Loading...
HomeMy WebLinkAbout20182911.tiffUSE BY SPECIAL REVIEW (USR) APPLICATION DEPARTMENT OF PLANNING SERVICES * 1555 N. 17TH AVENUE * GREELEY, Co 80631 www.weldoov.com * 970-353-6100 EXT 3540 * FAX 970-304-6498 FOR PLANNING DEPARTMENT USE AMOUNT APPLICATION RECEIVED BY DATE RECEIVED: CASE ## ASSIGNED: PLANNER ASSIGNED: Parcel Number*: Address of site: Legal Description: 011 Multiple parcels and addresses - See Attachment D (*A 12 digit number on Tax I D. Information, obtainable at vvww welclgov cam), Section: Township: N Range: v Zone District: Ag Acreage: 'y68 Floodplain: C eological Hazard: YCN Airport Overlay: Y sJ FEE OWNER(S) OF THE PROPERTY': Name: Company: Phone #: Street Address: Dity/State 'p Code: Name: i Company: Phone #: Email: Street Address: City/State/Zip Code: Name: Company: Phone #: Street Address: Email: Email: City/State/Zip Code: APPLICANT OR AUTHORIZED AGENT: (See below: Authorization must accompany all applications signed by Authorized Agents) Name: David Jost Company: DCP Operating Company, LP Phone #: (970) 378=6345 Street Address: 3026 4th Ave. City#State ip Code: Greeley, CO 80631 Email: DM,lost@DCPMidstrearri.com PROPOSED USE: Libsack 20" Discharge Piaeline I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating that the signatory has to legal aut rity to sign for the corporation. Signature: Ow or Authorized Agent fax 4.3 oft Print Name Signature: Owner or Authorized Agent Date Print Name Rev 4/2016 DCP OPERATING COMPANY, LP Assistant Secretary Certificate I, Stacey A. Metcalf; the duly appointed Assistant Secretary of DCP Operating Company, LP, a Delaware limited partnership (the "Company{"), do hereby declare and certify that: 1. David M. Jost is the duly elected, qualified and acting Vice President of the Company and is authorized under the Company's Delegation of Authority policy to act on behalf of the Company in connection with filings such as Use -by Special Review permit applications with Weld County, Colorado; and 2. he has the authority to do and perform all such acts and things, to sign such documents and instruments, and to take any or all other steps as each of he may deem necessary, advisable, convenient or proper to effectuate and accomplish the foregoing. IN WITNESS WHEREOF, I have executed this Assistant Secretary's Certificate as of the 18th day of September, 2017. tacey , Metcalfe .ssistan ecret DEPARTMENT T E PLANNING SERVICES 1555 N 17th AVE GREELEY, EL E ', CO80631 PHONE: (970) 353-6100, Ext. 3540 FAX: (970) 304-6498 AUTHORIZATION FORM Colin Mann represent DCP Operating Company, LP for the property (A€gent/Applicant) 'Owner) located at Libsack 20" Discharge Pipeline (see attached figures) LEGAL DESCRIPTION: SEC SUBDIVISION NAME: I can be contacted at the following Email: TWN RNG LOT Home ELI 720-315-8008 (cell) Work 303-605-3391 Dilann@dcpmidstream•com The property owner can be contacted at the following Home Work 970-378-6345 Email: DMJost@dcpmidstream.com correspondence emailed to: (check one) DATE /01iP20 OWNER'S SIGNATURE 40a Agent/Applicant Property Owner Isabella Juanicorena From: Auto_Sender@Accela.com To: cmann@dcpmidstream.com Subject: Your Application Has Been Deemed Complete Thank you for your USR18-0056 Application. We have deemed your application complete and are continuing to process your application. Please reference Case Number USR18-0056 if you have any questions about your case. If you need further assistance, please feel free to contact our office at 970-353-6100 ext 3540. 1 aCp Midstream.. USE BY SPECIAL REVIEW PERMIT APPLICATION FOR THE LIBSACK 20" DISCHARGE PIPELINE WELD COUNTY, COLORADO MAY2018 Submitted By: DP Operating Company, LP 370 17th Street, Suite 2500 Denver, Colorado 80202 USE BY SPECIAL REVIEW PERMIT APPLICATION PACKET LIBSACK 20 -INCH DISCHARGE PIPELINE WELD COUNTY, COLORADO May 2018 Table of Contents 1.0 INTRODUCTION AND CONTACT INFOMATION 1 2.0 SUMMARY OF THE PROJECT 2 2.1 Project Overview 2 2.2 Detailed Project description 3 2.2.1 Pipeline Description 3 2.2.2 Preferred Route and Alternatives Reviewed 3 2.2.3 Mitigation 4 2.2.4 Project Schedule 4 2.2.5 Public Outreach 5 2.2.6 Potential Hazards 5 2.2.7 Emergency Procedures 6 2.2.8 Irrigated agricultural lands 6 2.2.9 Conformity with Weld County Code and Zoning Requirements 7 2.2.10 Decommissioning Plan 7 2.2.11 Haul Routes 7 3.0 USR QUESTIONNAIRE RESPONSE 8 3.1 Planning Questions 8 3.1.1 Proposed use of the property 8 3.1.2 Consistency with Weld County Code, Chapter 22 of the Comprehensive Plan 8 3.1.3 Consistency with Weld County Code, Chapter 23 (Zoning) 8 3.1.4 Consistency and compatibility with surrounding land uses 8 3.1.5 Hours and days of operation ...8 3.1.6 Number of People Proposed to be Employed at this Site ..8 3.1.7 Shift Work 8 Page i of ii May 2018 3.1.8 Number of People Who Will Use the Site 9 3.1.9 Type and Number of Animals, if any, to be on the Site 9 3.1.10 Type of lot surface and the square footage of each type 9 3.1.11 Number of parking spaces ...9 3.1.12 Existing and proposed landscaping for the site 9 3.1.13 Fencing proposed around site ...9 3.1.14 Proposed screening for parking and outdoor storage areas 9 3.1.15 Reclamation procedures 9 3.1.16 Fire Protection to the Site 10 3.1.17 On -site and off -site improvements 10 3.2 Engineering questions 10 3.2.1 Types of vehicles that will access this Site and number of roundtrips/day 10 3.2.2 Expected travel routes and travel distribution along the routes 10 3.2.3 Travel distribution along routes 10 3.2.4 Time of highest traffic volumes 11 3.2.5 Access to the site 11 3.2.6 Drainage design 11 3.3 Environmental health questions 12 3.3.1 Drinking water source on the property 12 3.3.2 Sewage disposal system on the property 12 3.3.3 Storage or warehousing 12 3.3.4 Storage and/or stockpile of wastes, chemicals and/or petroleum 13 3.3.5 Fuel storage including the number of tanks and gallons 13 3.3.6 Washing of vehicles or equipment 13 Page ii of ii May 2018 3.3.7 Floor drains 13 3.3.8 Air emissions - dust abatement plan 13 3.3.9 Design and operations plan 13 3.3.10 Nuisance management plan .14 3.3.11 Stormwater management 14 3.3.12 Noxious weeds 14 3.4 Building questions 14 3.4.1 Type, size, and number of existing and proposed structures 14 3.4.2 How the existing structures will be used for this USR 14 3.4.3 Proposed use(s) of each structure 14 Table of Attachments ATTACHMENT A MEETING MINUTES FOR PRE -APPLICATION MEETING ATTACHMENT B APPLICATION FORM AND APPLICANT AUTHORIZATION ATTACHMENT C MAPS ATTACHMENT D LAND OWNERSHIP INFORMATION ATTACHMENT E EMERGENCY INFORMATION SHEET Page iii of ii May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 1.0 INTRODUCTION AND CONTACT INFOMATION As exploration and production (E&P) companies continue to drill for oil and natural gas, there is a need for increased infrastructure to gather, process, and distribute the natural gas liquids and natural gas produced from such drilling. Increasing volumes of produced gas and other fluids, as well as the siting of recent drilling facilities, have put a strain on the currently available gathering and processing systems. To reduce the strain and service the needs of the E&P companies, DCP Operating Company, LP (DCP) proposes a project to construct, own and operate a natural gas pipeline called the Libsack 20" Discharge Pipeline (the "Pipeline"). The Pipeline will connect the existing Libsack Booster Station to the O'Connor Gas Plant (2MJUSRI8-12-1792).The construction of this Pipeline will accommodate natural gas development in Weld County, provide flexibility to the existing gathering/processing infrastructure, and help stabilize natural gas volumes. Sec. 23-2-460 of the Weld County Code requires a Use by Special Review (USR) Permit for the construction of a Pipeline - Natural Gas and Pipeline - Petroleum Products Other than Natural Gas and Pipeline - Domestic Water. The following addresses the requirements set forth in Weld County Code Section 23-2-500 concerning Applications for Use by Special Review Permit. Applicant's name: DCP Operating Company, LP 3026 4th Avenue Greeley, CO 80631 Contacts: Colin Mann 303-605-3391 Patrick Groom 970-352-3161 On April 6, 2018, DCP had a pre -application meeting with Weld County. A copy of the meeting minutes is included as Attachment A. The completed Application Form and the Applicant's authorization form are included as Attachment B. Figures showing the overview of the project as well as the detailed pipeline alignment are included in Attachment C. DCP intends to construct this pipeline between October 2018 and January 2019. 1 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 2.0 SUMMARY OF THE PROJECT 2.1 PROJECT OVERVIEW DCP is planning to construct, own, and operate the Libsack 20" Discharge Pipeline (the "Pipeline"), an 7.47 mile, 20 -inch high pressure natural gas pipeline that will connect the Libsack Booster Station to the O'Connor Gas Plant (Appendix C). The Libsack 20" Discharge Pipeline will start at the Libsack Booster Station located in the northeast quarter of Section 36 T6N R651►, about 5.3 miles northeast of Greeley in Weld County, CO. The pipeline heads south approximately 4 miles, crossing both the South Platte River and Hwy 34. Approximately 0.12 mile south of Hwy 34, the pipeline heads east for 0.43 mile until going generally south again for another 3.1 miles where it ends at the O'Connor Gas Plant. All portions of the proposed route are located on private, state, or county lands. The Pipeline will be constructed within the following Township, Range and Sections: • Township 6N, Range 65W, Sections 36 • Township 5N, Range 65W, Section 1 • Township 5N, Range 64W, Sections 6, 7, 18, 19, 30, and 31 The Pipeline's temporary construction Right of Way (ROW) will be 75 feet wide, and the permanent ROW will be 50 feet wide. Except where the line is buried deeper at stream crossings, road crossings, or other areas, the pipeline will be installed at a nominal depth of 3 feet below the surface. For the purposes of this application, the ROW is defined as the right to cross the property and does not indicate Fee ownership. Ancillary, aboveground equipment will consist of a block valve in Section 18, T5N, R64W as well as pig traps located within the Libsack Booster Station and O'Connor Gas Plant. Additionally, a low-pressure 20 -inch diameter, gathering pipeline will be located within the same ROW as the Libsack 20" Discharge Pipeline. This low-pressure line does not