Loading...
HomeMy WebLinkAbout20180268.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 8 BETWEEN COUNTY ROADS 41 NORTH AND 41 SOUTH FOR APPROXIMATELY FOUR (4) WEEKS, FOR BRIDGE RE -DECK WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 8, between County Roads 41 north and 41 south, be temporarily closed, with said closure being effective February 5, 2018, for approximately four (4) weeks for a bridge re -deck, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc tSOC RS) , 0; poi-KA,, CO S#-o.+e ice•+c o t 03 -06-1$ 2018-0268 EG0024 TEMPORARY CLOSURE - COUNTY ROAD 8 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 24th day of January, A.D., 2018. BOARD OF COUNTY COMMISSIONERS WELDOUNTY, COLORADO ATTEST: dime& w •X,Geo•‘,4„ Weld County Clerk to the Board Deputy Clerk to the D AS Coun y ° tomey Date of signature: O.2 -a3-/8 ve Moreno, Chair Mike Freeman 2018-0268 EG0024 MEMORANDUM TO: Clerk to the Board DATE: January 19, 2018 FROM: Amy Joseph, Public Works Department SUBJECT: BOCC Agenda Item WCR 29 between WCR 86 and WCR 88 is closed from 1/29/2018 thru 2/9/2018 for two culvert replacements. WCR 61 between Hwy 52 and WCR 14 is closed from 2/5/2018 thru 2/9/2018 for a culvert replacement. WCR 74 between WCR 47 and WCR 49 is closed from 2/12/2018 thru 2/23/2018 for two culvert replacements. WCR 8 between WCR 41N and WCR 41S is closed from 2/5/2018 thru 3/2/2018 for a bridge re -deck. See attached closure diagram(s). 2018-0268 161/ HWY 52 N 4 I z 4 km ieuprajirst 5.4 irkwypit4 444Y4iiii6+546 i'4`v81 4w;44v4we've Ni a ;4414 is3 43/47 WI s1E4 I I I t P I I 4 I I I, 4 I Ii �1 i4 F 4 r 41 Ki I m WCR 8 Jr. c:7 ROAD CLOSED LOCAL TRAFFIC ONLY r Al r_ediewit ,JP WCR 41N DETOUR a Wh 41S F 1-76 i r BR 8/41A S PAGE 1 Project # AN -64 Road closure description WCR 8 between WCR 41n and WCR 41s closed 2/5/2018 thru 3/2/2018 for bridge re -deck Notice to Public Road signs and barricaded during closure Message boards to be used Detour Route WCR 41 north to HWY 52 then east 2 mile paved WCR 41 south to 1-76 frontage then west .25 mile gravel 1-76 frontage to WCR 4 then west 2 mile paved Notes ADT of WCR 8 is; 791/2016 Bridge BR 8/41A Re -Deck Mag chloride on .25 mile of WCR 41s, rest paved detour Bridge is between WCR 41n and WCR 41s Placement of signs not to scale Date 1/18/2018 Prepared by LEE STEPHEN Approved by county engineer CAMERON PARROTT Hello