Loading...
HomeMy WebLinkAbout20180940.tiffMEMORANDUM TO: Chris Gathman, Planning Services DATE: December 21, 2017 FROM: Hayley Balzano, E.I., Development Engineer SUBJECT: USR17-0067 Seltzer The Weld County Department of Planning Services -Engineering has reviewed this proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS: General Project Information/Location: Project description: Self -Storage and limited outdoor RV and Boat Storage This project is east of and adjacent to County Road 19 and is north of and adjacent to County Road 2. Parcel number: 146934300001 Drainage Requirements: Please contact Department of Planning Services/Engineering Development Review for questions or assistance for drainage requirements at 970-353-6100. URBANIZING VS NON -URBANIZING DRAINAGE AREA: This area IS within a Non -Urbanizing Drainage Area: Non -Urbanizing Drainage Areas typically require detention of runoff from the 1 -hour, 100 -year, storm falling on the developed site and release of the detained water at the historic runoff rate of the 1 -hour, 10 -year storm falling on the undeveloped site for NON -URBANIZING areas. Detention Pond summarized in a Drainage Report: The applicant's engineer has submitted a drainage report and detention pond design. A final drainage report and detention pond design shall be completed by a Colorado Licensed Professional Engineer and adhere to the drainage related sections of the Weld County Code. The drainage report must include a certification of compliance stamped and signed by the PE which can be found on the engineering website. General drainage report checklist is available on the engineering website. More complete checklists are available upon request. Grading Permit A Weld County Grading Permit will be required if disturbing more than 1 acre. Grading Permit applications are accepted after the planning process is complete (plan recorded). An Early Release Request Form may be entertained only after the applicant and Planning Department have reviewed the referral and surrounding property owner comments. The Early Release Request may or may not be granted depending on referral comments and surrounding property owner concerns. Contact an Engineering representative from the Planning Department for more information. A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact: Colorado Department of Public Health and Environment, Water Quality Control Division, Rik Gay, 303-692- 3575. Geologic Hazard Area: This area IS NOT in a Geologic Hazard Area. Floodplain: This area IS NOT in a FEMA regulatory floodplain. CONDITIONS OF APPROVAL: A. A Final Drainage Report and Certification of Compliance stamped and signed by a Professional Engineer registered in the State of Colorado is required. (Department of Planning Services -Engineer) B. The plan shall be amended to delineate the following: 1. The applicant shall show and label the accepted drainage features and drainage flow arrows. Water quality features or stormwater ponds should be labeled as "Stormwater Detention, No -Build or Storage Area" and shall include the calculated volume. (Department of Planning Services - Engineer) 2. Show and label the parking and traffic circulation flow arrows showing how the traffic moves around the property. (Department of Planning Services -Engineer) Prior to Construction: A. If more than one (1) acre is to be disturbed, a Weld County Grading Permit will be required. (Department of Planning Services -Engineer) DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) 1. