HomeMy WebLinkAbout20182505.tiffRESOLUTION RE: APPROVE REQUEST CONCERNING EXTENSION OF TIME FOR SUBMITTAL OF FINAL PLAN FOR CHANGE OF ZONE, PZ -1071, FOR ADLER ESTATES PUD - MEAD CROSSINGS, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, by Resolution #2005-2855, dated October 19, 2005, the Board approved the application of Melody Homes, Inc., dba DR Horton - The Melody Series, 11031 Sheridan Boulevard, Suite A, Westminster, Colorado 80020, requesting a Change of Zone, PZ #1071, from the A (Agricultural) Zone District to a PUD (Planned Unit Development) Zone District for 833 single family residential lots, along with an elementary school site, 70.08 acres of open space, and continued oil and gas production, for a parcel of land located on the following described real estate, to -wit: Part of the SW1/4 and part of the SE1/4 of Section 33, and part of the SW1/4 of Section 34, all in Township 3 North, Range 68 West of the 6th P.M., Weld County, Colorado WHEREAS, by Resolution #2008-2630, dated September 29, 2008, the Board granted a twelve-month extension of time for filing the PUD Final Plan for Adler Estates PUD until October 19, 2009; and by Resolution #2009-2807, dated October 26, 2009, the Board granted a second twelve-month extension of time for filing the PUD Final Plan until October 19, 2010; and by Resolution #2010-2341, dated October 4, 2010, the Board granted a third twelve-month extension of time for filing the PUD Final Plan until October 19, 2011; and by Resolution #2011- 3144, dated December 12, 2011, the Board granted a fourth twelve-month extension of time for filing the PUD Final Plan until December 12, 2012; and by Resolution #2014-3780, dated December 8, 2014, the Board granted a fifth twelve-month extension of time for filing the PUD Final Plan until December 8, 2015, and by Resolution #2015-3985, dated December 21, 2015, the Board granted a sixth twelve-month extension of time for filing the PUD Final Plan until December 8, 2016, and by Resolution #2017-0735, dated March 13, 2017, the Board granted a seventh twelve-month extension of time for filing the PUD Final Plan until December 8, 2017, and by Resolution #2018-1198, dated April 18, 2018, the Board continued the matter to May 2, 2018, and by Resolution #2018-1427, dated May 2, 2018, the Board again continued the matter to August 6, 2018, to allow Mead Crossings, LLC, adequate time to provide letters from the Longs Peak Water District stating water service is feasible and available, and from the developer that they can obtain financing for the water project, and WHEREAS, pursuant to Section 27-8-50 of the Weld County Code, the current owner of the property, Mead Crossings, LLC, do Fred Kelley, 1200 17th Street, Suite 850, Denver, Colorado 80202, submitted a letter dated May 30, 2018, requesting the Board consider an additional extension of time for filing the PUD Final Plan for the Adler Estates PUD, and cc : PLC K O f to r/ -r-P), GLpPt. R E P 2018-2505 PL1792 RE: EXTENSION OF TIME FOR SUBMITTAL OF FINAL PLAN (ADLER ESTATES PUD, PZ #1071) - MEAD CROSSINGS, LLC PAGE 2 WHEREAS, on August 6, 2018, the Board of County Commissioners heard all of the testimony and statements of those present, studied the request of the applicant and the recommendations of staff from the County Attorney's Office and the Weld County Department of Planning Services, and all of the exhibits and evidence presented in this matter and, having been fully informed, finds that this request shall be approved for the period of one (1) year, until June 3, 2019. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the time for filing the Final Plan for Change of Zone, PZ #1071, for the Adler Estates PUD, for Mead Crossings, LLC, be, and hereby is, extended for the period of one (1) year, until June 3, 2019. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 6th day of August, A.D., 2018. ATTEST: d,,itifik) ulditD;ei Weld County Clerk to the Board BY: _Lok Deputy Clerk to the Board APPROVED AS TO FOR Asst . County Attorney Date of signature: 0-.23--e. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO (AYE Steve Moreno, Chair rbara Kirkmeyer way ozad (111:4-k : t Mike Freeman (NAY) YE (AYE) (AYE) 2018-2505 PL1792 MEMORANDUM TO: Board of County Commissioners DATE: April 10, 2018 FROM: Kim Ogle, Planning Service* SUBJECT: Requestfor Extension forsubmittal of Final PlatApplication Adler Estates PUD, (PZ-1071), Mead Crossings, LLC PZ-1071, Change of Zone for Adler Estates PUD was approved by the Board of County Commissioners on October 19, 2005. Fred Kelly, Manager, Mead Crossings, LLC, the current owner of the property is requesting a one-year extension for the submittal of the Final Plat application for Adler Estates, PUD citing that development will be unavoidably delayed. Section 27-8-50 of the Weld County Code states: "If a PUD final plan application is not submitted within three (3) years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submittal of the PUD final plan. The Board of County Commissioners may extend the date for the submittal of the PUD final plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board of County Commissioners determines that conditions or statements made supporting the original approval of the PUD Zone District have changed or that the landowner cannot implement the PUD final plan, the Board may, at a public meeting, revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original zone district." (Weld County Code Ordinance 2002-9; Weld County Code Ordinance 2003-10) Case History: October 19, 2005 Change of Zone Approved fora PUD for 833 Single Family Residential Lots, along with an Elementary school site, 70.08 acres of open space and continued oil and gas production - Melody Homes, Inc. dba DR Horton [Adler Estates PUD] April 6, 2006 Special Warranty Deed between Floyd and Marian D. Adler and Mead Crossings, LLC for three tracts of land described as Part of the SW4 and Part of the SE4 of Section 33, and part of the SW4 of Section 34, all in Township 3 North, Range68 West of the 6th P.M., Weld County, Colorado September 29, 2008 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the currentmarket conditions. October 26, 2009 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current less - than -favorable economic and market conditions. SERVICE. TEAMWORK, fNTEGRITY, QUALITY 2018-2505 October 4, 2010 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17i1 Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions. December 12, 2011 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17i Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions. December 17, 2014 Fred R. Kelly, Jr., Partner,.Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 requested a three (3) yearextension forthe submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions do not make it possible for lots to be sold at present and therefore development will be unavoidably delayed. The Board of County Commissioners granted a one (1) year extension until December 8, 2015 with quarterly updates provided to the Department of Planning services and various benchmarks achieved. March 31, 2015 First Quarterly update letter - written record of progress to date Priority 1. Assemble team to advise on the technical project issues Priority 2. Commence work on project financing Priority 3. Engage services of an investment banker Had discussions with developers and builders in the vicinity of Mead to determine viability of the existing land plan in today's market. Attended two public meetings held with at the Town of Mead, on February 4 and March 16, 2015 to discuss plans and topics of mutual interest. July 10, 2015 Second Quarterly update letter - written record of progress to date Priority 1. Assemble team to advise on the technical project issues, discussions with Ken Puncerelli and Josh Rowland, Land Architects Priority 2. Commence work on project financing, discussions with the law firm of Fairfield and Wood Priority 3. Engage services of an investment banker, selection of D.A. Davidson Had further discussions with developers and builders in the vicinity of Mead to determine viability of the existing land plan in today's market. Met with Ms. Dawn Adams, Town of Mead Development Directorwho has provided assistance on the towns development plans. With assistance of Fairfield and Wood, had preliminary discussions with the oil and gas producer and the development of a surface use agreement. SERVICE, TEAMWORK, INTEGRITY, QUALITY October 10, 2015 Third Quarterly update letter - written record of progress to date From preliminary discussion had in the 2nd Quarter, received a new proposal outlining a new configuration for the surface use agreement. Goal is to have signed document by end of 2015 after review by Fairfield and Wood. In the last three months considerable time was devoted to update development costs, review of special district service plans and the means to provide financing for the expensive infrastructure. Some additional time may be required to determine a suitable financial vehicle. December 8, 2015 March 6, 2017 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 is requesting a three (3) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions do not make it possible for lots to be sold at present and therefore development will be unavoidably delayed. The Board took action on his request and granted him a one year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) until December 8, 2016 with quarterly updates provided to the Department of Planning Services. April 2, 2016 First Quarter update letter - written record of progress to date With assistance of Fairfield and Wood, have had ongoing discussions with the oil and gas producer and the development of a surface use agreement. Continuing to monitor Ballot Questions# 75 and #78 July 2, 2016 Second First Quarter update letter - written record of progress to date Ongoing discussion with oil and gas producer and the development of a surface use agreement. Evaluating number of housing units within development to address some of the infrastructure costs. October 12, 2016 Third Quarter update letter - written record of progress to date