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 23. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ob initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 24. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 25. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: Harrison Slaughter Permit Engineer Permit History Issuance Date Description Issuance 1 This issuance Issued to PDC Energy, Inc. Permit for condensate storage vessels at a new synthetic minor well production facility. COLORADO Mr Pollution Control Division 1 Department of Put Health (7 Environmet;t Page 5 of 7 (Regulation Number 3, Part A, Section VI.B.) r t e proc: `.ing time for this permit. An invoice for these . The per.`. it holder shall pay the invoice within 30 days the in will result in revocation of this permit. 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-regs 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Point Pollutant CAS # Uncontrolled Emissions (Ib/yr) Controlled Emissions (Ib/yr) 001 Benzene 71432 4,134 207 Toluene 108883 5,583 280 Ethylbenzene 100414 205 11 Xylenes 1330207 2,519 126 n -Hexane 110543 36,066 1,804 2,2,4- Trimethylpentane 540841 184 10 Note: All non -criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 001: CAS # Pollutant Uncontrolled Emission Factors lb/bbl Controlled Emission Factors lb/bbl Source NOx 9.52x10-3 9.52x10-3 TNRCC CO 1.9x10-2 1.9x10-2 TNRCC VOC 2.35 1.175x10-1 ProMax 71432 Benzene 5.0x10-3 2.5x10-4 ProMax 108883 Toluene 6.755x10-3 3.38x10-4 ProMax 1330207 Xylene 3.048x10-3 1.52x10-4 ProMax 110543 n -Hexane 4.364x10-2 2.182x10-3 ProMax Note: The controlled emissions factors for this point are based on the enclosed combustor control efficiency of 95%. COLORADO Air Pollution Control Division Pubic Iieukh. 6 L,-to,Drolenl Page 6 of 7 6) In thi AP th associ . ed wit is pe at (303)-692-3150. Pollut °,' t Emission Notice (APEN) associated with the e it was received by the Division. A revised ter t n 30 fl ;:ys before e five-year term expires. Please refer to voice * de mine the EN expiration date for each emissions point or a y que 1 • s rega • i ' • a specific expiration date call the Division 7) This permit fulfills the requirement to hold a valid permit reflecting the storage tank and associated control device per the Colorado Oil and Gas Conservation Commission rule 805b(2)(A) when applicable. 8) This facility is classified as follows: Applicable Requirement Status Operating Permit Synthetic Minor Source of: VOC, n -Hexane and Total HAPs NANSR Synthetic Minor Source of: VOC PSD True Minor Source MACT HH Major Source Requirements: Not Applicable Area Source Requirements: Not Applicable 9) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A - Subpart KKKK NSPS Part 60, Appendixes Appendix A - Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA - Subpart DDD MACT 63.1200-63.1439 Subpart EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ- Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ - Subpart MMMMM MACT 63.8980 -End Subpart NNNNN - Subpart XXXXXX COLORADO I Air Pollution Control Division Pubtz Heath Unvorrnem Page 7 of 7 ..1pN Condensate Storage Tank(s) APEN — souk Form APCD-205 Air Pollutant Emission Notice (APEN) and Application for Construction Permit All sections of this APEN and application must be completed for both new and existing facilities, including APEN updates. An application with missing information may be determined incomplete and may be returned or result in longer application processing times. You may be charged an additional APEN fee if the APEN is filled out incorrectly or is missing information and requires re -submittal. This APEN is to be used for tanks that store condensate associated with oil and gas industry operations. If your emission source does not fall into this category, there