trigger Weld County's USR review. The maximum allowable operating pressure (MAOP) of the Pipeline will be 1,285 pounds per square inch gauge (ping), with normal operating pressure of 1,285 psig. 2 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 2.2 DETAILED PROJECT DESCRIPTION 2.2.1 Pipeline Description DCP is planning to construct, own and operate the Pipeline. Land ownership and parcel information is included as Attachment D. DCP will have options for easements across all properties contained in this list. A list of surrounding property owners within 500 feet of the ROW is included in Attachment D. DCP does not have a fee interest in any of the property crossed by the ROW; therefore, a certificate of conveyance is not necessary for this application. The pipeline is almost entirely located within the Kersey Intergovernmental Agreement (IGA) boundary. 2.2.2 Preferred Route and Alternatives Reviewed The preferred route is described in detail in Section 2.1. This route was selected as the preferred project route as it balances environmental sensitivity, operational efficiency, cost minimization, and landowner approval. As such, DCP proposes this alignment as the preferred route as it helps meet the operational needs of the project while minimizing impacts to the surrounding community and environment. DCP considered an alternative route alignment that offered a straighter, more direct line than the preferred route; however, the alternative alignment required additional stream crossings and increased impacts to landowners. The additional distance of the preferred route was insignificant. DCP completed surveys for natural resources and for cultural/archeological resources in March 2018. The Pipeline will cross numerous wetlands, small ditches, and the South Platte River. The majority of these ditches and the South Platte will be avoided via boring. All impacts to wetlands will be temporary and DCP will coordinate with the US Army Corps of Engineers if applicable. No threatened and endangered species were identified as occurring within the ROW. Potential regulated cultural resources along the ROW were limited to linear features such as the Latham Ditch or UPRR lines. Impacts to these features will be avoid via bores or where they are open cut, they will be restored to their pre -construction condition which will not result in an adverse effects. • Land use along the selected route consists mostly of irrigated and non -irrigated farmland, pasture, oil and gas development, and other agricultural industries which generally provides poor quality wildlife habitat. Once construction is complete, the permanent Row will be restored to pre -construction conditions allowing any wildlife that was temporarily displaced during construction to return. • No threatened or endangered species were located within the ROW. • No scenic or unique natural resources will be affected. 3 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline The preferred project route offers the strongest combination of environmental and stakeholder sensitivity, operational efficiency, and cost minimization. As such, DCP believes that the preferred route represents the most balanced means of ensuring that the purpose and need of the project are met. 2.2.3 Mitigation The Pipeline will be installed underground with the exception of the ancillary equipment. All aboveground equipment will be located within fenced areas. No landscaping is proposed. Upon successful completion of construction, disturbed areas will be seeded with native grasses to encourage vegetation growth and soil stabilization. Agricultural crop land may be left fallow if that is the landowner's preferred reclamation procedure. Provisions for crop damage on agricultural land and/or remedies for soil erosion problems have been or will be addressed with individual landowners. 0CP will implement the following procedures to minimize adverse effects during construction and operation of the Pipeline: + 0CP's construction contractor will bore beneath Weld County roads to avoid damage to the road surface or disruption to traffic flow; + Surface waterbodies will be crossed by the Pipeline either by boring beneath the bed of the waterbody, or by utilizing an open -cut crossing method. If the open -cut crossing method is used, BMPs will be installed to protect the waterbody from erosion or sediment runoff; Tracking pads will be utilized where heavy equipment is required to cross paved roads to prevent damage to the road surface; Topsoil will be segregated from subsoil during grading activities. Once the Pipeline is installed in the trench, subsoil will be backfilled into the trench. The segregated topsoil will be placed atop the subsoil, and the ROW will be graded to preconstruction contours; Crops damaged due to Pipeline construction will be replaced by DCP; DCP will apply for a CDPH E Construction Stormwater Permit. The permit requires the development of a Stormwater Water Management Plan (SWMP) which will provide mitigation measures to be followed during construction and operation of the Pipeline; and The ROW will be stabilized by reseeding and installing permanent erosion controls as quickly as possible following final grading or left fallow per landowner requests. 