Discussions with the Town of Mead, Longs Peak Water and area developers for participation in a water line extension. The Town of Mead is running point pulling parties together to address this issue. Anadarko the oil and gas producer has changed their long term area plans and therefore the tentative SUA will be required to be reworked. February 28, 2017 First Quarter update letter - written record of progress to date Meeting of January 16, 2017 with the interim manager of the Town of Mead. Discussion on the status of potable water for area residential development and fire suppression. The Town indicated they had secured funding to bring a 6 -inch line to the intersection of Hwy 66 and County Road 7. Good news, as there is a potential for tie in at this point and bring water south into the Adler Estates PUD development. Details of an agreement between the Town and Adler Estates remain to be worked out. Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 in a letter dated October 12, 2016 is requesting a one (1) year extension for the submittal of the Final Plan application, Adler Estates SERVJCE, TEAMWORK, INTEGRITY, QUALITY PUD (PZ-1071) stating that the improvement in the Mead market conditions are now favorable for development. The Board took action on his request and granted him a one year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) until December 8, 2017 with quarterly updates provided to the Department of Planning Services. April 10, 2018 Fred R. Kelly, Jr. Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 in a facsimile letter dated March 1, 2018 and received March 6, 2018 is requesting a one (1) year extension for the submittal of the Final Plan application, Adler Estates Planning staff did not receive quarterly updates on the status of the application during the 2017 calendar year. This is the eighth (8) request for an extension of time for the submittal of a PUD Final Plan application from Mr. Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 171 Street, Suite 850, Denver, Colorado 80202 SERVICE, TEAMWORK, INTEGRITY, QUALITY motion carried unanimously. Commissioner Conway moved to re-classify CR 29, north of CR 392 from arterial to collector. Upon a roll call vote, the motion failed with Commissioners Kirkmeyer, Freeman, and Cozad being opposed. Commissioner Kirkmeyer moved to approve Code Ordinance #2017-01 on First Reading as amended. The motion, which was seconded by Commissioner Conway, carried unanimously. PLANNING: 1) CONSIDER RELEASE OF COLLATERAL FOR NGL WATER SOLUTIONS DJ, LLC, AND ACCEPT REPLACEMENT WARRANTY COLLATERAL FROM CENTENNIAL WATER PIPELINES, LLC: Ms. Lundquist requested the release of the NGL collateral in the amount of $2,400.00 and acceptance of replacement collateral, in the amount of $2,400.00, from Centennial Water Pipelines. The motion, which was made by Commissioner Kirkmeyer, and seconded by Commissioner Moreno, carried unanimously. 2) CONSIDER REQUEST CONCERNING EXTENSION OF TIME FOR SUBMITTAL OF FINAL PLAN FOR CHANGE OF ZONE, PZ-1071, FOR ADLER ESTATES PUD - MEAD CROSSINGS, LLC: Kim Ogle, Department of Planning Services, stated the Final Plan application was not submitted within the three-year time frame. Mr. Ogle stated that the Board has provided additional time for the applicant to submit the Final Plan application with a one (1) year extension to end December 8, 2016, while requiring quarterly updates, which have been submitted regarding the development. The applicant has requested an addidtional one (1) year extension due to a plan to bring water in through the Town of Mead. Mr. Ogle stated this is the seventh (7) request for extension of time. Fred Kelly, with Mead Crossings, LLC, stated a major issue has been getting water to the properties, which originally was to be built by a company that failed to do so. Mr. Kelly explained that the Town of Mead has plans to build a water line extension, which will allow for an extension from Mead to serve this property. He noted that January was when the discussion with Mead began and the construction will start within the next year. Mr. Ogle stated staff recommends a one-year extension, with the requirement of quarterly updates to continue. Upon a roll call vote, the motion to approve said extension, with conditions that quarterly reports continue, passed four to one, with Commissioner Kirkmeyer being opposed. 