HomeMy WebLinkAbout20181367.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 31 BETWEEN COUNTY ROADS 64 AND 66, AND BETWEEN COUNTY ROADS 74 AND 76 FOR APPROXIMATELY FOUR (4) WEEKS, FOR MAINTENANCE OF NATURAL GAS TRANSMISSION PIPELINE BY PUBLIC SERVICE COMPANY OF COLORADO WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, received a request from the Public Service Company of Colorado, and deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 31, between County Roads 64 and 66, and between County Roads 74 and 76, be temporarily closed, with said closure being effective May 3, 2018, for approximately four (4) weeks for maintenance of a Natural Gas Transmission Pipeline, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. Q,C: SO CRS) CO Sio.�t'Pa--bwa I D is peic 062-07-tcs 2018-1367 EG0024 TEMPORARY CLOSURE - COUNTY ROAD 31 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 30th day of April, A.D., 2018. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: deft/44);vi EXCUSED Steve Moreno, Chair Weld County Clerk to the Board BY: Deputy Clerk to the B APP '• -DASTO oun y ney Date of signature: 06-44-4 Sean P. Cpnway -/,/ Julie A. Cozad ,L,te Mike Freeman, Acting Chair Pro -Tern 2018-1367 EG0024 MEMORANDUM TO: Clerk to the Board DATE: April 26, 2018 FROM: Amy Joseph, Public Works Department SUBJECT: BOCC Agenda Item Public Service Company of Colorado is requesting permission to close CR 31 between CR 64 and 66 and CR 31 between CR 74 and CR 76 beginning Thursday, May 3rd and ending Thursday, May 31" to complete Federally mandated maintenance on their 8" Natural Gas Transmission pipeline. See attached closure diagram(s). 2018-1367 CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC Contractor: XCEL ENERGY WO# 4500075505 Project: 8" CHALK BLUFFS LINE - KODAK VS - CR 31 & CR 66 - WELD COUNTY Method of Handling Traffic: ROAD CLOSURE WITH DETOUR PREPARED BY: Je"euiller EE.txy 03/26/2.018 ATSSA TCS DATE PHONE: 970-242-0669 CERTIFICATION # 245588 ISSUE DATE: 01/12/2018 EXPIRATION DATE: 06/21/2021 CR 66 NOTES: 1. CONTRACTOR WILL NEED THE ROAD CLOSED AT AN INTERSECTION UNTIL COMPLETION OF WORK. 2. AT NIGHT, HAZARDS WILL BE BARRICADED. 3. REFER TO MUTCD 2009 EDITION FIGURE 6H-20 FOR A TYPICAL APPLICATION. 4. ALL TRAFFIC CONTROL DEVICES AND SETUP SHALL ADHERE TO THE 2009 MUTCD. 5. ACCESS TO PRIVATE DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. 6. SEE NOTES ABOUT CONCRETE BARRIER AND IMPACT ATTENUATORS ON MHT 1. IF BARRIER IS NEEDED WITHIN THE WORK ZONE. SIGNS & DEVICES: 4 - ROAD WORK AHEAD 6 - DETOUR AHEAD 2 - ROAD CLOSED 4 - DETOUR MARKER (2L/2R) 2 - ROAD CLOSED AHEAD 1 - ROAD CLOSED TO THRU TRAFFIC 2 - DETOUR ARROW (11./1R) 12 - FLASHING BEACON (TEMP) (OPTIONAL) 2 - VARIABLE MESSAGE BOARDS (OPTIONAL) CONCRETE BARRIER (ANY WORK IN SAME LOCATION OVER 3 DAYS - IF NEEDED WITHIN WORK ZONE) IMPACT ATTENUATORS (POSITIVE PROTECTION FOR ALL BLUNT ENDS ON TEMPORARY BARRIER) VERTICAL PANELS OR DRUMS / LIGHTS (18 +/- PORTABLE FLASHING BEACON N 47TH AVE W aE S MHT 2 W O ST 'OPTIONAL USE DETERMINED BY PERMITTING PARTY VMS MSG 1 CR31& CR 66 CLOSED WILL BE SET AT 2 LOCATIONS 1 WEEK PRIOR TO WORK START TO NOTIFY RESIDENTS OF UPCOMING CLOSURE. PERMITTING PARTY WILL APPROVE VMS MESSAGE: 1. CR 31 AND CR 66 2. CR 31 AND CR 64 MSG 2 MSG 3 5/21/18 USE TO CR 33 5/25/18 DETOUR Total work days: 4/23/18 thru 6/1/18. Road closures: (day and night): 5/21 thru 5/25, Shoulder work: 4/23/18 thru 5/21/18 and 5/25/18 thru 6/1/18 X18-XCED006-2 CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC Contractor: XCEL ENERGY WO# 4500075505 Project: 8" CHALK BLUFFS LINE - KODAK VS - CR 31 & CR94 - WELD COUNTY Method of Handling Traffic: ROAD CLOSURE WITH DETOUR PREPARED BY: J tr .E» 0342412024 ATSSA TCS DATE PHONE: 970-242-0669 CERTIFICATION # 245588 ISSUE DATE: 01/12/2018 EXPIRATION DATE: 06/21/2021 CR 76 NOTES: 1. CONTRACTOR WILL NEED THE ROAD CLOSED AT AN INTERSECTION UNTIL COMPLETION OF WORK. 2. AT NIGHT, HAZARDS WILL BE BARRICADED.. 3. REFER TO MUTCD 2009 EDITION FIGURE 6H-20 FOR A TYPICAL APPLICATION. 4. ALL TRAFFIC CONTROL DEVICES AND SETUP SHALL ADHERE TO THE 2009 MUTCD. 5. ACCESS TO PRIVATE DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. 6. SEE NOTES ABOUT CONCRETE BARRIER AND IMPACT ATTENUATORS ON MHT 3. IF BARRIER IS NEEDED WITHIN THE WORK ZONE. SIGNS & DEVICES: 4 - ROAD WORK AHEAD 2 - ROAD CLOSED AHEAD 6 - DETOUR AHEAD 2 - ROAD CLOSED TO THRU TRAFFIC 2 - ROAD CLOSED 2 - DETOUR ARROW (1L/1R) 4 - DETOUR MARKER (2L/2R) 12 - FLASHING BEACON (TEMP) (OPTIONAL) 2 - VARIABLE MESSAGE BOARDS (OPTIONAL) CONCRETE BARRIER (ANY WORK IN SAME LOCATION OVER 3 DAYS - IF NEEDED WITHIN WORK ZONE) IMPACT ATTENUATORS (POSITIVE PROTECTION FOR ALL BLUNT ENDS ON TEMPORARY BARRIER) VERTICAL PANELS OR DRUMS / LIGHTS (18 +/- PORTABLE FLASHING BEACON MHT 4 'OPTIONAL USE DETERMINED BY PERMITTING PARTY ram WILL BE SET AT 2 LOCATIONS 1 WEEK PRIOR TO WORK START TO NOTIFY RESIDENTS OF UPCOMING CLOSURE. PERMITTING PARTY WILL APPROVE VMS MESSAGE: 1. CR 31 AND CR 74 2. CR 31 AND CR 76 USE CR 29 DETOUR Total work days: 4/23/18 thru 6/1/18. Road closures: (day and night): 5/21 thru 5/25. Shoulder work: 4/23/18 thru 5/21/18 and 5/25/18 thru 6/1/18 X1 8-XCED006-4 Hello