2.2.4 Project Schedule Typical pipeline construction methods will be implemented. These include: 4 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline • Survey - The Pipeline alignment and workspace limits will be identified prior to construction activities; +� Clearing and Grading The temporary construction ROW will be cleared of trees and obstructions, and graded to a relatively► flat surface to accommodate construction equipment; Trenching - The Pipeline trenches will be excavated to provide a depth of cover required by the USDOT, Weld County or DCP Standards. Roads and waterbodies will either be open -cut or bored using standard construction techniques; Pipe Stringing and Laying - Pipe segments will be strung along the ROW parallel to the trench, and will be bent (where required), welded, and lowered -in to the trench; Backfilling and Grading - Once the Pipeline is installed in the trenches, subsoil will be replaced into the trench. Topsoil that was segregated during grading operations will be placed over the subsoil; Hydrostatic Testing - The Pipeline will undergo hydrostatic testing to ensure its integrity. Restoration - The ROW will be re -graded to its preconstruction contour and seeded to facilitate revegetation or left fallow per the landowner's request. DCP intends to construct the Pipeline between October 2018 and January 2019. 2.2.5 Public Outreach No public meetings pertaining to this project have been held. 2.2.6 Potential Hazards Fire/Explosion hazards: Transporting oil and gas products via pipeline is generally safer than other modes of transport. While not all risks can be eliminated, the use of pipelines minimizes those potential hazards. . In addition to RCP's monitoring and valve cutoff systems described in Section 2.2.7 below, DCP will clearly mark the Pipeline centerline with markers placed at line of site intervals, and at road and railroad crossings. The markers will clearly indicate the presence of a gas pipeline, and will provide a telephone number and address where a company representative can be reached in an emergency or prior to any excavation in the area of the Pipeline. In addition, DCP participates in the "One Gall" system. "One call" systems serve as the clearinghouse for excavation activities that are planned close to pipelines and other underground utilities. Flood hazards: The Pipeline crosses a Federal Emergency Management Agency (FEMA) designated floodplain: South Platte River. A floodplain permit application will be submitted to the county prior to construction. 5 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline Geological hazards: Not Applicable - According to the Weld County Assessor's Property Information Portal(http://propertyinfo.co.weld.co.us), no geologic hazards are present on the subject property. OCR employs highly trained operators and contractors and maintains close working relationships with all emergency response personnel. DCP also participates in a continuing education program to enable customers, the public, government officials, and those engaged in excavation activities to recognize a gas pipeline emergency and report it to the appropriate authority. 2.2.7 Emergency Procedures DCP maintains a monitoring system that includes a gas control center that continually tracks pressures, flows, and deliveries on its entire system. The gas control center is staffed 24 hours a day, 7 days a week, 365 days a year. DCP also staffs area offices near the pipeline route with personnel who can provide the appropriate response to emergency situations, notify public safety officials, and direct safety operations as necessary. DCP's pipeline systems are equipped with remotely controlled valves that can be operated from the gas control center. In the event of an emergency, the valves allow for a section of the pipeline to be isolated from the rest of the system. Data acquisition systems are also present at all of DCP's meter stations. If system pressures fall outside of a predetermined range, an alarm is activated, and notice is transmitted to the gas control center. Routine aerial and ground inspections are conducted by DCP personnel or contractors. These inspections allow DCP to identify soil erosion that may expose the pipeline; dead vegetation that may indicate a leak in the line; unauthorized encroachment on the ROW by a third party; or other conditions that may lead to a safety hazard and/or require preventative maintenance or repairs. Emergency contact information can be found in Attachment E. 2.2.8 Irrigated agricultural lands The pipeline ROW will be located in an agricultural zone district. During pipeline design and route selection, DCP made efforts to avoid actively cultivated agricultural fields to reduce impact to productive areas. The lands adjacent to the ROW are also zoned as agricultural. The Pipeline route is as direct as possible limiting the total acreage of land affected during construction. The effect on land that is disturbed during construction will be temporary in nature since the permanent ROW will be allowed to revert to its pre -construction state. In areas where active cultivation could not be avoided, impacts will be minimized by