Loading...
HomeMy WebLinkAbout20180724.tiffLAND USE APPLICATION SUMMARY SHEET Planner: Kim Ogle Hearing Date: March 6, 2018 Case Number: USR17-0077 Applicants: Green River DevCo LP and Noble Midstream Services LLC Representative: Pam Hora, Tetra Tech, Longmont, Colorado Request: A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -inch high pressure natural gas pipeline approximately four (4) miles long commencing at the DCP Colt Compressor Station heading northeasterly to the DCP Operating, LP, Crossroads Compressor Station (USR17-0023) near the intersection of County Road 49 and County Road 44 in the A (Agricultural) Zone District Legal Description: The Green River DevCo LP and Noble Midstream Services LLC Colt to Crossroads Pipeline route will be generally aligned in a northerly direction. The pipeline will cross multiple sections including Sections 12 and 1, T3N, R65W; and Sections 36, 25 and 24, T4N, R65W and Sections 19 and 18 T4N R64W of the 6th P.M., Weld County, CO Location: Generally located south of County Road 46; west of County Road 51; north of County Road 34 and east of County Road 47 Size of Parcel: 19 +/- acres Parcel No.s: Multiple The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received referral responses with comments from the following agencies: Weld County Department of Public Health and Environment, referral dated January 25, 2018 > Weld County Department of Public Works, referral dated The Department of Planning Services' staff has received referral responses without comments from the following agencies: V V V V V V Weld County Zoning Compliance, referral dated January 5, 2018 Colorado Parks and Wildlife, referral dated January 6, 2018 Southeast Weld Fire Protection District referral dated January 8, 2018 Weld County Sheriff's Office referral dated January 9, 2018 Platte Valley Fire Protection District referral dated LaSalle Fire Protection District referral dated The Department of Planning Services' staff has not received responses from the following agencies: ▪ History Colorado ▪ West Greeley Conservation District ▪ Weld County Office of Emergency Management U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 1 SPECIAL REVIEW PERMIT ADMINISTRATIVE REVIEW Planner: Kim Ogle Hearing Date: March 6, 2018 Case Number: USR17-0077 Applicants: Green River DevCo LP and Noble Midstream Services LLC Representative: Pam Hora, Tetra Tech, Longmont, Colorado Request: A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -inch high pressure natural gas pipeline approximately four (4) miles long commencing at the DCP Colt Compressor Station near the intersection of County Roads 49 and 34.5 and heading northeasterly to the DCP Operating, LP, Crossroads Compressor Station (USR17-0023) near the intersection of County Road 49 and County Road 44 in the A (Agricultural) Zone District Legal Description: The Green River DevCo LP and Noble Midstream Services LLC Colt to Crossroads Pipeline route will be generally aligned in a northerly direction. The pipeline will cross multiple sections including Sections 12 and 1, T3N, R65W; and Sections 36, 25 and 24, T4N, R65W and Sections 19 and 18 T4N R64W of the 6th P.M., Weld County, CO Location: Generally located south of County Road 46; west of County Road 51; north of County Road 34 and east of County Road 47 Size of Parcel: 34 +/- acres Parcel No.s: Multiple Case Summary: The Colt to Crossroads Gas Pipeline is a proposed 24" natural gas pipeline that will connect to the north end of the South Area Gas Pipeline near County Roads 49 and 34.5, then travel approximately four miles north to connect into DCP's Crossroads Compressor Station located at the northeast corner of County Roads 49 and 44. The selected route is approximately 4 miles long and was deemed to be the most direct and is immediately adjacent to and runs parallel to an existing oil and gas pipeline corridor used by Noble and other oil and gas companies in order to minimize the impact of pipelines on the land in the area. In addition, the route selected will minimize impacts on the community, minimize cost, and maximize safety during construction by crossing as few roads as possible. During construction of the pipeline, a 70 -foot lineal strip of land (34+/ - acres) along the alignment will be disturbed and then reclaimed following installation of the proposed Colt to Crossroads Gas Pipeline. Green River DevCo LP has acquired a permanent easement along the pipeline route, the width is 30 -feet (15 acres) in linear area. Physical facilities such as valves and pig launchers/receivers will be located off of the County Road right- of-way, and laid out to allow safe access by Green River maintenance technicians. The pipeline flow measurement will be monitored by a Supervisory Control and Data Acquisition (SCADA) system. The natural gas that flows into the pipeline will be the gas that is collected from Noble Econodes and fed into the South Area Gas Pipeline. U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 2 DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services' staff that the applicant has shown compliance with Section 23-2-480 of the Weld County Code as follows: A. Section 23-2-480.A.1 - All reasonable efforts have been made to avoid irrigated cropland or to minimize the negative impacts on agricultural uses and lands. Section 22-5-100.A.1 O.G. Policy 1.1 The County should encourage cooperation, coordination and communication between the surface owner and the mineral owner/operations with respect to any developments of either the surface or the mineral estate. The Colt to Crossroads Gas Pipeline is surrounded by land uses primarily associated with the Agriculture Zone. Land uses near the pipeline include existing oil and gas facilities including other pipelines, existing agricultural facilities, and a few existing residential properties. Residential properties surrounding the pipeline are