Loading...
HomeMy WebLinkAbout20183049.tiffCOLORADO Department of Public Health & Environment Dedicated to protecting and improving the health and environment of the people of Colorado Weld County - Clerk to the Board 1150O St PO Box 758 Greeley, CO 80632 September 6, 2018 Dear Sir or Madam: RECEWED SEP 1 3 2018 WELD COUNTY COMMISSIONERS On September 13, 2018, the Air Pollution Control Division will begin a 30 -day public notice period for Crestone Peak Resources Operating, LP - Minch 4H -L368 Battery. A copy of this public notice and the public comment packet are enclosed. Thank you for assisting the Division by posting a copy of this public comment packet in your office. Public copies of these documents are required by Colorado Air Quality Control Commission regulations. The packet must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please send any comment regarding this public notice to the address below. Colorado Dept of Public Health &t Environment APCD-SS-B1 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 Attention: Clara Gonzales Regards, Clara Gonzales Public Notice Coordinator Stationary Sources Program Air Pollution Control Division Enclosure Re:Aee 6q lam IA 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe John W. Hickenlooper, Governor Larry Wolk, MD, MSPH, Executive Director and Chief Medical Officer 2018-3049 Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: Crestone Peak Resources Operating, LP - Minch 4H -L368 Battery - Weld County Notice Period Begins: September 13, 2018 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Crestone Peak Resources Operating, LP Facility: Minch 4H -L368 Battery Well Production Facility NWSW of Section 4, Township 3N, Range 68W Weld County The proposed project or activity is as follows: The operator is requesting permit coverage for loadout of condensate from storage vessels to tank trucks at a synthetic minor well production facility located in the ozone non -attainment area. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 15WE1258 have been filed with the Weld County Clerk's office. A copy of the draft permit and the Division's analysis are available on the Division's website at https://www.colorado.gov/pacific/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Any such comment must be submitted in writing to the following addressee: Harrison Slaughter Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 cdphe.commentsapcd@state.co.us ADO al 6 Colorado Air Permitting Project � PRELIMINARY ANALYSIS-PROJECT SUMMARY Project Details Review Engineer. Narrisan���5!augher �- Package#: 3836i6f � Received Date: 6/11)2418"' � Review Start Date: 8�16rZ038 � Section 01-Facility Information Company Name: Crestotie Peak.Resouices Opera₹[ng,LIY,' � Quadrant Section Township Range CountyAIRSID: i23 .. ..... � NWSW �.�- 4 �3N �I �.'`.68 PlantAIR51D: 9E1F � Facility Name: Minch.4H-L368 Battery .�___. ___. _._ ..__ .._._ .. : . . ___. Physical - ...... �... _._:. .___ Address/Location: NWSw quadrant of Section 4,7ownship 3N,Range 68w County: Weld County Type of Facility: Ek IoraCion.Bi.Fmdcact€��YfelPFad �� ' ,� � .,-` ..lt . ..:;: . '�. What industry segment?i�il&NaFura€�as PraducttCan&#�flcessing ; Is this facility located in a NAAQS non-attainment area? : . „Y,e5 �" : � If yes,for what pollutant? � ca�no�m n ide(CO) Q ParGculate Matter(PM) �J Ozone(N0x&VOC) Sectian 02-Emissions Units In Permit Application � Emissions Self Cert Engineering AIRs Point# Emissions Source Type Equipment Name Permit�! Issuance ii Action Conirol? Required7 Remarks " _�BFtitF�I�3Ei`d[ . . '.001 '�.Liquic�Load7rtg ��.���� Condensate Loadout Yes'�� 15WE1258' �� 1 -Ye� : Gssuanee< � - �- Section 03-Description of Project Crestane Peak Resources Operating,LP(Ceestone)submitted an APEN to transfer owne�>hipaf the[aadaut aperation at₹he Minch 4H-L368 BatYerv.The origina!applicat�on forthis source was submitted on 07/29f�015'However,the o�igina{application was neuer procEssed and a permiC was not issued.as a res�;iz,thi=_wi€!be the first issuance of ' the loadout permit at this facilitp Crestone has not reqoested any changes fo-the ca[culations utiliied for permitted emissions.As a iesulL,the caiculat�ons suhmi₹ted,with the ' orig�nat applicaxfon,in�01S wilE be used io:esta�tish L�ep�rmit Iimits.forChi,'s source.7h,e permitwili be issued'to Crestpne becau5ethetrarrsfarr�f nwnersh�p documents have ! b�n sui�rraittecl and appro�ed,py ihe�ivis'ion.The previaus aw�n'er.ofthe fa¢ifity was Er�cana Q�t&Uas(USAjl�c. 7his sou�ce is APEN'�requ€red beca�se uncnrttrolled actual VQC ert�issions ar�,greater than 1 tpy(CdJorado Regulation 3 Parf A,$ec�ian II fl.�a_j_�Addi#ionaliy,the source is peYmit eeqaired betause uncoritrolEed acfual VOL emissions fror�i�al!APEN rE9uired souices acihefiac"tli#yare greaterthau�2 tpy(Coiarada�egtrlat3an 3,Part B,Secfioa �11.D.Z.a_); ; 'Pubfic.eammentisreqaEredfarthFssaurcebeca�en�v,�synF�eticmiaorlimitsare6eingestabtishedatth}sfaeiltty.. �� i, Section 04-Pu61ic Comment Requirements Is Public Comment Reqmred? - `tes If yes,why? Requeskl�i��*itgt?�Mimac�?ergn[Y�� ...,.�,,; , ,, ,,,,,,;,;, . . Section OS-Ambient Air Impact Analysis Requirement: Was a quantitative modeling analysis required? 