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Planning Services -Engineer) 2. Weld County is not responsible for the maintenance of onsite drainage related features. (Department of Planning Services -Engineer) MEMORANDUM TO: Chris Gathman, Planning Services DATE: December 19, 2017 FROM: Evan Pinkham, Public Works SUBJECT: USR17-0067 Brighton Self Storage The Weld County Department of Public Works has reviewed this Use by Special Review proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS GENERAL PROJECT INFORMATION/LOCATION Project description: A Site Specific Development Plan and Use by Special Review Permit for Any use permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial Zone Districts, (Self -Storage and limited outdoor RV and Boat Storage Facility), provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions in the A (Agricultural) Zone District This project is north of and adjacent to CR 2 and is east of and adjacent to CR 19. Parcel number 146934300001. Access is from CR 2. ACCESS Per Chapter 12, Article 5, Section 12-5-30, an Access Permit is required for access to Weld County maintained roadways. We strongly encourage you to discuss your access with Public Works prior to laying out your site plan to ensure the approved accesses are compatible with your layout. For new accesses and/or change of use of an existing access, the fee and photos are required (photo looking left and right along roadway from the access point and looking in to and out of the access point). These photos are used to evaluate the safety of the access location. Access permit instructions and application can be found at https://www.weldgov.com/departments/publIc works/permits/. Chapter 6, Sections 6.3, 6.4 and 6.5 of the Weld County Engineering and Construction Criteria offer access design guidance, which can be accessed at: https://www weldgov com/departments/public works/engineering/. Per Chapter 12, Appendix 12A.4.1 of the Weld County Code, an access approach that is gated shall be designed so that the longest vehicle (including trailers) using the access can completely clear the traveled way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled surface be less than 35 feet. For shared accesses, Public Works strongly recommends the property owner establish an access road maintenance agreement so future owners of the properties will be aware of their requirements for shared maintenance of the access road. This is not a requirement, but is recommended to avoid property owner conflicts in the future. ROADS AND RIGHTS -OF -WAY County Road 2 is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a(n) arterial road, which requires 80 feet of right-of-way. The applicant shall delineate on the site map or plat the future and existing right-of-way and the physical location of the road. If the right-of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. County Road 19 is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a(n) arterial road, which requires 140 feet of right-of-way. The applicant shall delineate on the site map or plat the future and existing right-of-way and the physical location of the road. If the right-of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. CR 19 north of CR 2 is planned for realignment. See the Weld/Adams County Line Alignment Study for more information. The study can be accessed on: www.weldcov.com/departments/public works/transportation planning/. Per Chapter 12, Article 4, Section 12-4-30.B, a Weld County Right -of -Way Use Permit is required for any project that will be occupying, constructing or excavating facilities within, and/or encroaching upon, any County rights -of -way or easement. Right -of -Way Use Permit instructions and application can be found at https://www.weldcov comldepartmentslpublicworks/permits/. Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the County right-of-way. TRAFFIC Latest ADT on CR 2 was taken on 4/9/2014 which counted 3121 vpd with 14% trucks. Latest ADT on CR 19 was taken on 2/15/2017 which counted 640 vpd with 21% trucks. At full development, the Brighton Self Storage will generate approximately 244 daily trip ends, 15 morning trip ends, and 26 afternoon peak hour trip ends. TRACKING CONTROL POLICY Per Chapter 12, Appendix 12A.10.1, traffic volumes to the proposed facility may require the installation of a tracking control device and/or a minimum of four inches of compacted recycled asphalt or aggregate road base. Tracking control is required to prevent tracking from the site onto public roadways. Temporary Tracking Control shall be used during construction unless permanent tracking control is installed ahead of construction activities. Recycled concrete is not allowed in County right-of-way. Tracking control devices can be double cattle guards or rip rap (6" washed rock). Tracking control for unmaintained public right-of- way is required just prior to entering publicly maintained roadways. A variance request for alternatives to the tracking control requirement can be submitted to Public Works for review and consideration. IMPROVEMENTS AND ROAD MAINTENANCE AGREEMENT Public Works may require an Improvements Agreement for one or all the following reasons: • Off -Site Public Improvements • Road Maintenance Agreement • Construction Maintenance Agreement • Access Improvements Agreement An Improvements Agreement is required for sites with required off -site improvements per Chapter 12, Article 5, Section 12-5-60. Collateral is required to ensure the improvements are completed, and maintained. Improvements/Road Maintenance Agreement: An example agreement is available at: https://www.weldgov com/UserFiles/Servers/Server 6/File/Deoartments/Publie/020Works/DevelopmentR eviewlsprusr.pdf. It will detail the approved haul route(s), outline when off -site improvements will be triggered, and include a maintenance agreement for the haul routes. Possible mitigations included in the road maintenance agreement may include but are not limited to: dust control, specified haul routes, damage repairs, and future improvement triggers. CONDITIONS OF APPROVAL A. An Improvements and Road Maintenance Agreement is required for off -site improvements at this location. Road maintenance including, but not limited to dust control, tracking control, damage repair, specified haul routes and future traffic triggers for improvements will be included. (Department of Public Works) B. The plan shall be amended to delineate the following: 1. County Road 2 is a paved road and is designated on the Weld County Functional Classification Map as an arterial road which requires 140 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the future and existing right-of-way. All setbacks shall be measured from the edge of future right-of-way. This road is maintained by Weld County. (Department of Public Works) 2. County Road 19 is a paved road and is designated on the Weld County Functional Classification Map as an arterial road which requires 140 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the future and existing right-of-way. All setbacks shall be measured from the edge of future right-of-way. This road is maintained by Weld County. (Department of Public Works) 3. Show and label the approved access locations, and the appropriate turning radii (60') on the site plan. The applicant must obtain an access permit in the approved location(s) prior to construction. (Department of Public Works) 4. Show and label the approved tracking control on the site plan. (Department of Public Works) 5. Show and label the entrance gate if applicable. An access approach that is gated shall be designed so that the longest vehicle (including trailers) using the access can completely clear the