HomeMy WebLinkAbout20180525.tiffMEMORANDUM
TO: Michael Hall, Planning Services
DATE: December 20, 2017
FROM: Hayley Balzano, E.I., Development Engineer
SUBJECT: USR17-0055 ACHIEVE MORE
The Weld County Department of Planning Services -Engineering has reviewed this proposal. Staff
comments made during this phase of the application process may not be all-inclusive, as other issues may
arise during the remaining application process.
COMMENTS:
General Project Information/Location:
Project description: An event center and 150 space family RV park
This project is east of County Road 39 and is north of and adjacent to County Road 2.
Parcel number: 147333300004
Drainage Requirements:
Please contact Department of Planning Services/Engineering Development Review for questions or
assistance for drainage requirements at 970-353-6100.
URBANIZING VS NON -URBANIZING DRAINAGE AREA:
This area IS within a Non -Urbanizing Drainage Area:
Non -Urbanizing Drainage Areas typically require detention of runoff from the 1 -hour, 100 -year, storm falling
on the developed site and release of the detained water at the historic runoff rate of the 1 -hour, 10 -year
storm falling on the undeveloped site for NON -URBANIZING areas.
Detention Pond summarized in a Drainage Report:
The applicant's engineer has submitted a Preliminary Drainage report indicating 4 possible plans for
stormwater management. At this time, the applicant is proposing detention of the 100 year storm and
releasing at the 10 year storm release rate into a neighboring irrigation ditch, managed by the Henrylyn
Irrigation Company. The applicant has indicated that they have submitted the Preliminary Drainage design
to the irrigation company for review.
Grading Permit
A Weld County Grading Permit will be required if disturbing more than 1 acre. Grading Permit applications
are accepted after the planning process is complete (plan recorded). An Early Release Request Form may
be entertained only after the applicant and Planning Department have reviewed the referral and surrounding
property owner comments. The Early Release Request may or may not be granted depending on referral
comments and surrounding property owner concerns. Contact an Engineering representative from the
Planning Department for more information.
A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact:
Colorado Department of Public Health and Environment, Water Quality Control Division, Rik Gay, 303-692-
3575.
Geologic Hazard Area:
This area IS NOT in a Geologic Hazard Area.
Floodplain:
This area IS NOT in a FEMA regulatory floodplain.
CONDITIONS OF APPROVAL:
A. A Final Drainage Report and Certification of Compliance stamped and signed by a Professional
Engineer registered in the State of Colorado is required. (Department of Planning Services -Engineer)
B. The plan shall be amended to delineate the following:
1. The applicant shall show and label the accepted drainage features and drainage flow arrows. Water
quality features or stormwater ponds should be labeled as "Water Quality Feature/Stormwater
Detention, No -Build or Storage Area" and shall include the calculated volume. (Department of
Planning Services -Engineer)
2. Show and label the parking and traffic circulation flow arrows showing how the traffic moves around
the property. (Department of Planning Services -Engineer)
Prior to Construction:
A. If more than one (1) acre is to be disturbed, a Weld County Grading Permit will be required.
(Department of Planning Services -Engineer)
DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN)
1. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Planning
Services -Engineer)
2. Weld County is not responsible for the maintenance of onsite drainage related features. (Department
of Planning Services -Engineer)
MEMORANDUM
TO: Michael Hall, Planning Services
FROM: Evan Pinkham, Public Works
SUBJECT: USR17-0055 Achieve More
DATE: December 19, 2017
The Weld County Department of Public Works has reviewed this Use by Special Review proposal. Staff
comments made during this phase of the application process may not be all-inclusive, as other issues may
arise during the remaining application process.
COMMENTS
GENERAL PROJECT INFORMATION/LOCATION
Project description: A Site Specific Development Plan and Use by Special Review Permit for Agricultural
Service establishments primarily engaged in performing agricultural, animal husbandry or horticultural
services on a fee or contract basis, including animal boarding and animal training facilities, livestock sale
barns and facilities, rodeo arena, roping arena to include both indoor and outdoor arenas and any Use
Permitted as a Use By Right, an Accessory Use, or a Use By Special Review in the Commercial or Industrial
Zone Districts (an events center and a 150 space RV park with an office) provided that the property is not
a lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any
regulations controlling subdivisions in the A (Agricultural) zone district.