may be a more specific APEN available for your source (e.g. crude oil storage tanks, produced water storage tanks, hydrocarbon liquid loadings, etc.). In addition, the General APEN (Form APCD-200) is available if the specialty APEN options will not satisfy your reporting needs. A list of all available APEN forms and associated addendum forms can be found on the Air Pollution Control Division (APCD) website at: www.colorado.gov/pacific/cdphe/air-permits. This emission notice is valid for five (5) years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Permit Number: 'EWE0042 AIRS ID Number: 123 ign3 /00 [Leave blank unless APCD has already assigned a permit # and AIRS ID] Section 1 - Administrative Information Company Name1: PDC Energy, Inc. Site Name: Gillham 18 Sec HZ Site Location: SESE Sec 18 T5N R64W Mailing Address: (Include Zip Code) 1775 Sherman Street, Suite 3000 Denver, CO 80203 Site Location County: Weld NAICS or SIC Code: 1311 Permit Contact: Phone Number: E -Mail Address2: Jack Starr (303) 860-5800 Jack.Starr@pdce.com 1 Use the full, legal company name registered with the Colorado Secretary of State. This is the company name that will appear on all documents issued by the APCD. Any changes will require additional paperwork. 2 Permits, exemption letters, and any processing invoices will be issued by APCD via e-mail to the address provided. Form APCD-205 - Condensate Storage Tank(s) APEN Revision 02/2017 373484 COLORADO 1 I =V "g �'�wa�u..en, Permit Number: l'ItZEocHZ AIRS ID Number: I /'F/I [Leave blank unless APCD has already assigned a permit # and AIRS ID] Section 2 - Requested Action El NEW permit OR newly -reported emission source ❑✓ Request coverage under traditional construction permit 0 Request coverage under a General Permit ❑ GP01 0 GP08 If General Permit coverage is requested, the General Permit registration fee of $250 must be submitted along with the APEN filing fee. -OR- ❑ MODIFICATION to existing permit (check each box below that applies) ❑ Change in equipment 0 Change company name ❑ Change permit limit 0 Transfer of ownership3 0 Other (describe below) -OR- ❑ APEN submittal for update only (Note blank APENs will not be accepted) - ADDITIONAL PERMIT ACTIONS - ❑ APEN submittal for permit exempt/grandfathered source Additional Info Et Notes: Initial permit request for new facility 3 For transfer of ownership, a completed Transfer of Ownership Certification Form (Form APCD-104) must be submitted. Section 3 - General Information General description of equipment and purpose: Condensate Storage Tanks For existing sources, operation began on: For new or reconstructed sources, the projected start-up date is: Normal Hours of Source Operation: 24 Storage tank(s) located at: hours/day 9/22/2017 7 days/week 52 weeks/year ❑✓ Exploration Et Production (EEtP) site 0 Midstream or Downstream (non EEtP) site Will : is equipment be operated in any NAAQS nonattainment area? • Yes ■ No Are Flash Emissions anticipated from these storage tanks? GI Yes ■ No Is the actual annual average hydrocarbon liquid throughput ≥ 500 bbl/day? • Yes ■ No If "yes", identify the stock tank gas -to -oil ratio: m3/liter Are these storage tanks subject to Colorado Oil and Gas Conservation Commission (COGCC) 805 series rules? If so, submit Form APCD-105. Yes No Fl ■ Are you requesting ≥ 6 ton/yr VOC emissions (per storage tank), or are uncontrolled actual emissions ≥ 6 ton/yr (per storage tank)? Yes No O ■ Form APCD-2O5 - Condensate Storage Tank(s) APEN - Revision 02/2017 COLORADO 2 I AV �rhwne-mmwc�c ! Nu1iT 6 Envva�un.ni Permit Number: 1%i�?ECX7-i2. AIRS ID Number: 121/9F��/ E01 [Leave blank unless APCD has already assigned a permit # and AIRS ID] , Section 4 - Storage Tank(s) Information Actual Annual Amount (bbl/year) Requested Annual Permit Limit' (bbl/year) Condensate Throughput: 826,349 From what year is the actual annual amount? 