Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20180234.tiff
USE BY SPECIAL REVIEW (USR) APPLICATION DEPARTMENT OF PLANNING SERVICES *1555 N. 17 AVENUE * GREELEY, CO 8003t • 970.3536100 EXT 3540 ' FAX 9703046408 DATE RECEIVED: AMOUNT $ CASE # ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: parcel Number: '1 2 1 1 0 9_ 2_ 0 0 0 2 4 eAudigo nunber on Tax LO. r moan oisile: 14230 Canty Road 3E. PtaeeWle. CO 80651 i ao Deacipuon; txr tillit4 9396 LOT Cam SOAK REC(11-0014_ Section: 80 Toe ishlp: 03 N Range:66 W Zone District: A Acteege: 120 Floodplain:OYCN Geological Hazard:OVEN Airport Overlay:CYCtii EFFO111NERSISE Company: Phone#: 970-38.0617 Street Add[eas: 14230 County Road a6 City/Steterip Code: Pbervik. CO 80851 Errad: badaarorne@aotnarrr Name Phone #: Street A9drrs: _ CityiState 2lp Code: Email: meucargignAnuaziLmem [Saes belowAudnrhaferomusteaaon ryralra ficatkesafbnedbyAid arfa«d lei Mane: Wheal Borkowsld Phone* '2024444423 3423 Email: elbanal'enadOaoeen Prom PROPOSED USE: Amend the existing USR15-0019 for a dog kennel to indude a 100kW solar farm utifizing less 'than i we of land an the corner atb+e parceL No changes proposed existing ken fecilitfi; I (we)ffe) herary compose and state under penalties of penury that al! sratements, propose s, as}dlet plans submfttar with or containedwarmsappfloaann are true an ri cortect to Isle best of my (our)knowle age. S lc naturo s of all fa owners of property m Listsignilttls applIcatian. ffan Authoriand Agent aligns. a letter of authorition from all fee owner's mint be included wtiti the application_ if a corporation Is tuner, nikarized evidence must be included indlt rxg that 1h jratory has to gat sattsaritybar Print Name 4 1 <1\ L or Authorrzad Agent at Signature: Darer er Authorized Agent Date Anne Backstam Print Name Re'A,20143 DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 PHONE: (970) 353-6100, Ext. 3540 FAX: (970) 304-6498 AUTHORIZATION FORM Community Power Group, LLC represent Anne Backelran t IVAP ) (Owner) located at 14230 County Road 36, Platteville, CO 80651 for the property LEGAL DESCRIPTION: SEC 9 TWN 3N RNG BOW SUBDIVISION NAME: I can be contacted at the following Home Work -844-6423 Email: mbortcowski©corrmrrundypowergroup.com The property owner can be contacted at the following Home 910-396-0817 Work Email: backstorraimad.com Correspondence ernailed to: Agent/Applicant (Check one) ❑ Property Owner DATE OWNER'S SIG blin TURE A.9.1 Planning Questions: 1. Explain, in detail, the proposed use of the property. a. We will use a small portion land outside an agricultural pivot to install a 100kW solar farm on less than 1 acre. This land is generally unusable and infertile. 2. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 22 of the Comprehensive Plan. a. Part D, Section 22-2-10: The location of the solar facility allows for the collection, or "extraction" in the case of this section of the Weld County Code, of natural resources with no effect on the surrounding agricultural field itself. b. Section 2-2-20, Policy 2.2: The solar facility will benefit the land owner while utilizing unfarmed and unproductive land. c. Section 2-2-20, Policy 6.2: By allowing a solar facility to be built on this portion of the landowner's property, it will supplement their agricultural income allowing them to continue their rural lifestyle. d. Section 2-2-20, Policy 9.3: The technique being utilized in this USR is using land made difficult to cultivate or unproductive due to the incompatibility between agricultural pivots and naturally rectangular parcel boundaries. As mentions before, this allows for solar and agriculture to co -exist. e. Section 2-2-20, Policy 9.4: Due to the naturally flat land that comes with agriculture, little to no topographical or other land alterations will be required. Due to the benign nature of the panels, the length of the lease, and the grasses that are planted below the panels, the land will be preserved in its natural state. 3. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 23 (Zoning) and the zone district in which it is located. a. Since the solar farm proposed will utilize less than 1 acre of land, it qualifies as a small- scale solar facility and is allowed through a USR permit process. Furthermore, the proposed solar farm meets the goals of the Agriculture Zone District in that it preserves active agricultural land by only using land that is difficult or impossible to effectively cultivate. 