traveled way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled surface be less than 35 feet. (Department of Public Works) Prior to Construction: A. The approved access and tracking control shall be constructed prior to on -site construction. This site requires a tracking control device and 100 feet of asphalt OR 300 feet of asphalt for tracking control. (Department of Public Works) DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) 1. The property owner shall control noxious weeds on the site. (Department of Public Works) 2. The access on the site shall be maintained to mitigate any impacts to the public road including damages and/or off -site tracking. (Department of Public Works) 3. There shall be no parking or staging of vehicles on public roads. On -site parking shall be utilized. (Department of Public Works) 4. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works) WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org Memorandum To: Chris Gathman From: Lauren Light, Environmental Health Services Date: December 14, 2017 Re: USR17-0067 Seltzer Environmental Health Services has reviewed this proposal for a Site Specific Development Plan and Use by Special Review for any use Permitted as a Use By Right, an Accessory Use, or a Use By Special Review in the Commercial or Industrial Zone Districts (Self -Storage and limited outdoor RV and Boat Storage Facility), provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions in the A (Agricultural) Zone District. The application states that Todd Creek Village Metropolitan District will provide water. A conditional will serve letter, dated June 12, 2017, was included in the application. A commercial septic system designed by an engineer will serve the main office for the self -storage units. A portable toilet and bottled water can be utilized, according to EH policy, for the outdoor storage portion of the facility. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. The facility shall operate in accordance with Chapter 14, Article 1 of the Weld County Code. Health Administration Vital Records lot: 9/0 304 6410 Fax: 9/0-301-64I2 Public Health & Clinical Services cic: 9/0 304 6420 Fax: 910-301-64 16 Environmental Health Communication, Services Education & Planning Tele: 970-304-6415 Tele: 970-.304-6470 Fax. 970-304-6411 Fox. 970-304-6452 Emergency Preparedness 8 Response Te le: 970-304-6470 Fax: 970-304-6462 Public Health 4. Fugitive dust should attempt to be confined on the property. Uses on the property should comply with the Colorado Air Quality Commission's air quality regulations. 5. This facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in 25-12-103 C.R.S. 6. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Onsite Waste Water Treatment Systems. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. 7. RV dump stations shall be connected to an appropriately engineer designed On Site Wastewater Treatment System which complies with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. 8. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. 9. Adequate drinking, handwashing and toilet facilities shall be provided for employees and patrons of the facility, at all times. For 10 or less customers or visitors per day, and 2 or less full time employees on site, portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. 10. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. KERR-MCGEE OIL & GAS ONSHORE LP 1099 18`" STREET, SUITE 1800 • DENVER, COLORADO 80202 errAltGee February 20, 2018 VIA E-MAIL Weld county Department of Planning Services Chris Gathman - Planner 1555 N. 17`x' Ave. Greeley, CO 80631 cgathman@weldgov.com NOTICE OF OIL AND GAS LEASEHOLD INTERESTS OWNED BY KERR-McGEE OIL & GAS ONSHORE LP Re: USR17-0067 Seltzer Robert L. Family Trust — Owner or Applicant Township 1 North, Range 67 West, 6th P.M. Section 34: Part of the SW/4 Weld County, Colorado Mr. Gathman: This letter is being sent by Anadarko Petroleum Corporation on behalf of its subsidiary Kerr-McGee Oil & Gas Onshore LP ("KMOG" or the "Company") to inform you KMOG is the owner of valid oil and gas leases underlying all or parts of Section 34, Township 1 North, Range 67 West ("Leased Lands"), for which Seltzer Robert L. Family Trust ("Applicant") is seeking approval of USR17-0067. KMOG is submitting this comment timely, in accordance with State of Colorado and the County's procedural requirements. KMOG's recorded oil and gas leases are real property interests entitling it to produce oil and gas from the Leased Lands (and, as may be applicable, adjacent lands). The Company has the right to produce from existing wells, to maintain, rework, recomplete, and fracture those existing wells to enhance production, and to drill new wells to produce oil and gas, in accordance with applicable Colorado Oil and Gas Conservation Commission regulations and Colorado Statutes. KMOG's oil and gas assets have significant value, and the Company is consequently concerned about any development, surface use, plan of use, PUD, zoning or rezoning, or other action by the County that would impair or preclude its ability to develop its oil and gas interests. KMOG does not object to the Applicant's proposal providing it conforms to the information contained in the notice. Please note that although KMOG does not object to this application, we continue to assert our rights to make reasonable use of the surface of the property to develop our oil and gas leasehold. A SUBSIDIARY OF ANADARKO PETROLEUM CORPORATION Please contact me at 720-929-3321 if you have any questions or comments about this matter. Sincerely, KERR-MCGEE OIL & GAS ONSHORE LP on be .o.1F c4 Emma Vannoy Landman cc: Jeff Fiske, Lead Counsel Ron Olsen Don Jobe Brett Cavanagh A SUBSIDIARY OF ANADARKO PETROLEUM CORPORATION Submit. by Email Weld County Referral November 20, 2017 The Weld County Department of Planning Services has received the following item for review: Applicant: SELTZER ROBERT L FAMILY TRUST Case Number: USR17-0067 Please Reply By: December 18, 2017 Planner: Chris Gathman Project: A Site Specific Development Plan and Use by Special Review Permit for Any use permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial Zone Districts, (Self -Storage and limited outdoor RV and Boat Storage Facility), provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions in the A (Agricultural) Zone District Location: North of and adjacent by County Road 2 and East of and adjacent to County Road 19. Parcel Number: 146934300001-R4727107 Legal: PART SW4/W2SE4 SECTION 34, T1 N, R67W LOT A REC EXEMPT RE -4482 OF THE 6TH P.M., WELD COUNTY, COLORADO. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. I We have reviewed the request and find that it does /does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. Signature Agency Brighton Fire Re cue District Date 12/19/17 Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 353-6100 ext.3540 (970) 304-6498 fax Brighton Fire Rescue District 500 S. 4th Avenue, 3rd Floor • Brighton, Colorado 80601 Telephone: (303) 659-4101 • Fax: (303) 659-4103 • Website: www.brightonfire.org. December 19, 2017 SUBJECT: WELD COUNTY PLANNING REVIEW NAME: USR 17-0067 SELF STORAGE AND OUTDOOR STORAGE LOCATION: WCR 2 AND WCR 19 The Fire Prevention Bureau has reviewed your submission to Weld County and have the following comments based on the 2012 International Fire Code (IFC): General Information: 1) Please be aware that plans for the site development including civil plans and building construction plans will need to be reviewed by our office to verify compliance with the 2012 IFC as adopted. This will need to occur for each phase. 