2017 Average API gravity of sales oil: 51.5 degrees 0 Internal floating roof Tank design: ❑✓ Fixed roof 826,349 RVP of sales oil: 11.1 0 External floating roof Storage Tank ID # of Liquid Manifold Storage Vessels in Storage Tank Total Volume of Storage Tank (bbl) Installation Date of Most Recent Storage Vessel in Storage Tank (month/year) Date of First Production (month/year) TK-1 20 10760 5/2017 9/2017 Wells Serviced by this Storage Tank or Tank Battery5 (EE P Sites Only) API Number Name of Well Newly Reported Well 05 - 123- 42865 Gillham 18X-102 0 05 - 123- 43902 Gillham 18X-104 ' FA 05 - 123- 42864 Gillham 18X-232 • o 05 - 123- 43904 Gillham 18X-234 . al 05 - 123- 42861 Gillham 18X-332 BI 4 Requested values will become permit limitations. Requested limit(s) should consider future growth. 5 The EEtP Storage Tank APEN Addendum (Form APCD-212) should be completed and attached when additional space is needed to report all wells that are serviced by the equipment reported on this APEN form. Section 5 - Stack Information Geographical Coordinates (Latitude/Longitude or UTM) 40.394325 / -104.585206 Operator Stack ID No. Discharge Height Above Ground Level (feet) Temp. (°F) Flow Rate (ACFM) Velocity (ft/sec) Indicate the direction of the stack outlet: (check one) D Upward 0 Downward 0 Horizontal ❑ Other (describe): Indicate the stack opening and size: (check one) ❑ Circular ❑ Square/rectangle ❑ Other (describe): ❑ Upward with obstructing raincap Interior stack diameter (inches): Interior stack width (inches): Interior stack depth (inches): Form APCD-205 - Condensate Storage Tank(s) APEN - Revision 02/2017 ®V COLORADO 3 I o�N 4 Permit Number: l $OE C`'i7— AIRS ID Number: (2Z, i p$F,3/ 001 [Leave blank unless APCD has already assigned a permit # and AIRS ID] Section 6 - Control Device Information ❑ Check this box if no emission control equipment or practices are used to reduce emissions, and skip to the next section. Pollutants Controlled: Vapor ❑ Recovery Unit (VRU): Size: Make/Model: Requested Control Efficiency: % VRU Downtime or Bypassed (emissions vented): % ❑ Combustion Device: Pollutants Controlled: VOC and HAPs Rating: MMBtu/hr 10 x Cimarron 48", 1 x Cimarron 60" Type: Enclosed Combustor Make/Model: Requested Control Efficiency: 95 % Manufacturer Guaranteed Control Efficiency: 98 Minimum Temperature: Waste Gas Heat Content: Constant Pilot Light: ❑✓ Yes ❑ No Pilot Burner Rating: Btu /scf MMBtu/hr ❑ Closed Loop System Description of the closed loop system: ❑ Other: Pollutants Controlled: Description: Control Efficiency Requested: % Section 7 -Gas/Liquids Separation Technology Information (E£tP Sites Only) What is the pressure of the final n parator vessel prior to discharge to the storage tank(s)? 23 psig Describe the separation process between the well and the storage tanks: High/Low Pressure Separator Form APCD-205 - Condensate Storage Tank(s) APEN - Revision 02/2017 ®(NCO LORADO 4 I AV �a��� Permit Number: i$ue cot-11AIRS ID Number: ij 9E -SE/ co' [Leave blank unless APCD has already assigned a permit It and AIRS ID] Section 8 - Emissions Inventory Information Attach all emissions calculations and emission factor documentation to this APEN form6. If multiple emission control methods were identified in Section 6, the following table can be used to state the overall Pollutant Description of Control Method(s) Overall Requested Control Efficiency (% reduction in emissions) VOC Enclosed Combustor 95% NOx CO HAPs Enclosed Combustor Other: From what year is the following reported actual annual emissions data? 2017 Criteria Pollutant Emissions Inventory Pollutant Emission Factor6 Actual Annual Emissions Requested Annual Permit Emission Limit(s)4 Uncontrolled Basis Units Source (AP -42, Mfg. etc) Uncontrolled Emissions. (Tons/year) Controlled Emissions (Tons/year) Uncontrolled Emissions (Tons/year) Controlled Emissions (Tons/year) VOC 2.3491 • lb/bbl ProMax 970.60 . 