4. Describe what type of land uses surround the site. Explain how the proposed use is consistent and compatible with surrounding land uses. a. Property surrounding this portion of land is all used for agriculture and will not be affected in any way by this proposed use. 5. What are the hours and days of operation? (e.g. Monday thru Friday 8:00 a.m. to 5:00 p.m.) a. Solar farm will operate when the sun is out and is monitored remotely. Virtually no on -site work will take place after initial construction. 6. List the number of full time and/or part time employees proposed to work at this site. a. During operation, estimated 1-2 visits by one person on a yearly basis. Additional visits only necessary for extreme weather/individual events that may affect solar panels. 7. If shift work is proposed include the number of employees per shift. a. No shift work proposed. 8. List the number of people who will use this site. Include contractors, truck drivers, customers, volunteers, etc. a. This site will not host any individuals. 9. If this is a dairy, livestock confinement operation, kennel, etc., list the number and type of animals. a. N/A 10. Describe the type of lot surface and the square footage of each type. (e.g. asphalt, gravel, landscaping, dirt, grass, buildings) a. Less than 1 acre of land will be used, most of which will have solar panels on it. Below the panels will be low growing grass to ensure little to no impact on soil quality. A small perimeter surrounding the solar farm will have a fence for basic security and compliance concerns. 11. How many parking spaces are proposed? How many handicapped (ADA) parking spaces are proposed? a. No parking spaces proposed. 12. Explain the existing and proposed landscaping for the site. a. The 1 acre area is currently not landscaped other than the agricultural pivot it will be next to. Additional landscaping is not anticipated. 13. Describe the type of fence proposed for the site (e.g. 6 foot chain link with earth tone slats) a. We will use 78' of game fence with 6' treated wood posts and a 20' wide gate. 14. Describe the proposed screening for all parking and outdoor storage areas. If the site is located in a floodplain outdoor storage is restricted. a. N/A 15. Explain any proposed reclamation procedures when termination of the Use by Special Review activity occurs. a. While the installation of the solar facility is relatively undisruptive to the soil and surroundings, the lease agreement requires that the plot of land is returned to similar conditions as before. 16. Who will provide fire protection to the site? a. A key to the facility will be provided to local safety officials. 17. List all proposed on -site and off -site improvements associated with the use (e.g. landscaping, fencing, buildings, drainage, turn lanes, etc.) and a timeline of when you will have each one of the improvements completed. a. N/A Engineering questions: 1. Describe how many roundtrips/day are expected for each vehicle type: Passenger Cars/Pickups, Tandem Trucks, Semi-TrucklTrailer/RV (Roundtrip =1 trip in and 1 trip out of site) a. The construction will take less than one month with approximately 3 passenger/small trucks per day. 2. Describe the expected travel routes for site traffic. a. During operation, there will be virtually no traffic resulting from the facility. During construction, a majority, if not all, traffic will come from nearby highway 85, travel west briefly on county road 36 towards the access road on site. 3. Describe the travel distribution along the routes (e.g. 50% of traffic will come from the north, 20% from the south, 30% from the east, etc.) a. A majority, if not all, will come from the west (highway 85/county road 36). 4. Describe the time of day that you expect the highest traffic volumes from above. a. During operation, no traffic will be expected. During construction period, traffic will occur primarily at the beginning of business hours and near the end of business hours. 5. Describe where the access to the site is planned. a. An existing access road will be used at the north end of the property off of county road 36 to reach the NW side of the pivot. To reach the project site on the SE side of the pivot, the solar site will be accessed by driving on a pathway around the pivot, as marked on the attached site plans. 