Loading...
HomeMy WebLinkAbout20184131.tiff MEMORANDUM 1. T1 t„. To: Kim Ogle, Planner June 15, 2018 From: Bethany Pascoe, Zoning Compliance Officer Subject: USR18-0059 Referral Upon review of my case files and computer, an active Zoning Violation (ZCV18-00033)was noted. This violation was initiated due to the presence of a commercial trucking operation without first completing the necessary Weld County Zoning Permits. This case has not been forwarded to the County Attorney's Office; therefore, an investigation fee is NOT required. Due to records release laws, staff no longer tracks complainant information, but please be aware it is staff's policy to no longer accept staff initiated complaints. Approval of this application by the Board of County Commissioners would correct the outstanding violations. If this application is denied,the Department of Planning Services asks that the Board refer this case to the County Attorney's Office for legal action, but to delay legal action for 30(thirty)days to remove all but 1 (one) Commercial Vehicle and all associated commercial storage and operations from the property. SERVICE.TEAMWORK.INTEGRITY.QUALITY z8o MEMORANDUM TO: Kim Ogle, Planning Services DATE: July 13, 2018GOU.Nr� FROM: Evan Pinkham, Public Works SUBJECT: USR18-0059 Shockley Trucking The Weld County Department of Public Works has reviewed this proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS GENERAL PROJECT INFORMATION/LOCATION Project description:A Site Specific Development Plan and Use by Special Use Permit for any Use permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial Zone Districts (parking, staging and storage of commercial vehicles and equipment), provided that the property is not a lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions in the A(Agricultural)Zone District This project is south of and adjacent to CR 40 and is west of and adjacent to CR 55. Parcel number 105333000011. Access is from CR 55. ACCESS An Access Permit application was not submitted with the application materials. Public Works has reviewed the submitted materials and provides a recommendation for access locations based on County code and safety criteria in accordance with the Weld County Engineering and Construction Criteria. The current location of the access point on CR 55 approx. 750 ft. South of CR 40 meet the spacing requirements for a locally classified roadway. The turning radii will need to be verified and upgraded if it doesn't meet the minimum requirement of 60 ft. radii. No other existing access points could be verified. Questions concerning access requirements can be directed to Public Works access permit division. Per Chapter 12, Article 5, Section 12-5-30, an Access Permit is required for upgrading access points to Weld County maintained roadways. We strongly encourage you to discuss your access with Public Works prior to laying out your site plan to ensure the approved accesses are compatible with your layout. For new accesses and/or change of use of an existing access, the fee and photos are required (photo looking left and right along roadway from the access point and looking in to and out of the access point). These photos are used to evaluate the safety of the access location. Access permit instructions and application can be found at https://www.weldgov.com/departments/public works/permits/. Chapter 6, Sections 6.3, 6.4 and 6.5 of the Weld County Engineering and Construction Criteria offer access design guidance, which can be accessed at: https://www.weldgov.com/departments/public works/engineering/. Per Chapter 12, Appendix 12A.4.1 of the Weld County Code, an access approach that is gated shall be designed so that the longest vehicle (including trailers) using the access can completely clear the traveled way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled surface be less than 35 feet. For shared accesses, Public Works strongly recommends the property owner establish an access road maintenance agreement so future owners of the properties will be aware of their requirements for shared maintenance of the access road. This is not a requirement, but is recommended to avoid property owner conflicts in the future. ROADS AND RIGHTS-OF-WAY County Road 55 is a gravel road and is designated on the Weld County Functional Classification Map(Code Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way.The applicant shall delineate on the site map or plat the future and existing right-of-way and the physical location of the road. If the right- of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of- way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. County Road 40 is a gravel road and is designated on the Weld County Functional Classification Map(Code Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way.The applicant shall delineate on the site map or plat the future and existing right-of-way and the physical location of the road. If the right- of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of- way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. Per Chapter 12, Article 4, Section 12-4-30.B, a Weld County Right-of-Way Use Permit is required for any project that will be occupying, constructing or excavating facilities within, and/or encroaching upon, any County rights-of-way or easement. Right-of-Way Use Permit instructions and application can be found at https://www.weldgov.com/departments/publicworks/permits/. Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the County right-of-way. TRAFFIC Latest ADT on CR 55 counted 113 vpd with 16%trucks. Semi-tractor trailers: up to 10 trucks, 2 round trips per day and 6 round trips bi-weekly Pickups and cars: 3-5 trips/day for personal and office personnel. TRACKING CONTROL POLICY Per Chapter 12, Appendix 12A.10.1, traffic volumes to the proposed facility may require the installation of a tracking control device and/or a minimum of four inches of compacted recycled asphalt or aggregate road base. Tracking control is required to prevent tracking from the site onto public roadways. Temporary Tracking Control shall be used during construction unless permanent tracking control is installed ahead of construction activities. Recycled concrete is not allowed in County right-of-way. Tracking control devices can be double cattle guards or rip rap (6"washed rock). Tracking control for unmaintained public right-of- way is required just prior to entering publicly maintained roadways. A variance request for alternatives to the tracking control requirement can be submitted to Public Works for review and consideration. 4 to 10 round truck trips/day (tandem or semi-trucks): • Access onto gravel roads requires recycled asphalt or road base on all driving surfaces. • Access onto paved roads requires a tracking control device and a minimum of 100 feet of recycled asphalt/road base OR 300 feet of asphalt. (Surface improvements less than 300 feet may be allowed if site constraints would prohibit meeting condition.) IMPROVEMENTS AND ROAD MAINTENANCE AGREEMENT Public Works may require an Improvements Agreement for one or all the following reasons: • Off-Site Public Improvements • Road Maintenance Agreement • Construction Maintenance Agreement • Access Improvements Agreement An Improvements Agreement is required for sites with required off-site improvements per Chapter 12, Article 5, Section 12-5-60. Collateral is required to ensure the improvements are completed, and maintained. Improvements/Road Maintenance Agreement: An example agreement is available at: https://www.weldgov.com/UserFiles/Servers/Server 6/File/Departments/Public%20Works/DevelopmentR eview/sprusr.pdf. It will detail the approved haul route(s), outline when off-site improvements will be triggered, and include a maintenance agreement for the haul routes. Possible mitigations included in the road maintenance agreement may include but are not limited to:dust control, specified haul routes,damage repairs, and future improvement triggers. Drainage Requirements: This area IS within a Non-Urbanizing Drainage Area: Non-Urbanizing Drainage Areas typically require detention of runoff from the 1-hour, 100-year, storm falling on the developed site and release of the detained water at the historic runoff rate of the 1-hour, 10-year storm falling on the undeveloped site for NON-URBANIZING areas. Detention pond waived and a simple drainage narrative: A drainage narrative is required and full drainage report and detention pond waived if the site qualifies for an exception to detention requirements listed below. The drainage narrative must include at the minimum: 1. Description which exception is being applied for and supporting rationale 2. Where the water originates if it flows onto the property from an offsite source 3. Where it flows to as it leaves the property 4. The direction of flow across the property 5. If there have been previous drainage problems with the property Exceptions. 1. Exceptions to stormwater detention shall not jeopardize the public health, safety, and welfare of public and private property. Exceptions shall be supported with a drainage narrative. a. No stormwater detention will be required for sites that meet any of the following conditions. Requirements of the Municipal Separate Storm Sewer System (MS4) areas remain applicable. 14) A parcel greater than 5 gross acres in size is allowed a onetime exception for a new 2,000 sq ft building or equivalent imperviousness. MS4: This site is not in a defined Municipal Separate Storm Sewer System (MS4)area which is a more urbanized area with state mandated, higher water quality requirements Grading Permit A Weld County Grading Permit will be required if disturbing more than 1 acre. Grading Permit applications are accepted after the planning process is complete(plan recorded). An Early Release Request Form may be entertained only after the applicant, Public Works and Planning Department have reviewed the referral and surrounding property owner comments. The Early Release Request may or may not be granted depending on referral comments and surrounding property owner concerns. Contact an Engineering representative from the Public Works for more information. A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact: Colorado Department of Public Health and Environment, Water Quality Control Division, 303-692-3575. CONDITIONS OF APPROVAL A. An Improvements and Road Maintenance Agreement is required for off-site improvements at this location. Road maintenance includes, but is not limited to, dust control and damage repair to specified haul routes.The Agreement shall include provisions addressing engineering requirements, submission of collateral, and testing and approval of completed improvements. (Department of Public Works) B. The plan shall be amended to delineate the following: 1. County Road 40 is a gravel road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) 2. County Road 55 is a gravel road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) 3. Show and label the approved access locations, approved access width and the appropriate turning radii (60')on the