Loading...
HomeMy WebLinkAbout20180731.tiffColt to Crossroads Gas Pipeline Environmental Health Statement The following Environmental Health Statement is being submitted for the Colt to Crossroads Gas Pipeline USR to address sanitary facilities for workers, waste disposal, dust control and APEN requirements. Sanitary Facilities for Workers The Colt to Crossroads Gas Pipeline USR is to permit the installation of a gas pipeline. The only time during which sanitary facilities would be necessary is during construction of the pipeline. Therefore, during construction, it will be the contractor's responsibility to provide portable toilets with handwashing facilities for use by the construction crews. Waste Disposal The only time when waste disposal will be necessary is during construction and the contractor will be responsible for providing waste receptacles to collect trash as a result of the construction process or by the construction workers. There will be no hazardous waste or materials generated during construction of the pipeline. Dust Control and APEN Requirements During the installation of the pipeline, water trucks will be utilized to suppress dust. An APEN will be obtained for construction of this project. Hello