The Weld County Department of Planning Services has received the following item for review:
Applicant: DCP Operating Company, LP Case Number: USR18-0057
Please Reply By: July 16, 2018 Planner: Chris Gathman
Project: A Site Specific Development Plan and Use by Special Review Permit for a 4.47 mile long
16 -inch high pressure natural gas pipeline proposing to connect the Northstar Booster (applied for under
USR18-0018) to the existing DCP pipeline system.
Location: The proposed Pipeline is located North of County Road 64.5, south of County Road 74, east
of County Road 45 and west of County Road 47.
Parcel Number: Multiple Parcels
Legal: The proposed pipeline is located in Sections 2, 11, 14, 23, and 26, T6N, R65W of the 6th P.M.,
Weld County, Colorado.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
We have reviewed the request and find no conflicts with our interests.
See attached letter.
BPascoe 06/18/2018
Signature Date
Agency
Zoning Compliance
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax
Submit by Email
Weld County Referral
June 18, 2018
The Weld County Department of Planning Services has received the following item for review:
Applicant: DCP Operating Company, LP Case Number: USR18-0057
Please Reply By: July 16, 2018 Planner: Chris Gathman
Project: A Site Specific Development Plan and Use by Special Review Permit for a 4.47 mile long
16 -inch high pressure natural gas pipeline proposing to connect the Northstar Booster (applied for under
USR18-0018) to the existing DCP pipeline system.
Location: The proposed Pipeline is located North of County Road 64.5, south of County Road 74, east
of County Road 45 and west of County Road 47.
Parcel Number: Multiple Parcels
Legal: The proposed pipeline is located in Sections 2, 11, 14, 23, and 26, T6N, R65W of the 6th P.M.,
Weld County, Colorado.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
We have reviewed the request and find no conflicts with our interests.
See attached letter.
Capt. Alan Caldwell 062518
Signature Date
Agency
W CSO
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax
Submit by Email
Weld County Referral
June 18, 2018
The Weld County Department of Planning Services has received the following item for review:
Applicant: DCP Operating Company, LP Case Number: USR18-0057
Please Reply By: July 16, 2018 Planner: Chris Gathman
Project: A Site Specific Development Plan and Use by Special Review Permit for a 4.47 mile long
16 -inch high pressure natural gas pipeline proposing to connect the Northstar Booster (applied for under
USR18-0018) to the existing DCP pipeline system.
Location: The proposed Pipeline is located North of County Road 64.5, south of County Road 74, east
of County Road 45 and west of County Road 47.
Parcel Number: Multiple Parcels
Legal: The proposed pipeline is located in Sections 2, 11, 14, 23, and 26, T6N, R65W of the 6th P.M.,
Weld County, Colorado.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
We have reviewed the request and find no conflicts with our interests.
See attached letter.
Signature
Agency
Eaton School District RE2
6/18/18
Date
Weld County Planning Dept 1555 N 17th Ave, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax
Submit by Ernail
Weld County Referral
June 18, 2018
The Weld County Department of Planning Services has received the following item for review:
Applicant- PCP Operating Company, LP Case Number- USR18-0057
Please Reply By: July 16. 2818 Planner Chris Gathman
Project. A Site Specific Development Plan and Use by Special Review Permit for a 4.47 mile long
16 -inch high pressure natural gas pipeline proposing to connect the Northstar Booster (applied for under
USR18-0018) to the existing DCP pipeline system_
Location: The proposed Pipeline is located North of County Road 64.5. south of County Road 74, east
of County Read 45 and west of County Road 47.
Parcel Number: Multiple Parcels
Legal: The proposed pipeline is located in Sections 2, 11, 14.23, and 26, T6N, R65W of the 61h P.M,.
Weld County. Colorado_
The application is submitted to you far review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or or this date may be deemed to be a positive response to the Department of Planning
Services, If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does /does not comply with our Comprehensive
—/ Plan because:
V We have reviewed the request and find no conflicts with our Interests.
See attached fetter.
Signature
Agency
Date 7/2/le
Weld Counly Panning Dept 1555 N 17th Ave. Greeley. CO. 80551 1978) 400-5100 l970i 304-5458 fax
Submit by Email
Weld County Referral
June 18, 2018
The Weld County Department of Planning Services has received the following item for review:
Applicant: DCP Operating Company, LP Case Number: USR18-0057
Please Reply By: July 16, 2018 Planner: Chris Gathman
Project: A Site Specific Development Plan and Use by Special Review Permit for a 4.47 mile long
16 -inch high pressure natural gas pipeline proposing to connect the Northstar Booster (applied for under
USR18-0018) to the existing DCP pipeline system.
Location: The proposed Pipeline is located North of County Road 64.5, south of County Road 74, east
of County Road 45 and west of County Road 47.
Parcel Number: Multiple Parcels
Legal: The proposed pipeline is located in Sections 2, 11, 14, 23, and 26, T6N, R65W of the 6th P.M.,
Weld County, Colorado.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
We have reviewed the request and find no conflicts with our interests.
See attached letter.
Brandon Muller 6/20/18
Signature Date
Agency
Colorado Parks and Wildlife
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax
Hello