This project is north of and adjacent to CR 2 and is west of CR 45. Parcel number 147333300004.
Access is from CR 2.
ACCESS
Access to the site has been preliminarily approved at the following location(s):
On CR 2 located approximately 7170 feet east of CR 39
Per Chapter 12, Article 5, Section 12-5-30, an Access Permit is required for access to Weld County
maintained roadways. We strongly encourage you to discuss your access with Public Works prior to laying
out your site plan to ensure the approved accesses are compatible with your layout.
For new accesses and/or change of use of an existing access, the fee and photos are required (photo
looking left and right along roadway from the access point and looking in to and out of the access point).
These photos are used to evaluate the safety of the access location. Access permit instructions and
application can be found at https://www.weldgov.com/departments/publIc works/permits/. Chapter 6,
Sections 6.3, 6.4 and 6.5 of the Weld County Engineering and Construction Criteria offer access design
guidance, which can be accessed at: https://www weldgov com/departments/public works/engineering/.
Per Chapter 12, Appendix 12A.4.1 of the Weld County Code, an access approach that is gated shall be
designed so that the longest vehicle (including trailers) using the access can completely clear the traveled
way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled surface
be less than 35 feet.
For shared accesses, Public Works strongly recommends the property owner establish an access road
maintenance agreement so future owners of the properties will be aware of their requirements for shared
maintenance of the access road. This is not a requirement, but is recommended to avoid property owner
conflicts in the future.
ROADS AND RIGHTS -OF -WAY
County Road 2 is a paved road and is designated on the Weld County Functional Classification Map (Code
Ordinance 2017-01) as a(n) collector road, which requires 80 feet of right-of-way. The applicant shall
delineate on the site map or plat the future and existing right-of-way and the physical location of the road.
If the right-of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld
County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future
right-of-way line. Be aware that physical roadways may not be centered in the right-of-way. This road is
maintained by Weld County.
Per Chapter 12, Article 4, Section 12-4-30.B, a Weld County Right -of -Way Use Permit is required for any
project that will be occupying, constructing or excavating facilities within, and/or encroaching upon, any
County rights -of -way or easement. Right -of -Way Use Permit instructions and application can be found at
https://www.weldgov comidepartments/publicworks/permIts/.
Weld County will riot replace overlapping easements located within existing right-of-way or pay to relocate
existing utilities within the County right-of-way.
TRAFFIC
Latest ADT on CR 2 was taken on 5/12/2016 which counted 2397 vpd with 17% trucks.
The traffic will not require a right turn deceleration or acceleration lane, but the traffic will require a left turn
deceleration lane for the eastbound traffic turning into the facility. The traffic study references asking for a
variance for the required left turn deceleration lane required for the eastbound traffic turning into the facility
due to a culvert to the west that would need to be replaced. While this culvert will need to be replaced to
accommodate the required left turn lane, not constructing a left turn lane will potentially have a negative
effect on the traffic flow in this area by impeding the free flow of the through traffic. It is important for the
overall functionality of the transportation system to allow the traffic to continue to flow as freely as possible.
Public Works would therefore recommend denying the request of a variance. The traffic study mentions the
deceleration lane length needing to be 635 feet long. This length would need to be checked against the
State Highway Access Code but does appear to be a reasonable length for this posted speed limit. This
lane would also need to include the appropriate Redirect Taper Ratio of 55:1, see State Highway Access
Code Table 4-9.
TRACKING CONTROL POLICY
Per Chapter 12, Appendix 12A.10.1, traffic volumes to the proposed facility may require the installation of
a tracking control device and/or a minimum of four inches of compacted recycled asphalt or aggregate road
base. Tracking control is required to prevent tracking from the site onto public roadways. Temporary
Tracking Control shall be used during construction unless permanent tracking control is installed ahead of
construction activities. Recycled concrete is not allowed in County right-of-way. Tracking control devices
can be double cattle guards or rip rap (6" washed rock). Tracking control for unmaintained public right-of-
way is required just prior to entering publicly maintained roadways. A variance request for alternatives to
the tracking control requirement can be submitted to Public Works for review and consideration.