implementing the following: • Topsoil will be segregated and preserved during grading operations, and returned as surface layer soil once the Pipeline is installed; + The Pipeline will be installed in an area that will avoid affecting the operation of irrigation equipment; and 6 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline Following construction of the Pipeline, the ROW will be seeded or left fallow per the landowner's preferred reclamation procedure. Upon successful completion of construction, disturbed areas will be seeded with native grasses to encourage vegetation growth and soil stabilization. Agricultural crop land may be left fallow if that is the landowner's preferred reclamation procedure. Provisions for crop damage on agricultural land will be addressed with individual landowners. 2.2.9 Conformity with Weld County Code and Zoning Requirements The properties intersected by the proposed pipeline project are within the agricultural zone district. Weld County Code Section 23-2-200 et seq. permits construction of oil and gas support and service facilities in agricultural zoned districts. Chapter 22 of the Weld County Code addresses goals and policies for agriculturally zoned properties and oil and gas deposit production. Specifically, Section 22-5-90 of the Weld County Code Comprehensive Plan states: "The most efficient and environmentally friendly way to transport crude oil is by pipeline, rather than by truck. Transportation of the product by pipeline has less impact on County roads. Less truck traffic also benefits air quality in the area". Weld County Code Section 22-5-100 further states: "Oil and gas activities should be planned to accommodate current and future subdivision activities to the extent such development can reasonably be anticipated". The proposed Pipeline project meets the objectives outlined in the Weld County Code Comprehensive Plan without changing the use of the land. The Pipeline will be buried beneath the ground's surface and therefore the effect on any active agriculture will be temporary and isolated to the construction phase of the project. Once the Pipeline is operational, the surface will be restored to its condition prior to construction, and agricultural activities may resume. 2.2.10 Decommissioning Plan In the event that any portion of the Pipeline is decommissioned, that portion will be cleaned, isolated, and abandoned in place or removed per all State and local regulations and per the landowner agreement. 2.2.11 Haul Routes The movement of construction equipment and materials to the ROW may temporarily affect existing transportation networks. To minimize disruption, equipment and material will be stored in the vicinity of the construction site. Where access to roadways may impede traffic flow, appropriate traffic control measures will be used. DCP will work with Weld County Department of Public Works to obtain all necessary road crossing or special transport permits. DCP will utilize the existing construction office location for storage, staging, and laydown areas. The office is located at 26960 WCR 47, Greeley, CO 80631. 7 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 3.0 USR QUESTIONNAIRE RESPONSE 3.1 PLANNING QUESTIONS 3.1.1 Proposed use of the property See Section 2.1. 3.1.2 Consistency with Weld County► Code, Chapter 22 of the Comprehensive Plan See Section 2.2.9 3.1.3 Consistency with Weld County Code, Chapter 23 (Zoning) See Section 2.2.9 3.1.4 Consistency and compatibility with surrounding land uses The Pipeline route is located in unincorporated Weld County in the agricultural zone district. The area surrounding the Pipeline route contains plowed fields, pivot irrigation systems, oil and gas infrastructure, and other agricultural activities. The project is consistent and compatible with the surrounding land uses as a use allowed by right under Weld County Code Section 23-3-20. In addition, any impacts to actively cultivated land by the Pipeline will be temporary, and agricultural operations can resume once the Pipeline is operational. 3.1.5 Hours and days of operation Once constructed, the Pipeline will operate 24 hours a day, seven days a week, 365 days a year. Trucks used for regular inspection and/or maintenance will usually travel along the Pipeline's route between 6:00 AM and 5:00 PM, unless they are responding to an emergency. Daily visits to the pipeline ROW are not anticipated. 3.1.6 Number of People Proposed to be Employed at this Site DCP does not anticipate that the project will require any new permanent workforce. The Pipeline will be operated and maintained by 5-10 existing personnel. The Pipeline will be un-manned during operation. The ROW may be periodically driven by one or two employees for regular inspection and/or maintenance. All non -emergency work will take place between 6:00 AM and 5:00 PM, Monday through Friday. 3.1.7 Shift Work Not applicable as the Pipeline is unmanned during operations. 8 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 3.1.8 Number of People Who Will Use the Site DCP anticipates that approximately 200-225 construction personnel will be required to construct the project. Construction personnel will consist of DCP's employees and independent contractors. The contractor will utilize an existing contractor yard at 26960 WCR 47, Greeley, CO 80631 for its base of operations. 