Loading...
HomeMy WebLinkAbout20182830.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 28 BETWEEN COUNTY ROAD 21 AND U.S. HIGHWAY 85 FOR APPROXIMATELY TWO (2) WEEKS.. FOR BRIDGE 28/23A REPAIRS WHEREAS, the Board of County Commissioners of Weld County, Colorado. pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado. and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may. for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...". and WHEREAS, the Board. pursuant to said statute and upon the basis of traffic and personal investigations. has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate. warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado. deems it necessary to regulate. warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate. warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado. does declare and establish that County Road 28. between County Road 21 and U.S. Highway 85. be temporarily closed, with said closure being effective September 10. 2018, for approximately two (2) weeks for Bridge 28/23A repair, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. c c SCA RS), O;6( c^.tch, CO S+a.+e, 1G -1 S- 2018-2830 EG0024 TEMPORARY CLOSURE - COUNTY ROAD 28 PAGE 2 The above and foregoing Resolution was. on motion duly made and seconded. adopted by the following vote on the 5th day of September. A.D.. 2018. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: ddraitys ) C to;d, Weld County Clerk to the Board BY: eputy Clerk to the Board APP�D Countyttorney Date of signature: 1O/3/lg Ste Mike Freeman L� 2018-2830 EO0024 MEMORANDUM TO: Clerk to the Board DATE: August 31, 2018 FROM: Amy Joseph, Public Works Department SUBJECT: BOCC Agenda Item Bridge 28-23A will be closed from 9/10/2018 thru 9/24/2018. This closure is required for concrete repairs, asphalt mill/overlay, and expansion joints work. The Contractor is Kehn Construction. See attached diagram. 2018-2830 9/s Comments: 1. All Traffic Control Devices to Conform to the M.U.T.C.D. 2. Drawing not to scale 3. All Signs will be spaced minimum of 500' as per MUTCD 4. The Contractor will work within the limits of the permanent ROW and store all equipment and materials within these limits 5. Non -vehicular access Bicyclists are to be treated as a vehicle there are no pedestrian facilities 6. Exact placement of devices will be dependent on site conditions. Changes art to be implemented where applicable 7. VMBs Verbiage and placement shall be directed by Weld County Comments: Sign Dimensions and Tabulations 30x48 2 Road Closed 30x60 3 Road Closed to Thru Traffic 18x48 1 Left Detour 1 Right Detour 36x48 2 Begin Fines Doubled In Work Zone 2 End Fines Doubled In Work Zone 46x46 8 Road Work Ahead 5 Road Closed Ahead 24x30 4 Detour +/- 50 Barrels 5 Tvna Rarricades C tSTIST- - c\`'1 O -Z\'-1- OCo Project: 2018 Weld County Bridge Rehabilitation Comments: Road Closure of Cr. 28 at The South Platte River Dates: 9/10/18 to 9/24/18 Times of Closure: 24 Hours NOZ NHO NI 0119(1O0 SENId NIO99 Comments: Weld County Sign Kehn Construction Sign. QTC Inc Si• n. NOZ Nel0 NI a3iunoa S3NI3 ON3 www.invarion.com Legend • Barrel END FINES DOUBLED IN 'ORK ZON ROM) WORM ARRA BEGIN FINES DOUBLED IN BORK ZON Date Date Date Comments Al Tra*c Control Deuces to Conform to the M U T.C.D 2 Drawing not to sub 3 Al Signs id be spaced mnrnurr of 500' a per MUICD 4 The Contractor well *NA w1Wn the Imes 0 The permanent ROW and store aD equipment and rruterab wtthn tntst hits 5 Non•vehwtar access Bicycists are to be firmed as a vehi k there are no pedestrian lac.+it es 6 Fed placement of devices din dobenxfenl on nit wnoelons Changes en to be mplemenled enere o:.yt • 7 VLIBe Verbiage and placement stud be drecea by Vivb Corn'Y Comments. Sign Dimensions and Tabulations 30x48 2 Road Closed 30x80 3 Road Closed to Thru Traflrc 18x48 1 Lott Detour 1 Right Detour 36x48 2 Begin Fates Doubled In Work Louis 2 End Fines Doubled In Work /one 46x46 8 Road Work Ahead 5 Road Closed Ahead 24x30 4 Detour *1- 50 Barrels 5 type 3 BagrrcntuNb w Project: 2018 Weld County Bndge Rshabililalion Comments Road Closure of Cr. 28 al The South Platte River Dales 9/1011810 9/24118 Tunes of Closure 24 Hours COMalenta:.c Kenn Construction Sign Dale Date Date wcv,; War - Legend BEGIN FINES DOUBLED IN 'tNORK ZON "tMF it w. ce3s. 'Ste • ° o - Zfl -- O(0‘5 Hello