Loading...
HomeMy WebLinkAbout20182902.tiffMEMORANDUM TO: Chris Gathman, Planning Services DATE: July 9, 2018 FROM: Evan Pinkham, Public Works SUBJECT: USR18-0055 DCP The Weld County Department of Public Works has reviewed this Use by Special Review Pipeline proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS GENERAL PROJECT INFORMATION/LOCATION Project description: A Site Specific Development Plan and Use by Special Review Permit for a one -mile long 16 -inch High -Pressure Natural Gas Pipeline connecting the O'Connor Gas Plant (2MJUSR18-12- 1792) to an existing Kinder Morgan Meter Station in the A(Agricultural) Zone District. ACCESS For new accesses and/or change of use of an existing access, the fee and photos are required (photo looking left and right along roadway from the access point and looking in to and out of the access point). These photos are used to evaluate the safety of the access location. Access permit instructions and application can be found at https://www.weldgov.com/departments/public works/permits/. Chapter 6, Sections 6.3, 6.4 and 6.5 of the Weld County Engineering and Construction Criteria offer access design guidance, which can be accessed at: https://www.weldgov.com/departments/public works/engineering/. ROADS AND RIGHTS -OF -WAY Pursuant to CRS 43-2-110(1.5), County Road 49 is designated as a County Highway. The County Highway is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as an arterial road, which requires a minimum of 140 feet of right-of-way, or 180 feet of right-of-way in some locations. Contact Public Works for the location of the current right-of-way alignment and easements so they can be delineated accurately on the map. If the right-of-way cannot be verified it shall be dedicated. The applicant shall also delineate the physical location of the road. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-way line. This road is maintained by Weld County. Per Chapter 12, Article 4, Section 12-4-30.B, a Weld County Right -of -Way Use Permit is required for any project that will be occupying, constructing or excavating facilities within, and/or encroaching upon, any County rights -of -way or easement. Pipelines crossing a county road shall obtain a Right -of -Way Permit and possibly a Special Transport Permit. Pipelines crossing county roads shall be bored, unless otherwise approved by Public Works. Right -of -Way Use Permit instructions and application can be found at https ://www.weldgov. com/d epartments/publicworks/perm its/. Any oil and gas pipeline crossing an arterial road shall be bored a minimum of twenty (20) feet below arterial roads, fifteen (15) feet below collector and paved local roads, and ten (10) feet below gravel local roads. This depth shall be measured below the lowest roadside ditch flowline elevation, for the full width of the future right of way. Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the County right-of-way. TRACKING CONTROL POLICY Per Chapter 12, Appendix 12A.10.1, traffic volumes to the proposed facility may require the installation of a tracking control device and/or a minimum of four inches of compacted recycled asphalt or aggregate road base. Tracking control is required to prevent tracking from the site onto public roadways. Temporary Tracking Control shall be used during construction unless permanent tracking control is installed ahead of construction activities. Recycled concrete is not allowed in County right-of-way. Tracking control devices can be double cattle guards or rip rap (6" washed rock). Tracking control for unmaintained public right-of- way is required just prior to entering publicly maintained roadways. A variance request for alternatives to the tracking control requirement can be submitted to Public Works for review and consideration. IMPROVEMENTS AND ROAD MAINTENANCE AGREEMENT Public Works may require an Improvements Agreement for one or all the following reasons: • Off -Site Public Improvements • Road Maintenance Agreement • Construction Maintenance Agreement • Access Improvements Agreement An Improvements Agreement is required for sites with required offsite improvements per Chapter 12, Article 5, Section 12-5-60. Collateral is required to ensure the improvements are completed, and maintained. Improvements/Road Maintenance Agreement: An example agreement is available at: https://www.weldgov.com/UserFiles/Servers/Server 6/File/Departments/Public%20Works/DevelopmentR eview/sprusr.pdf. It will detail the approved haul route(s), outline when offsite improvements will be triggered, and include a maintenance agreement for the haul routes. Possible mitigations included in the road maintenance agreement may include but are not limited to: dust control and damage repairs. DRAINAGE REQUIREMENTS Pipelines are excepted from the requirements of a drainage report and detention pond design under 23- 12-30.F.1.a.5 for pipelines or transmission lines. MS4: This site is located in a Municipal Separate Storm Sewer System (MS4) Area which may trigger specific water quality requirements or other drainage improvements. In addition to compliance with applicable Weld County regulations, property owner is required to be compliant with any additional MS4 requirements. Questions pertaining to the MS4 requirements should be directed to the Public Works Department 970- 304-6496. GRADING PERMIT If more than 1 acre is to be disturbed for construction of non -pipeline items such as structures, parking lots, laydown yards etc..., a Weld County grading permit will be required prior to the start of construction. Grading Permit applications are accepted after the planning process is complete (plan recorded). An