3.1.9 Type and Number of Animals, if any, to be on the Site Not applicable. No animals will be kept onsite. 3.1.10 Type of lot surface and the square footage of each type The Pipeline will be installed underground and only ancillary equipment will be built above ground. Once construction is complete, the majority of the ROW surface will be turned over to the landowner. Areas were ancillary equipment will be located will be graveled. See Section 2.1 for a description and location of ancillary equipment. 3.1.11 Number of parking spaces Not applicable. There will be no permanent parking spaces. 3.1.12 Existing and proposed landscaping for the site The Pipeline will be installed underground with the exception of the ancillary equipment. All aboveground equipment will be located within a fenced area. No landscaping is proposed. The project ROW will either be seeded with native grasses, or, on agricultural land, left fallow per the landowner's preferred reclamation procedure. Type of fence and/or screening 3.1.13 Fencing proposed around site All aboveground facilities will either be located within existing fenced areas or there will be a 6 - foot chain -link fence constructed around the facility. No additional screening is planned. 3.1.14 Proposed screening for parking and outdoor storage areas Not applicable. There are no parking or storage areas required for the project. 3.1.15 Reclamation procedures Upon successful completion of construction, disturbed areas will be seeded with native grasses to encourage vegetation growth and soil stabilization. Agricultural crop land may be left fallow per the landowner's preferred reclamation procedure. Provisions for crop damage on agricultural land and/or remedies for soil erosion problems have been or will be addressed with individual landowners. In the event that the Pipeline is no longer in service see Section 2.2.10 for the Decommissioning Plan. 9 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 3.1.16 Fire Protection to the Site The Western Hills and/or Platte Valley Fire Protection Districts would be dispatched depending on the location of the emergency along the Pipeline route. The project will not have a water source appropriate for fire suppression; therefore, water or other fire retardants would be transported to the ROW if needed. 3.1.17 On -site and off -site improvements The majority► of the Pipeline will be belowground with no above grade improvements. Ancillary► equipment (launcher/receiver facilities, valves, meter stations, etc.) will be located either within existing facilities or within fenced areas. No new permanent access roads will be required. 3.2 ENGINEERING QUESTIONS 3.2.1 Types of vehicles that will access this Site and number of roundtrips/day During construction earthmoving equipment (graders, disking, etc.), stringing trucks, welding trucks, and pickup trucks would be required along the ROW for construction, installation, and reclamation activities. The number of roundtrips/day will vary depending on the stage of construction. Most heavy equipment will remain on the ROW throughout construction. Any additional traffic resulting from construction of the pipeline will be minor and temporary During pipeline operation, additional traffic will be limited to an occasional vehicle used for regular inspection and maintenance. Since the Pipeline will not contribute to the alteration of traffic patterns in Weld County, DCP assumes that a traffic study is not required for this application. 3.2.2 Expected travel routes and travel distribution along the routes Travel routes to the ROW during construction would vary depending on the pipeline section being installed. The majority of the workers live in or near the Greeley area and will access the ROW by travelling east to the ROW. Most equipment and supplies will be staged in the Greeley area. Routes that would commonly be used include Hwy 34 and CR 60 1/2. DCP will obtain applicable Road Crossing permits for the construction and operation of the Pipeline. During operation, access routes to the pipeline would vary depending on the inspection and maintenance routes. 3.2.3 Travel distribution along routes The heaviest travel during construction would be between the equipment staging area and the construction area. Travel routes during operations would be dependent on inspection needs and time of day. 10 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 3.2.4 Time of highest traffic volumes construction will typically take place between 6:00 AM and 5:00 PM, Monday through Saturday with the highest traffic volumes typically at those times when construction personnel are coming to or leaving the job site. During operation traffic will be limited to periodic site visits. 3.2.5 Access to the site Temporary access to the ROW would be from existing public and private roads. DCP will consult with the Weld County Department of Public Words and individual landowners concerning access to the ROW. No temporary► or permanent access roads or easements are planned outside of the construction ROW for the proposed pipeline. As such, no Weld County Access Permits are needed at this time. 3.2.6 Drainage design The Pipeline project qualifies for an exemption from a stormwater detention requirement as described in additional detail below. 