48.53 , 970.60 • 48.53 ' NOx 0.1380 . lb/MMBtu TCEQ N/A 3.93 • N/A 3.93. CO 0.2755 . lb/MMBtu TCEQ N/A 7.85 • N/A 7.85 , Non -Criteria Reportable Pollutant Emissions Inventory Chemical Emission Factor6 Actual Annual Emissions Chemical Name Abstract Service (CAS) Number Uncontrolled Basis Units Source (AP -42, Mfg. etc) g Uncontrolled Emissions Pounds/ ear (Pounds/year) ) Controlled Emissions7 (Pounds/year) Benzene 71432 0.0050. lb/bbl ProMax 4133.82 . 206.69 • Toluene 108883 0.0068 • lb/bbl ProMax 5582.30 - 279.12 ' Ethylbenzene 100414 0.0002- lb/bbl ProMax 204.69 (DM) . 10.23 (DM) • Xylene 1330207 0.0030 • lb/bbl ProMax 2518.49 • 125.92 • n -Hexane 110543 0.0436 • lb/bbl ProMax 36065.20 • 1803.26 • 2,2,4-540841 Trimethylpentane 0.0002' lb/bbl ProMax 183.92•(DM) 9.20.(DM) 4 Requested values will become permit limitations. Requested limit(s) should consider future growth. 6 Attach condensate liquid laboratory analysis, stack test results, and associated emissions calculations if you are requesting site specific emissions factors according to the guidance in PS Memo 14-03. 7 Annual emissions fees will be based on actual controlled emissions reported. If source has not yet started operating, leave blank. Form APCD-205 - Condensate Storage Tank(s) APEN - Revision 02/2017 5 I AV COLORADO Degartment of Pub,. 11..10, u r,.m.•n,an, Permit Number: %y� AIRS ID Number: III /ciF icot [Leave blank unless APCD has already assigned a permit 1{ and AIRS ID] Section 9 - Applicant Certification I hereby certify that all information contained herein and information submitted with this application is complete, true and correct. If this is a registration for coverage under General Permit GP01 or GP08, I further certify that this source is and will be operated in full compliance with each condition of the applicable General Permit. s-- 1/30 Z o/8 Sign re of Legally Authorized Person (not a vendor or consultant) Date Jack Starr EHS Professional Name (print) Title Check the appropriate box to request a copy of the: ❑ Draft permit prior to issuance El Draft permit prior to public notice (Checking any of these boxes may result in an increased fee and/or processing time) This emission notice is valid for five (5) years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Send this form along with $152.90 and the General Permit registration fee of $250, if applicable, to: Colorado Department of Public Health and Environment Air Pollution Control Division APCD-SS-B1 4300 Cherry Creek Drive South Denver, CO 80246-1530 Make check payable to: Colorado Department of Public Health and Environment Telephone: (303) 692-3150 For more information or assistance call: Small Business Assistance Program (303) 692-3175 or (303) 692-3148 Or visit the APCD website at: https://www.colorado.gov/cdphe/apcd Form APCD-205 - Condensate Storage Tank(s) APEN - Revision 02/2017 'COLORADO 6I AVIt�N� c Hmlll. b CnwonmeN E&P Storage Tank Air Pollutant Emissions Notice (APEN) Addendum Form' Company Name: PDC Energy, Inc. Source Name: Gillham 18 Sec HZ Emissions Source AIRS ID2: I2 /c(65/ 00 Wells Services by this Storage Tank or Tank Battery (E&P Sites Only) API Number Name of Well Newly Reported Well 05 - 123 - 43908 Gillham 18X-334 A 05-123-42862 Gillham 18Y-202 @ 05 -123 - 43916 Gillham 18Y-214 O/ 05 -123 - 42863 Gillham 18Y-312 @ 05 -123 - 43914 Gillham 18Y-314 /1 - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ - - ❑ Footnotes: I Attach this addendum to associated APEN form when needed to report additional wells. 2 If this is a newly report source that has not been assigned an AIRS ID by the APCD, enter N/A Form APCD-212 TK-1 Addendum Hello