IMPROVEMENTS AND ROAD MAINTENANCE AGREEMENT
Public Works may require an Improvements Agreement for one or all the following reasons:
• Off -Site Public Improvements
• Road Maintenance Agreement
• Construction Maintenance Agreement
• Access Improvements Agreement
An Improvements Agreement is required for sites with required off -site improvements per Chapter 12,
Article 5, Section 12-5-60. Collateral is required to ensure the improvements are completed, and
maintained.
Improvements/Road Maintenance Agreement: An example agreement is available at:
https://www.weldclov com/UserFiles/Servers/Server 6/File/Degartments/Publie/020Works/DevelopmentR
eviewlsprusr.pdf. It will detail the approved haul route(s), outline when off -site improvements will be
triggered, and include a maintenance agreement for the haul routes. Possible mitigations included in the
road maintenance agreement may include but are not limited to: dust control, specified haul routes, damage
repairs, and future improvement triggers.
CONDITIONS OF APPROVAL
A. An Improvements and Road Maintenance Agreement is required for off -site improvements at this
location. Road maintenance including, but not limited to dust control, tracking control, damage repair,
specified haul routes and future traffic triggers for improvements will be included. (Department of Public
Works)
B. The plan shall be amended to delineate the following:
1. County Road 2 is a paved road and is designated on the Weld County Functional Classification
Map as a collector road which requires 80 feet of right-of-way at full buildout. The applicant shall
delineate on the site plan the future and existing right-of-way. All setbacks shall be measured from
the edge of future right-of-way. This road is maintained by Weld County. (Department of Public
Works)
2. Show and label the approved access locations, and the appropriate turning radii (60') on the site
plan. The applicant must obtain an access permit in the approved location(s) prior to construction.
(Department of Public Works)
3. Show and label the approved tracking control on the site plan. (Department of Public Works)
4. Show and label the entrance gate if applicable. An access approach that is gated shall be designed
so that the longest vehicle (including trailers) using the access can completely clear the traveled
way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled
surface be less than 35 feet. (Department of Public Works)
Prior to Construction:
A. The approved access and tracking control shall be constructed prior to on -site construction. This site
requires a tracking control device and 100 feet of asphalt OR 300 feet of asphalt for tracking control.
(Department of Public Works)
Prior to Operation:
A. Accepted construction drawings and construction of the off -site roadway improvements are required
prior to operation. Off -site roadway improvements include an eastbound left deceleration turn lane.
(Department of Public Works)
DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN)
1. The property owner shall control noxious weeds on the site. (Department of Public Works)
2. The access on the site shall be maintained to mitigate any impacts to the public road including damages
and/or off -site tracking. (Department of Public Works)
3. There shall be no parking or staging of vehicles on public roads. On -site parking shall be utilized.
(Department of Public Works)
4. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire
an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works)
TO:
FROM:
DATE:
RE:
WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org
MEMORANDUM
Michael Hall, Planning Services
Lauren Light, Environmental Health Services
December 14, 2017
USR17-0055 Cherry Knolls Estates
Environmental Health Services has reviewed this proposal for a Site Specific
Development Plan and Use by Special Review Permit for Agricultural Service
establishments primarily engaged in performing agricultural, animal husbandry or
horticultural services on a fee or contract basis, including animal boarding and animal
training facilities, livestock sale barns and facilities, rodeo arena, roping arena to include
both indoor and outdoor arenas and any Use Permitted as a Use By Right, an
Accessory Use, or a Use By Special Review in the Commercial or Industrial Zone
Districts (an events center and a 150 space RV park with an office) provided that the
property is not a lot in an approved or recorded subdivision plat or lots parts of a map or
plan filed prior to adoption of any regulations controlling subdivisions in the A
(Agricultural) Zone District.
An individual well (permit 68969-F) which is permitted for "irrigation, commercial and
domestic uses" is located on the adjacent property owned by the co -applicant. The
application indicates the adjacent well will be utilized for this USR and is approved for
use per the provided Court Decree (Case No. 2004CW16) item 16.
