HomeMy WebLinkAbout20181741.tiffNOTICE
The Board of County Commissioners of Weld County, Colorado, on June 13, 2018,
conditionally approved a Site Specific Development Plan and Use by Special Review Permit,
USR18-0026, for the property and purpose described below. Conditional approval of this plan
creates a vested property right pursuant to Article 68 of Title 24, C.R.S., for a period of three
years.
DOCKET #: 2018-55
APPLICANT:
DCP Operating Company, LP
3026 4th Ave.
Greeley, CO 80631
LEGAL DESCRIPTION: The pipeline commences in the NE1/4 of Section 12, Township 3
North, Range 65 West, and crosses into Section 1, Township 3 North, Range 65 West proceeding
into Sections 36, 31, 30, 19, and 18, Township 4 North, Range 65 West of the 6th P.M., Weld
County, Colorado and terminates at the Crossroads Booster Station
TYPE AND INTENSITY OF APPROVED USE: For a greater than 12 -inch high pressure natural
gas pipeline approximately 5.45 miles in length (16 -inch discharge pipeline) in the A (Agricultural)
Zone District
SIZE OF PARCEL: 49.5 acres, more or less
Failure to abide by the terms and conditions of approval will result in a forfeiture of the vested
property right.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
DATED: July 24, 2018
PUBLISHED: July 27, 2018, in the Greeley Tribune
Affidavit of Publication
NOTICE
The Board of County Commissioners of Weld County, Colorado,
on June 13, 2018, conditionally approved a Site Specific Devel-
opment Plan and Use by Special Review Permit, USR18-0026,
for the property and purpose described below. Conditional ap-
proval of this plan creates a vested property right pursuant to Ar-
ticle 68 of Title 24, C.R.S., for a period of three years.
DOCKET #: 2018-55
APPLICANT:
DCP Operating Company, LP
3026 4th Ave.
Greeley, CO 80631
LEGAL DESCRIPTION: The pipeline commences in the NE1/4
of Section 12, Township 3 North, Range 65 West, and crosses
into Section 1, Township 3 North, Range 65 West proceeding in-
to Sections 36, 31, 30, 19, and 18, Township 4 North, Range 65
West of the 6th P.M., Weld County, Colorado and terminates at
the Crossroads Booster Station
TYPE AND INTENSITY OF APPROVED USE: For a greater
than 12 -inch high pressure natural gas pipeline approximately
5.45 miles in length (16 -inch discharge pipeline) in the A (Agri-
cultural) Zone District
SIZE OF PARCEL: 49.5 acres, more or less
Failure to abide by the terms and conditions of approval will re-
sult in a forfeiture of the vested property right.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
DATED: July 24, 2018
The Tribune
July 27, 2018
STATE OF COLORADO
County of Weld,
I Vickie Garretts
of said County of Weld, being duly sworn, say
that I am an advertising clerk of
THE GREELEY TRIBUNE,
ss.
that the same is a daily newspaper of general
circulation and printed and published in the City of
Greeley, in said county and state; that the notice or
advertisement, of which the annexed is a true copy,
has been published in said daily newspaper for
consecutive (days): that the notice was published in
the regular and entire issue of every number of said
newspaper during the period and time of
publication of said notice, and in the newspaper
proper and not in a supplement thereof; that the
first publication of said notice was contained in the
Twenty -Seventh day of July A.D. 2018 and the
last publication thereof: in the issue of said
newspaper bearing the date of the
Twenty -Seventh day of July A.D. 2018 that said
The Greeley Tribune has been published
continuously and uninterruptedly during the period
of at least six months next prior to the first issue
thereof contained said notice or advertisement
above referred to; that said newspaper has been
admitted to the United States mails as second-class
matter under the provisions of the Act of March
3,1879, or any amendments thereof; and that said
newspaper is a daily newspaper duly qualified for
publishing legal notices and advertisements within
the meaning of the laws of the State of Colorado.
July 27, 2018
Total Charees: $9.66
27th day of July 2018
My Commission Expires 09/28/2021
KELLY ASH
NOTARY PUBLIC
STATE OF COLORADO
NOTARY ID 20174040535
MY COMMISSION EXPIRES SEPTEMBL'R 28 2021
Notice
Pursuant to the zoning laws of the State of Colorado and the Weld County Code, a public hearing
will be held before the Weld County Planning Commission and the Board of County Commissioners in the
Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado, at the times
specified below.
The complete case file may be examined by calling the Department of Planning Services at (970)
353-6100 to make arrangements with the case planner, or at the office of the Clerk to the Board of County
Commissioners, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631. E -Mail
messages sent to an individual Commissioner may not be included in the case file. To ensure inclusion of
your E -Mail correspondence into the case file prior to the Planning Commission hearing, please call
the Department of Planning Services to obtain the appropriate contact information. For inclusion of
any correspondence prior to the Board of Commissioners hearing E-mail egesick@co.weld.co.us.