sparsely distributed and consist mainly of range homes and large lot single family homes. Other than County roads, the pipeline will not travel through or underneath any significant structure. Green River will agree to an easement with each property owner that the pipeline crosses in order to ensure that the pipeline is compatible with the land the pipeline crosses. By agreeing to an easement with each landowner, Green River is committed to working with all landowners along the pipeline route to ensure that the pipeline will not adversely impact any property along the route. The application indicates that the pipeline will be located to minimize impacts on the operation of irrigation equipment. All soils removed for installation of the pipeline will be returned to their original location and will not be moved offsite. Green River DevCo LP and Noble Midstream Services LLC [Green River - Noble Midstream] indicates that they will repair and/or replace any facilities damaged or removed during the placement of the pipeline. The preferred pipeline route minimizes environmental impacts such as wetland areas, water bodies, floodplains and agricultural lands. The selected route is sited on plowed fields and pivot irrigation systems. B. Section 23-2-480.A.2 - The pipeline will not have an undue adverse effect on existing and future development of the surrounding area, as set forth in applicable Master Plans. The pipeline is not located within the 3 -mile referral area of a municipality or County. C. Section 23-2-480.A3 - The design of the proposed pipeline mitigates negative impacts on the surrounding area to the greatest extent feasible. The applicant indicates that many private easements (rights -of -way without Fee ownership) have been negotiated for the pipeline with private land owners, whereas any alternative alignments would require new easements to be negotiated and involve crossings that may result in greater environmental impacts in certain locations. The preferred pipeline route minimizes environmental surface impacts. D. Section 23-2-480.A.4 - The site shall be maintained in such a manner so as to control soil erosion, dust and the growth of noxious weeds. The Conditions of Approval and Development Standards will ensure that there is no fugitive dust or U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 3 erosion and will ensure the control of noxious weeds. Best Management Practices (BMPs) will be required for all construction areas, including erosion control methods, dust suppression, et cetera. E. Section 23-2-480.A.5 -- The applicant has agreed to implement any reasonable measures deemed necessary by the Board of County Commissioners to ensure that the health, safety and welfare of the inhabitants of the County will be protected, and to mitigate or minimize any potential adverse impacts from the proposed pipeline. The applicant has proposed a number of measures to mitigate impacts from the pipeline including the boring beneath County roads to avoid damage to the road surface or disruption to traffic flow; if surface waterbodies will be crossed by the pipeline either by boring beneath the bed of the waterbody, or by utilizing an open -cut crossing method. If the open -cut crossing method is used, BMPs will be installed to protect the waterbody from erosion or sediment runoff; tracking pads will be utilized where heavy equipment is required to cross roads to prevent damage to the road surface; topsoil will be segregated from subsoil during grading activities. All pipelines will be compliant with the Department of Transportation (DOT) requirements. Per this standard, pipelines are required to have a minimum of 30 -inches of cover and in many locations there will be a minimum of 36 -inches of cover or greater if required by local or state agencies. The pipeline trench will be excavated mechanically; pipe segments will then be strung along the ditch line and then welded together using welders and weld procedures qualified under the requirements of the Code of Federal Regulations; each weld will be examined utilizing industry standard non- destructive examination, or x-ray, procedures by qualified technicians; the coating on the pipeline will be inspected for damage and repaired as necessary and then the line(s) will be lowered into the trench and backfilled. The pipeline(s) will subsequently be pressure tested using water (hydrostatically tested) to industry regulations. The transportation of natural gas via pipeline is generally safer than other potential modes of transport. There is some small risk of an accident in which the integrity of the pipeline may be compromised resulting in a release of natural gas or natural gas liquids. Wet natural gas contains condensed forms of heavier natural gas liquids and produced water and is considered both flammable and combustible. Dry natural gas is a clean burning fuel source, also considered both flammable and combustible. In general, signs of a pipeline leak, include dead or discolored vegetation that is otherwise green along the pipeline right-of-way, along with pools of liquid or clouds of vapor or mist not usually present. Green River - Noble Midstream will clearly mark the pipeline centerline with markers placed at line of site intervals and at all road and canal crossings. The markers will clearly identify the pipeline, and will provide a telephone number and address where a company representative can be reached in an emergency or prior to any excavation in the area. Green River - Noble Midstream also participate in the Colorado "One Call" system, which serves as a clearinghouse for excavation activities that are planned close to pipelines and other underground utilities. Each respective pipeline centerline will be clearly identified with markers placed at line -of- sight intervals and at all road crossings. These markers will clearly identify Green River - Noble