6. Drainage Design: Detention pond summarized in a drainage report is required unless the project falls under an exception to stormwater detention requirements per code section 23-12-30 F.1. A. Does your site qualify for an exception to stormwater detention? If so, describe in a drainage narrative the following a. Which exception is being applied for and include supporting documentation. i. Exceptions 8 and 11. The project will encompass less than 1 gross acre and will not increase imperviousness of the site. b. Where the water originates if it flows onto the property from an offsite source i. The water would originate from the SE corner of the property and travel to the agricultural pivot and/or irrigation ditch nearby. c. Where it flows to as it leaves the property i. Water will travel to the nearby ditch. d. The direction of flow across the property i. Excess flow not drained through the nearby cultivated soil will drain into the ditch. e. If there have been previous drainage problems with the property i. No. 14,13 B. Does your site require a stormwater detention pond? If so, the following applies: a. Does not apply. USE BY SPECIAL REVIEW (USR) QUESTIONNAIRE (PAGE 2) Environmental Health questions: 1. What is the drinking water source on the property? a. For construction, bottled water will be used. No on -site activity will take place during operation. b. If utilizing a drinking water well include either the well permit or well permit application that was submitted to the State -Division of Water Resources. If utilizing a public water tap include a letter from the Water District, a tap or meter number, or a copy of the water bill. i. N/A 2. What type of sewage disposal system is on the property? a. For construction, port -o -johns will be utilized. b. If utilizing an existing septic system provide the septic permit number. If there is no septic permit due to the age of the existing septic system, apply for a septic permit through the Department of Public Health and Environment prior to submitting this application. If a new septic system will be installed please state "a new septic system is proposed". Only propose portable toilets if the use is consistent with the Department of Public Health and Environment's portable toilet policy. i. N/A 3. If storage or warehousing is proposed, what type of items will be stored? a. No storage or warehousing proposed. 4. Describe where and how storage and/or stockpile of wastes, chemicals, and/or petroleum will occur on this site. a. No storage mentioned above will be utilized. 5. If there will be fuel storage on site indicate the gallons and the secondary containment. State the number of tanks and gallons per tank. a. No fuel storage required. 6. If there will be washing of vehicles or equipment on site indicate how the wash water will be contained. a. No washing of vehicles/equipment with water will be required. 7. If there will be floor drains indicate how the fluids will be contained. a. No floor drains required. 8. Indicate if there will be any air emissions. (e.g. painting, oil storage, etc.) a. No air emissions will result from any part of this activity. 9. Provide a design and operations plan if applicable. (e.g. composting, landfills, etc.) a. N/A 10. Provide a nuisance management plan if applicable. (e.g. dairies, feedlots, etc.) a. N/A 11. Additional information may be requested depending on type of land use requested. a. NIA Building questions: 1. List the type, size (square footage), and number of existing and proposed structures. Show and label all existing and proposed structures on the USR drawing. Label the use of the building and the square footage. a. No new structures are being proposed and there are no existing structures on the proposed site. 2. Explain how the existing structures will be used for this USR? a. No existing structures will be utilized for this USR. 3. List the proposed use(s) of each structure. a. N/A Weld County Code — Requirements for Solar Facilities The Planning Commission and Board of County Commissioners shall consider the following criteria in making their determination in approving or denying a Special Review Permit for a Solar Facility in addition to those criteria enumerated in Chapter 23, Article 11. Division 4 and its impact on prime agricultural land which is defined as soils with agricultural capability classifications of I, II and Ill as indicated on maps completed by the U.S.D.A. Natural Resource Service. A. A Decommissioning Plan. Adequate financial assurance to cover the decommissioning of the facility maybe required as a condition of approval of the Decommissioning Plan. Response: The Lease provides the landowner with the option to purchase the facility and has a Company guarantee for the removal of the facility. The proposed facility is less than one acre and the lease provides an option for the facility to be transferred to the landowner at FMV at the end of the lease term. Additionally, to the extent the landowner does not wish to accept ownership of the facility at the end of the lease term, the lease requires that the company provide an adequate financial surety to ensure the