The application states that a new engineered on site wastewater treatment system will
be installed. State review will be required if 2,000 GPD is exceeded. Portable toilets can
be used in accordance with EH Policy.
The RV park will have water and sewer connections at each site. A shower and laundry
facility as well as a community center will be built in the future
Health Administration
Vital Records
lot: 9/0 304 6410
Fax: 9/0-301-64 I'2
Public Health &
Clinical Services
Icic: 9/0 304 6420
Fax: 910-304-64 16
Environmental Health
Services
Tele:970-304-6415
Fux: 970-304-6411
Communication,
Education & Planning
Tele: 970-304-6470
Fox: 970-304-6452
Emergency Preparedness
8 Response
Te le: 970-304-6470
Fax: 970-304-6462
Public Health
The Consumer Protection Division of Weld County Environmental Health Services shall
be contacted for plan review and licensing requirements for any proposed food
establishment at the facility. Any vendors serving food at the facility shall comply with
Colorado Retail Food Establishment Rules and Regulations.
We recommend that the following requirements be incorporated into the permit as
development standards:
1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and
Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for
final disposal in a manner that protects against surface and groundwater
contamination.
2. No permanent disposal of wastes shall be permitted at this site. This is not
meant to include those wastes specifically excluded from the definition of a solid
waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.,
as amended.
3. Waste materials shall be handled, stored, and disposed in a manner that controls
fugitive dust, fugitive particulate emissions, blowing debris, and other potential
nuisance conditions. The applicant shall operate in accordance with Chapter 14,
Article 1 of the Weld County Code.
4. Animal and feed wastes, bedding, debris and other organic wastes shall be
disposed of so that vermin infestation, odors, disease hazards, and nuisances
are minimized.
5. Fugitive dust shall attempt to be confined on the property. Uses on the property
should comply with the Colorado Air Quality Commission's air quality regulations.
6. The facility shall adhere to the maximum permissible noise levels allowed in the
Commercial Zone as delineated in 25-12-103 C.R.S.
7. Adequate drinking, hand washing and toilet facilities shall be provided for
employees and patrons of the facility, at all times.
8. Sewage disposal for the facility shall be by septic system. Any septic system
located on the property must comply with all provisions of the Weld County Code,
pertaining to Onsite Wastewater Treatment Systems.
9. In the event the septic systems require a design capacity of over 2,000 gallons of
sewage per day the applicants shall adhere to the requirements of the Colorado
Department of Public Health and Environment, Water Quality Control Division's
(WQCD) Regulations.
10.Any large -capacity septic system (a septic system with the capacity to serve 20
or more persons per day) shall comply with the Underground Injection Control
(UIC) Class V Injection Well requirements of the Environmental Protection
Agency (EPA).
11. Temporary uses for a period of six months or less, portable toilets and bottled
water are acceptable. Records of maintenance and proper disposal for portable
toilets shall be retained on a quarterly basis and available for review by the Weld
County Department of Public Health and Environment. Portable toilets shall be
serviced by a cleaner licensed in Weld County and shall contain hand sanitizers.
12.A permanent, adequate water supply shall be provided for drinking and sanitary
purposes. In the event the facility's water system serves more than 25 persons
on a daily basis the water system shall comply with the Colorado Primary
Drinking Water Regulations (5 CCR 1003-1). If not subject to these requirements,
the Weld County Department of Public Health and Environment strongly
encourages well users to test their drinking water prior to consumption and
periodically thereafter.
13. The applicant shall comply with Colorado Retail Food Establishment Rules and
Regulations governing the regulation of food service establishments.
14. The operation shall comply with all applicable rules and regulations of the State
and Federal agencies and the Weld County Code.
Submit by Email
Weld County Referral
November 20, 2017
The Weld County Department of Planning Services has received the following item for review:
Applicant: Cherry Knolls Estates Case Number: USR17-0055
Please Reply By: December 18, 2017 Planner: Michael Hall
Project: A Site Specific Development Plan and Use by Special Review Permit for Agricultural Service
establishments primarily engaged in performing agricultural, animal husbandry or horticultural services
on a fee or contract basis, including animal boarding and animal training facilities, livestock sale barns
and facilities, rodeo arena, roping arena to include both indoor and outdoor arenas and any Use
Permitted as a Use By Right, an Accessory Use, or a Use By Special Review in the Commercial or
Industrial Zone Districts (an events center and a 150 space RV park with an office) provided that the
property is not a lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior
to adoption of any regulations controlling subdivisions in the A (Agricultural) zone district.
