Loading...
HomeMy WebLinkAbout20182105.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 105 BETWEEN STATE HIGHWAY 14 AND COUNTY ROAD 390 FOR APPROXIMATELY FOUR (4) MONTHS, FOR ROAD CONSTRUCTION AND PAVING WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 105, between State Highway 14 and County Road 390, be temporarily closed, with said closure being effective July 16, 2018, for approximately four (4) months for road construction and paving, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc: 5OCRS), CO State Po.troi, scotch, 08-07-I 2018-2105 EG0024 TEMPORARY CLOSURE - COUNTY ROAD 105 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 9th day of July, A.D., 2018. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: d.itsf,„ti,�,'� Weld County Clerk to the Board BY: Deputy Clerk to the B APP' • -, AS TO ounty • •,: ney Date of signature: O8-03/8 Ste e Moreno, Chair P arbar irkmeye1 o -T em Sean P. Conway 2018-2105 EG0024 MEMORANDUM TO: Clerk to the Board DATE: July 5, 2018 FROM: Amy Joseph, Public Works Department SUBJECT: BOCC Agenda Item WCR 105 between Hwy 14 and WCR 390 is closed from 7/16/2018 thru 11/15/2018 for road construction and paving. See attached closure diagram(s). 7lq 2018-2105 aioDa-5` N - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WCR 103 I 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 [!t] O 1 1 1 0360n NUJI0S • .4.- ,1 4. l 1 1 1 1 1 1 1 1 1 WCR 105 1 I 1 1 1 l I 1 i 1 1 1 1 1 1 PU ,w RUM) CLOSED JCAI. TRAFFIC ONLY 1. 2A/ AEI m O c �t7 t t 4 z I HWY 14 S Project # HRP-64 Road closure description WCR 105 between HWY 14 and WCR 390 closed 7/16/2018 thru 11/15/2018 for road construction and pave Notice to Public Road signs and barricaded during closure No Message boards to be used Detour Route WCR 103 between WCR 390 and HWY 14 4 mile gravel Notes ADT of WCR 105 is; 217/ 2017 Road construction with pave project. Placement of signs not to scale Date 7/5/2018 Prepared by LEE STEPHEN Approved by county engineer CAMERON PARROTT Hello