'k�a�`��t�„: , � � If yes,for what pollutants? „_ , If yes,attach a copy of Technical Services Unit modeling results summary. Section 06-Facility-Wide Stationary Source Classification Is Yhis sYationary source a true minor? ,,,,,,f�7,a��,� - Is this stationary source a synthetic minor? Y�s If y25,indicate programs and which pollutants: �5O2 NOx CO� VOC PM2.5 PM10 TSP HAPs Prevention of Significant Deterioration(PSD) Title V Operating Permits(OP) e � e � � ❑ ❑ . Non-Attainment New Source Review(NANSR) J Is this stationary source a major source? �,'t�'a „ ���� If yes,explain what programs and which pollutants here 5O2 Nox co voc Ptvtz.s PM10 rsP HAPs Prevention of Signifcant Deterioration(PSD) e � e � � e o O Title V Operating Permits(OP) .Non-Attainment New Source Review(NANSR) Hydrocarbon Loadout Emissions Inventory 001 Liquid Loading FecilltyAlRsID: '3� � '�_� � �'��F ��,. ' �1 ,.. �County Plant Point � Section 02-Enuioment Dgcriotion�etails Deta led Emisswns Unit ' - �r-- � _.: �: : : '' C nden at�ioadou[[rmastocagevess€C,t tm&uucksusmg ub rg df7) � Descnption: ��� - � � EmissionControlDevice . �'�-' � -- ""`� � : � � � � : Ep4(tls@U CatuhU5₹Qt .; ,J ,: ,: Descrlptlon: �� � � _,,,,,;, ,, ,,,,, ,� : . -. :: . � �aa,,r .,,.s.�.,. y, �� Is this loadout controlled? Ygs.' Collection Efficienry: 100.6 Control Efficiency: 95 . Requested Overall VOC&HAP Control Efficienry%: 95.00 Section 03-Processin¢Rate Information for Emissions Es[imates Primary Emissions-Hydrocar6on Loadout Actual Volume Loaded= .':-93,964:earrels(6hl)per year Actual Volume Loaded Whiie Em ssions Controls Opereting= 43,9S§.�:earrels(h61)per year RequestedPermtLimitThroughput= .���..523,G92:Barrels(661)peryear RequestedMonthlyThroughput= 449a`3 Barrels�6hl�permonth Potential to Emit(PTE)Volume Loaded= I�S29.dtl2t Barrels(bhl)per year Semndary Emissions-Com6us[ion Device(s) Heat mntent of waste gas= 225b;:Btu/scf .............:..::................. Volumeofwastegasemit�dperyear= 664302 scf/year Ac[ualheatwntentoFwasiegasroutedtocombustiondevice= 266 MMBNperyear Requestedheatcontentofwastegasroutedtocomhustiondevice= 1,448 MMBTUperyear PotentialtoEmit(PTE)heaimntentofwastegasroutedtocomhustiondevice= 1,498 MMBTUperyear Section 04-Emissions Factors&Methodoloeies � �:�� Doesthemmpanyusethestatedefaultemissionsfactorstoestimateemissions. ,#tA,,,, v Are the emissions factors based on a stabilized hydrocarhon liquid sample drawn at the faciliry ��� he ng permitted? �„��7he stabilized hydrocar6on Iiquid sample is valid for devEloping site specific emissions factars. Loading Loss Equation L=12.4b"5'�P*M/T Fac[or Meaning Value Units Source 5 SaturationFactor 0,6 ;B�d�ttsapeeC�.2Ta19�5.2�.$tl��sSFg"� �trfp§=33¢d"reatedt�r�-a�"Ses��{S�}��„ ; P True Vapor Pressure b'.4 �,''�,psia Ap-02 Gliapter 71 Talile 7.1 T3a M MolecularWeightofVapors :`68 '�Ib/Ib-mol AP-52Chapter7�:1Ta6feI1�2-(GasolineRVP8.09`. T LiquidTemperature -���512.i2- :�.Ranl<ine EFATanks4:09dLquidBulk�:Temperature��.�GasohneRVP�>8/Qenw_rC6� L LoadingLosses 536043739716/1000gallons AP-42��.ChapterS.2Equat�onl a.22513s371 Ib/bbl Component Mass fraciion Emission factor Units Source Benzene ���.:O,fl094' 0.002115301 ib/bbl Toluene �:':aQiGB 0,003737297 Ib/bbl Ethylbenzene ���.Q.1}907 0.000157597 Ih/661 ( � ��� �. Xylene .����:0.0o73 0.0016435116/661 Ca�aangspecf*.�zsEimatedw,fghL%val�es n-Hezane �����:0.0233 0.0052457241h/66I 224TMP �:..{I.Ofl24n3 0.000543259 Ib/bbI Emission Factars Hydrocar6on loadout Uncontrolled Conuolled Emission Factor Saurce Pollutan4 (16/661) (Ib/bbl) (Volum (Volume Loaded) Loaded) VOC 2���:25YE UE 1.126E o2 �5p�yjj¢ ¢p-�,`(+„�A ��%�%"�,''�, eenzene Z:116E a3 - 1.OSSE 04 � rj�('� - �,�.�. , ��'`�r� i� Toluene 3:737E-03 1.869E 04 ��{�..1��{(g� _;,; � Ethyl6enzene 1��.576t�4 7.880E 06 �tf��C �,� �d� ,,,�j Xylene i�.54AE 03 8.218E OS ;It��$p�F1Y��+�� � , n-Hexane 5�,24bE-63 2.623E 04 - �'�p����- . > _�� 224TMP �.5.433E-fi4 - 2.716E OS `...�� � GLgap�eE 1;':<;g - . . ,,,,,, ,,, „i,,. , .. ,. Control Device Unrontrolled Uncontrolled Pollutant (6/MMBtu) (16/hbl) EmissionFactor5ource (Valume (was[e heat combusted) Loaded) PMIO D.OOE+00 ��/1i €��.,`�� .�/���% . ? PM2.5 O.OOE+oO ��y �ii����.�� � : � � SOx O.o0E+00 `�;j �.�,�., � ��,'� � � ��5��'; NOx ��A.0580 192E 04 {y�u����,$.t��[��[�p�(#d(#k��, � : CO :0.3264 - &J7E04 ,q,,,- t�3';�fl(��, ,„,,,,,(,&"b i,�z%.�. �+ 2 of 4 K:\PA\2015\LSWE1258.CPi.xlsm Hydrocarbon Loadout Emissions Inventory Section OS-Emissions Inventory Potential to Emit Actual Emissions Requested Permit Limits Requested Monthly Limits Criteria Pollutants Uncontrolled Unwntroiled Controlled Uncontrolled Controlled Controlled � (tons/year� ga��/year� �to�s/year� �to�s/year� go�s/year� p6s/monch) PM30 o.on o.00 o.ao o.00 o.ao o - PM2.5 0.00 0.00 0.00 0.00 0.00 0 sox o.ao o.00 o.oa o.00 o.aa o Nox 0.05 D.o1 a.al 0.05 0,05 9 VOC 59.59 10.58 0.53 59.59 2.98 506 CO 0.23 0.04 0.04 0.23 0.23 39 Potential to Emit Actual Emissions Requested Permit limits HazardousAirPollutants Uncontrolled Uncontrolled Controlled lfncontrolled Controlled � (Ibs/year) (Ibs/year� (Ibs/year) . �Ibs/year) Qbs/year) � . Benzene 1120.37 198.86 9.94 112037 56.02 Toluene 1978.53 351.17 17,56 1978.53 98.93 Ethyl6enzene 83.43 14.81 0.74 53.43 4.17 %ylene 870.08 154.43 7.72 870.08 43.50 n-Hexane 2777.10 492.91 24.65 3777.0968 135.85 � 224 TMP � 287.60 51.05 2.55 287.60 14.38 Section O6-Re ulato Summa Anal sis Regulation 3,Parts A,e Source requires a permit RACT-Regulation 3,Part B,Sation III.D1.a The loadout must operete with submerged fill and loadout em:ssions must be routed to Flare to satisfy RACT. (See regulatary applica6iliry warksheetfor detailed analysis) Section 07-Initial and Periodk Samplin¢and Testine Reauirements j�//��/i F���a Doesthecompanyrequestawntroldeviceeffmiencygreaterthan95%foraflareorcomhustiondeviie? "���,������ � _„� � If yes,ihe permit will contain and initial compliance test condition to demonstrate the destru�tion effiiency of the com6ustion device 6ased on inlet and outlet concentration sampling Sec[ion08-TechnicalAna sisNotes , . ......... . .., . .,....,_ . . ...... ,.._ ._..._.. _ __ ........_. .,,,,, T.