1. Which exception is being applied for and include supporting documentation. The project falls under Section 23-12-30.F.1a.5 of the Weld County Code. This section specifies that "Exceptions to the stormwater detention shall be limited to the following: 5) Pipelines or transmission lines." 2. Where does the water originate if it flows onto the property from an offsite source. The southern half of the pipeline is located at a slightly higher elevation than the northern part. Stormwater and overland flow would move across the proposed ROW from nearby agricultural fields. Where the ROW crosses farmland, water may also enter the ROW from irrigation and pivot systems. Several agricultural ditches (including the Gilmore Ditch, Latham Ditch, Plumb Ditch, and the Ogilvy Ditch,) and some smaller drainage ditches cross the ROW; however, these would be bored underneath so the flow of these systems would not be disturbed during construction or operations. The pipeline ROW also crosses the South Platte River in T5N R64 W Section 6. 3. Where it flows to as it leaves the property. As the ROW would be restored to its natural contour and drainage patterns, water would flow across the ROW as it has historically. Surface flow would collect in the local ditch systems along active fields and roadways and eventually flow into the South Platte River System. As the ROW would be revegetated, the project is not anticipated to increase the sediment burden on the local watersheds. 11 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 4. The direction of flow across the property. The direction of flow during the operational period of the pipeline would be identical to its pre - construction flow. 5. If there have been previous drainage problems with the property. None of the properties have known drainage issues. Based on the criteria set forth in Section 23-12-30.F.1 a.5 of the Weld County Code, this pipeline project does not require a detention pond. Following construction of the Pipeline, the land will be returned to its pre -construction contours and the ROW will be seeded or left fallow according to landowner stipulations. Once restoration is complete there will be no change in historical flow patterns. 3.3 ENVIRONMENTAL HEALTH QUESTIONS 3.3.1 Drinking water source on the property During construction, bottled water will be provided for construction personnel. Water may also be used for dust suppression during construction. After the Pipeline is installed, and the trench is backfilled, the Pipeline will be pressure -tested with water in accordance with U.S. Department of Transportation (DOT) pipeline safety regulations identified in 49 CFR 192, Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards. The hydrostatic test water will be discharged per the Colorado Department of Public Health and Environment's (CDPHE) Discharges Associated with Hydrostatic Testing of Pipelines, Tanks and Similar Vessels permit. All water used for dust suppression and hydrostatic testing will come from a municipal source and be disposed of in compliance with the Colorado Discharge Permit System. No surface water will be withdrawn by DCP or its contractors during construction or operation of the project. 3.3.2 Sewage disposal system on the property Temporary sewage disposal units (portable toilets) will be placed in areas of active construction, and will be maintained regularly to prevent water or soil contamination. 3.3.3 Storage or warehousing Not applicable. The project will not require permanent storage or warehousing. 12 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 3.3.4 Storage and/or stockpile of wastes, chemicals and/or petroleum During construction, all liquid and solid waste will be stored and removed for disposal according to applicable regulations. Temporary sewage disposal units (i.e., portable toilets) will be placed in areas of active construction, and will be maintained regularly to prevent water or soil contamination. Any leaks from equipment or vehicles will be cleaned up in accordance with all applicable regulations and disposed of at appropriate disposal facilities. No wastes, chemicals or petroleum products will be stored or stockpiled on the ROW during operation of the Pipeline. 3.3.5 Fuel storage including the number of tanks and gallons There will be no bulk fuel storage at the site. Construction equipment and vehicles will receive fuel from mobile fuel trucks as needed. Fuel trucks and construction equipment will be equipped with spill kits and fire extinguishers, and personnel will be trained in spill prevention, control, and countermeasures to mitigate any spills that may occur during refueling operations. Equipment and vehicles will not receive regular maintenance at the construction site. Any leaks from equipment or vehicles will be cleaned up in accordance with applicable regulations and disposed of properly. 