If a court reporter is desired for either hearing, please advise the Department of Planning Services
or the Clerk to the Board's Office, in writing, at least five days prior to the hearing. The cost of engaging a
court reporter shall be borne by the requesting party. In accordance with the Americans with Disabilities
Act, if special accommodations are required in order for you to participate in this hearing, please contact
the Department of Planning Services at (970) 400-6100, or the Clerk to the Board's Office at (970) 336-
7215, Ext. 4226, prior to the day of the hearing. All cases scheduled before the Planning Commission or
Board of County Commissioners are subject to continuance, due to lack of quorum or otherwise. Contact
the Department of Planning Services or the Clerk to the Board's Office at the numbers above, for hearing
continuance information.
DOCKET #: 2018-55
PLANNING COMMISSION DATE: May 15, 2018
TIME: 12:30 p.m.
BOARD OF COMMISSIONERS DATE: June 13, 2018
TIME: 10:00 a.m.
CASE #: USR18-0026
APPLICANT: DCP OPERATING COMPANY, LP
PLANNER: Kim Ogle
REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a greater than 12 -
inch high pressure natural gas pipeline approximately 5.45 mile in length (16 -inch discharge pipeline) in the
A (Agricultural) Zone District
LEGAL DESCRIPTION: The pipeline commences in the NE4 of Section 12, T3N, R65W, and crosses into
Section 1, T3N, R65W proceeding into Sections 36, 31, 30, 19 and 18, 14N, R65W of the 6th P.M., Weld County,
Colorado and terminates at the Crossroads Booster Station.
LOCATION: Generally located south of CR 46; west of CR 51; north of CR 34 and east of CR 47. (See
Legal Description for precise location.)
SIZE: 49.5 acres, more or less.
DATED: April 24, 2018
PUBLISHED: April 27, 2018, in the Greeley Tribune
Affidavit of Publication
Notice
Pursuant to the zoning laws of the State of Colorado and the
Weld County Code, a public hearing will be heldbefore the
Weld County Planning Commission and the Board of County
Commissioners in the Hearing Room, Weld County,Adminis-
tration Building, 11500 Street, Greeley, Colorado, at the times
specified below.
The complete case file may be examined by calling the Depart -
meat of Planning Services at (970) 353-6100 to make arrange-
ments with the case planner, or at the office of the Clerk to the
Board of County Commissioners, Weld County Administration
Building, 1.150;0 Street, Greeley, Colorado 80631.. E -Mail mes-
sages sent to an individual Commissioner may not be Included
in the case.file. To ensure Inclusion of your E -Mail correspon-
dence into the case tile prior to the Planning Commission
hearing, please call the Department of Planning Services to
obtain the appropriate contact information For inclusion of any .,-
correspondence prior to the Board of Commissioners hearing
E-mail egesick@co.weld.cous. I
If a court reporter is desired for either hearing please advise
the Department of Planning Services or the Clerk to the Board's
Office, in writing, at least five days prior to the hearing. The cost
of engaging a court reporter shall be borne by the requesting
party..ln accordance with the Americans with Disabilities Act, if
special accommodations are required in order. for you to partic-
ipate in this hearing, please contact the Department of Planning
Services at (970) 400-6100, or the Clerk to the. Board's Office
at (970) 336-7215, Ext. 4226, prior to the day of the hearing. All
cases scheduled before the Planning Commission or Board of
County Commissioners are subject to continuance, due to lack
.of quorum or otherwise. Contact the Department of Planning
Services or the Clerk to the Board's Office at the numbers
above,'for hearing continuance €nformation.
DOCKET it: :2018 55
PLANNING COMMISSION DATE: May 15, 2018 •
TIME: 12:30 p.m.
BOARD OF COMMISSIONERS DATE: June 13, 2018
TIME: 10:00:a.m
CASE ff, USR18 0026
APPLICANT: DCP OPERATING COMPANY, LP
PLANNER: Kim Ogle
REQUEST A Site Specific. Development Plan and Use by
Special Review Permit for a greater than .12 -inch high pressure
natural gas pipeline approximately 6.45 mile in length (16 -inch
dischargepipeline) in the A:(A9ricultural) Zone District
LEGAL DESCRIPTION: The pipeline: commences in the NE4 of
Section 12, T3N, R65W, and: crosses into Section 1, T3N, R65W.
proceeding into Sections; 36, 31, 30, 19 and 18, T4N, R65W
ofthe 6th P.M., Weld County, Colorado and terminates at the
Crossroads Booster Station.