Location: North of and adjacent to CR 2; approximately 2 miles east of CR 39
Parcel Number: 147333300004-R6778681 Legal: PART S2 SECTION 33, -11 N, R65W LOT D REC
EXEMPT RE -4994 OF THE 6TH P.M., WELD COUNTY, COLORADO.
The application is submitted to you for review and recommendation. Any comments or
recommendation you consider relevant to this request would be appreciated. Please reply by the
above listed date so that we may give full consideration to your recommendation. Any response not
received before or on this date may be deemed to be a positive response to the Department of Planning
Services. If you have any further questions regarding the application, please call the Planner
associated with the request. Please note that new information may be added to applications
under review during the review process. If you desire to examine or obtain this additional
information, please call the Department of Planning Services.
n
We have reviewed the request and find that it does / does not comply with our Comprehensive
Plan because:
We have reviewed the request and find no conflicts with our interests.
See attached letter.
Rod Baumgartner
Signature Date
Agency
Henrylyn Irrigation District
12-12-17
Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 353-6100 ext,3540 (970) 304-6498 fax
Weld County Referral for the Achieve More Agricultural Complex
The following comments are offered to Weld County in context of protecting the property and operating
practices of Henrylyn Irrigation District ("District").
1. Site layout — the complex is concentrated along the Denver -Hudson Canal, owned and operated
by the District. It appears the applicant retains significant space left undeveloped in the parcel
to the east. Recommend moving the layout a minimum of 100 feet from the canal edge to
provide a reasonable buffer.
2. Canal access and maintenance — The District retains the right and obligation to maintain its
water conveyance systems, including access to the Denver -Hudson Canal from the east bank.
Providing the aforementioned 100 -foot buffer will provide sufficient room for excavation
equipment and truck traffic, when necessary to perform these functions.
3. Wastewater Treatment— it appears the wastewater treatment facility adjoins the canal.
Additional information is warranted to address:
a. Wastewater treatment facility design and capacity to assure it is a closed system with no
surface discharge or infiltration into the canal.
b. Material disposal and location of sludge, brine or other by-products from the treatment
facility in a licensed landfill.
4. Safety— applicant proposes to include a playground and picnic areas (2) near the canal. It is
necessary and reasonable for the project developer to install and maintain locked gates and a
chain link or other near -impenetrable fence no less than 8 feet in height, and other necessary
measures, to prevent access to the canal from the prevention of drowning or other injury. The
developer shall also include signage that prohibits any and all trespass upon District property.
fence and signage
5. Storm water runoff — to prevent the degradation of water quality in the canal or pulse flows that
may overtop and damage the canal, it is prudent to require installation of a berm parallel to the
canal to prevent contribution of all sheet flow into the canal; and construction of a retention
pond to capture flow from all impervious surfaces. Further, we recommend the use of gravel or
crushed concrete in parking or other applicable areas instead of crushed asphalt for improved
water quality.
6. Trash — to prevent the introduction of trash or other debris from the Complex into the canal, a
refuse or trash collection, disposal and operation plan that describes the number and capacity of
receptacles, with disposal frequency and narrative to address high -attendance events, is
warranted.
LOCI I I3U I E
Town of Lochbuie
TO: Kristine Ranslem. Weld County Planning Technician
FROM: Steve Stamey, Town of Lochbuie Town Administrator
DATE: December 13, 2017
RE: Comments on USR17-0055
The following are the Town of Lochbuie's comments on USR17-0055:
1. The Town is concerned with the installation of private water treatment system, and wastewater
treatment system.