decommissioning of the facility. B. Landscaping is extremely important for enhancing the quality of development in the area. trees, shrubs and other plantings add greatly to the aesthetic appeal while reducing glare. As no single landscaping plan can be prescribed for all developments due to differing land features, topography and soils, these guidelines encourage flexible and creative landscape designs. Landscaping/screening shall include, at a minimum, decorative fencing, berming, and/or vegetation such that the facility is aesthetically pleasing as viewed from adjacent properties and rights -of -way. Response: The facility is less than one acre and is far from the road or neighbors view shed. Furthermore, we will be providing ascetically pleasing fencing with wood posts with game fence and will be planting native grasses that will blend in with the existing agriculture. C. All reasonable alternatives to the proposed location have been adequately assessed, and the proposed action is consistent with the best interests of the people of the County and represents a balanced use of resources in the affected area. Response: Location allows for full preservation of existing agricultural land and is utilizing land that is far from view shed and on land that has minimal alternative uses. D. The nature and location or expansion of the facility will not unreasonably interfere with any irrigation systems on or adjacent to the solar facility. Response: See E.1 E. No outdoor storage of any materials and equipment including, but not limited to, solar panels and support structures not in operation will be allowed. Response: None will be onsite. F. No equipment associated with the solar facility shall be located nearer than thirty (30) feet to the boundary of ADJACENT properties, irrigation ditches and/or rights -of -way. The Board of County Commissioners may set a greater distance than mentioned above when, in its opinion, it is justified. Response: See E.1 for compliance with 30ft boundary requirement. G. A Property Maintenance Plan is required for the facility. The Property Maintenance Plan shall address dust, weeds and erosion. The property shall be maintained in such a manner as to control dust, needs and drainage that could cause erosion. Response: The facility is less than one acre and there will be minimal disturbance to complete the proposed project. The existing topography will be maintained, with the system being installed using rammed posts which will hold the solar array's tracking system, and minor trenching to run conduit between electrical equipment. The limits of disturbance will be maintained with sediment control logs for the duration of construction. Any disturbed areas will be reseeded as to maintain the current perviousness of the site. Part of the on -going maintenance plan for this project involves mowing the native grass around the solar arrays. Existing roads will be utilized and no new access roads will be required. SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW (USR) APPLICATION 4 i Etel Address: Address: City/State/Zip Code FOR PLANNING DEPARTMENT USE DATE RECEIVED: j RECEIPT # /AMOUNT ## 1 CASE # PPPLIDATION RECEIVED BY _ PLANNER Parcel Number J_ J — — Ci :.... (12 digit number ^ found on Tax ID, information, obtainable at the Weld County Assessor's Office, or www.comeld.co.up) Legal Descriptio Zone District: 1t , Total Acreage:_ )Qi) _= Flood Plain:AA , Geological Hazard: , Airport Overlay District...NA FEE OWNER(S) OF THE PROPERTY: Name: Work Phone # T70la" Home Phone Address: Address: _ City/Stat ip Code �S�4, r_ Name: Work Phone ## Home Phone $# Email )t1�,cX2o a64!} , Section Lam,, 7ownshipit North, Range 6We8t Name: Work Phone # _Home Phone # Email Address: Address:,_,,,, City/State/Zip Code 1/21 APPLICANT OR AUTHORIZED AGENT (See Below: Authorization must accompany applications signed by Authorized Agent) Name: +b Work Phone ## - 8ID _Home Phone #--- �- Email Address: wit Address: City/StatelZip Code is PROPOSED USE: 4franned art 45 et 7 I (We) hereby deposeand state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to(our)knowledge. the best of my Signatures of all fee owners of property must sign this application, if an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be in ded indicati ; t at the sig to as to legal authority to sign for the corporation. Signature: Owner or Authorized Agent a Si ature: Owner or Authorized Agent Date w gb. ite-aO)5 .1 , Armee En taoiSronn Qafha7/Z8 %ea MA90 -40 be- /N,y �Ps�� C'�' AH �j U.