Midstream as the owner / operator, provide a telephone number and address where a company representative can be reached in an emergency. In the event of an emergency, a call to the number on these markers will go to Green River - Noble Midstream operations and control center that is staffed 24 hours / day, 7 days / week by trained operators, qualified in both the day-to-day operation of the respective pipelines and associated facilities, and in emergency response procedures. These operators will also have the ability to monitor the operation of the pipeline system through a Supervisory Control and Data Acquisition ("SCADA") system. Through the SCADA system, operators will be able to see key parameters associated with the operation of the U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 4 respective pipelines, including pressure, temperature, and flow rate. In the event that these parameters, or other critically identified criteria fall outside of pre -determined normal operating allowances, the SCADA system will raise warnings of potential operational upsets or pending emergency conditions, providing the operator with time to make corrections, if possible, to the system operation in order to clear the warning. In the event that the specified parameters, or critically identified criteria reach pre -determined set points within the system operation, the SCADA system will alarm. Upon notification of an emergency, either through the public emergency call number, SCADA system, operator inspection and training, or other originating source, Green River - Noble Midstream will have the ability to isolate the respective pipelines by closing remotely operated valves in the natural gas pipeline, isolate any potential fuel source and mitigate propagation of the emergency situation. Depending upon the nature of the emergency, local emergency responders would be notified, and Green River - Noble Midstream would implement their internal safety response procedures, including dispatching trained personnel to the site of the emergency. F. Section 23-2-480.A.6 - All reasonable alternatives to the proposal have been adequately assessed, and the proposed action is consistent with the best interests of the people of the County and represents a balanced use of resources in the affected area. The applicant reviewed alternative pipeline locations. The preferred route utilizes a pipeline right-of- way corridor negotiated through agreements with private property owners. The applicant has proposed two alternatives for this pipeline in Section 25, Township 4 North, Range 65 West to accommodate property owners. G. Section 23-2-480.A.7 - The nature and location or expansion of the pipeline will not unreasonably interfere with any significant wildlife habitat and will not unreasonably affect any endangered wildlife species, unique natural resource, known historic landmark or archaeological site within the affected area. A Desktop Environmental Review prepared by SWCA Environmental Consultants dated February 13, 2018 for the Colt to Crossroads Pipeline project route for a specific site assessment of the biological, aquatic and cultural resources adjacent to the proposed pipeline route. The purpose of this review was to identify any significant natural or cultural resource constraints or risks associated with the development of the pipelines. Colorado Parks and Wildlife returned a referral date January 6, 2018 indicating no conflict with their interests and History Colorado did not return a referral response. H. Section 23-2-480.A.8 - No adverse impact, from stormwater runoff, to the public rights -of -way and/ or surrounding properties as a result of the pipeline. The applicant will be required to maintain historic flow patterns and runoff amounts, per the Department of Planning Services, engineering review stated a drainage plan will be not be required for this project. Section 1.A.5 of the drainage criteria provides an exception for pipelines and transmission lines. Green River - Noble Midstream acknowledges in their application that the historical flow patterns and runoff amounts will be maintained on the site or in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2- 250, Weld County Code), Conditions of Approval and Development Standards can ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 5 This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services' staff recommendation for approval is conditional upon the following: 1. Prior to recording the map: A. A copy of the signed and recorded (construction and post -construction) lease agreements (or other acceptable authorization from property owner) for pipeline right-of-way (easements) shall be submitted to the Department of Planning Services. (Department of Planning Services) B. An Improvements and Road Maintenance Agreement is required for off -site improvements at this location during the construction of the pipeline. Road maintenance may include dust control, tracking control, damage repair attributable to construction of the pipeline and located within 1/2 mile of any construction access point for the project. (Department of Public Works) C. The map shall be amended to delineate the following: 1. All sheets of the map shall be labeled USR17-0077 (Department of Planning Services) 2. The attached Development Standards. (Department of Planning Services) 3. The map shall be prepared in accordance with Section 23-2-520 of the Weld County Code. (Department of Planning Services) 4. The final location of the permanent gas pipeline easement with dimension of permanent easement, property ownership, parcel number, and all easements of record. (Department of Planning Services) 5. County Road 38 is a gravel road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall call out the existing right-of-way on the USR map. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) 6. County Road 40 is a gravel road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall call out the existing right-of-way on the USR map. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) 7. County Road 42 is a gravel road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) 8. County Road 44 is a paved road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall call out the existing right-of-way on the USR map. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 6 9. County Road 49 is designated on the Weld County Functional Classification Map as an arterial road which typically requires 140 feet of right-of-way at full build out. Weld County is currently in the process of widening this corridor. The alignment of the road widening project varies along the section line for the corridor. Contact Public Works for the location of the existing and future right-of-way and easements and call these out on the USR map. (Department of Public Works) 10. Show and label the section line Right -of -Way as "CR 36 Section Line Right -of -Way, not County maintained." (Department of Public Works) 11. Show and label all recorded easements on the map by book and page number or reception number and date on the plan. (Department of Planning Services) 2. Upon completion of Condition of Approval #1 above, the applicant shall submit one (1) paper copy or one (1) electronic copy (.pdf) of the map for preliminary approval to the Weld County Department of Planning Services. Upon approval of the map the applicant shall submit a Mylar map along with all other documentation required as Conditions of Approval. The Mylar map shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services. The map shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar map and additional requirements shall be submitted within one hundred twenty (120) days from the date of the Board of County Commissioners Resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 3. In accordance with Weld County Code Ordinance #2012-3, approved April 30, 2012, should the map not be recorded within the required one hundred twenty (120) days from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance charge shall added for each additional three (3) month period. (Department of Planning Services) 4. The Department of Planning Services respectfully requests a digital copy of this "Use by Special Review", as appropriate. Acceptable format is a projected ESRI shapefile (.shp, .shx, .dbf, .prj) with a defined coordinate system (i.e., NAD 1983 UTM Zone 13N, WGS 1984, NAD 1983 HARN StatePlane Colorado North FIPS 0501 (US Feet)....etc.). This digital file may be sent to maps@co.weld.co.us. (Department of Planning Services) 5. Prior to Construction: A. If more than 1 acre is to be disturbed for construction of non -pipeline items such as structures, parking lots, laydown yards et cetera, a Weld County grading permit will be required prior to the start of construction. (Department of Planning Services - Engineer) 6. Prior to Operation: A. The applicant shall develop an Emergency Action and Safety Plan with the Office of Emergency Management and the Fire District. The plan shall be reviewed on an annual basis by the Facility operator, the Fire District and the Weld County Office of Emergency Management. Submit evidence of acceptance to the Department of Planning Services. (Department of Planning Services) 7. The Use by Special Review activity shall not occur, nor shall any building or electrical permits be issued on the property, until the Use by Special Review map is ready to be recorded in the office of the Weld County Clerk and Recorder or the applicant has been approved for an early release agreement. (Department of Planning Services) U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 7 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Green River DevCo, LP- Noble Midstream USR17-0077 1. A Site Specific Development Plan and Use by Special Review Permit, USR17-0077, for a greater than 12 -inch high pressure natural gas pipeline approximately four (4) miles long commencing at the DCP Colt Compressor Station near the intersection of County Roads 49 and 34.5 and heading northeasterly to the DCP Operating, LP, Crossroads Compressor Station (USR17-0023) near the intersection of County Road 49 and County Road 44 in the A (Agricultural) Zone District, subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. The property owner or operator shall provide written evidence of an approved Emergency Action and Safety Plan on or before March 15th of any given year signed by representatives for the Fire District and the Weld County Office of Emergency Management to the Department of Planning Services. (Department of Planning Services) 4. The property owner shall control noxious weeds on the site. (Department of Public Works) 5. The access to the site shall be maintained to mitigate any impacts to the public road including damages and/or offsite tracking. (Department of Public Works) 6. There shall be no parking or staging of vehicles on public roads. On -site parking shall be utilized. (Department of Public Works) 7. The historical flow patterns and runoff amounts on the site will be maintained. (Department of public Works) 8. Building permits may be required, per Section 29-3-10 of the Weld County Code. Currently, the following have been adopted by Weld County: 2012 International Codes, 2006 International Energy Code, and 2014 National Electrical Code. A Building Permit Application must be completed and two (2) complete sets of engineered plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A Geotechnical Engineering Report performed by a Colorado registered engineer shall be required or an Open Hole Inspection. (Department of Building Inspection) 9. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 10. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. (Department of Public Health and Environment) 11. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. The facility shall operate in accordance with Chapter 14, Article 1 of the Weld County Code. (Department of Public Health and Environment) 12. Fugitive dust and fugitive particulate emissions shall be controlled along the construction route. Uses on the property should comply with the Colorado Air Quality Commission's air quality regulations. (Department of Public Health and Environment) U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 8 13. The applicant shall submit an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit Application and obtain a permit from the Air Pollution Control Division, Colorado Department of Public Health and Environment, as applicable. (Department of Public Health and Environment) 14. Adequate handwashing and toilet facilities shall be provided. Portable toilets are acceptable. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. (Department of Public Health and Environment) 15. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) 16. The property owner or operator shall be responsible for complying with the Design and Operation Standards of Chapter 23 of the Weld County Code. 17. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. 18. The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards, as shown or stated, shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 19. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 20. RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT: Weld County has some of the most abundant mineral resources, including, but not limited to, sand and gravel, oil, natural gas, and coal. Under title 34 of the Colorado Revised Statutes, minerals are vital resources because (a) the state's commercial mineral deposits are essential to the state's economy; (b) the populous counties of the state face a critical shortage of such deposits; and (c) such deposits should be extracted according to a rational plan, calculated to avoid waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state. Mineral resource locations are widespread throughout the County and person moving into these areas must recognize the various impacts associated with this development. Often times, mineral resource sites are fixed to their geographical and geophysical locations. Moreover, these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resource. 21. WELD COUNTY'S RIGHT TO FARM: Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long-standing agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. Agricultural users of the land should not be expected to change their long-established agricultural practices to accommodate the intrusions of urban users into a rural area. Well -run agricultural U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 9 activities will generate off -site impacts, including noise from tractors and equipment; slow -moving farm vehicles on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; hunting and trapping activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County. Section 35-3.5-102, C.R.S., provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential development. When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water. Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and county roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and fire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. People are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center pivot operations, high speed traffic, sandburs, puncture vines, territorial farm dogs and livestock, and open burning present real threats. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. U S R17-0077 Green River DevCo LP and Noble Midstream Services LLC Page 10 January 29, 2018 DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: kogle@weldgov.com PHONE: (970) 353-6100, Ext. 3549 FAX: (970) 304-6498 HORA PAM 1900 S SUNSET BLVD STE 1E LONGMONT, CO 80501 Subject: USR17-0077 - A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -inch high pressure natural gas pipeline approximately four (4) miles long in the A (Agricultural) Zone District On parcel(s) of land described as : The Pipeline will commence in the NE4 of Section 12, T3N, R65W and cross into Section 1 then head into Section 36, T4N, R65W and crossing into Sections 25 and 24 turning east into Section 19, T4N, R64W and crossing into Section 18 and terminating at the DCP Operating LP Crossroads Compressor Station All in the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on March 6, 2018, at 12:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on March 21, 2018 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at www.weldcountyplannIngcases.org If you have any questions concerning this matter, please call. Respectfully, Kim Ogl Planner DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: kogle@weldgov.com PHONE: (970) 353-6100, Ext. 3549 FAX: (970) 304-6498 January 05, 2018 PAM HORA 1900 S SUNSET BLVD STE 1E LONGMONT, CO 80501 Subject: USR17-0077 - A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -inch high pressure natural gas pipeline approximately four (4) miles long in the A (Agricultural) Zone District On parcel(s) of land described as: The Pipeline will commence in the NE4 of Section 12, T3N, R65W and cross into Section 1 then head into Section 36, T4N, R65W and crossing into Sections 25 and 24 turning east into Section 19, T4N, R64W and crossing into Section 18 and terminating at the DCP Operating LP Crossroads Compressor Station All in the 6th P.M., Weld County, Colorado. Dear Applicants: Your application and related materials for the request described above are complete and in order at this time. I will schedule a meeting with you at the end of the review period to discuss the referral comments received by our office. If you have any questions concerning this matter, please call. Respectfully, Kim Ogl Planner Hello