2) Nothing in this review is intended to approve any aspect of these plans or this project that does not strictly comply with all applicable codes and standards. Any changes that are made to the plans will require additional review and comment by the Fire District. 3) This comment letter is not all inclusive of the 2012 IFC code requirements, but provides typical site development requirements. 4) The IFC defines a facility as a building or use in a fixed location including exterior storage areas for flammable and combustible substances and hazardous materials, piers, wharves, tank farms and similar uses. This term includes recreational vehicles, mobile home and manufactured housing parks, sales and storage lots. Fire Access Roads: 5) In accordance with IFC Section 503.1.1, fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. 6) In accordance with IFC Section 503.1.2, if additional fire and emergency access is deemed necessary, an additional access permit(s) for fire safety may be requested from Weld County through the access permit process set forth in the Weld County Code. 7) In accordance with IFC Section 503.2.1, fire apparatus access roads shall have an unobstructed width of not less than 24 feet, exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches. Brighton Fire Rescue District 500 S. 4th Avenue, 3rd Floor • Brighton, Colorado 80601 Telephone: (303) 659-4101 • Fax: (303) 659-4103 • Website: www.brightonfire.org. 8) In accordance with IFC Section 503.2.3 fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Note: The term "all-weather driving capabilities" would typically require some type of paved or hard surface. Gravel would be prone to problems in areas subject to much rain or in snowy climates where plowing. 9) In accordance with IFC Section 503.2.4 the required turning radius should be determined using the fire apparatus specifications attached. A drive path analysis using the attached fire apparatus specifications to show that our fire apparatus will be able to navigate along the fire access roads within the facility will be required. 10) In accordance with IFC Section 503.2.5 dead-end fire apparatus access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. 11) In accordance with IFC Section 503.6 where security gates are installed, they shall have an approved means of emergency operation. The security gates and the emergency operation shall be maintained operational at all times. Fire Protection Water Supply: 12) IFC Section 507.1 Required water supply. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. 13) IFC Section 507.2 Type of water supply. A water supply shall consist of reservoirs, pressure tanks, elevated tanks, water mains or other fixed systems capable of providing the required fire flow. 14) IFC Section 507.3 Fire flow. Fire flow requirements for buildings or portions of buildings and facilities shall be determined by Appendix B. 15) IFC Section 507.5.1 Where required (hydrant system). Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on -site fire hydrants and mains shall be provided. 16) Please also refer to Appendix B and Appendix C for additional information on fire flow and fire hydrant requirements. Brighton Fire Rescue District 500 S. 4th Avenue, 3rd Floor • Brighton, Colorado 80601 Telephone: (303) 659-4101 • Fax: (303) 659-4103 • Website: www.brightonfire.org. Should there be any questions regarding this review please do not hesitate to contact me. Safet, through Fire Prevention, Whitney ven — Deputy Fire Marshal 29b MI .�• / O /•� .•. •. rrn I ��� . (t) FINE I[YMCFI SOW E� FOaJ5 LIAR/ CAR AIR Gael imfA (3) HELEN //i\�/-\./-\./ ■■ ■ 500 SUPER •-->. ! 