�7}ie�weight%valuesti3edmsakuiatethe6enzerte;ioluene,etFylhenzene,nyleneandn-Hexane�m�snonsassocaEedwiththeload�utaremmpanyspeofic.Theoperatorexpressedzhesespecificvaluesare -� ��flized6eausedeEerrt3YamgEhecompostionoPemis3ionsforthedisplacedvaporsfrom�h��cankRtucktsdifficuhtnpcedicr�TRisisduett�tfiefactthatsGmeo$eReassociatedwpoE�kortF[hztariRtiuckswillindude; _.thesompos�iion af prev'+a�s(pa�s eontained in khe�irucks.fram differenF faciliCies.�I�was deteradped thaY the tompany speClfie�valties fed fo a mnsexv�Piue e�timat�of ihe HAR emissions(emissfamfacfars€or -:-henzeneando-He�mne.segreaterthan�tfie�statedefaul6�emission#actors).0.sa.resuh,lhey�wece�approved:andusedintiie�.analysis �� � 2.Theemission factar for 2,2,4•TMPwas calculexzd us7ng a raCfo�aP the VOt and 22fE-TMF cwndznsate C2ok em<ssion fectors tokhe wlculaCed VpCloadoErt'emission facrars,The tb34owFngeqyatdo�4vas used Ca[- determinethe2,2,4TMPln�aut'.emissionfartor: - . - 2,z,a;7rvs0.�F (Ib�bbtvcief�dqut)'((16/bblz,z,s-TnnP7anks)Jqb/btrtVocranl��a , 2,2,4TMPEF=�0.2257fb�VftC/56tj.*('[0.0016986162,�4TMP(6n€j�(07a4II366&IEF�VQC(661jj-OA�543f6/66t � _ . :3.ftshouldkfefuerhetnoFe�'thatthepoCeotialmassSracUonsatNe�oadouewastegaswereesNmaxedusingmolefraoetons.InthesCa6te�oilliquidstrearEztrom-CheHYSYSsilnufafionioconjunttfomwitFRaoufC'si2w - ��.The�internalcalc¢lationshe�xhatprouidesthiscaicu(afionls:basedonanambienttemperature�of6+YF.ihisassumpno�nis[ik�lym rvatives�ncefhemaeimum�annuaEaveageam6ienttemperaturefortheDenveo ; �'�areais64.3'F(kP42Cha.pEer7.ITabte-7.1J{.Usingihesecalculations,theesfimatedffAP.�massfra�ionsareasfollow:(�j-8enzene-�0.0011,(ii)To3uene=0.00a75�,[iii)Eihytben¢ene�.=Q.�fl0624;(i�v}Xylene=0.00026 i�. .��(v�n-Hexane-4.0234,;vij 2,2,4-TMY=-0.0006T The estrmated riAP massfractionsare less:conservative than ihe o-pe�atar pmvided�values for benzene,:totaene;ethyl6enzene,�ylene,and Z;2;4-TM P�.Tfie estimated �HAF'mass�fracYlonforn€texafleuslightl'y,ms�ecanse[uativetha�ihaoperaioresClmatedvalu¢.�HMveve4thedlffereneeurt{1C�massfracilonvalueonlyr8sulistb'approxlmatelya70�.165hc�easeiRn�hexaoe �. ; em�sswM;',Tfiisdfiffesenceissmallenor�ghtobeeonsi�ered�nngraficentrasitdoesnoPchanget(�efaciG#yclassiPicattonarreg:rtlatoryapp�icabGNforthisfaciEftyT#ia�comparativeevalF�aCioc�deenoastratesthe : ;aperatar.espmatetlwe�gEt�vatues��sedtoeetim�eHAAemissians-areaaeptahl�eforpermCt�ingp�{rposes-� ;�T.TFte.RUPusedinthecafeulazionsWa5'�ete�minedbSednnanaveregeofeightsfa8₹epiEsampfesatilainedftomtheeigErewallsat�hlsfatilttyon06/11f�2t1#5.'t"[qea�eregeR�Pa€th.eeigE�3sampiesis8,09.Usingthis; ��value along with AP-42 Gkapter 7.I=Ta61e 71 13a and-a teispera{ure of 60`F,tMe Y�ve vaF�'P;essu�of Ehecondensate uras��.determined�fo be 5.A psa.#ddi₹anally�The RVP wasused�.��cunjuncrors wiE h AP 72������� -Etiapter 71 Tabte 7.12 to determine the molecularvreight.7hista6le lists the motecularweights��amline with RVP 7.8��.and�83 to be 6816/16-mote.Stnce the�:RVP of the rondensate ai l6is faciliry fal4s 6etweem�. -Ctsasevalues,itisreasana6tetaassumetAemolecularweigfi€IsaFsob&Iblib-moie.. = ----- � '�. ���5.Fhissource is located in the�nan-attainmen[area ar�id was m��nslrucYed after NovemBer 20,2o07(iJate ofthe S hour ozone no�o-attainme�t area design�eion}_As a resuk,this murceiswbjectto RACT.24CTfor� Inadou2sourcesin₹hendrzat4tnmenYarea�stauCtl2z:esubmerged€illd�ringieadfngoperatfnns.Yhisisdemar�stra₹edthfoughik�euseofasaYurationfacEoroF0.6.AdditiortaliV.��E16adauesourGedsrequiredto � .� eoritro4emissions2osatisF5+AALTbecaU5eSlnqonErol�edVqCeml5sionsaregrQaCgethart24tpy.Theoperaeorhssindicatedth:issouiceiseontrolledbyamencfosedcom6ustor,SjdcetFseaperaiaristontroiling�� � � missloos using art enc}osed coin6ustoeand usmg sub�merged fill during loa�ng nperahons,the lFAQ requirements€or th�s source are satisf ed. ��� �e� . � �,�} :a `¢.TheoperatorwosprovidedwithadtaPipexmrtand�APENredhnetoreviewpno€eaputrliccbmment.TfieoperatnFseviewed$athdocumentsandexpressedtheyhad��n �mrmenfs.- ��' Section 09-Inventory SCC Cadine and Emissions Factors Uncontrolled Em ians AIR5Paint# Process# SCCCode Pollubnt Fac[or Control% Units 001 Ol 4-06-00132 Crude Oil:Submerged Loading Nortnal Service(S=0.6) PM10 0.00 � Ib/1,000 gailonstransferred PM2.5 O.OU 0 16/1,OOOgallonstransferred SOx o.o0 0 ib/1,OOOgallonstransferred NOz 4.55E-03 0 Ib/1,OOOgallonstransferred VOC 5.4 95 Ib/1,OOOgallonstransferred CO 2.D9E-02 0 Ih/1,OOOgallonstrensferred Benzene 5.�4E-02 95 Ib/1,OOOgallonstransferred Toluene 8.90f-02 95 16/1,OOOgallonstransferred Ethyl6enrene 3.75E-03 95 Ib/S,OOOgallonstransferred Xylene 3.91E-02 95 16/1,OOOgallonstransferred n-Hexane ZZSE-01 95 16/1,OOOgallonstransferred 224TMP ?.29EA2 95 16/1,OOOgallonsiransferred 3of4 K:\PA\2015\15WE1258.CPlxism � HYdrowrbon Loatlout Regularory Analysls Warksheet vrlxee��uon3,v:rz0.5ecuonii.o.i.al� � m �wo�=em.�ao��oe��e,�.���ea�W=u�we�ixee.iavo�z,a.�ak�u�u.o.inr . �:��e eeu�a�,�a�mro.�aa.a�a�.�����,.,�e�i:v s.nremwrtnup� rr Ix�s =arc..,s.�ao�.o.�..v i n,����o�o-om�m::o�.o-oma�v���«aao�m�ar�mmx�amu�a:o�«.a�.����n.�i. �aoo�3, �nw.,ae�. �. smeoaooutoca�eea�anevoo�auonanaproau�uonsrelax..w.wa��q.pua�nna.var�a,se�von.o.i.l� Y4[.... .:��.�o�otnene��Quesuon ns1]36eeLa�olv'ruEno v +nn .m ra ebaelsi N�, 1VC,...: �.xncr ioaeou�mus�ocen&w�sueme�see�n.no omou�em��o�smus�ee rourea mmnvo nseu.ry xnn.�na«onmo ka,a A.+n anaHs s b requ rea enn prw ae a s�uu�an N samne. olzcleimer mtinlnpap0lsabtiilyolwrtain requiierrsnfs olf�e Ckan fi4ACI.Ifslmpbirenlirpiepulaiions,aMAiipualrty CanlmlCommlssbn repulatuns Thls Dowwman� ' an01h enayssilwnleNsmaynolappyloepa�licularvfualun�asetluponl�eNrlividuallacfsenticvcumslanss.�hisdocurrrenitlaesnolcliengeorsubstiluVeloiany law.�iepula.on.