3.3.6 Washing of vehicles or equipment Not applicable. There will be no washing of vehicles or equipment at the site. 3.3.7 Floor drains Not applicable. There will be no floor drains associated with the project 3.3.8 Air emissions — dust abatement plan short-term air emissions would result from the operation of project vehicles and machinery during the construction period. During construction of the project, water trucks will be used to maintain dust and fugitive particulate suppression. DCP and its contractors will follow the SWMP to prevent soil erosion during construction, and will install permanent BMPs and/or apply seed to the ROW to encourage revegetation and soil stabilization during operation of the Pipeline to minimize dust. The Colorado Department of Public Health and Environment requires an Air Pollution Emission Notice (ADEN) to be filed for projects that disturb 25 or more acres of land. This project will disturb more than 25 acres and will require an APEN. 3.3.9 Design and operations plan Not applicable. 13 May 2018 USR Permit Application Packet Libsack 20" Discharge Pipeline 3.3.10 Nuisance management plan Not applicable. 3.3.11 Stormwater management From north to south to west, the Pipeline will cross the Ogilvy Ditch, the South Platte River and the associated floodplain, Plumb Ditch, Latham Ditch, and Gilmore Ditch. DCP has will obtain a Construction Stormwater Permit from the CDPHE and will implement a Stormwater Management Plan (SWMP) to implement Best Management Practices (BMPs) to minimize soil erosion and water runoff. During construction, temporary BMPs (e.g., hay bales and silt fences) will be installed to stabilize the disturbed ROW and workspaces. After construction of the Pipeline is completed, the ROW and workspaces will be graded and restored, as nearly as practicable, to the original contour of the land using the original soil. Permanent soil stabilization efforts may include construction of water bars and/or silt barriers along surface contours of disturbed area, which will begin and end in undisturbed soils within the ROW and designed to direct runoff into areas of low erosion potential. Disturbed areas will be seeded with native grasses to encourage vegetation growth and soil stabilization. Agricultural crop land may be left fallow as a landowner's preferred reclamation procedure. 3.3.12 Noxious weeds If noxious weeds are identified on the right-of-way, they will be controlled to minimize further propagation pursuant to Chapter 15, Articles I and II of the Weld County Code. 3.4 BUILDING QUESTIONS 3.4.1 Type, size, and number of existing and proposed structures See Section 2.1 for a detailed description of proposed structures. 3.4.2 How the existing structures will be used for this USR No existing structures would be utilized by the proposed Pipeline 3.4.3 Proposed use(s) of each structure Aboveground appurtenances associated with this project are used to monitor and maintain the integrity and safety of the Pipeline. This includes valves, launchers and receivers, and a cathodic protecting rectifier. Additionally, aboveground meters will allow OCR to monitor the volume of gas in the Pipeline. None of these facilities will be manned during the operation of the Pipeline. 14 May 2018 Attachment E Emergency Contact/Information Sheet FOR COMMERCIAL SITES, PLEASE COMPLETE THE FOLLOWING INFORMATION BUSINESS EMERGENCY INFORMATION: Business Name: Libsack Discharge 20 -inch Loop Pipeline Phone: 970-356-9700 T6N R65W S36 T5N R64W $6,7,18,19,30, and 31 Address: T5N R65W S1 City, ST, Zip: Weld County, CO 80631 Business Owner: DCP Operating Company, LP Phone: (970) 378-6340 Home Address: 3026 4th Avenue City, ST, Zip: Greeley, CO 80631 List three persons in the order to be called in the event of an emergency: NAME TITLE David Jost ADDRESS PHON E VP Operations North 3026 4th Ave., Greeley, CO, 80631 (970) 378-6345 Pete Stevenson Environmental Manager 3026 4th Ave., Greeley, CO, 80631 (303) 726-8937 Paul Park Reliability Manager 3026 4th Ave., Greeley, CO, 80631 (970) 378-6372 Business Hours: 24 Days: 7 Type of Alarm: I None Burglar Holdup Name and address of Alarm Company: N/A Location of Safe: N/A Fire Silent Audible ********************************************************************************************************************************* MISCELLANEOUS INFORMATION: Number of entry/exit doors in this building: N/A Location(s): , Is alcohol stored in building? NSA Location(s): Are drugs stored in building? N/A Location(s): Are weapons stored in building? N/A Location(s): The following programs are offered as a public service of the Weld County Sheriff's Office. Please indicate the programs of interest. Physical Security Check Crime Prevention Presentation UTILITY SHUT OFF LOCATIONS: Main Electrical: N/A Gas Shut Off: N/A Exterior Water Shutoff: N/A Interior Water Shutoff: N/A From: Chris Gathman To: "cma nn a.dcpmldstream.com" Subject: Libsak - SPO list & Kersey Notification Date: Monday, June 04, 2018 5:29:00 PM Dear Colin, 1. Similar to my comments for the SPO list. The notification requirement is for properties within 150 -feet of the centerline of the pipeline vs. 500 -feet. 2. Has Kersey been contacted? Regards, Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue tel:: 970-400-3537 fax: 970-400-4098 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. Hello