1.E.0. NININs �. i� •`J - Lives (2) HELEN FIREEOaI FMNIMI , �,z ` O( EMIT EY19(ET (•...j`F ■•w�� • '�� 2, I.E.D. IICHIVIES /C• / RO1AIED AT 30. \ I,; 0440.E -� ■ 1 OPtICOM 794 L.E.O. n , ��Es 1 ( ((Iall _ TyRQIg(EUII I TEA I a d 1 NQAITED �'1\ lI /ma, a. — - - r� — — ^'rte .)^. 1■I NO �_ :u IIIIIIIIIIIIIIIIIIIIMIIIMIIIIIIIIIIIIIIII01 LIT *Wm r7 L.E.D. UT FIRE RE%AA[N DENIS 11011 EACH SIDE scow >o I I FOCUS LIAITS RECESSED s I UOEp KRIK BA91I �e I CE STORAGE OM � — — moo. Too OE 1 7s• HEATED romoots cio I I O O I EACH 510E WITH CONVEX %CTION AM) 7tlo-Pus T T _ r1�.50•� REMOTE Min I I g (2) AELEM SPEW 600 — — ® 0 O _ L.E.D. YNMINi LIGNTs IN - j_ A CONDI KIEL EACH SIDE .., ... �..��...... �. I V 1 O 0 al 7 I�1I (I) FEDERAL 029 SIREN SOI •�I�I�>> K 75 WOETED o ' .. CENTER pOiE 1ROLI01 ( . ... " 9l M EXTENSION FOR 100' t .75 D.J. NOSE / f� !—r ' 1 ICCA26.00. O AQD/E OMER OEM HOWL IC i I v , • 1- NR NOCiL EW-16-6 Ylt I WITH 1.50 CUTLET chi A --A ' 2.00PIPHC w0 SNIriL ' . tlt CAPACITY Fa 100OF 0.25 I.O. _ �, Ifl5 , (:1 / • .o O JK IYDRAULIC HOSE NV CNTER ■ t 1' a - +' Cr—IRRX7(-LITE , , ��M ; 1 , '� _-- o ;); o TRAY FM HYDRAULIC TOOLS WITH yM �j y • `'t.f s�' "P oOo FLLl YIDIN COVER WITH MAID \>1F// I !! o o CENTER SECTION FOR NOSE ACCESS AIELEN SWFA 600 I.E.0. FLU F its ECG STIIRILIIER so IC Lion EACH SIDE7 (I) 600 Kai. GOIISY ACCT% TO COPARTENt P6 CCPRARO 01002 5t.IKE5S St[[L FEEDER STAICTICI HELEN 91yER EACH SIDE - DIIECTIasL/MARIER 11011 TI NIAN BODY CANNA L1011 Q450 NI 1m 1)S) LITTLE GIANT 5001 MODEL 17-10102 LADDER WITH FA a 11 MD TEAR — _ I.E.O. LIARS EACH SIDE(2) _ WINCE TOGO A,OFUP EACH 510E 110115 KHIINAI 4 -MAY 1801101 � � FRONT AC REAR 16.00 - , N (B) IR B01ILE COMM CARTPENiS (I) TT0 FIRE KKRr 7.75 IECEPTAQE rN (2) AIR FORKS LIT0:0E 3 P9100 Ig1A�0 OPENING WITH EACH SIDE _� A STAINLESS PEEL OOP >R / I. 1 1 1 LI _/ 21w �� I ■ it -7 ylARl POIER NR- 15 IIYORMIIC IC .�, •GENERATOR ,• 1 .I!'^1' _� . [I it _ ,_.,... •.�1 ' ' �•'yl► 1iI , ,� - / _ .. r (- - - - - T \ �A 100" Of 5.00• D.J. POLY 11D9E • 1 (2) C11355LAY NOW Q I I (IIQ(DIF.tanWA tan !WAKE ' _ 1I FOR 200' OF 1.75 D. J. * •�` NOSE Slim 7.00. PIPIIi • I `• i ` Po oo 85.00 1 I +►26.25 (I) inn NaciEO 139.00 1 FOR 200. O: 2.§0 D.J. NOSE WITH 2.50 PIPING ,x.23.75 * I BAR • IN5. �r L - - _- — ,� / FOAM •J T>i �\ HfJn3 5Y5TEll I -J `-, I I \ rL°`mADOERR elf OiYFL`I is X Is \ SECT - X \ Cal IOC ORADOEIS FM FIRE RUTLAND, 50011 M0.10ING FOR PIC POLE COQ ODE 3 ML 4115HALOGEN N AXE IN kilt 1w49(ET FO.115 1 101 ON KRIK FLT --DISPLAY BAR GRAPH 1 44 CORD REEL UT / WITH ll/ TELf5CDRINi PQf EACH Sla SECTION scat LIAR WITH CAST PAOa[T5 IS' Fella) INIEpgC110N NQ151Ni (I) EACH 510[ AT FCM RER, Doan WIN IOW OF Kt1NTINlN Wt 10/3 ER)NC-16-6 COED will.,011 AID MUSK 5T f- *ilk 5 STOWS DRAD[trs SASE ?Via 6.00 APO WITH MIND Can SET ING 104 A6 40 .tAD(ETS (7) HELEN Ift2 LLD. NDF TTIISCO►IIt Plata HORS -- __- __ J j _— — ��\__ - - A •\r� -. �i ��...ai�i����. EQUIPMENT SIGNED I/ F _ AT NE RE MI 1 I P! 0 w1,,�/` 1}It • L — I I • ` 35 2 —SEC 1200* I I I of It 2 -SEC 12004 00*�•��`WITH a / - 'Fi .L� �, ►/ / ( ��Jj( at 6 ROOF E75A - - - - ` - _ • JI ►. 1` i ONE It 800 DMA : - — — — f--' 11 _ L I I �1 NNNNN� ��---J -`_ .. LOGE 3 NA3517 L . E .O. OlE10• caDl16 r • •I0_�-�\\'/ • • TRAFFIC Pfl 0 ! �1 JI- _, ` DIRECTINGLlpll / SEVEN KIMtN/( PIKE POI T6�5 A -NAY ENCIOSUEAid (2) AI TY K OEM L IOIIS L /.3 I _ _ u — POP I _ 11 IL ' I 4 CHUTE ) N L I � 4 • _+• c.7 HE � II '� 1t Liffm , I I I • ._ -- - - 1�1 '' RI -TAR L.E.D. CLEARANCE/ • / , -! At.', '••�'O� IDENTIFICATION 110115 IY .50 --- w IK.00 ( 38.25 s v--�O.00 1.E 65. Ilnl1u11nlnluluufllli_IInRw111R1 u' I �' I_� ,.. IIIIIIIIIIII I ., 11 1 • 37 75 I I 1 (17 -2e) -' - N R e1 I v) coot 3 NaDEL ILEA �.,■Fr_a� _ NKOOEY SCENE APPIpX — A •.4• • . �� 31 38... LIGHTS — - - - — — — _ w—�3. r 5 O.A.M. 20.50 T A se 29 63 _ —35.00—� 42.00 + ,_' AM 1 9.00 f CA - _ l 6 CI) \lt o 0 , I _ � — — Il 1.'