3) CONSIDER RECORDED EXEMPTION, RECX16-0203 - ROBERT AND SALLY DALTON: Michael Hall, Department of Planning Services, stated the applicants are proposing a two -lot recorded exemption on Lot B, which is 20.2 acres in size. He stated staff recommends denial due to the lot being less than the required thirty-five (35) acres. Robert Dalton, applicant, stated annexation into Frederick is not an option due to the property being within the Frederick -Boulder Creek Planning Area Intergovernmental Agreement (IGA) between Boulder County and the Town of Frederick. Mr. Dalton stated research shows the Commissioners have previously allowed exemptions with less than thirty-five (35) acres on a lot. He pointed out the easement and access that is granted to Lot B has no restrictions and agreements are in place for road maintenance, which is maintained by the owners of Lot A, and is already in use by himself for farm equipment. Commissioner Kirkmeyer stated that the new Lot B must have a separate access and utility easement use agreement. Mr. Hall addressed Commissioner Kirkmeyer stating that this does meet the intent of the surrounding neighborhood. Commissioner Kirkmeyer moved to grant Recorded Exemption RECX16-0203, with the conditions of approved as presented. Seconded by Commissioner Conway, the motion carried unanimously. Chair Cozad stated it is important to meet with the Town of Frederick, to attempt to get out of the IGA with Boulder County, which restricts development in unincorporated Weld County. RESOLUTIONS AND ORDINANCES: The resolutions were presented and signed as listed on the Consent Agenda. Code Ordinance #2017-01 was approved on First Reading, as amended. Minutes, March 13, 2017 Page 5 2017-0717 BC0016 ** INBOUND NOTIFICATION FAX RECEIVED SUCCESSFULLY ** TIME RECEIVED March 6, 2018 at 1 02 15 PM MST REMOTE CSID DURATION PAGES STATUS 35 1 Received Mar 06 2018 0204PM HP Fax page 1 Mar 1, 2018 Sent via fax: 970 304.6498 Mr. Kim Ogle Senior Planner Weld County Planning Department 1555 N 17th Avenue Greeley, CO 80631 Dear Mr. Ogle. I am writing to request a one-year extension of time from the due date for finalizing the plat on the Adler Farm near Mead. Development will be unavoidably delayed Thank you in advance for your consideration of my request I eagerly await your written response Sincerely, Fled Fred R Kelly, Jr Partner Mead Crossings 1200 17th Street, Suite 850 Denver, CO 80202 (303) 572-6990 i$ I f--, a W- From: Amber Kauffman [mailto:akauffman@LTWD.org] Sent: Thursday, March 8, 2018 10:17 AM To: Kim Ogle <kogle@weldgov.com> Subject: Phone Call Kim, Thank you for the call and voicemail. The developer located north of WCR 26 and South of SH 66 west of I-25 and east of WCR 5 /z is correct, we do have an IGA with the Town of Mead to serve where they annex. We are working with the Town and Longs Peak Water District to determine if a planning boundary is appropriate and where that boundary would be. We are currently anticipating generally half way between WCR 3 and WCR 5 however that is not set in stone at this time. We have talked to a developer about the same area you mentioned. I believe they understand that we have no waterlines in that area and a system upgrade would be required. We do currently have a 24 -inch stub underneath l- 25 approximately 1/3 mile south of SH 66 (behind the U -Haul business. We are working with Developers that annex into Mead to exclude from Longs Peak Water District and be included in LTWD. I hope that helps! Feel free to call/email with other questions. I would also like to talk to you at some point about water dedication and development and how the County would like development to move forward in this regard. Sincerely, Amber Amber Kauffman, P.E., District Engineer Li►lie Thompson Water District 835 E. State Highway 56, Berthoud, CO 80513 PH: 970-532-2096 I FX: 970-532-3734 akauffman@ltwd.org I www.ltwd.org Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast Ltd, an innovator in Software as a Service (SaaS) for business. Providing a safer and more useful place for your human generated data. Specializing in; Security, archiving and compliance. To find out more Click Here Legend Roads LPWD Boundaries LPWD Water Mains LPWD Nodes S. Pump Station Rail Road ---- Expanded Area — LPWD Water Mains a Blowoff u Reducer Lakes ---- Boundary A Fire Hydrant a Tank Streams ---- Gap Area 7, PRV s Valve Outside of District ® Plant Vault - - - LTWD Water Mains • lion MIAMI FILLS lCoRd]4 Co Rd VI M LONGS PEAK WATER DISTRICT PRV411-2' ELEV 5240 FT 120 PSI IN ! 80 PSI OUT Pil LONGS PEAK WATER DISTRICT Mr .................. 50K GAL TANK MWL a 5348 FT BASE ELEV a 5330 FT 0" LONGS PEAK WATER DISTRICT SI OUT /OA LONGS PEAK WATER DISTRICT RABBIT MTN PUMP STATION 55 PSI IN ' 136 PSI OUT Rabbit Mountain Rd Fietuua Or 50K GAL TANK HWL=5348FT BASE ELEV = 5330 FT 250K GAL TANK HWL=5363FT BASE ELEV = 5334 FT PRV M1 •4' ELEV 5129 FT 95 PSI IN 1 70 PSI OUT PRIMARY FEED PRV 2 - 4" ELEV 5103 FT 110 PSI IN 1'1'0 PSI OUT SECONDARY FEED 6' Anhawa Ave a •................. Ynllowflona Rd r -r t , SHEET 4 ---- I -- 1 Co Rd 30 W ya Ch Co Rd 34 150K GAL. TANK HWL = 5258 FT BASE ELEV=5218FT F LONGSPEAK WATER DISTRICT Daley Dr N c a 20th Ave j Calkins Ave PRV 03 • 4' ELEV 5127 FT 96 PSI IN ( 70 PSI O TERTIARY FEED Kelly PI 1 Crisman Dr r 19th Ave Vermillion Rd SHEET 5 PRV #4 . 4• ELEV 5040 FT 100 PSI IN 180 PSI OUT TERTIARY FEED U " • 1 Cheyenne Ave Saint An4Mvrs LONGS PEAK WATER DISTRICT F11ThAve Tonkin PI PRV Ai6.8' ELEV 5087 FT 125 PSI IN / 80 PSI OUT PRIMARY FEED - �w R�Oltch PRV 08•8' ELEV 5087 FT 130 PSI IN / 80 PSI OUT SECONDARY FEED a •................. • PRV #7 .2- ELEV 5054 FT -"60 PSI IN 170 PSI OUT v a U 3 PRV M6 .2" EMERGENCY FEED ELEV 4979 FT 110 PSI IN/ 60 PSI OUT Co Rd 32 Mulligan Reservoir LP - LT INTERCONNECT VAULT 4' - ELEV 4976 FT 95 PSI IN / 75 PSI OUT S Vatley Or LONGS PEAK WATER DISTRICT PRV#7.2' ELEV 5054 FT 80 PSI IN , 70 PSI OUT Peak Ave Co Rd 26 Co Rd 48 SHEET 7 LP - LW EMERGENCY INTERCONNECT VAUL 2' co re b 4r Sanborn Reservoir A EC .O • • • ��`�\ / i-- I `( // I I \\ \,�--.,\ 1 \ i // t` _� a et, 4 LP - LT INTERCONNECT VAULT 4" - ELEV 4976 FT 95 PSI IN / 75 PSI OUT 72' Harbour Po ►cast Chance Esarbour P ..