�a�y oiheilepz1y01ndiiprequiremanl antl is nol lepallyenlorceabk.ln Iha eveni olanymnllici bol�wen IM1e IanWa5e olMisOocumsnl aM I�e Ian0��8e a�M1eClaan AHAct,ils Mpkmenrine re9���bians,enaalroualry Can raCommixtion repulellons,tne Nnwapa ortne slalule oirepuWlbn urvllmnva.Tne uss ornon-manrlaiory lanpuepe sucn as>emmmene,'iney,' °shouN,"and'cen,'is Intenrleo'lo tlexnba APCOinleiprelel.rmns vntl rewmrtrentlalons.Mantlabry lerminobpysucli es'mu&"entl"i�uiied'aie inlenrletllo desc�l0e wnlmllinB�9��R���s un0er ' Ihelerms oli�e Claan AliAcf and Ai�QuaNy Gonlml Commissbn rtipulaliwis.Lul lhisdocumenl doesnol esla41i.4i lepaly bintlinpreqWiemenis in antlolifrell. , CONSTRUCTION PERMIT Permit number: Date issued: Issued to: 15WE1258 Facility Name: Plant AIRS ID: Physical Location: County: General Description: Issuance: 1 Crestone Peak Resources Operating, LP Minch 4H -L368 Battery 123/9E1 F NWSW SEC 4 T3N R68W Weld County Well Production Facility Equipment or activity subject to this permit: Facility Equipment ID AIRS Point Equipment Description Emissions Control Description Condensate Loadout 001 Condensate loadout from storage vessels to tank trucks using submerged fill. Enclosed Combustor This permit is granted subject to all rules and regulations of the Colorado Air Quality Control Commission and the Colorado Air Pollution Prevention and Control Act (C.R.S. 25-7-101 et seq), to the specific general terms and conditions included in this document and the following specific terms and conditions. REQUIREMENTS TO SELF -CERTIFY FOR FINAL AUTHORIZATION 1. YOU MUST notify the Air Pollution Control Division (the Division) no later than fifteen days of the latter of commencement of operation or issuance of this permit, by submitting a Notice of Startup form to the Division for the equipment covered by this permit. The Notice of Startup form may be downloaded online at www.colorado.gov/pacific/cdphe/other-air-permitting- notices. Failure to notify the Division of startup of the permitted source is a violation of Air Quality Control Commission (AQCC) Regulation Number 3, Part B, Section III.G.1. and can result in the revocation of the permit. 2. Within one hundred and eighty days (180) of the tatter of commencement of operation or issuance of this permit, compliance with the conditions contained in this permit shall be demonstrated to the Division. It is the owner or operator's responsibility to self -certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit. A self certification form and guidance on how to self -certify compliance as required by this permit may be obtained online at www.colorado.gov/pacific/cdphe/air-permit-self- certification. (Regulation Number 3, Part B, Section III.G.2.) 3. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) does not commence construction/modification or operation of this source within 18 months COLORADO Air Pollution Control Division rPublic Health ee, E.`immert Page 1 of 8 after either, the date of i date which such construction or activity wathe per t application associated with this permi ° " . scont co on : = ". of ei • ` =' months or more; (iii) does not complete construction within a reasonable time of the estimated completion date. The Division may grant extensions of the deadline. (Regulation Number 3, Part B, Section III .F.4.) 4. The operator shall retain the permit final authorization letter issued by the Division, after completion of self -certification, with the most current construction permit. This construction permit alone does not provide final authority for the operation of this source. EMISSION LIMITATIONS AND RECORDS 5. Emissions of air pollutants shall not exceed the following limitations. (Regulation Number 3, Part B, Section II.A.4) Annual Limits: Facility Equipment ID AIRS Point Tons per Year Emission Type PM2.5 NOX VOC CO Condensate Loadout 001 --- --- 3.0 --- Point ote: See "Notes to Permit Holder" for information on emission factors and methods used to calculate limits. Compliance with the annual limits for criteria pollutants shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months' data. The permit holder shall calculate actual emissions each month and keep a compliance record on site or at a local field office with site responsibility for Division review. 6. The emission points in the table below shall be operated and maintained with the emissions control equipment as listed in order to reduce emissions to less than or equal to the limits established in this permit. (Regulation Number 3, Part B, Section III.E.) Facility Equipment ID AIRS Point Control Device Pollutants Controlled Condensate Loadout 001 Enclosed Combustor VOC and HAP PROCESS LIMITATIONS AND RECORDS 7. This source shall be limited to the following maximum processing rates as listed below. Monthly records of the actual processing rate shall be maintained by the owner or operator and made available to the Division for inspection upon request. (Regulation Number 3, Part B, Section II.A.4) Process/Consumption Limits Facility Equipment ID AIRS Point Process Parameter Annual Limit Condensate Loadout 001 Condensate Loaded 529,402 barrels The owner or operator shall monitor monthly process rates based on the calendar month. Compliance with the annua throughput limits shalt be determined on a rolling twelve (12) month total. By the end of each month a new twelve-month total is calculated based on the previous COLORADO AirPolintion Control Division t: 3- h.1s E, :.,rr..vrie t Page 2 of 8 twelve months' data. The de ha , calcul , ughp a ch mo and keep a compliance record on site or fief offi c wit site r .onsl lily, for Dl pion review. STATE AND FEDERAL REGULATORY REQUIREMENTS 8. No owner or operator of a smokeless flare or other flare for the combustion of waste gases shall allow or cause emissions into the atmosphere of any air pollutant which is in excess of 30% opacity for a period or periods aggregating more than six minutes in any sixty consecutive minutes. (Regulation Number 1, Section II.A.5.) 