�G cyttoi}4,...41., �Dr ll \1 prinar %"'tU 1�a3�ia R .36 P/aGuil�c 6 120‘514 E. i .3 Backstrom Proposed USR for 35 Dog Kennel 14230 WCR 36 Platteville,Co 80651 1. Proposed Use of Property : The Backstrom family has raised Labradors and Golden Retrievers on the property for many years. They would like to have a USR on their property at 14230 WCR 36, Platteville to increase the number of dogs they are allowed on the property from 10 to 35. They are planning on erecting a steel building to house the dogs and continuing to comply with all PACFA guidelines. They have a current PACFA license #Pl oo15 S and are inspected yearly by the AKC and have received consistent good ratings. The use of the property would stay the same with them running a farm, raising horses and hay. This will be a kennel for personal use only no boarding, training or outside dogs will be brought on the property. 2. The proposal is consistent with Weld Cty Coded Chapter 22 by continuing to be a farm .Hay will continue to be raised on the property along with horses. Calves are grazed in the summer on the non -irrigated ground. No land that is used for agricultural purpose will be taken out of production. The area they are proposing to build the new building on is currently used as a fenced area for the dogs. This area is large enough for the buildings to be erected and still have adequate room for the dogs to exercise. 3. The proposal is consistent with Weld Cty Code ; Chapter 23 by continuing to be used as a farm. Raising Hay and horses and grazing calves in the summer. The USR will be for a kennel that will be used by the Backstrom's for their personal use. They are not boarding dogs nor will training dogs that are not owned by the Backstrom#s be done on the premises. This is consistent with the Zoning code allowing kennels in the Ag zoning. 4. The types of uses surrounding this property are two Kennel USR's, one vacant lot, and two property owners on small acreages. Both of these owners have dogs and all neighbors are in agreement with the Backstrom's being granted a USR. Attached are letters in support from all neighbors. S. A. The number of people using the site will be family members and public by appointment only and limited to no more than two families on the weekends. B. There will be no employees on the site. The kennel will be maintained by family members. C. The facility will not be open to the public. The public will have to set appointments and there will be no more than two families on the property on the weekends . D. The number of new structures to be built is one 40'x50' steel building with a proposed second 40'x50' building to be built in the future. At this time they do not have a time frame for the second building to be built. They will be doing a change of use on the garage that is south of the home this is an existing structure that will be used for meeting the people that are there to look at the dogs. The existing old bunkhouse they are also planning on converting to a dog facility in the future. E. The number of dogs they are proposing for this kennel is up to 35. F. The types of vehicles coming onto the property will be the family's vehicles which include standard pickups, Suva's and personal cars. They live on the property or on the adjoining property and use a road at the back of the property to come to the home so it will not add any additional road usage, Kerr McGee also uses the road to maintain the oil tanks and gas wells. They come and go daily and it is the service trucks that come onto the property. The people coming to look at puppies will be limited to two families per day on the weekends only and they would be using personal vehicles such as UV's and trucks to come to the property. E.I.K Backstrom Proposed USR for 35 Dog Kennel 14230 WCR 36 Platteville,Co 80651 G. Fire protection is provided by Platteville/Giicrest Volunteer Are Dept H. Domestic water is provided by Central Weld Cty Water, irrigation water is provided by Platte Valley Irrigation Company I. The sewage disposal system is a septic tank and leach field. The septic permit number is SP 9800126. The Septic system has a 1000 gal tank and 562 ft absorption field. After speaking to Bob Wright PE of Alles Taylor and Duke LLC, Surveying and Engineering Services about the need to have the system inspected by an engineer he indicated if we were not doing a commercial business or having employees an engineer's evaluation was not needed, He contacted James Taloumis of Weld County Environmental Health and Mr. Taloumis stated if we were not doing a commercial facility or adding employees we do not need an evaluation done. Please refer to email I have attached. J. No storage or warehousing is proposed on the property. 