-- Co Rd 2412 1 Barbour Pond ctir m If A t PPR LONGS PEAK WATER DISTRICT la .................. MEMORANDUM TO: Board of County Commissioners DATE: August 6, 2018 FROM: Kim Ogle, Planning Service* SUBJECT: Adler Estates PUD, (PZ-1071), Mead Crossings, LLC PZ-1071, Change of Zone for Adler Estates PUD was approved by the Board of County Commissioners on October 19, 2005. Fred Kelly, Manager, Mead Crossings, LLC, the current owner of the property is requesting a one-year extension for the submittal of the Final Plat application for Adler Estates, PUD citing that development will be unavoidably delayed. Section 27-8-50 of the Weld County Code states: "If a PUD final plan application is not submitted within three (3) years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submittal of the PUD final plan. The Board of County Commissioners may extend the date for the submittal of the PUD final plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board of County Commissioners determines that conditions or statements made supporting the original approval of the PUD Zone District have changed or that the landowner cannot implement the PUD final plan, the Board may, at a public meeting, revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original zone district." (Weld County Code Ordinance 2002-9; Weld County Code Ordinance 2003-10) Case History: October 19, 2005 Change of Zone Approved for a PUD for 833 Single Family Residential Lots, along with an Elementary school site, 70.08 acres of open space and continued oil and gas production - Melody Homes, Inc. dba DR Horton [Adler Estates PUD] April 6, 2006 Special Warranty Deed between Floyd and Marian D. Adler and Mead Crossings, LLC for three tracts of land described as Part of the SW4 and Part of the SE4 of Section 33, and part of the SW4 of Section 34, all in Township 3 North, Range68 West of the 6th P.M., Weld County, Colorado September 29, 2008 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the currentmarket conditions. October 26, 2009 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current less - than -favorable economic and market conditions. SERVICE TEAMWORK. INTEGRITY. QUALITY October 4, 2010 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17i1 Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions. December 12, 2011 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 171 Street, Suite 850, Denver, Colorado 80202 requested a one (1) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions. December 17, 2014 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 requested a three (3) year extension forthe submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions do not make it possible for lots to be sold at present and therefore development will be unavoidably delayed. The Board of County Commissioners granted a one (1) year extension until December 8, 2015 with quarterly updates provided to the Department of Planning services and various benchmarks achieved. March 31, 2015 First Quarterly update letter - written record of progress to date Priority 1. Assemble team to advise on the technical project issues Priority 2. Commence work on project financing Priority 3. Engage services of an investment banker Had discussions with developers and builders in the vicinity of Mead to determine viability of the existing land plan in today's market. Attended two public meetings held with at the Town of Mead, on February 4 and March 16, 2015 to discuss plans and topics of mutual interest. July 10, 2015 Second Quarterly update letter - written record of progress to date Priority 1. Assemble team to advise on the technical project issues, discussions with Ken Puncerelli and Josh Rowland, Land Architects Priority 2. Commence work on project financing, discussions with the law firm of Fairfield and Wood Priority 3. Engage services of an investment banker, selection of D.A. Davidson Had further discussions with developers and builders in the vicinity of Mead to determine viability of the existing land plan in today's market. Met with Ms. Dawn Adams, Town of Mead Development Directorwho has provided assistance on the towns development plans. With assistance of Fairfield and Wood, had preliminary discussions with the oil and gas producer and the development of a surface use agreement. SERVICE, TEAMWORK_ IN I I (,RI IY, QUALITY October 10, 2015 Third Quarterly update letter - written record of progress to date From preliminary discussion had in the 2nd Quarter, received a new proposal outlining a new configuration for the surface use agreement. Goal is to have signed document by end of 2015 after review by Fairfield and Wood. In the last three months considerable time was