9. This source is subject to the odor requirements of Regulation Number 2. (State only enforceable) 10. This source is located in an ozone non -attainment or attainment -maintenance area and is subject to the Reasonably Available Control Technology (RACT) requirements of Regulation Number 3, Part B, III.D.2.a. Condensate loading to truck tanks shall be conducted by submerged fill and emissions shall be controlled by an enclosed combustor. (Regulation Number 3, Part B, III.D.2) 11. All hydrocarbon liquid loading operations, regardless of size, shall be designed, operated and maintained so as to minimize leakage of volatile organic compounds to the atmosphere to the maximum extent practicable. (Regulation Number 3, Part B, III.E.) 12. The owner or operator shall follow loading procedures that minimize the leakage of VOCs to the atmosphere including, but not limited to (Regulation Number 3, Part B, III.E.): a. The owner or operator shall inspect onsite loading equipment to ensure that hoses, couplings, and valves are maintained to prevent dripping, leaking, or other liquid or vapor loss during loading and unloading. The inspections shall occur at least monthly. Each inspection shall be documented in a log available to the Division on request. b. All compartment hatches at the facility (including thief hatches) shall be closed and latched at all times when loading operations are not active, except for periods of maintenance, gauging, or safety of personnel and equipment. Inspections of all compartment hatches at the facility (including thief hatches) shall occur at least monthly. Each inspection shall be documented in a log available to the Division on request. c. Inspect thief hatch seals annually for integrity and replace as necessary. Thief hatch covers shall be weighted and properly seated. d. Inspect pressure relief devices (PRD) annually for proper operation and replace as necessary. PRDs shall be set to release at a pressure that will ensure flashing, working and breathing losses are not vented through the PRD under normal operating conditions. e. Document annual inspections of thief hatch seals and PRD with an indication of status, a description of any problems found, and their resolution. 13. For this controlled loading operation, the owner or operator shall follow loading procedures that minimize the leakage of VOCs to the atmosphere including, but not limited to (Regulation 3, Part B, III.E.): a. Install and operate the vapor collection and return equipment to collect vapors during loading of tank compartments of outbound transport trucks and route the vapors to the control device listed in the Emission Limitations and Records section of this permit. b. Include devices to prevent the release of vapor from vapor recovery hoses not in use. COLORADO 1 Air Pollution Control Division DepartYreunt cf Pttd Her1`n E^vncnme;e Page 3 of 8 c. Use operating proce•r es to .ur� ha ydroc `'• • •uid n ' be tra ,ferred unless the vapor collection d. Operate all recovery and disposal equipment at a back -pressure less than the pressure relief valve setting of transport vehicles. OPERATING Et MAINTENANCE REQUIREMENTS 14. Upon startup of this point, the owner or operator shall follow the most recent operating and maintenance (O&M) plan and record keeping format approved by the Division, in order to demonstrate compliance on an ongoing basis with the requirements of this permit. Revisions to your O&M plan are subject to Division approval prior to implementation. (Regulation Number 3, Part B, Section III.G.7.) COMPLIANCE TESTING AND SAMPLING Initial Testing Requirements 15. This source is not required to conduct initial testing, unless otherwise directed by the Division or other state or federal requirement. Periodic Testing Requirements 16. This source is not required to conduct periodic testing, unless otherwise directed by the Division or other state or federal requirement. ADDITIONAL REQUIREMENTS 17. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Regulation Number 3, Part A, Section II.C.) • Annually by April 30th whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five (5) tons per year or more, above the level reported on the last APEN; or For volatile organic compounds (VOC) and nitrogen oxides sources (NOX) in ozone nonattainment areas emitting less than 100 tons of VOC or NO, per year, a change in annual actual emissions of one (1) ton per year or more or five percent, whichever is greater, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted. For any non -criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. • Whenever there is a change in the owner or operator of any facility, process, or activity; or • Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or • Whenever a permit limitation must be modified; or • No later than 30 days before the existing APEN expires. !COLORADO Air Pollution Control. Division ^ep,;:n ' nt ta". ANT. hied.^.^ 3 Enw*ri.3ter+. Page 4 of 8 18. The requirements of Colora• ` Regul on u -r 3, . "'� all -• ly�Fat suc ime that any stationary source or modifica b- es ' aj �stat'-nary ication solely by virtue of a relaxation in orcea." it- .t w '- " : s- ed aft- st 7, 1980, on the capacity of the source or modification to otherwise emit a pollutant such as a restriction on hours of operation (Regulation Number 3, Part D, V.A.7.B). GENERAL TERMS AND CONDITIONS 19. This permit and any attachments must be retained and made available for inspection upon request. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation Number 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 20. If this permit specifically states that final authorization has been granted, then the remainder of this condition is not applicable. Otherwise, the issuance of this construction permit does not provide "final" authority for this activity or operation of this source. Final authorization of the permit must be secured from the APCD in writing in accordance with the provisions of 25-7- 114.5(12)(a) C.R.S. and AQCC Regulation Number 3, Part B, Section III.G. Final authorization cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. Once self -certification of all points has been reviewed and approved by the Division, it will provide written documentation of such final authorization. Details for obtaining final authorization to operate are located in the Requirements to Self -Certify for Final Authorization section of this permit. 21. This permit is issued in reliance upon the accuracy and completeness of information supplied by the owner or operator and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the owner or operator or owner or operator's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 22. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), C.R.S. 23. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to self -certification and final authorization by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the owner or operator, or the Division revokes a permit, the owner or operator of a source may request a hearing before the AQCC for review of the Division's action. 24. Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 25. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. By: Harrison Slaughter COLORADO } Air Pollution Control Division Debfirimebtof Public Health &Gwxordnxr;t Page 5 of 8 Permit Engineer Permit History Issuance Date Description Issuance 1 This Issuance Issued to Crestone Peak Resources Operating, LP. Permit for condensate loadout at a synthetic minor well production facility. COLORADO Air Pollution Control Division Page 6 of 8 Notes to Permit Holder at the time o 1) The permit holder is required tor o me - it. An a for these fees will be issued after the permit is issued. The permit holder shall pay the invoice within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit. (Regulation Number 3, Part A, Section VI.B.) 2) The production or raw material processing limits and emission limits contained in this permit are based on the consumption rates requested in the permit application. These limits may be revised upon request of the owner or operator providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and complete application form must be submitted with a request for a permit revision. 3) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative Defense Provision for Excess Emissions During Malfunctions. The owner or operator shall notify the Division of any malfunction condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than noon of the next working day, followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1 of the Common Provisions Regulation. See: https://www.colorado.gov/pacific/cdphe/aqcc-regs 4) The following emissions of non -criteria reportable air pollutants are estimated based upon the process limits as indicated in this permit. This information is listed to inform the operator of the Division's analysis of the specific compounds emitted if the source(s) operate at the permitted limitations. AIRS Point Pollutant CAS # Uncontrolled Emissions (lb/yr) Controlled Emissions (lb/yr) 001 Benzene 71432 1,121 56 Toluene 108883 1,979 99 Ethylbenzene 100414 84 5 Xylenes 1330207 870 44 n -Hexane 110543 2,777 139 2,2,4- Trimethylpentane 540841 288 15 Note: All non -criteria reportable pollutants in the table above with uncontrolled emission rates above 250 pounds per year (lb/yr) are reportable and may result in annual emission fees based on the most recent Air Pollution Emission Notice. 5) The emission levels contained in this permit are based on the following emission factors: Point 001: Pollutant CAS # Uncontrolled Emission Factors lb/bbl Controlled Emission Factors lb/bbl Source VOC 2.25x10-1 1.13x10-2 AP 42 Chapter 5.2 Equation 1 Benzene 71432 2.116x1O3 1.06x10-4 Mass Balance Toluene 108883 3.737x1O3 1.87x10-4 Xylene 1330207 1.64x10-3 8.22x10-5 n -Hexane 110543 5.246x10-3 2.62x1O4 2,2,4- Trimethylpentane 540841 5.43x10-4 2.72x10-5 The uncontrolled VOC emission factor was calculated using AP -42, Chapter 5.2, Equation 1 (version 1/95) using the following values: ;COLORADO Air. Pollution Control Division Dep8rvneruc,t Putties i-ic i t'h Ensiircrrient Page 7 of 8 L = 12.46*S*P*M/T S = 0.6 (Subm P (true vapo 5. M (vapor molecular weight) = 68 lb/lb-mot T (temperature of liquid loaded) = 512.12 °R The uncontrolled non -criteria reportable air pollutant (NCRP) emission factors were calculated by multiplying the mass fraction of each NCRP in the vapors by the VOC emission factor. Controlled emission factors are based on a flare efficiency of 95% and a collection efficiency of 100%. 6) In accordance with C.R.S. 25-7-114.1, each Air Pollutant Emission Notice (APEN) associated with this permit is valid for a term of five years from the date it was received by the Division. A revised APEN shall be submitted no later than 30 days before the five-year term expires. Please refer to the most recent annual fee invoice to determine the APEN expiration date for each emissions point associated with this permit. For any questions regarding a specific expiration date call the Division at (303)-692-3150. 