2. A Landscape Plan should be provided, which demonstrates screening of the RV parking area from
adjacent properties.
apex
1675 Lorimer Street, Suite 400 I Denver, CO 80202 o: 303.339.0440 www.apexdesignpc.com I
memo
APEX DESIGN, PC
TO: Steve Stamey, Town of Lochbuie Town Administrator
FROM: Jeff Ream, PE, PTOE, Apex Design
DATE: November 30, 2017
RE: Comments on September 2017 Achieve More Traffic Impact Analysis
The following are Apex Design's comments on the September 2017 Achieve More Traffic Impact Study, prepared
by Delich Associates (Delich).
Trip Generation
• Page 5. The site includes an indoor show arena and an outdoor rodeo. It is unclear from the application
whether these facilities will be for internal use only, or will be used for events that generate off -site traffic. If the
latter is planned, the study will need to be updated to provide information on the anticipated event size, event
frequency, traffic forecasts, and off -site impacts, including impacts to the WCR 2/1-76 interchange. This should
be a separate analysis from the everyday impacts associated with the RV Park and agricultural uses.
Improvement Recommendations
• WCR 2. The project should contribute a pro rata share to the Town of Lochbuie for the improvements planned
for this road.
• WCR 2/West Frontage Road. The project should contribute a pro rata share to the Town of Lochbuie for the
improvements planned for this intersection.
• Site Access Intersection. I agree with the road geometry recommendations at this location.
apex
1675 Lorimer Street, Suite 400 I Denver, CO 80202 o: 303.339.0440 www.apexdesignpc.com 1
COLORADO
Division of Water Resources
Deaa-trnent of Natj at?esources
December 12, 2017
Michael Hall
Weld County Department of Building and Planning Services
Transmitted via email: mhall@weldgov.us
John W. Hickenlooper
Governor
Robert Randall
Executive Director
Kevin Rein, P.E.
Director/State Engineer
Re: Cherry Knolls Estates - Site Specific Development Plan and Use by Special Review
Case no. USR17-0055
Part of S1/2, Sec. 33, T1 N, R65W, 6th P.M., Lot D Recorded Exemption RE -4994
Water Division 1, Water District 2
Dear Mr. Hall,
This referral does not appear to qualify as a "subdivision" as defined in Section 30-28-101(10)(a),
C.R.S. Therefore, pursuant to the State Engineer's March 4, 2005 and March 11, 2011
memorandums to county planning directors, this office will only perform a cursory review of the
referral information and provide informal comments. The comments do not address the adequacy
of the water supply plan for this project or the ability of the water supply plan to satisfy any
County regulations or requirements. In addition, the comments provided herein cannot be used to
guarantee a viable water supply plan or infrastructure, the issuance of a well permit, or physical
availability of water.
According to the submitted information, the Applicant is seeking a site specific development plan
and use by special review permit for agricultural service establishments primarily engaged in
performing agricultural, animal husbandry or horticultural services on a fee or contract basis,
including animal boarding and animal training facilities, livestock sale barns and facilities, rodeo
arena, roping arena to include both indoor and outdoor arenas and an events center and a 150
space RV park with an office; provided that the property is not a lot in an approved or recorded
subdivision plat or lots part of a map or plan filed prior to adoption of any regulations controlling
subdivisions in the A (Agricultural) Zone District. The referral information contained well permit no.
68969-F.
Well permit no. 68969-F was issued on February 10, 2010 pursuant to § 37-90-137(4), C.R.S, for an
average annual withdrawal of 18.05 acre-feet in the nontributary Lower Arapahoe aquifer for
irrigation, commercial and domestic uses. The well, as permitted, cannot be used for any other
uses besides those allowed per permit no. 68969-F. If the applicant plans to use the well for any
other uses, such as stock watering; a well permit allowing such uses must first be obtained. Since
the decree in Division 1 Water Court Case no. 04CW16 allows for all beneficial uses the Applicant
could seek to re -permit the well for any non -speculative beneficial use. The ability of the
Applicant to re -permit the well will be determined at the time that well permit application is
submitted to this office.
Office of the State Engineer
1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581
www.water.state. co. us
Case no. USR17-0055 Page 2 of 2
December 12, 2017
Should you or the applicant have any questions, please contact Allis Thyne at (303) 866-3581 x8216.
Sincerely,
Jcanr*Williams, P.E.
Water Resource Engineer
Ec: Permit file 68969-F
Hello