Early Release Request Form may be entertained only after the applicant, Public Works and Planning Department have reviewed the referral and surrounding property owner comments. The Early Release Request may or may not be granted depending on referral comments and surrounding property owner concerns. Contact an Engineering representative from the Public Works for more information. A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact: Colorado Department of Public Health and Environment, Water Quality Control Division, 303-692-3575. CONDITIONS OF APPROVAL A. A Road Maintenance Agreement is required during the construction of the pipeline. Road maintenance may include dust control, tracking control, damage repair attributable to construction of the pipeline and located within 1/2 mile of any construction access point for the project. (Department of Public Works) B. The plan shall be amended to delineate the following: 1. The County Highway is designated on the Weld County Functional Classification Map as an arterial road which typically requires 140 feet of right-of-way at full build out. The alignment of the road widening project varies along the section line for the corridor. Contact Public Works for the location of the existing and future right-of-way and easements and delineate these on the site plan. (Department of Public Works) 2. Show and label the approved access locations on the site plan (If applicable). The applicant must obtain an access permit in the approved location(s) prior to construction. (Department of Public Works) Prior to Construction: A. The approved access and tracking control shall be constructed prior to construction of the pipeline. (Department of Public Works) B. The applicant shall submit evidence of a right-of-way permit for any work that may be required in the right-of-way and/or a special transport permit for any oversized or overweight vehicles that may access the site. (Department of Public Works) C. If more than one (1) acre is to be disturbed for construction of non -pipeline items, a Weld County grading permit will be required. (Department of Public Works) DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) 1. The property owner shall control noxious weeds on the site. (Department of Public Works) 2. During construction, the access(es) on the site shall be maintained to mitigate any impacts to the public road including damages and/or off -site tracking. (Department of Public Works) 3. During construction, there shall be no parking or staging of vehicles on public roads. On -site parking will be utilized. (Department of Public Works) 4. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works) 5. Any oil and gas pipeline crossing a county road shall be bored a minimum of twenty (20) feet below arterial roads, fifteen (15) feet below collector and paved local roads, and ten (10) feet below gravel local roads. This depth shall be measured below the lowest roadside ditch flowline elevation, for the full width of the future right of way. (Department of Public Works) 6. With exception of perpendicular crossings, oil and gas pipelines are not to be located within Weld County right of way or future right of way. (Department of Public Works) 7. Any damage occurring to the right of way, caused by the pipeline, will be the responsibility of the operator. (Department of Public Works) 8. The historical flow patterns and runoff amounts on site will be maintained. (Department of Public Works) WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org Memorandum To: Chris Gathman From: Lauren Light, Environmental Health Services Date: June 28, 2018 Re: USR18-0055 DCP Operating Company, LP Environmental Health Services has reviewed this proposal for a Site Specific Development Plan and Use by Special Review Permit for a one -mile long 16 -inch High - Pressure Natural Gas Pipeline connecting the O'Connor Gas Plant (2MJUSR18-12- 1792) to an existing Kinder Morgan Meter Station in the A(Agricultural) Zone. Permanent water and sewer is not required as this request is a temporary construction use. Portable toilets and bottled water can be utilized during construction of the pipeline. As the amount of disturbed area does not exceed 25 acres an Air Pollution Emission Notice (APEN) is not required. We have no objections to the proposal; however, we do recommend that the following requirements be incorporated into the permit as development standards: 1. During construction, all liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. During construction, no permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. 3. During construction, waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. The facility shall operate in accordance with Chapter 14, Article 1 of the Weld County Code. 4. Fugitive dust and fugitive particulate emissions shall be controlled throughout the duration of construction of the pipeline and until ground cover is established. Health Administration Vital Records Icic: 9/U 304 6410 Fax: 9/U -3U1-6112 Public Health & Clinical Services Icic: 9/0 304 6420 Fax: 9 /0-304-6416 Environmental Health Services Tele: 970-304-6415. Fax. 970-304-6411 Communication, Education & Planning Tele: 970-304-5470 Fax: 970-304-6452 Emergency Preparedness & Response Tele: 970-304-6470 Fax: 970-3O4-6452 Public Health Uses on the property shall comply with the Colorado Air Quality Commission's air quality regulations. 5. During construction, adequate toilet facilities and handwashing units shall be provided. Portable toilets are acceptable. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. 6. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. Hello