7) This facility is classified as follows: Applicable Requirement Status Operating Permit Synthetic Minor Source of: VOC NANSR Synthetic Minor Source of: VOC PSD True Minor Source 8) Full text of the Title 40, Protection of Environment Electronic Code of Federal Regulations can be found at the website listed below: http://ecfr.gpoaccess.gov/ Part 60: Standards of Performance for New Stationary Sources NSPS 60.1 -End Subpart A - Subpart KKKK NSPS Part 60, Appendixes Appendix A - Appendix I Part 63: National Emission Standards for Hazardous Air Pollutants for Source Categories MACT 63.1-63.599 Subpart A - Subpart Z MACT 63.600-63.1199 Subpart AA - Subpart DDD MACT 63.1200-63.1439 Subpart EEE - Subpart PPP MACT 63.1440-63.6175 Subpart QQQ - Subpart YYYY MACT 63.6580-63.8830 Subpart ZZZZ - Subpart MMMMM MACT 63.8980 -End Subpart NNNNN - Subpart XXXXXX ;COLORADO Air Pollution Control Division ' .�ratrx L+^.,f Yu tip 3 �e & E-airhrmee;C Page 8 of 8 Hydrocarbon Liquid Loading APEN - Form APCD-208 Air Pollutant Emission Notice (APEN) and Application for Construction Permit All sections of this APEN and application must be completed for both new and existing facilities, including APEN updates. An application with missing information may be determined incomplete and may be returned or result in longer application processing times. You may be charged an additional APEN fee if the APEN is filled out incorrectly or is missing information and requires re -submittal. JUN): This APEN is to be used for Hydrocarbon Liquid Loading only. If your emission unit does not fall into this category, there may be a more specific APEN for your source. In addition, the General APEN (Form APCD-200) is available -if the specialty APEN options will not satisfy your reporting needs. A list of all available APEN forms can be found on the Air Pollution Control Division (APCD) website at: www.colorado.Qov/cdphe/apcd. This emission notice is valid for five (5) years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Permit Number: 15WE 1258 AIRS ID Number: 123 /9E1 F /001 [Leave blank unless APCD has already assigned a permit # and AIRS ID] Company equipment Identification: Condensate Loadout [Provide Facility Equipment ID to identify how this equipment is referenced within your organization] Section 1 - Administrative Information Company Name': Crestone Peak Resources Operating, LP Site Name: Minch 4H -L368 Battery Site Location: NWSW Section 4, T3N, R68W Mailing Address: (Include Zip Code) 10188 East 1-25 Frontage Road Firestone, CO 80504 E -Mail Address2: taryn.weiner@crestdnepr.com Site Location County: Weld NAICS or SIC Code: 1311 Permit Contact: Taryn Weiner Phone Number: 303-774-3908 'Use the full, legal company name registered with the Colorado Secretary of State. This is the company name that will appear on all documents issued by the APCD. Any changes will require additional paperwork. 2 Permits, exemption letters, and any processing invoices will be issued by APCD via e-mail to the address provided. 383614 Form APCD-208 - Hydrocarbon Liquid Loading APEN - Rev 02/2017 1 I !COLORADO !. Dnlmrlmant al Publ. Hc49tbE rMortmtnt Permit Number: 15WE 1258 AIRS ID Number: 123 /9E1F/001 / 001 [Leave blank unless APCD has already assigned a permit # and AIRS ID] Section 2- Requested Action ❑ NEW permit OR newly -reported emission source ❑ Request coverage under construction permit 0 Request coverage under General Permit GP07 If General Permit coverage is requested, the General Permit registration fee of $250 must be submitted along with the APEN Filing fee. -OR- Q MODIFICATION to existing permit (cbeck each box below that applies) El Change fuel or equipment El Change company name ❑ Change permit limit ❑✓ Transfer of ownership3 ❑ Other (describe below) - OR O APEN submittal for update only (Blank APENs will not be accepted) - ADDITIONAL PERMIT ACTIONS - ▪ Limit Hazardous Air Pollutants (HAPs) with a federally -enforceable limit on Potential To Emit (PTE) Additional Info Et Notes: TOO from Encana Oil & Gas (USA) Inc. to Crestone Peak Resources 3 For transfer of ownership, a completed Transfer of Ownership Certification Form (Form APCD-104) must be submitted. Section 3 - General Information General description of equipment and purpose: Condensate loadout from tanks to trucks For existing sources, operation began on: For new or reconstructed sources, the projected start-up date is: 4/ 29 /2015 / / Will this equipment be operated in any NAAQS nonattainment area? Is this equipment located at a stationary scarce that is considered a Major Source of (HAP) emissions? Does this source load gasoline into transport vehicles? Is this source located at an oil and gas exploration and production site? If yes: Does this source load less than 10,000 gallons of crude oil per day on an annual average? Does this source splash fill less than 6750 BBL of condensate per year? Does this source submerge fill less than 16308 BBL of condensate per year? Form APCD-208 -Hydrocarbon Liquid Loading APEN - Rev 02/2017 ❑✓ Yes 0 No ❑ Yes 0 No ❑ Yes ❑✓ No ❑ Yes ❑ No ❑✓ Yes ❑ No ❑✓ Yes El No ❑ Yes ❑r No COLORADO 2 I �� , ,< NW1hb EnvtwnmMl Permit Number: 15WE1258 AIRS ID Number: 123 /9E1 F/ 001 [Leave blank unless APCD has already assigned a permit # and AIRS ID] Section 4 - Process Equipment Information Product Loaded: ❑✓ Condensate El Crude Oil ❑ Other: If this APEN is being filed for vapors displaced from cargo carrier, complete the following: Requested Volume r Actual Volume Bbl/ Loaded4: 529,402 y Loaded: 4 Requested values will become permit limitations. Requested limit(s) should consider future process growth 93,964 Bbl/yr This product is loaded from tanks at this facility into: (eg, "rail tank cars" or "tank trucks") tank trucks If site specific emission factor is used