6. The landscaping around the new building will consist of native grass and the existing trees. 7. There will be no need for reclamation on the property if the dog kennel is not being used. The building that is being proposed could be used for many other uses if the kennel was not being utilized. There will be no additional driveways or parking put on the property. B. Storm drainage will be handled by installation of a ditch on the east side of the new building draining towards the North. This is an existing drainage and it will be utilized to continue to drain any water away from the new building. 9. Construction of the new building will begin after the USR is finalized. The building should be constructed within 90 Days after the permits are received. The permits will not be applied for until after the USR is approved. 10. `theme will be no storage or stockpiling of waste on the property. All animal waste will be put into dumpsters and removed by Band C Refuse , 845 South Fulton Avenue ,Fort Lupton, CO 80621 - Phone: (970) 785-2908 11, The site wilt have the addition of one 40x50 building, they landscaping around this building will be native grass. Any ground that is disturbed during the construction of the building will be reseeded with native grass. The existing fences will be used and no other changes are planned at this time. x,1.5 3112/2015 WarlepaceMikinall :Mt P1iRt CIQse Window Subject Re Remaining s for Backetrom LERapplication Rom: roseetearnpIrpcom Date: Wed, Mar 11, 2015 #I aim To: "Chris ttwnan' ga n v c0 weld.cou> Mach: Ima DO3jpg Chris, In response to the additional questions that have been asked about the USR application for Anne Backstrom these are the answers. We have had the septic system inspected by Alles Taylor and Duke and repairs lil need to be done. That information has been sent to Public health from Bob Wright. I will be taking the application to Public Health tomorrow so we can proceed with the repairs. The engineer was designed the new system to be more then adequate for the washing of dog bowls and mop water that will go in the system. There will be no bedding that is washed and the kennels will be mopped rather then hosed down to keep water usage to a minimum .The same people that live in the home will be using the bathroom so it will not add additional usage to the field. The public using the facility will be minimal because the kennel is not open to the public and the Backstrom's only allow two families per weekend day to come to look at puppies. The noise will be controlled at night because all dogs will be brought in to the kennel at night and not allowed access to outside runs until morning. That is what the Backstrom's do currently and that is what they will continue to do. Dust will be contained by having all outside runs covered in pea gravel. Any dirt that is exposed due to digging will be watered down and pea gravel will be replaced in the runs. Please let me know if this answers your questions and I can pay the application fee. I would like to do that tomorrow while I am paying the septic permit fee. Thanks Rose Netto Premier Lifestyle Realty 2802 Madison Sq. Dr. #120 Loveland, Colo. 80538 970-227-8105 CELL 970-613-4408 OFFICE 970-613-4401 FAX tittpellemallseateseiratnelMartirintnut prar 8314JINBOXSent itecns&Si art=0 1/3 E.1.6 3,12/2015 illfaimpece Wilma .. Print &int I close Winticm Subject Flemaining items fa Backer USR application Rom: Chris Gathman ehocgattursanecosekl.cono, Date: Wed, Feb 04, 2015 7112 am To: "Droseektampir.comm r@peampir. > Mach: knaga003jpg Dear Rose, Staff has reviewed the Backstrom USR application and the following information is needed: The septic system must be reviewed by an engineer. The kennel wilt required washing of dishes, bedding ect and the waste handling plan states waste water wilt be put Into the septic system. also outside people are coming to the site and need access to a restroont Please indude a statement from an Engineer. Need information regarding noise. Wilt dogs be brought inside at night? How wilt noise from barking dogs be contained? How will dust in the outside kennel runs be controlled` Maybe supply the applicant with a recent kennel application to reference. If you have any specific questions as to these requirements — please contact Lauren Ught with the Environmental Health Department at Iliiight weidgov.com or 970404-6415 ext. 2211. Once this information is provided the application fee of $20500.00 can be submitted. Regards, Chris Gathman Planner I I I Weld County Department of Pi anning Services 1555 ND 17th Avenue, Greeley COt 80631 Ph: (970)353w6100 ext. 3537 Fax: (970)30 498 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication In error, please Immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited* p stain i ermetMaw_pri$ jafl.pflic `+ IN ' l o 112 Weld County Public Works Dept. 1111 H Street P.O. Box 758 Greeley, Co 80632 Phone: (970)304-6496 Fax: (970)304-6497 Applicant Name Company -- - - - Address 011)(2"Area tie City Stateto t _ Zip Business Phone QJ&.C1n` 1OL9 Pax E-mail r Parcel t ocation &,§ketch The access is on WCR 3/s Nearest Intersection: WCR .3& & WCR C7 Distance from Intersection lip mtle. cirma. Ci. 