devoted to update development costs, review of special district service plans and the means to provide financing for the expensive infrastructure. Some additional time may be required to determine a suitable financial vehicle. December 8, 2015 March 6, 2017 Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 is requesting a three (3) year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) citing the current market conditions do not make it possible for lots to be sold at present and therefore development will be unavoidably delayed. The Board took action on his request and granted him a one year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) until December 8, 2016 with quarterly updates provided to the Department of Planning Services. April 2, 2016 First Quarter update letter - written record of progress to date With assistance of Fairfield and Wood, have had ongoing discussions with the oil and gas producer and the development of a surface use agreement. Continuing to monitor Ballot Questions# 75 and #78 July 2, 2016 Second First Quarter update letter - written record of progress to date Ongoing discussion with oil and gas producer and the development of a surface use agreement. Evaluating number of housing units within development to address some of the infrastructure costs. October 12, 2016 Third Quarter update letter - written record of progress to date Discussions with the Town of Mead, Longs Peak Water and area developers for participation in a water line extension. The Town of Mead is running point pulling parties together to address this issue. Anadarko the oil and gas producer has changed their long term area plans and therefore the tentative SUA will be required to be reworked. February 28, 2017 First Quarter update letter - written record of progress to date Meeting of January 16, 2017 with the interim manager of the Town of Mead. Discussion on the status of potable water for area residential development and fire suppression. The Town indicated they had secured funding to bring a 6 -inch line to the intersection of Hwy 66 and County Road 7. Good news, as there is a potential for tie in at this point and bring water south into the Adler Estates PUD development. Details of an agreement between the Town and Adler Estates remain to be worked out. Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 in a letter dated October 12, 2016 is requesting a one (1) year extension for the submittal of the Final Plan application, Adler Estates SERMJCE, TEAMWORK. INTEGRITY. QUALITY PUD (PZ-1071) stating that the improvement in the Mead market conditions are now favorable for development. The Board took action on his request and granted him a one year extension for the submittal of the Final Plan application, Adler Estates PUD (PZ-1071) until December 8, 2017 with quarterly updates provided to the Department of Planning Services. April 10, 2018 July 30, 2018 Fred R. Kelly, Jr. Partner, Mead Crossings, LLC, 1200 17th Street, Suite 850, Denver, Colorado 80202 in a facsimile letter dated March 1, 2018 and received March 6, 2018 is requesting a one (1) year extension for the submittal of the Final Plan application, Adler Estates Planning staff did not receive quarterly updates on the status of the application during the 2017 calendar year. This is the eighth (8) request for an extension of time for the submittal of a PUD Final Plan application from Mr. Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 171 Street, Suite 850, Denver, Colorado 80202 Planning staff received by facsimile correspondence from Mr. Fred R. Kelly, Jr., Partner, Mead Crossings, LLC, 1200 171 Street, Suite 850, Denver, Colorado 80202 concerning availability of potable water for the Adler Estates development. Also attached to this facsimile are documents associated with the financial viability of Mead Crossings LLC Mr. Kelly is hopeful that he is able to continue to work with Weld County to see the project through [with the submittal of a PUD Final Plan application] as stated in his letter to Kim Ogle dated July 30, 2018 SERVICE, TEAMWORK. INTEGRITY. QUALITY * TIME RECEIVED INBOUND NOTIFICATION : FAX RECEIVED WITH ERRORS REMOTE CSID July 30, 2018 at 1:15:04 PM MDT 3035726995 ERROR CODE ( 700 ) Error in fax transmission. DURATION PAGES STATUS 972 29 Failed to receive Jul 30 2018 01:05PM HP Fax 3035726995 May 30, 2018 Mr. Kim Ogle Senior Planner Weld County Planning Department 1555 N. 17th Avenue Greeley, Co 80631 page 1 Dear Mr. Ogle: Shortly after the commissioner's meeting on May 2, 2018 I was in contact again with Gary Allen manager of Long's Peak Water District. I asked him to search for the commitment letter previously issued by the District for the land now owned by Mead Crossings. I also asked him for a new letter outlining the conditions necessary for the district to provide water service to our site. He said that he could and would provide such a letter. I received word that the Newby farm on the west side but coterminous with mine has sold to the City of Longmont for open space. This was a surprising result, for a couple of reascns. First, I