LOCATION: Generally located south of CR 46; west of CR 61;
north of CR 34 and east of CR 47. (See Legal Description for.
precise location.)
SIZE: 49.5 acres, more or less.
DATED: April 24, 2018
PUBLISHED:April 27, 2018 in the Greeley Tribune
.
The Tribune
STATE OF COLORADO
County of Weld,
I Vickie Garretts
of said County of Weld, being duly sworn, say
that 1 am an advertising clerk of
THE GREELEY TRIBUNE,
SS.
that the same is a daily newspaper of general
circulation and printed and published in the City of
Greeley, in said county and state; that the notice or
advertisement, of which the annexed is a true copy,
has been published in said daily newspaper for
consecutive (days): that the notice was published in
the regular and entire issue of every number of said
newspaper during the period and time of
publication of said notice, and in the newspaper
proper and not in a supplement thereof; that the
first publication of said notice was contained in the
Twenty -Seventh day of April A.D. 2018 and the
last publication thereof: in the issue of said
newspaper bearing the date of the
Twenty -Seventh day of April A.D. 2018 that said
The Greeley Tribune has been published
continuously and uninterruptedly during the period
of at least six months next prior to the first issue
thereof contained said notice or advertisement
above referred to; that said newspaper has been
admitted to the United States mails as second-class
matter under the provisions of the Act of March
3,1879, or any amendments thereof; and that said
newspaper is a daily newspaper duly qualified for
publishing legal notices and advertisements within
the meaning of the laws of the State of Colorado.
April 27, 2018
Total Charges: $23.81
\it:r3Zi-Q-5IiaNhAjl>
27h day of April 2018
My Commission Expires 09/28/2021
e, •
KELLY ASH
NOTARY PUBLIC
STATE OF COLORADO
NOTARY ID 2O174O4O535
MY COMMISSION EXPIRES SEPTEMBER 28, 2O21
ii
fir_IF
0-4DIC517 .01
14
Vi, ,C JR: 44
LC",
_z I
I
'IpjtR 44 i' 'c R 44
66W
23
INCR. 42
04N66W
24
IPICR 42
r
1PP
04N66W 04N66W
26 fikfli 25
C R 40
4_r i
tt
N66W
35
_%NCR4O
�. 04N66W
,i 36
el? l
ir
03N66W 66W
2
I
I
_ -
I
r; i I
I
aI
WCR 36
O3 N 66W
11
w
a-
4
I
— -
65W
18
W CR 44
04N65
17 ,,I 16
•
WCR44
- ia - I
04N65W
CF. 44
Tal
14 N 6 5 W
5
W CFA. 44
I
4N65 IN
4
I
I
1 4 U 6 5 !N
-i
WR 42
C
ray
l
04N65W
30 0
N
03N66W
12
J3N66W
66
=1'
04 N6 SW n
C.R 38
aNI
ir
03 651/1
6
t
ae.
'I.
ON 65W
20
e G -I
•Iiii!! 42
.a,aa,-a-a sS a,a-a:
04N65W
29
wCF.4_
IMO
I
I
03N65
7
04N65W
2.1
y t 17 R. 14. i
65W
28
i
W OR. 40 WOR 40 W Cr 4'J
1
a.
0-4N
33
"e•e.
_HIV
03N65W
4
O:rig 1171,
03
F
I
Vi R44
13
1
4,
CI d F' c2 0 'SS Fii'LL'� ,tee CTS ST pe I
COR17-002:3kiPRESSO 1 4 STATI e 1 I ON
L_ Is
- - - — r
I
—
ia--
r 22
14N65W v 04F e5W
tt
26 .41
1 ee.14.1:I
I'ee� I
WR 40
WCR 42
04N 655 .i_
f' J
es
I
04N65W
J
r—,
Ste I
4t Q
1
r
Ia 7,
'ai'VCR 42
a a a a
I
sfea
ICI 04N65W
art
Fl 645
•der 7
Future DCP M IEton
Co nppresso r Station
us R18-0017
Eim
MaaprrtaGernriaa
1
LE 1
I
I
I
i
I W CR 38
.a a a a a :rocs
S a
a
U
34N6401,
1
w•
I
I
671
I
O 4N64W
16
w CR 44 W CR 44 WCR. 44
II
a a a
04N64W
31
WCR 38
Ana
a a a a
N64- Va
0
—
04N64W id}
29 0
r _a..r_—a._aa-
L
cc
/04 N 64W
e..?1
W CR 42
�v
I
O 4N64W
286
'W .40
04N64W 04N64W
32 33
03N64WW
S
a a NM
13N64
7
SCR 30
03N64WI
Pt
CR. 34
03N64'i
4
r
J
criL
e
31� 541181_
1�
Hello