'i Parcel plumber ...�._ Section/Township/Range •or ea, go Is there an existing access to the property? Number of Existing Accesses_ I Road Surface Typ�, Construction Information AsphaltGravel V Treated Other Culvert Size & Type Materials used to construct Access NO ACCESS PERMIT APPLICATION FORM Property Owper Of different than Applicant) Name E.I.7 Address 1l-1, A tom (',R %.19 4 _. City Wisjle,‘,4114.- _. State Cb Zip 2.04.8! Phone Cbtit i4..., --- * Fax Email .,*Sings . A= Existing Access A= Proposed Access I N WCR WCR346, Construction Start Date Finish Date ProposedUse o Temporary (Tracking Pad Required)/ $75 I4 Single Residential/$75 a Small Commercial or Oil & Gas/$75 a Large Commercial/$130 Q Field (Agriculture Only)/Exempt Ca4 . o Industrial/$15D in Subdivision/5150 Is this access associated with a Planning Process? c No�JJSR a RE o PUD c Other Required Attached Documents - Traffic Control Plan -Certificate of Insurance - Access Pictures (From the Left, Right, & into the access) By accepting this permit, the undersigned Applicant, under penalty of perjury, verifies that they have received all pages of the permit application; they have read and understand all of the permit requirements and provisions set forth on all pages; that they have the authority to sign for and bind the Applicant, if the Applicant Is a corporation or other entity; and that by virtue of their signature the Applicant is bound by and agrees to comply with all said permit requirements and provisions, all Weld County ordinances, and state laws rega rdi ng facilities construction. nted Nam 1r� �`'`...''''M�= rte Date Approval or Denial will be issued in minimum of 5 days. Revised Date 6/29/10 Approved by Main Driveway off County Road 36 East side of entry off County Road 36 West side of Driveway off County Road 36 E. 1 .9 Backstrom Proposed USR for 35 Dog Kennel 14230 WCR 36 Platteville,Co 80651 Traffic Narrative The type of vehicles coming into the site will be family member's vehicles which Include SW's and pickups. If any potential buyers are coming on to the properity this will also be private vehicles consisting of SI.J 's , pickups and cars this will be limited to no more than 4 families on the weekends, thus adding four more vehicles twice a week. There will be a minimal amount of additional traffic created with the USR then is currently on the property. The road is also an easement for Kerr McGee/ Anadarco to work on their oil tanks and wells. They will come in daily to check there wells. These are service trucks for Kerr McGee. They maintain the road and gravel it* We do not see any peak traffic hours since this is a family ran operation and they are not opening the facility to board or train other people's dogs. Any person coming onto the farm will come off County' Road 364 There as only one access to the property and we are not asking to add any additional accesses. Most vehicles will come from Highway 85 to west traveling east on County Road 36 to the access. E.I,Io Backstrom Proposed USR for 35 Dog Kennel 14230 WCR 36 Platteviiie,Co 80651 Waste Handling The waste created by the dogs will be bagged and disposed of Into a dumpster. mpste r. This service will be provided by B and C Refuse , 845 South Fulton Ave, Fort Lupton, Co. 80621 970-785•1908 The outside kennel runs will have gravel in them and any urine will be absorbed into the ground. The inside runs will be maintained by washing and mopping the areas to keep water usage to a minimum, The waste water will be put into the existing septic system. Backstrom Proposed USR for 35 Dog Kennel 14230 WCR 36 Platteville,Co 80651 DUST ABATEMENT PLAN Vehicles coming into the site will reduce speed to reduce dust being generated. The parking area at the site will be covered in gravel. On -site vehicle speeds will be restricted to reduce the amount of dust generated. Any Construction vehicles will cover the loads and reduce speed to reduce dust generated. Et a page 2 Jan 16 2015 835PM HP Fax I, - L•r .• • - a• •• •. • • 1 ' • a< - • a • �• • • 4 It.. • .+ Vnne P -a a nag• a • •w • ♦ • `a• .�.� ` •. • ■ '• r., • ,s••t' . • •• • M.