- 73.25 I 1 . Ei9.25 ® 62 25 — 3 D O 60.50 .�. lLACR VIIFR I.IIE ® w2 ty P Q 53.50 i BOTH SIDES �r� (2) HELEN 54pER 600 - — y H L L.E.D. IONIC 110115 Q y 7I} ' —— -,715 I _, •`- ',1i ' ~ L t /TAILE110415___0411:3 •� 79 L1 STOPELEN II 00 1* ` Ji4' O - e o I — ''�`` /I- _ _ Q) HELEJI i00 SERIES Q ••n DIRECTION. ..� *•�J ( ''t�- I��:, l -E.0 LI011S �— iIt►• IS� ` __ -_. (7) PETERSN HI . o 0 � IQ! '� � r BACK LIGHTS " 1►�♦� \I 1 LP AIR MEET WITH- -NAILER LIME Y11N USUAL AIR -EJECT 96.00 a. 00. KPA4 IN. D Ric COPW1 Nr SPEAKER app• RL R MN EACH 51(i W AUTO -EJECT 3 MW STiAIDND WPA MIN. STABILIAR CONFTIOLS 5.00AEAIKMAP j 0.195MII SLIM NEAR INLET U) ZIAAA1IC SAC 44f FOLO11L 30.00 I 2.0O —a •a— (REEL UOCK5 25.00 a••C 27.00 30.00 is .•f 52.00 op .NI --I . SO r 87.00 70.00 0•..* 60.50 -----dos 123.50 •r 104.50 PNAFE CJTOFF AN N+ SOD _. 104.00 257.50 Ne we 152.50 a 562.00 (46'-)0.00')APPROX. DAL CUSTOMER APP VAL (ALUMINUM BODY) (SIDE ROLL AND FRONTAL IMPACT PROTECTION) MANUFACTURING JOB NO 23784 APPIDICIIT: Citilb.nalriie> INC. Tat DATE: 1.24 DATE NOTE =- OMMIlmas I. Ram iPoo BASE FoR STUNS LOCATED PER 51IDR ceOER to. AIR OOTLET LOCATED co flvER's SIN PIP PANEL(TONAb REAR OF Plitt) 100 AERIAL PLATFORM It BODY ASSEMBLY (PAP100A) OkaN 2. Cat. WEE KwLO AtED PER SHOP wan CHASSIS DIMENSIONS SHOWN ARE APPROXIMATE II. (ERIK PECESTK RAISED 3.00 3. BATTERY ONAGER LOCATED IN COPMITMENT D4 11. ONE 2401,, RECEPTACLE IN CGPARTMENT P6 Om YAK SALL TOYAO REAR COINERDATA 4 ow FLOOR Di SLIDE -aft TRAY IN CIN TITLE 330 GALLON TANK, 300 GAL. MATER/30 GAL. FOAM SHU 02AUG 10 AND ARE SUBJECT TO MINOR DEVIATIONS AME 9. ccpFFNI5 WI TN Al ID, LACER FRONT BtAPER CONED 5. IRO ADA6TA8lE SLIOE-0Yi tom WADS IN IINNT P5 t3. KRIK YArERwr 9UtOLF VALVE 6. T $' 04pCT10 SiU a ow FOR GREATER BRIGHTON FIRE PROTECTION DISTRICT O� AS MAY OCCUR DR BE NECESSARY IN CONSTRUCT ION. P4.TWJ 19 P4; TametRIO IN DI,DI,P1,P2 �IPt II TER SCENEPELF LOCATED B. CIRCUIT PHIL PUt•5 ® 105EP10 SiU cm PIERCE BRIGHTON, COLORADO JBL 09AUG10 EIREAKEN IN CaPM(TNEYT 04 ® 124(11410 at LEFT SIPE 9EEI'S. MINOR DETAILS NOT SHOWN. g. ONE 12Gr OIPIfX FECEPTmER'5AQE LOCATED a TOP OF CENTER CFA FACING STORAGE COPARiNEMi SFU Jel DwG ^/� A ARO ORE IN PA5R SIDE 196 COIPMRTIENT D MN DATE BY CN VEL7010 ( D NO. 1 a 1 View File CreoLed DS-OCT-2010 08,19=22 Turning Performance Analysis Bid Number: 219 Department: Brighton Fire Rescue District 01/14/2016 Chassis: Velocity Chassis, PAP/SkyArm/Midmount (Big Block) Body: Aerial, Platform 100', Alum Body Additional Bumper Depth 1 Chassis Overhang Wheelbase I L Category l .L r , Axle Track Wheel Offset Cramp Angle Tread Width , it C' Ore fo L ti L Option to Inside Turning Radius Description Parameters: Inside Cramp Angle: Axle Track: Wheel Offset: Tread Width: Chassis Overhang: Additional Bumper Depth: Front Overhang: Wheelbase: Calculated Turning Radii: 40° 82.92 in. 5.3 in. 13.5 in. 78 in. 26 in. 146.1 in. 257.5 in. Inside Turn: Curb to curb: Wall to wall: Comments: 24 ft. 7 in. 39 ft. 11 in. 47 ft. 6 in. Axle, Front, Custom Wheels; Front Tires, Front Bumpers Aerial Devices 0508846 0019618 0582746 0123627 0592931 Axle, Front, Oshkosh TAK-4, Non Drive. 24,000 lb. Velocity Wheels, Front, Alcoa, 22.50" x 13.00". Aluminum, Hub Pilot Tires, Front, Goodyear, G296 MSA, 445/65R22.50, 20 ply Bumper, 26" Extended, Imp/Vel Aerial, 100' Pierce Platform, 50 MPH Wind Rating, 1501b Tip Load Allowance Notes: Actual Inside cramp angle may be less due to highly specialized options. Curb to Curb turning radius calculated for 9.00 inch curb. Hello