HomeMy WebLinkAbout20180767.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 29 BETWEEN COUNTY ROADS 86 AND 88 FOR
APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 29, between County Roads 86 and 88,
be temporarily closed, with said closure being effective March 20, 2018, for approximately four
(4) days for a culvert replacement, and further, that standard official traffic control devices shall
be erected at said closure giving notice of the restrictions.
cc= SO CRS), Oigpa-ich,
CO 5+O.44 ctrot
oy-25-18
2018-0767
EG0024
TEMPORARY CLOSURE - COUNTY ROAD 29
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 12th day of March, A.D., 2018.
BOARD OF COUNTY COMMISSIONERS
WELDGOUNTY, COLORADO
ATTEST: dit/Lov G ... o:el
Weld County Clerk to the Board
BY:
Deputy Clerk to the
APP D AS T
ou Attorney
Date of signature: ea -114
Stev
Mike Freeman
%'t —m. -O"
Moreno, Chair
A Li
ara Kirkmeyer, P o-Tem
EXCUSED
Sean P. C; nway
2018-0767
EG0024
MEMORANDUM
TO: Clerk to the Board
DATE: March 8, 2018
FROM: Amy Joseph, Public Works Department
SUBJECT: BOCC Agenda Item
* WCR 29 between
replacement.
WCR 32 between
replacement.
WCR 86 and WCR 88 is closed from 3/20/2018 thru 3/23/2018 for a culvert
WCR 13 and WCR 17 is closed from 3/20/2018 thru 3/23/2018 for a culvert
See attached closure diagram(s).
2018-0767
'F,&! Lay C' -d4 W1 ?+S ?(•I'!De•CK !Y,"34I+!$±
1
I
R- ri L'9 Y'B! R+ r;sflfl men L'! 4r . gir. Li g Co.,sawn._. w. trial! • ra & r9 ?Ir rrF.i.n v !'•'1 L' 3b e'2? t 2"E rig.. •- .jai— 7 : h"tfir
1
3
4
fi
Y
2
�laC.l ecem, vS !!.44i,&4'�. '.• Cd4drr .Wd 5it4£pq!gn.' C.4S4!&r! t'-Srr.812 tr9 ±,3 au• vrBs"�!
yM
2
1
WCR 88
rift
rtif
Pr
ROAD CLOSED
LOCAL
TRAFFIC ONLY
f.i
Art
rat
i,
I
WCR 86
4
4
m
I
t
t
WOR 31
4
1
I
4
t
I
s
t
X
f
1
I
4
I
r
4
I
ell 4
f
w. re-a-tiz
N
S
Project # AN -59
Road closure description
WCR 29 between WCR 86 and WCR 88
closed 3/20/2018 thru 3/23/2018
for culvert replacement
Notice to Public
Road signs and barricaded during closure
No Message boards to be used
Detour Route
WCR 86 between WCR 29 and WCR 31
WCR 31 between WCR 86 and WCR 88
WCR 88 between WCR 29 and WCR 31
1 mile gravel
1 mile gravel
1 mile gravel
Notes
ADT of WCR 29 is; 130/2013
Culvert replaced is drainage: with new 18" CSPR
Water to be used for dust control
Culverts is 30" north of WCR 86 on WCR 29
Placement of signs not to scale
Date
3/5/2018
Prepared by
LEE STEPHEN
Approved by county engineer
CAMERON PARROTT