site plan. The applicant must obtain an access permit in the approved location(s) prior to construction. (Department of Public Works) 4. Show and label the approved tracking control on the site plan. (Department of Public Works) 5. Show and label the entrance gate if applicable.An access approach that is gated shall be designed so that the longest vehicle (including trailers) using the access can completely clear the traveled way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled surface be less than 35 feet. (Department of Public Works) 6. The applicant shall show the drainage flow arrows. (Department of Public Works) 7. Show and label the parking and traffic circulation flow arrows showing how the traffic moves around the property. (Department of Public Works) Prior to Construction: A. The approved access and tracking control shall be constructed prior to on-site construction. This site requires road base or recycled asphalt on all driving surfaces for tracking control. (Department of Public Works) B. If more than one (1) acre is to be disturbed, a Weld County Grading Permit will be required. (Department of Public Works) DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) 1. The property owner shall control noxious weeds on the site. (Department of Public Works) 2. The access on the site shall be maintained to mitigate any impacts to the public road including damages and/or off-site tracking. (Department of Public Works) 3. There shall be no parking or staging of vehicles on public roads. On-site parking shall be utilized. (Department of Public Works) 4. Any work that may occupy and or encroach upon any County rights-of-way or easement shall acquire an approved Right-of-Way Use Permit prior to commencement. (Department of Public Works) 5. The Property Owner shall comply with all requirements provided in the executed Improvements Agreement. (Department of Public Works) 6. The Improvements Agreement for this site shall be reviewed on an annual basis, including possible updates (Department of Public Works) 7. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Public Works) 8. Weld County is not responsible for the maintenance of onsite drainage related features. (Department of Public Works) �•`T . ` WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT -► ! 1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org Memorandum To: Kim Ogle From: Lauren Light, Environmental Health Services Date: July 9, 2018 Re: USR18-0059 Shockley Environmental Health Services has reviewed this proposal for a Site Specific Development Plan and Use by Special Review Permit for any Use permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial Zone Districts (parking, staging and storage of commercial vehicles and equipment), provided that the property is not a lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions in the A (Agricultural) Zone District. The existing residence is served by an individual domestic well (permit 234205) and a septic system permitted for 4 bedrooms (SP-0100586). The well cannot be used for the business unless it is repermitted to allow commercial use. The application indicates there is a holding tank used for a restroom in the office. The tank is not permitted and cannot be used with the domestic well for the business. A portable toilet and bottled water is acceptable in accordance with EH policy. Oil and antifreeze drums are stored inside the shop and are replaced when new drums are delivered. The application states that oil changes are done off site and there is no fuel storage or washing. A covered dumpster will be provided for trash disposal. Dust will be controlled by watering as necessary and roads, parking and operations are overlain with ground asphalt. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and Health Administration Public Health& Environmental Health Communication, Emergency Preparedness Vitol Records Clinical Services Services Education&Planning &Response [�] cla 9/U 304 6410 Icic:9/0 304 6420 Tele:970-304-6415 Tele:970-304-6470 Tele:970-304-6470 Fax: 9/U-3UT-6412 Fax: 9i0-304-6416 FIIx: 970-304-6411 Fax: 970-304-6452 Fax: 970-304-6452 Public Health removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. The facility shall operate in accordance with Chapter 14, Article 1 of the Weld County Code and the accepted waste handling plan. 4. Fugitive dust should attempt to be confined on the property. Uses on the property should comply with the Colorado Air Quality Commission's air quality regulations. 5. The facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in 25-12-103 C.R.S. 6. Adequate drinking, hand washing and toilet facilities shall be provided for employees, at all times. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to On-site Wastewater Treatment Systems. 7. For employees or contractors on site for less than 2 consecutive hours a day, and 2 or less full-time employees on site, portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. 8. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. The existing well (permit 234205) cannot be used for the business unless it is repermitted to allow commercial use. 9. All potentially hazardous chemicals must be handled in a safe manner in accordance with product labeling and in a manner, that minimizes the release of hazardous air pollutants (HAPs) and volatile organic compounds (VOCs). All chemicals must be stored securely, on an impervious surface, and in accordance with manufacturers' recommendations. 10.The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. Hello