to calculate emissions, complete the following: Saturation Factor: 0.6 Average temperature of bulk liquid loading: 52.45 °F True Vapor Pressure 5.4 Psia @ 60 °F68 Molecular weight of displaced vapors Lb/lb-mol If this APEN is being filed for vapors displaced from pressurized loading lines, complete the following: Requested Volume Loaded5: 4 Requested values wilt become permit limitations. Requested limit(s) should consider future process growth Bbl/yr Bbl/yr Actual Volume Loaded: Product Density: Lb/ft3 Load Line Volume: ft3/truckload Vapor Recovery Line Volume ft3/truckload Form APCD-208 -Hydrocarbon Liquid Loading APEN - Rev 02/2017 A© COLOR ADO 3 H v, offflt Permit Number: 15WE1258 A�RS�� Number: 123/9E1 F/001 [Leave blank uniess APCD has air��d��assigned a pei-mit#t and AIP.S ID] Section 5 - Geographieal Information Geographical Coordinates (Latitude/Longt�ude or UTM) - 40.25225/-105.01608 Discha��e F��i�ht> Opera�o� � � l"emp. ���Flow��at� � �� Ve4�e%t�r� Above�rou�rd Level Stack ID Na.. : �� ('�) (dCFh�}� �(f�fsec)�; {�e�t) LO 15 Indicate the direction of the stack outlet: ��ne�k one� �✓ Upward ❑ Downward ❑ Upward with obstructing raincap ❑ Horizontal ❑ Other(describe): Indicate the stack opening and size: (check one� 0✓ Circular Interior stack diameter(inches): q..$ ❑ Other(describe): Section 6 - Control Device Information ❑ Loading oecurs using a vapor balance system: Requested Control Efficiency % Pollutants Controlled: �/�CS, HAPs Rati ng: MMBtu/hr Type: Enciosed Combustor Make/ModeL•48" Hlgh-Capacity � COmbustlon Requested Control Efficiency: 95 % Device: Manufacturer Guaranteed Control Efficiency 98-}- % Minimum Temperature: Waste Gas Heat Content Btu/scf Constant Pilot Light: ✓� Yes ❑ No Pilot burner Rating MMBtu/hr Pollutants Controlled: ❑ Other: Deseription: Control Efficiency � Requested ° _. _._. _ _ ,, .., caco�aao Forr�t�PCD-2(78-Hydre��arf�on Liquic! Lc�dii�g hPEN- Rev�2i2017 4 � �I„;e�„�F�s�o`r;n°;,: Permit Number: 15WE1258 AIRS ID Number: 123/9E1 F/001 (Le�.ve blank untess APCD has atreaci}�assigned a p�rmit#and AIRS ID] Sect9on 7 - Criteria Pollutant Emissions Informat9on Attach all emission calculations and emission factor documentation to this APEN form. Is any emission control equipment or practice used to reduce emissions? ❑✓ Yes ❑ No If yes, describe the control equipment AND state the overall control efficiency(% reduction): Overalf Requested Control; Pol(utant Control Equipment Qescription Efficiency ; (%reduction in emissions) PM SOx NOX CO VOC Enclosed Combustor 95% HAPs Enclosed Combustor 95% Other: ❑ Using State Emission Factors(Required for GP07) VOC Benzene n-Hexane ❑ Condensate 0.23b Lbs/BBL 0.00041 Lbs/BBL 0.0036 Lbs/BBL ❑ Crude 0.104 Lbs/BBL 0.00018 Lbs/BBL 0.0016 Lbs/BBL From what year is the following reported octuo(annuo(emissions data? 2�17 Use the followin�table to report the criteria pollutant emissions from source: (Use the data reported in Sectrons 4 and 6 to ca(cu(ate these emissions.} ' '��� � � Emigsion � � � Requested Anrival Perm9t . � Uncontrolled Emission � Factor ��- ����al At�nual-Erritssa�r�s � � � � � s Pollutarrt ! Emission Factor �im3s�ion�imit(s� ; �qt�42 Uncontrolled Con � � ,. , _ 'factor Un9ts , tr�tleds Uncontro([ed Controlled Mfg,etc (Tor�s/year) (Tons/year)' (Tons/year)- (Tons/year) ' PM SOX NOX VOC 0.225 � Ib/bbl AP-42 10.57° 0.53' 59.56 • 2.98 ' CO Benzene 0.0021� Ib/bbl Eng. Est. 0.10 • 0.005 • 0.56 • 0.03 • Toluene 0.0037 • Ib/bbl Eng. Est. @� p,� 0.009 0.99 ' 0.05 ' Ethylbenzene Xylenes 0.0016' Ib/bbl Eng. Est. 0.08 � 0.004' 0. �4y 0.02 � n-Hexane 0.0052• Ib/bbl Eng. Est. 6�0;i 0.012 . 1.39 � 0.07 � Trimethylpentane 5:-LZY.1q� ��� � ��� �7.03 d•�\ t`�.t`{ �'�� Other: ��� 0��2���$ 4 Requested values will become permit limitations. Requested limit(s)should consider future process growth. SAnnual emission fees will be based on actual controlted emissions reported. If source has not yet started operating, leave blank. __. __ __. __ _ ___ ..... __.. .. .._... _ _ _. �"-���� CQL0R A6C3 Form APCD-20$-Nydroca��bon L�quid Laadii�g l�PEN- Rev 02/2G�17 5 � - '„��h4��,o�`�, Permit Number: 15WE 1258 AIRS ID Number: 123 /9E 1 F/ 001 [Leave blank unless APCD has already assigned a permit # and AIRS ID] Section 8 - Applicant Certification I hereby certify that all information contained herein and information submitted with this application is complete, true and correct. If this is a registration for coverage under General Permit GP07, I further certify that this source is and will be operated in full compliance with each condition of the applicable General Permit. Signature of Legally Authorized Person (not a vendor or consultant) Date Taryn Weiner Air Quality Engineer Name (print) Title Check the appropriate box to request a copy of the: O Draft permit prior to issuance ❑ Draft permit prior to public notice (Checking any of these boxes may result in an increased fee and/or processing time) This emission notice is valid for five (5) years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type, etc). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Send this form along with $152.90 and the General Permit registration fee of $250 as applicable to: Colorado Department of Public Health and Environment Air Pollution Control Division APCD-SS-B 1 4300 Cherry Creek Drive South Denver, CO 80246-1530 Make check payable to: Colorado Department of Public Health and Environment Telephone: (303) 692-3150 For more information or assistance call: Small Business Assistance Program (303) 692-3175 or (303) 692-3148 Or visit the APCD website at: https: //www.colorado.gov/cdphe/apcd Form APCD-208 -Hydrocarbon Liquid Loading APEN - Rev 02/2017 COLORADO 6 I A►W littaft ItZronraffn Hello