{••a i'•• •.. r r C r • .sit; . . •f J ..• .r ;i _.• re' -t• .r • • • t •a u. • : L • aa..1• ••if 1.. • a.1Y•i.! .L rr••• ; • I • aw -•,- • • 1 •. • i '• 1 •• ;Rn• • i a . r•,• .1 • • ••• _ .I. 1 y •. • ' a •. • • a 3 J- )U illi•�' • • I •'' • •• • • 1 ' t . Y : • ^• ..r, r•• •~ + B AY•Y• N.lr • t • • 1 . ri•..• ••y ••• n, • •;. rti • • . F. •i.F. •4.. •ado• •rVI .• : ur • • - a +. p•• •11 l:411. •y. i • 1 v a. AO 1 1 '. r va T i ar„. ' N♦ • r • • '. d;1;. . • • ar a. •F'• • i• . .r. • r S• r• "aix 4• R jai.* v r. 1 . _.■. ••• 4t • -i +;•t- ..t 1r,• `. r+ - t Y • • tae .• • •J• a'••• 1:'�. �' - • • a Ir"' ,` ��:,,••' !' r advised that the will not process any r a • 4 4 • a. 1 a. • i• •-a • • -r•at. 1 Y •'•• •'1. i%aT • —.1 a: 1' :A ••' Fiti- Y i.• L •w• • • • k• • ,• r a • I - n a . fl with do 1 a ' •• • •. • • !to a! + , 1+r . 1 1 ." • r 54 are Jo, rdot • • ,1 y( .F i • ♦ "- t • a'I0' : 1 " i * Viii •1 , '1 .k. ``4-ts_ A • T .•► i• NI-7%T....�tWit- `#7• 74••%;; 1 h Y -''.. '''AI..„ r.2.- i . •j •'Fi' cal. - 4i M ..:. i• ! �i•• w • �'1 ' - ..Y t - h Y .'•�l N • i'ii jet. ` - •.t a ..a "10w•,.:-i'Tr•S - r. 7 ; has -r..!•:•• '.+'v_•N.• Iii. -' ": • 0111 a • fib• rilm/'Yir • 1 •• • J • ..ic I' • ;d • -- _� 4_�r •rm.• + . • ,• 4 .• r { • V. I • .4•.,i• - f' J 4"Yh� yt y 14 1, '!•n.. cif, r.. J e. S�+ Y• .- ..xi �•' •�. ♦ �• ��, �' ♦`•+P►t war¢ t vi} .''fie'}'.' ki;..h, S. •'-. •,!r � 6. . I?, ''' N "a 7 Ine• r• ,y,,,.a • • I. r a. 3- Y "+• a a 1 1..r • r tip •••al •*“. 1` • • • • II It • r et File • Or SHIS14,322 Refimence DNA Retersnie. COMPIalnee • • I • • 411211 County griarOrrirs,341 86 in I Phone on mord Businses Phone USDA Inspected No ; news - Approval Mader :-r• 1" • • •a . •' ,11 r i• . • Il.F• •,., •• ••••• 1 •, i 4,31%. • 1 1 SIPS _ 180 or wamens ken Non -Compliance neserwer _ 91712013 O Cunene must Identity dogs to mon,. ti Baader must construct individast dog mons O Customer must construct litter mord Customer meet most AKC dog catelsonditions standards has 10 adult dogs and 24 puppies on S mil are AKC registered or AICC Adult doge ate with draw*. arid numbers are molded on ownership words., Ten ovmership records and bin ilter reaords wawa ceviewaci and found b be accents when compare:node base informisibna Customer meet MCC requirements for cam end cot • • • • V A.13.1 Fencing and Landscaping Information We will be using 6' treated wooden posts with game fence to surround the solar farm. This was chosen as opposed to traditional chain link fence to blend in with its natural surroundings. As for landscaping, the site presently has grass and the installation of the solar farm will cause minimal disturbance. Any disturbed areas will be reseeded with low-lying, shade -tolerant grasses. 9/5/2017 Mail - nmento@communitypowergroup.com RE: Solar Project Permitting Process Troy Renken <trenken@plattevillegov.org> Tue 9/5/2017 10:02 AM To:Nick Mento <nmento@communitypowergroup.cam>; Nick, The property you're inquiring about is within the Town of Platteville's Urban Growth Boundary but not within town limits. Weld County does require referrals to the Town per our cooperative planning agreement but this project won't require anything else (permitting) from the Town. I'm back in the office today so please give me a call if needed to discuss further. Troy Renken Town Manager Town of Platteville 400 Grand Avenue, Platteville, CO 80651 Office (970) 785-2245 / Fax (970) 785-2476 trenken@plattevillegovorg From: Nick Mento [mailto:nmento@communitypowergroup.com] Sent: Friday, September 1, 2017 1:01 PM To: Troy Renken <trenken@plattevillegov.org> Subject: Solar Project Permitting Process Hello Troy, My name is Nick Mento; I left a voicemail but wanted to reach out through e-mail as well. We are working on a 100kW, 1 acre solar farm near Platteville and Weld County requires us to reach out if the property is in a Cooperative Planning Area. I have been notified that the property in question (14230 County Road 36) is within that area and so I wanted to reach out and determine if additional permits or processes would be required that are not already required by the county. I would be happy to provide any details as necessary over the phone or through e-mail. Thank you, Nick Nick Mento Community Power Group (o) 202-844-6424 (c) 443-878-8296 nmentot communitypowergrou p.cQm www.communitvnowergroup.com This message is for the named person's use only. It may contain confidential, proprietary, or legally privileged information. No confidentiality or privilege is waved or lost by any mis-transmission. If you receive this message in error, please immediately delete it https://outlook.office.com/owa/ 1/2
Hello