was told that the public entities had previously agreed that road 5 would be the easternmost boundary of Longmont. This clearly is a change in that understanding. Second, at the price the owner was asking it seemed logical that the property could only be sold to a developer. I had thought that a new developer coming in could share the costs of a pipeline with me. Apparently, this will never happen now and the County loses out on $400,000,000 of market value, approximately $32,000,000 in additional assessed valuation and $400,000 in lost annual tax revenue. For me bottom line, this probably also means that a smaller water line will suffice which will reduce my cost. Sincerely, Fred R. Kelly, Jr. Partner Mead Crossings 1200 17th Street, Suite 850 Denver, Co 80202 (303) 572-6990 avn.a Co rc ego nclLe" ce cr-f(%td Kra k +o KcaF' 1211 e ctoc. co, Jul 30 2018 01.05PM HP Fax 3035726995 page 2 June 30, 2018 Mr. Kim Ogle Senior Planner Weld County Planning Department 1555 N. 17th Avenue Greeley, Co 80631 Dear Mr. Ogle: On June 9, 2018 I attended the regularly scheduled meeting of Long's Peak Water District. I introduced myself to the board and gave a short presentation describing why I was there and outlining the relationship we were trying to establish with them. What followed was a lengthy discussion of all the issues that I had previously disclosed to the Commissioners and a few more all involved with the various topics and parties surrounding water issues in my area of the County. Also in attendance was Gary Allen, manager. After the meeting, Gary informed me that he was unable to find the commitment letter previously issued by the District for the land now owned by Mead Crossings. The letter was issued before he became manager and he could not find it in his files. I will ask you also if you can find a copy in your files since this was a request of the commissioners. I asked him again for a new letter outlining the conditions necessary for the district to provide water service to our site. He said that he could and would provide such a letter. I reminded him of the August 8, 2018 time frame. Sincerely, Fred R. Kelly, Jr. Partner Mead Crossings 1200 17th Street, Suite 850 Denver, Co 80202 (303) 572-6990 Jul 30 2018 01'05PM HP Fax 3035726995 page 3 July 30, 2018 Mr. Kim Ogle Senior Planner Weld County Planning Department 1555 N. 17" Avenue Greeley, Co 80631 Dear Mr. Ogle: On July 20, I was again in touch with Gary Allen, manager of Long's Peak Water District asking for an ability to serve letter. He said that he was going to his lawyer's office on Monday July 23, 2018 to prepare it. I had hoped to be able to attach the letter to this communication, but I may have to bring it with me if I don't get it prior to the meeting. I have attached the financials requested by the commissioners and would request that this information be kept strictly confidential. I believe that this information very definitely demonstrates our seriousness and financial ability to proceed. I have also attached a time line leading to development. During the month I have had discussions with Gary Allen and also with the Town Manager of Mead who are basically competing for the 830 taps we have preliminarily approved. The Mayor of Mead ran for reelection, got elected, then resigned. So there is some question again about the future direction of the Town. I have developed a pretty good rapport with both entities. There does not appear to be any doubt that I can get water from one or the other or both. My fervent hope is continue to work with the County and see this through. I hope that the Commissioners will allow me to do so. Sincerely, Fred R. Kelly, Jr. Partner Mead Crossings 1200 17th Street, Suite 850 Denver, Co 80202 (303) 572-6990 Jul 30 2018 01:05PM HP Fax 3035726995 page 4 Re: Mead Crossings Page 1 of 1 From: Gary Allen <gary@Ipwd.org> To: Kristen Pine <kef1111Oaol.com> Subject: Re: Mead Crossings Date: Tue, Jul 24, 2018 2:49 pm Fred, I have reached out, but have not heard back as of yet. I know he was out of the office for a couple of days. And I'm fairly confident he will be in the office tomorrow. I will reach back out to him either later today or first thing in the morning to get clarification on what direction Longs Peak water district can go. As we discussed over the phone, I'm hopeful that you and the district can get together and work out a game plan for your water needs. But I definitely don't want to waste your time if I don't even have that option. Hopefully I will hear something back from him tomorrow. What is your email so I can add it to my allowed list? Gary Allen General Manager Longs Peak Water District Tuesday, 24 July 2018, 02:46PM -06:00 from Kristen Pine kcfl 11 1@aol.com: Hi Gary. I tried to send an email to remind you to contact your attorney about ability to serve for Mead Crossings. It was rejected so I'm trying again. Thanks. Fred https:%/mail.aol.com/webmail-stdlen-us/PrintMessage 7/27/2018 Jul 30 2018 01:05PM HP Fax 3035726995 page 5 RE: Mead Crossings Page 1 of 1 From: gary cgary@Ipwd.org> To: Kristen Pine <kcf1111 @aol.com> Subject: RE: Mead Cross'ngs Date: Fri, Jul 27, 2018 12:34 pm Hello Kristen, This message is for Fred. Could you forward me his email so I can start corresponding directly with him? Fred, I talked with our attorney, and he thought it would be wise for me to set up a meeting with Mead alone. Not with their water provider so I could "read the tea leaves" with Helen. I have sent her an email, and will get back to you just as soon as I can. I apologize that this is so complicated. Talk soon. Best regards, Gary Allen General Manager Longs Peak Water District 303-618-7971 Original Message --- Subject: Mead Crossings From: Kristen Pine <kcf1111Cilaol.com> Date: Tue, July 24, 2018 2:46 pm To: Garv(lpwd.orq Hi Gary. I tried to send an email to remind you to contact your attorney about ability to serve for Mead Crossings. It was rejected so I'm trying again. Thanks. Fred https:firnail.aol.com/webmail-std,'en-us/PrintMessage 7/27/2018 111 PEAK LON S \'\' .. .± 1 _ i ij!SnrR;c.:x iM ® 4.r' ti.' 1% 0 t,' 4 • 0 i Its S 98. ) (►si(2.4 • it) i, 77h- iJl4,` July 7018 Commitment itment I et.ter• Fred Kelly Manager anager Mead C.'rossirir►s I _l._(, 1200 17" Street. Suite 850 I )eii\ cr. Colorado 80201 RI . Adler Fstates I)e:arr 1\t1. k`I!\ 111R letter k to eon that tlr4 property located in the East V2 of Section 3, and the Soutlmest ' 'I of scat h ni 34. low !Ishii) N. Range 68W. in Weld County. otherwise known as Adler [stales (the development) is curr•eratk located entirely within the boundaries of the longs Peak Water I )1striet. and I ongs leak riiav he the provider of domestic :stet' service. this letter serves ds the District's conditional commitment to sent: the development subject to all of the following terms and conditions stated herein. payment of all applicable fees. and compliance with District rules and regulations. I he District currently does not have the capacity or infrastructure to serve the entire development of 83 ; residential lot equivalents ( IZI.I:), however there is temporary capacity to sere c' approximately' ititl RI I= \\ hilc c°fi`site infrastructure is being built. An). additional capacity requirements would necessitate construction of an of l -site transmission water line, I\li of f -site infrastructure will r iced to be complete heIbre the sails or the 301 ' up. \II developnk'iii.L, in the District will R.egiiire a separate out door irrigation (or Brown \ atct') s\ stein to reduce die amount of CH I. that will be required For domestic use. The current tap free for de\ elopuients \\ 1W ca brown water irrigation system is $10,970.00. l he developer will he required to iv> 1.\\ components of the tap lee before the sale of the fi Nt tap. 'those two components are the Infrastructure ln\ esifia ant Fee ( - $3.400.00. and the (.'apcac: it\ Purchase Fee - $2,17(),00, Both of these lees must he paid at the time of recording the final plat for the development phase and arc rc'c}trir•ed for each RI I. approved in that development phase. l he balance othe tap lee 1or each RIJN M $S.()U0,00I1(1,F. is to he paid prior to the issuance ol'a building permit. A separate tap purchase agreement will he required between the developer/builder and the District. ft is the responsibility of the developer, under the direction of the District, to pay for and install any waterline connections needed to provide adequate water services to the property It will be necessary for the developer to meet with the District to discuss these infrastructure requirements and receive the District's approval of any construction plans prior to any development actiNities being on the property l'he developer will also be responsible for purchasing and transferring the appropriate amount of raw water for the tap purchases they secure from the District The District will require the development to develop a separate brown water irrigation system that will reduce the amount of raw water to be transferred to the District in regards to the domestic water system The raw water requirement regarding the Brown Water Irrigation system will be handled through a separate agreement, but the current raw water transfer for this development would be 1 share of the }highland Ditch per 75 RL1: The District's current raw water transfer requirement in regards to treated water for developments with blown water Irrigation systems is 0 8 units of Colorado Big Thompson Project water per RI I, That is a reduction from 1 4 units of CBT !Nulled for homes without brown water irrigation The transfer of CBT units will also be requited before the sale of the first tap The current amount of CB I needed to supply the entire development is 667 units Please contact the office for the then current raw water rate transfer All fees and requirements are subject to change with Board direction This letter represents the current fees and requirements as of the date of this letter Capacity is on aifirst come first served basis f his Icttet serves as a conditional commitment only, and not a binding contract If you have further questions please contact me Best Regards, J Gary Allen General Manager Hello